33
1 UBS Global Oil and Gas Conference Beijing September 2010 O I L S E A R C H L I M I T E D

1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

1

UBS Global Oil and Gas

ConferenceBeijing

September 2010

O I L S E A R C H L I M I T E D

Page 2: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

2

Oil Search Profile

Established in Papua New Guinea (PNG) in 1929

Operates all of PNG’s producing oil and gas fields. Current gross production ~40,000 boepd, net share ~21,000 boepd

Proven reserves base of 344 mmboe, proven and probable of 567 mmboe plus 281 mmboe in the 2C resource category still to be commercialised

PNG Government is largest shareholder with 15%. In early 2009, Govt issued exchangeable bond over shares to IPIC of Abu Dhabi

29% interest in PNG LNG Project, world scale LNG project operated by ExxonMobil. Project in construction, first LNG sales expected 2014

Exploration interests in PNG and Middle East/North Africa

Market capitalisation ~US$7 billion. Listed on ASX (Share Code OSH) and POMSOX, plus ADR programme (Share Code OISHY)

Page 3: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

3

Oil Search Locations

TunisiaIraq

Yemen

Papua New Guinea

Australia Brisbane

Sydney

Port Moresby(Head Office)

Kutubu Ridge Camp

Dubai

Sana’a

TunisSulaymaniyah

Page 4: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

4

Strong Long Term Share Price Performance

Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

0.00

1.00

2.00

3.00

4.00

5.00

6.00

Jan05

Jul05

Jan06

Jul06

Jan07

Jul07

Jan08

Jul08

Jan09

Jul09

Jan10

Jul10

7.00

Woodside

Santos

ASX 100

WTI oil

Oil Search

Share price (rebased to OSH)

Page 5: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

5

Oil Search Strategic Priorities

Assist ExxonMobil in delivering PNG LNG Project on time and on budget:

Transformational impact on Oil Search and PNG

ExxonMobil quality operator

Lays foundation for major LNG industry in PNG

Focus on further LNG development:Gas exploration and appraisal activities in PNG

Strategic PNG gas acquisitions

Partner alignment

Optimise current oil field production

Undertake measured oil exploration in PNG and MENA

Page 6: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

6

PNG LNG Project

Page 7: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

7

PNG LNG Project Overview

6.6 MTPA, 2 train LNG development, operated by ExxonMobil

Fully contracted to quality Asian customers (Sinopec, TEPCO, Osaka Gas & CPC) with continuing strong market interest

Financial Close in March 2010, construction underway

First LNG sales targeted for 2014

Estimated investment for initial phase: US$15 billion

Capital cost (incl capitalised interest, fees etc)

being funded 70:30 debt: equity. US$14bn

project finance facility secured during GFC

Page 8: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

8

PNG LNG Project Competitive Advantages

ExxonMobil quality operator with strong reputation for project delivery on time and on budgetComplemented by OSH’s PNG country expertiseConventional LNG project, based on tried and tested technology Contracts underpinned by 1P reserves, with commitment of 9.3 tcf 2P reservesProject returns enhanced by top quality onshore resource with high liquids content Fiscal stability agreement in place Highly supportive host Government –also equity partner

Page 9: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

9

Tari

Koroba

NomadMogulu

Komo

Idawi

Homa

OSH PNG Operated & Participating Projects

Hides Nogoli Camp

GTE PL1

Hides GTE Plant

PDL 9 – Juha Field4 new wells

Juha Facility

PL 7 - Juha ~55km Gas & Liquids Pipelines

PDL 1 – Hides Field8 new wells

PDL 7 – South Hides

Hides Gas Conditioning Plant

Hides Field 22km gathering lines

OSH Facilities PNG LNG Facilities

PDL 8 – Angore Field2 new wells

Komo Airfield

PL 5 – HGCP to Kutubu 88km Condensate

Pipeline

PL 4 – HGCP to LNG Plant (Onshore)

~284km Gas Pipeline

Page 10: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

10

Tari

Koroba

NomadMogulu

Komo

Idawi

Homa

OSH PNG Operated & Participating Projects

Page 11: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

11

Poroma

Pimaga

Kantobo

Erave

Semberigi

Inu Mission

OSH PNG Operated & Participating Projects

Moro Airstrip & Camp

Moran Oil Field

SE ManandaOil Field

Agogo Oil Field

Kutubu Oil Field

Gobe Oil Field

Gobe Airstrip & Camp

PL 2 KutubuExport

Pipeline

PL 3 Gobe

ExportPipeline

GPF

Iagifu Ridge Camp

CPF

Agogo FacilityAdditional Gas

Treatment & ~19km pipeline

Kutubu FacilityAdditional Gas

Treatment & ~2km pipeline

SE Hedinia Field2 new wells

Gobe FacilityAdditional Gas

Treatment & ~10km Pipeline (PL8)

OSH Facilities PNG LNG Facilities

Page 12: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

12

Poroma

Pimaga

Kantobo

Erave

Semberigi

Inu Mission

OSH PNG Operated & Participating Projects

Page 13: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

13

Kikori

Ba

OSH PNG Operated & Participating Projects

Kopi Dock & Camp

Kopi – major extension to logistics site

Kumul Marine Terminal

PL 4 (Offshore)~407km Gas Pipeline

OSH Facilities PNG LNG Facilities

Page 14: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

14

Kikori

Ba

OSH PNG Operated & Participating Projects

Page 15: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

15

PORT MORESBY

Sogeri

OSH PNG Operated & Participating Projects

OIL SEARCH LIMITED

Head Office

LNG FacilityCapacity 6.6 MTPA2 x 165,000m3 LNG tanks2 x 8,500m3 condensate tanksLNG JettyMaterials offloading facility

