SAMES Copyright 2014 [email protected] +49 (0) 9128 9253-300 reliable - flexible - .innovative SAMES .innovative Project task Process For SAMES the cooperation with KONCAR Electric vehicles Inc. (KEV) was a major project. In early 2003 SAMES was selected by KEV to manage the entire development process of a new 100% low-floor tram. Starting with the basic vehicle concept, vehicle dynamics, bogie design and production, articulation design and production and final documentation, SAMES was responsible for a main part of the new vehicle CROTRAM (KEV & TZV Gredelj). Starting from scratch the tram was designed to needs of the customer. Basic idea was to use the articulated vehicle concept in combination with a multi-articulated version. This ensures large capacity while there is high comfort. In cooperation with KEV engineers, SAMES creates a basic vehcile concept. The concept has been validated by numerical simulation (Multi- Body System) according to UIC 518 and UIC 513. An additional challenge was to fulfil gauging of Zagreb infrastructure while there are running also Tatra and GT6 vehicles. The bogie proposed by SAMES; a real 100% low-floor version with no steps and ramps, based on a lateral traction concept with lateral shaft and supporting gearboxes with integrated axleboxes, was a combination of sophisticated LRV-solutions and new ideas. SAMES integrated a hydro-pneumatic (HP) secondary and primary suspension with auto- height leveling. This ensures highest passenger comfort and constant entrance height independent to passenger loading status. The bogie design was done to all international and local requirements. E.g. the week. Subsequent to a pre-series of more than 120 bogies, SAMES did the know-how transfer of production to KEV in Zagreb. Result Along with the concept, design and production works, SAMES enabled the customer to start the production with an verified process and to run the 1st vehicle on Zagreb streets already 12 months after project start. bogie frame (welded steel and casted node design) was calculated by FEM to EN 13749 standard and loadcases influenced by local infrastructure. Documentation & Production SAMES prepared all documents necessary for the local production of bogies in Feucht / Germany. The complete bogie production and delivery has been done from Feucht factory. During this period 3 bogies were delivered each .i Bogie characteristics Gauge: 1000 mm Wheelbase: 2000 mm Wheel diameter: 660 mm Max. design speed: 77 km/h Weight: 4950 kg Secondary suspension: hydro-pneumatic Primary suspension: hydro-pneumatic Damping: HP integrated Brake equipment: 2 x disc brakes Magnetic track brake Standards (e.g.): EN 13749, UIC 518, UIC 513, BOStrab, VDV 1000 mm gauge CROTRAM (LRV) 1000 mm gauge tramway motor bogie Customer Operator Scope Status of project Project size Project duration KONCAR Electric Vehicles Inc. Zagrebački Električni Tramvaj Development and production of LRV-bogie completed >420 bogies 2003 - 2009 Contact SAMES Rad-Schiene Systemtechnik GmbH Gsteinacher Str. 41 # 90537 Feucht # Germany Internet: www.sames.org Technical data is subject to change 100% low-floor tramway motor bogie Engineering & Production for Croatia Doc. RS140312-002 SAMES .innovative project fact sheet

100% low-floor tramway motor bogie Engineering ... low-floor version with no steps and ramps, based on a lateral traction concept with lateral shaft and supporting gearboxes with integrated

Embed Size (px)

Citation preview

Page 1: 100% low-floor tramway motor bogie Engineering ... low-floor version with no steps and ramps, based on a lateral traction concept with lateral shaft and supporting gearboxes with integrated

SAMES Copyright 2014 • [email protected] • +49 (0) 9128 9253-300

reliable - flexible - .innovative

SAMES.innovative

Project task

Process

For SAMES the cooperation with KONCAR Electric vehicles Inc. (KEV) was a major project. In early 2003 SAMES was selected by KEV to manage the entire development process of a new 100% low-floor tram. Starting with the basic vehicle concept, vehicle dynamics, bogie design and production, articulation design and production and final documentation, SAMES was responsible for a main part of the new vehicle CROTRAM (KEV & TZV Gredelj).

Starting from scratch the tram was designed to needs of the customer. Basic idea was to use the articulated vehicle concept in combination with a multi-articulated version. This ensures large capacity while there is high comfort. In cooperation with KEV engineers, SAMES creates a basic vehcile concept. The concept has been validated by numerical simulation (Multi-Body System) according to UIC 518 and UIC 513. An additional challenge was to fulfil gauging of Zagreb infrastructure while there are running also Tatra and GT6 vehicles. The bogie proposed by SAMES; a real 100% low-floor version with no steps and ramps, based on a lateral traction concept with lateral shaft and supporting gearboxes with integrated axleboxes, was a combination of sophisticated LRV-solutions and new ideas. SAMES integrated a hydro-pneumatic (HP) secondary and primary suspension with auto-height leveling. This ensures highest passenger comfort and constant entrance height independent to passenger loading status. The bogie design was done to all international and local requirements. E.g. the

week. Subsequent to a pre-series of more than 120 bogies, SAMES did the know-how transfer of production to KEV in Zagreb.

ResultAlong with the concept, design and production works, SAMES enabled the customer to start the production with an verified process and to run the 1st vehicle on Zagreb streets already 12 months after project start.

bogie frame (welded steel and casted node design) was calculated by FEM to EN 13749 standard and loadcases influenced by local infrastructure.

Documentation & ProductionSAMES prepared all documents necessary for the local production of bogies in Feucht / Germany. The complete bogie production and delivery has been done from Feucht factory. During this period 3 bogies were delivered each

.i

Bogie characteristicsGauge: 1000 mmWheelbase: 2000 mmWheel diameter: 660 mmMax. design speed: 77 km/hWeight: 4950 kg

Secondary suspension: hydro-pneumaticPrimary suspension: hydro-pneumaticDamping: HP integrated

Brake equipment: 2 x disc brakesMagnetic track brake

Standards (e.g.):EN 13749, UIC 518, UIC 513, BOStrab, VDV

1000 mm gauge CROTRAM (LRV)

1000 mm gauge tramway motor bogie

Customer

Operator

Scope

Status of project

Project size

Project duration

KONCAR Electric Vehicles Inc.

Zagrebački Električni Tramvaj

Development and production of LRV-bogie

completed

>420 bogies

2003 - 2009

ContactSAMES Rad-Schiene Systemtechnik GmbHGsteinacher Str. 41 # 90537 Feucht # GermanyInternet: www.sames.org

Technical data is subject to change

100% low-floor tramway motor bogieEngineering & Productionfor Croatia

Doc. RS140312-002

SAMES.innovative

project fact sheet