3 SOME RURAL BUILDINGS OF THE TERRITORY CONCERNED Mountain Community “Agordina” Mountain Community “Comelico Sappada”
Citation preview
1
U
.C. P
iani
ficaz
ione
Ter
ritor
iale
e P
.T.R
.C. ““ALPCITY”ALPCITY”
VENETO CASE-PROJECTSVENETO CASE-PROJECTSRenovation and optimum use of abandoned Renovation and optimum use of abandoned
rural and productive buildingsrural and productive buildings
2 0
0 5
Interreg IIIB “Alpine Space” – ALPCITY PROJECT
Giunta Regionale
Assessorato alle politiche per il territorio
GRAINAU MEETING 9-10 MAY 2005GRAINAU MEETING 9-10 MAY 2005Arch. Tiziana QuagliaArch. Tiziana Quaglia
2
Mountain Community “Comelico Sappada”
THE TWO CASE-PROJECTS OF VENETO REGION ARE SITUATED IN BELLUNO PROVINCE
Mountain Community “Agordina”
3
SOME RURAL BUILDINGS OF THE TERRITORY CONCERNED
Mountain Community “Agordina”
Mountain Community “Comelico Sappada”
4
VENETO CASE-PROJECTS
The activities carried out starting from the 1The activities carried out starting from the 1stst of April 2005 of April 2005 are:are:
• Drafting of a detailed Drafting of a detailed work planwork plan on the implementation of on the implementation of the two case-projectsthe two case-projects
• a coordination meetinga coordination meeting with the two Mountain with the two Mountain Communities involved (“Agordina” and “Comelico Communities involved (“Agordina” and “Comelico Sappada”)Sappada”)
• Collection of documentsCollection of documents necessary to start up with the necessary to start up with the cases’ implementationcases’ implementation
““RENOVATION AND OPTIMUM USE OF ABANDONED RURAL RENOVATION AND OPTIMUM USE OF ABANDONED RURAL AND PRODUCTIVE BUILDINGSAND PRODUCTIVE BUILDINGS””
will be implemented by a group of external experts
5
CASE-PROJECTS IMPLEMENTATION
PHASE 1:PHASE 1: preliminary analysis
PHASE 2:PHASE 2: local community involvement
PHASE 3:PHASE 3: collection and assessment of local needs
PHASE 4:PHASE 4: data collection and identification of rural
buildings
PHASE 5:PHASE 5: definition of renovation and valorization
criteria of abandoned buildings
PHASE 6:PHASE 6: feasibility projects
PHASE 7:PHASE 7: information and publicity
6
PHASE 1: preliminary analysis
The Analysis will concern historical and cultural heritages of the small alpine towns and underline architectural and urban characteristics of rural buildings.
• historical and cultural heritageshistorical and cultural heritages of the territory concerned;of the territory concerned;• social-economic resources social-economic resources of the two Mountain of the two Mountain
Communities;Communities;• traditional jobstraditional jobs related to rural buildings related to rural buildings used for production used for production
purposes;purposes;• local development potentialitieslocal development potentialities related to the renovation related to the renovation
and use of rural buildings;and use of rural buildings;• legislation issueslegislation issues concerning the renovation of rural buildingsconcerning the renovation of rural buildings
The topics considered in the analysis:The topics considered in the analysis:
7
PHASE 2: local community involvement
PHASE 3: collection and assessment of local requests
the local communities are invited to workshops for express the local communities are invited to workshops for express their needs and indicate the buildings to be restoretheir needs and indicate the buildings to be restore
a set of questions are prepared to collect the local requests a set of questions are prepared to collect the local requests and needs concerning the restoration of rural buildingsand needs concerning the restoration of rural buildings
the relevant requests and needs are considered in the the relevant requests and needs are considered in the implementation of the case-projectsimplementation of the case-projects
Activities of the PhasesActivities of the Phases:: 2 initial workshops2 initial workshops
2 mid-term workshops 2 mid-term workshops
1 final regional conference1 final regional conference
The implementation of the two case-projects will be based on a bottom-up approachbottom-up approach:
8
PHASE 4: data collection and identification of rural buildings
In this phase the experts will provide to collect data concerned the main characteristic of the rural buildings and to identify those that have an evident historical value.
• Identification of historical rural buildingsIdentification of historical rural buildings registered by local registered by local
municipalities in cataloguesmunicipalities in catalogues
• Implementation of a databaseImplementation of a database and data storage and data storage
• Identification of the architectural featuresIdentification of the architectural features of the buildings of the buildings
registeredregistered
The topics of this phase are:The topics of this phase are:
9
PHASE 5: definition of renovation and valorization criteria of abandoned buildings
The aim of this phase is to identify new possible uses of the rural buildings and problems linked to their re-use.
• Analysis of legislation Analysis of legislation
• Identification of re-use criteria and techniques Identification of re-use criteria and techniques
• Working proposals to preserve peculiar features of alpine Working proposals to preserve peculiar features of alpine
landscapeslandscapes
Outputs:Outputs:““Guidelines for renovation and optimum use of rural abandoned buildings”Guidelines for renovation and optimum use of rural abandoned buildings”
““Handbook of new building uses, working tools and best practices”Handbook of new building uses, working tools and best practices”
The topics of this phase are:The topics of this phase are:
10
PHASE 6: feasibility projects
The criteria defined in the previous phases will be applied to specific buildings as explanatory examples.
Structure of the projects:Structure of the projects:
• technical reportstechnical reports
• planimetries and mapsplanimetries and maps
• preliminary estimation preliminary estimation
cost and financial plancost and financial plan
• specificationsspecifications
11
PHASE 7: information and publicity
•Invitation leafletsInvitation leaflets
•Meeting and conference minutes Meeting and conference minutes
•Photos and cartographies of buildingsPhotos and cartographies of buildings
•Brochures Brochures
The aim of this phase is to disseminate the results of Veneto case-projects. The experts will draw up the “communication plan” which will provide the following outputs:
Some of these outputs will be handed out during the workshops and Some of these outputs will be handed out during the workshops and the final conference, some others will be published on the project web the final conference, some others will be published on the project web sitesite
12
CASE-PROJECTS GANNT
Month 1 2 3 4 5 6 7 8 9 10 11 12
Activity
Preliminary analysis
Local community involvement
Collection and assessment of local requests
Data collection and identification of rural buildings
Definition of renovation and valorization criteria
Feasibility projects
Information and publicity
The implementation of the foreseen activities have begun on the 1st of April 2005 and will probably last until the 31st of March 2006, as described in the following chart: