30
1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

Embed Size (px)

Citation preview

Page 1: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

1

Writing Clear and Concise Non-conformances (NCs)

Presented By

Larry Henderson

BSI Americas, Inc

Mike Gallagher

Lockheed Martin Space Systems Company

Page 2: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

2

RMC Aerospace Auditor Workshop

AGENDA• Writing Non-conformances (NC)

Analysis.• Parts of a Non Conformance.• Making it clear. • What is the Process Approach?• Accepting NC Responses.

Page 3: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

3

Non-conformance Report Writing

AND THE CLIENT SAYS:

• I DON’T HAVE A CLUE WHAT YOU ARE SAYING OR WHAT YOU ARE TALKING ABOUT……???

OR PRIME INDUSTRY OVERSIGHT AUDITOR

• WHY IS THIS AN NC?• WHAT REQUIREMENT IS VIOLATED?

Page 4: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

4

NC Writing Analysis

From analysis of data collected from witness audits, office audits aerospace oversight and other feedback, NC writing has been identified as one of the more significant concerns.

Identified weaknesses were:• The NC as written was “incident specific” and did not address

the systematic issue (s).• The NC as written could not be understood by the organization

after the audit was completed; and not understandable at later date.

• The NC did not identify the actual requirement being offended.• The NC did not identify the supporting objective evidence.• Poor CA and root cause analysis accepted by the auditor.• No indication corrective actions were verified at NC closure.

NOTE: POORLY WRITTEN NCs SUPPORTS “SOFT GRADING” CUSTOMER, OEM, AND IAQG AND AAQG CONCERNS.

Page 5: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

5

Writing Process Non-conformances

• NCs must be clearly written.• Should address the process/system which is

deficient.• Objective evidence gathered should identify

which process is deficient.• What is the process?

– You must understand the process to verify conformance or non-conformance.

• Is the non-conformance identified, systemic to the process?

Page 6: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

6

Process Approach

The process approach emphasizes the importance of:

• Understanding and meeting requirements.• Looking at processes in terms of added value.• Obtaining results of process performance.• Continual improvement of processes via the

documenting of NCs.

Page 7: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

7

Process Approach

The process approach systematically identifies and manages the linkage,

combination, and interaction of a system of processes within an organization

The process approach systematically identifies and manages the linkage,

combination, and interaction of a system of processes within an organization

AS9100 is based on a process approach to quality management

AS9100 is based on a process approach to quality management

A process is a set of interrelated or interacting activities that uses resources

to transform inputs into outputs

A process is a set of interrelated or interacting activities that uses resources

to transform inputs into outputs

Page 8: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

8

Process Approach

Input Output

Resources Product

Monitoring & Measurement Opportunities(Before, During, and After the Process)

Process Approach

PROCESS(set of interrelated or interacting activities)

PROCESS(set of interrelated or interacting activities)

PROCEDURE(Specified way to carry out an activity or process – may be documented or

not)

Page 9: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

9

Your Your ProcessProcess

Process Approach

PLAN DO

CHECKACT

• Activities• Controls• Documentation• Resources• Objectives

• Deploy & conform with plan

• Measure & monitor for conformity & effectiveness

• Analyze/review• Decide/change• Improve

effectiveness

ContinualImprovement

The Plan-Do-Check-Act (PDCA) methodology applies to all processes

Page 10: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

10

Process Audit Scope

•Specific to the function, area, requirement, system or process being audited.•Processes audited should remain constant.•Follow audit trails to the end to obtain good objective evidence.•Document objective evidence to support NC identified.

Page 11: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

11

HOW DEEP SHOULD YOU GO!----INTO THE PROCESS

•Evaluate the process thoroughly.•Avoid “tunnel vision”.•Ensure objective evidence supports conformance or non-conformance of the process.•Gather enough objective evidence to support your final decision.•Adequate “sampling” of objective evidence.

– Repeatability of objective evidence which indicates the process is not working.

– indication of consistent process failure.

Page 12: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

12

Three Distinct Parts of An NC

An audit NC should have three distinct parts:• A clear statement of the non-conformance.• The requirement, or specific reference to the

requirement.– If you cannot identify a requirement, then

you cannot raise a non-conformance.• And finally, objective evidence that supports the

statement of non-conformance; based on the requirement.

Page 13: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

13

Statement of the NC

• Should be self-explanatory and related to the process.

• Be unambiguous and concise.• Not be a restatement of the audit evidence. • Record the requirement against which the NC

was detected.– If possible, write out the exact text of the

requirement. • The audit evidence must support the audit

finding.– The evidence must be specific to the violated

requirement.– Evidence must be traceable to the NC.

Page 14: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

14

Examples of POOR NC Statements

• Example: Two pieces of calibrated equipment was past due calibration.

(THIS GIVES ONLY A BRIEF INDICATION OF THE PROBLEM)

AND ALSO• The statement does not give the auditee any indication

that there is a system/process failure.• It appears as a single instance.• It does not identify the actual requirement being

offended-actually, it incorrectly states the requirement.• As written, the auditee could easily assume the NC was a

single incident and take action ONLY related to the two pieces of calibrated equipment.

Page 15: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

15

Making it Clear

• Changing the structure and the way the NC is written can assist in getting the auditee to address the “root cause” of why the calibrated equipment is past due calibration.

• The NC must highlight the issue that there is a system/process failure vs a single incident failure.

• Thus, the corrective action and root cause should be focused towards system/process failure, not the observed incident.