OSH Facilities PNG LNG Facilities

Page 16: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

16

PNG LNG Project Construction Activities Planned/Underway

Page 17: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

17

PNG LNG Project

Page 18: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

18

Logistics: Highlands Highway – Bridge construction

Page 19: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

19

Logistics: Kopi Wharf

Page 20: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

20

Proposed LNG Plant Layout

FutureExpansion

Page 21: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

21

LNG Plant site construction

Page 22: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

22

PNG LNG Project – Training Centre, Port Moresby

Page 23: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

23

PNG LNG Project – Graduates

Page 24: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

24

Proposed Hides Plant and Wellpads

Page 25: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

25

GrowthOpportunities

Mananda-5

Page 26: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

26

PNG Gas Growth

PNG LNG will have expansion capabilities with excellent cost structure:

Use of capacity in pipeline, jetty, tanks and servicesTrained local work force

Additional synergies available if construction follows T1/2

Government is very supportive of, and expects, future gas growth

T3 would have highly competitive and positive position in the LNG market

Page 27: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

27

PNG Gas Growth

Two core development strategies:Train 3 Development

PNG LNG ExpansionBrown fields development leveraging synergiesUnderwritten by PNG LNG fields resource base

Train 4 DevelopmentUtilising discovered gas resource baseAugmented by exploration, concentrating on offshore licence base

Page 28: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

28

PNG LNG Dedicated Fields

Potential upside possible in all PNG LNG fieldsNear term focus on:

Associated Gas Fields (Kutubu/Moran/Gobe/Agogo)Recent wells and additional production history indicate increased gas resource. Recertification required

HidesYet to test depth of gas water contact or northern segmentTwo development wells scheduled to test both in 2012Currently considering accelerating drilling

Page 29: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

29

Requirements for LNG train growth in PNG

OSH Operated LicenceOSH Interest LicencePetroleum Development LicencePetroleum Retention LicenceLicence ApplicationOil FieldGas FieldOil & Gas FieldOil PipelineProposed Gas Pipeline

Kumul Terminal

PRL01

PPL234

PRL08PPL240

PRL03

PRL11

PRL12

PPL239

PDL1

PPL233

PPL190

PPL219

PRL10

PRL02

PDL2

PDL5PDL6

PDL4

PDL3

PRL09

142°E

9°S

7°S

145°E50km

APDL14

PPL260

AngoreJuhaHides

Moran

Agogo Kutubu

Gobe Main

PNG LNG ProjectGas Resources

Pandora

Barikewa

Uramu

P’nyang

Kimu

Juha North

SE Gobe

Non PNG LNG Gas Resources

3rd Train Threshold

0

5

10

15

20

25tcf

PNG LNG3C

Upside

PNG LNG

2P

Base Volume

2C

3C

Other Highlands JV Partner Resources1

4th Train Threshold

2C

3C

Forelands &

Offshore Resources2

Exploration

1. P’nyang, Juha North, SE Gobe

2. Barikewa, Kimu, Pandora, Uramu, Cobra, Iehi

Flinders

Huria

OffshoreProspects

Hides Deep ExplorationGas Resources

Mananda Attic

Page 30: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

30

Strategic Review

Major strategic review underway to optimise growth path and prepare for substantial production and revenue growth. Dedicated review team in placeFocus areas :

PNG oil and gas operations interfacePNG LNG deliveryGas New Business (T3 & T4) plus other optionsGrowth and business developmentCapital management, pre and post LNG cash flowsOrganisation capability

Provide programmes and organisation to deliver value and maximise shareholder returns through to, and beyond, first LNG production

Page 31: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

31

Production Outlook

Despite maturity, recent development drilling success expected to reduce oil production decline curve prior to first LNG. High value barrelsPNG LNG adds ~18 mmboe pa to OSH at plateau in 2015 onwards. 30 year Project lifeT3 could add an additional ~9 mmboe pa, with T4 of similar magnitude

Net

Pro

du

ctio

n (

bo

ep

d)

0

10,000

20,000

30,000

40,000

50,000

60,000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

LNG GasLNG Gas

PNG DevelopmentPNG Development

70,000

80,000

Potential T3 LNG GasPotential T3 LNG Gas

LNG CondensateLNG Condensate

90,000

Potential T3 LNG CondensatePotential T3 LNG Condensate

Page 32: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

32

Summary

Company undergoing major transformation through development of PNG LNGPNG LNG T1/2 construction progressing steadily, timing and budget estimates unchanged. Project is in good handsWith PNG LNG underway, new OSH strategic objective is LNG expansion:

De-risking/appraisal of existing gas discoveries and further gas exploration to underpin train expansion

Core oil production remains solid, generating strong cash flows Measured oil exploration in PNG and MENA

Activities underwritten by strong balance sheet and ample liquidity to meet LNG obligations, T3/T4

Page 33: 1009 UBS Global Oil and Gas Conference Beijing · 2017-01-22 · 4 Strong Long Term Share Price Performance Annualised TSR of 29.5% for five years to end 2009, top ASX 100 performer

33

O I L S E A R C H L I M I T E D