10
10.23.09 TEAM 13—GEOMELT

10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

Embed Size (px)

Citation preview

Page 1: 10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

10.23.09

TEAM 13—GEOMELT

Page 2: 10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

The Team

Jacob Speelman (ME)

Caleb Rottman (EE)

Eric Ledy (ME)

Eric Geerlings (CE)

Page 3: 10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

OutlineProblemProjectDesign NormsProgressQuestions

Page 4: 10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

ProblemSnowmelt Systems are InefficientConventional Snowmelt Systems are

InefficientAll Snowmelt Systems on Calvin’s Campus

are near buildings

Problem Project Design Norms

Progress Questions

Page 5: 10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

ProblemBurton Street EntranceHigh Traffic AreaDifficult To Plow Due to Burton StreetHigh Salt/Sand Area

Problem Project Design Norms

Progress Questions

Page 6: 10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

ProblemCalvin College Burton St. Entrance

Problem Project Design Norms

Obstacles Progress

Page 7: 10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

ProjectSnowmelt System Powered by Geothermal

HeatPhysical Detailed Model

Control System for pump speed based on temperature sensors

Successful modeling ground and concreteExpanded Analysis for Burton Street

EntranceInclude size of the system neededInclude additional site planning and runoff

concernsProblem Project Design

NormsObstacles Progress

Page 8: 10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

Design NormsStewardship

Saves on energy typically used in snowmelt systems

CaringIncrease safety for both pedestrians and

vehicles

Problem Project Design Norms

Obstacles Progress

Page 9: 10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

ProgressProject Well DefinedContacts With Physical PlantDesign Questions:

Optional HeaterVertical/Horizontal System

FutureCollect Ground Temperature DataCollect Data from Current Snowmelt Systems

Problem Project Design Norms

Progress Questions

Page 10: 10.23.09 TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)

Questions

Problem Project Design Norms

Progress Questions