Page 16: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

16

NC Statement “TIPS”

TIPS:• The statement of NC should be as

generic as possible to help direct the auditee to the system’s issue… instead of the specific incident.

• Keep the “specific details” in the objective evidence area, if at all possible.

• The NC statement should include enough details so that the auditee can respond to exactly what the auditor found…….even years later.

Page 17: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

17

Examples of Poorly Written NCs

Non-conformance states:• A required block torque test was not being

performed. (Classified as “Minor” yet a test not performed would be detrimental to the integrity of the product.)

Non-conformance states:• No preventative action records exist. (This

would equate to an absence of a quality management system element.)

Neither NC statement tells the client what went wrong...what process is broken?

Page 18: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

18

Writing of NC Statements

• Non-conformance:  (Clearly define and document the systemic failure within the non-conformance.    You want ensure the client understands the exact nature of the non-conformance.  Too many words could mis-lead the client.)– The system for the control of the process for product

design failed to ensure authorization or approval was given prior to proceeding from Stage 2 to Stage 3 of the product design.

• Objective Evidence: (Quote appropriate aerospace standard clause, work instruction, procedure or process requirement)– The Design/Engineering review record did not

indicate authorization was given to proceed to Stage 3 of the product design.

 

Page 19: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

19

Writing of NC Statements

• Stated Requirement: (What objective evidence is/was used to indicate a non-conformance existed?  What record, document, procedure was used to verify existence of a non-conformance)– AS9100, Clause 7.3.4c, at suitable stages,

systematic reviews of design and development shall be performed in accordance with planned arrangement; authorization is required for progression to the next design stage.

Page 20: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

20

Accepting Closure of CAR Responses

The auditee’s corrective action response should cover three areas, as a minimum:

• Containment of the current situation and identified systemic failure.– Action to control or mitigate a problem; could

includes correction, corrective action. • Root cause analysis as to why the system

failed.• Finally, a systemic corrective action to prevent

a recurrence of a failure in the system/process (could be preventive action may apply here.)

Page 21: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

21

Corrective Action Acceptance/Closure

• Does CA response address system process NC?

• Is Root Cause adequate?• You must know and understand the

process to accept the CA and root cause.

• Does client’s response ensure no re-occurrence?

Page 22: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

22

Scenario One

-Auditor John Hancock is reviewing control of non-conforming material at The Great Widget Company. The Great Widget Company has a separate locked room where all non-conforming material is stored until the material is dispositioned.

-During John’s review of the room he notices that material dispositioned as scrap is placed in large metal containers and the containers are then also stored in the locked room. When John asks what happens with the containers, he is told that the local scrap dealer takes them away.

Should John:• Show that The Great Widget Company is

conforming?• Ask to see the customer approval of the current

scrap procedure?• Write an NC?

Page 23: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

23

Scenario One

The Correct answer is C: Write an NC.

• John should write an NC because AS9100 Section 8.3 requires that scrap material be segregated until physically rendered unusable.

• Currently The Great Widget Company segregates their scrap but when it leaves their facility it has not been rendered unusable.

Page 24: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

24

Scenario Two

• During an audit, you read the Management Review procedure. It states they have defined measurable objectives for productivity, Customer satisfaction, and quality. When you ask to see the measures looked at during a management review meeting, the Plant Manager hands you a 3 inch pile of papers. As you go through the information, you notice there are plenty of charts, graphs, and pivot tables. Seems like this place measures everything they possible can, but there are no goals listed or explanations for trends going in the wrong direction.

• The Plant Manager understands each chart and is clearly involved, but when asked how he uses them to drive improvement, or how he knows if he is meeting his goals, he has no answer.

Page 25: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

25

Scenario Two

You Should:

A. Do nothing, the thoroughness of the management review is evidence that it is acceptable. Improvement, although desirable, is not required.

B.Write an NCR because there has been no improvement and therefore the management review is ineffective.

C. Write an NCR, as there is no evidence of defined measurable quality objectives as stated in the procedure.

Page 26: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

26

Scenario Two

The Correct answer is C: Write an NC.

• AS9100 Section 5.6.1 states, in part “that top management shall include assessing opportunities for improvement of its effectiveness of it’s QMS.”

• The plant’s procedure stated they will have defined measurable objectives for quality and none were found during this review.

Page 27: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

27

Scenario Three

While auditing the purchasing department of Hector Aircraft Components, you note that the purchasing procedure, HAC 123, does not address positive recall per AS9100 section 7.4.3 paragraph two, and the company’s process does not address periodically validating test reports for raw material in accordance with section 7.4.3 paragraph three.

The QM, Hector, immediately corrects the master purchasing procedure and saves the revised form in the company’s electronic media. He demonstrates that the master purchasing document, HAC Admin Form 01 now shows the requirement to validate test reports, and that the procedure shows the positive recall requirement.

You should:A. Write an NC and accept it on siteB. Write an NC and leave it openC. Do not write an NC because the issue has been resolvedD. Follow up to see if the company actually uses the new procedure

Page 28: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

28

Scenario Three

You should:

A. Write an NC and accept it on site

B. Write an NC and leave it open

C. Do not write an NC because the issue has been resolved

D. Follow up to see if the company actually uses the new procedure

Page 29: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

29

Scenario Three

The Correct answer is B: Write an NC.

• When a major component of the quality system is missing, it requires an NC.

• Base on severity of NC, some NCs cannot be closed on site

Page 30: 1 Writing Clear and Concise Non-conformances (NCs) Presented By Larry Henderson BSI Americas, Inc Mike Gallagher Lockheed Martin Space Systems Company

30

????Questions????