Tower RoadProject Update

Page 2: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

2

The Project Team requests the

Alachua County Commission:Authorize staff to:

Proceed with re-evaluating four (4) key issues using remaining project fees:

Stormwater ManagementDesign Alternatives for two Intersections

Right of Way Requirements

Project Costs Present key issue results and recommendations

and discuss the projects final course with Commission

Page 3: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

3

Tower RoadProject Limits

Archer Road

Newberry RoadSW 8th Avenue

SW 53 rd Place

Page 4: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

4

Project History & Status

Page 5: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Project History & Status

Project Inception: 1999 Tower Road Charrette held 2000 Tower Road & SW 24th/SW 20th Avenue

Corridor Study prepared 2001 Corridor design directives from Commission

Project design begins:CHW consultant contract approved in 2003

5

Page 6: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Project History & Status

Project Activity:

October, 2005, 60% plans submitted to County staff

January, 2006, New County ULDC effective date

February, 2006, 60% plans presented to Commission

Commission approved plans based on design presented showing nine (9) roundabouts (at all major intersections) with conditions and authorized Staff to proceed with final designCommission approved additional motions regarding roadway network enhancements

6

Page 7: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

7

DiscoveriesRequiring ProjectScope Revision

Page 8: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Project Discoveries

60% Design results required original scope re-evaluation

Intersection TreatmentsRoundabout quantityAlternative intersection treatment, signals and left turn lanesLand Rights not secured

Stormwater ManagementChanging regulatory criteriaAdditional testing needed as a result of inconsistent geotechnical observationsAdditional analysis needed to refine Stormwater Management DesignLand Rights not secured

Underground UtilitiesUnderground Utilities and associated cost not fully vettedUnderground Utilities decision impacts roadway corridor design/ $6m magnitude of construction cost

8

Page 9: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Project Discoveries

60% Design results required original scope re-evaluation

Value EngineeringRoadway typical section modifications for unique locationsRoadway profile modifications:

earthwork reductiongroundwater table relationshipStormwater Management provisions within the Right-of-Way

Pavement Section Engineering Design re-evaluation (thickness & type)Gravity Wall(s) utilization (Quantity, Location, Character, Land Rights, and Cost)

9

Page 10: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Project Discoveries

60% Design results required original scope re-evaluation

Network EnhancementsEnhancement 1- NB right-turn slip lane for SW 24th Ave roundabout. Enhancement 2- Connecting SW 8th Ave to SW 20th Ave via SW 61st Street improvements. Enhancement 3- Roundabout at SW 46th Blvd and SW 91st. Enhancement 4- Lengthening turn lane at SW 20th Ave and SW 62nd Blvd.Enhancement 5-Dual left-turn lane for SW Ft. Clarke Blvd at Newberry Road.Enhancement 6- Four-laning of SW 20th Ave over I-75.

10

Page 11: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

11

Moving ForwardRe-evaluation of four (4) key issues identified;

stormwater management, intersection design alternatives, right of way requirements, and

project costRe-evaluation effort uses the balance of the

contract fees;Additional funding is needed to complete the

project design and permitting; andAfter key issues decisions are made, additional

funding needs will become finite.

Page 12: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

12

What do we propose?Commission to approve moving forward with

Step #1 of the three-step plan;Step #1, Re-evaluate four (4) key issues

utilizing $103,520 remaining on existing contract;

Step #2, Present the key issues, results, options, and recommendations; and

Step #3, Implement selected option as directed by the Commission.

Page 13: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

13

Step #1, Key Issues

Page 14: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Step #1, Key Issues

1. Stormwater Management

2. Design alternatives for two Intersections

3. Right-of-way requirements

4. Project costs

14

Page 15: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Step #1, Key Issues

15

1. Stormwater Management

2. Design alternatives for two Intersections

3. Right-of-way requirements

4. Project costs

Page 16: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Step #1, Key Issues

16

1. Stormwater Management

2. Design alternatives for two Intersections

3. Right-of-way requirements

4. Project costs

Page 17: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Step #1, Key Issues

17

1. Stormwater Management

2. Design alternatives for two Intersections

3. Right-of-way requirements

4. Project costs

Page 18: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

18

Stormwater Management

Page 19: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Stormwater Management

Original bases of the stormwater management design was SJRWMD and 2003 County ULDC

Current ULDC stormwater design requirements became effective January, 2006, after project design reached 60% completion.

Which design criteria should be used to complete the project?

19

Page 20: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Stormwater Management

Existing corridor Stormwater Management Facilities (SMF) are deficient with regard to “regulatory criteria”

Existing Corridor SMF were neither planned nor designed to accommodate Tower Road runoff

Expansion or new SMF opportunities are limited by surrounding development

20

Page 21: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Stormwater Management

Re-evaluation of facility siting opportunitiesObtain additional geotechnical data to improve SMF modeling analysis & resolve inconsistenciesPerform refined SMF modeling analysisIdentify supplemental alternatives (Low Impact Design (LID))Create a matrix of regulatory criteria resultsPresent recommendations

21

Page 22: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

22

Intersection Alternative

Page 23: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Intersection Alternative

Tower Road design presented in 2006 to Board of County Commissioners has roundabouts at 9

intersections:

23

South North

SW 4

2nd A

venu

e/SW

41

st Pl

ace

(Ka

napa

ha P

ark

/ Ken

woo

d)

SW

51

st Bou

leva

rd (S

tillw

ind)

SW 4

6th B

lvd.

(H

aile

Blv

d.)

SW 3

6th A

venu

e (K

enw

ood)

SW 2

4th A

venu

eSW

18

th B

oule

vard

(Sun

rise

)SW

13

th R

oad

/ Oak

Hal

l

S

choo

l Drive

SW 8

th A

venu

e

SW

53

rd Pla

ce (V

alw

ood)

Page 24: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Intersection Alternative

Board of County Commissioners approved Staff to move forward to final plans with the roadway design presented on February 21, 2006

Issues remain with two intersections:SW 46th Boulevard: Roundabout with independent signalized turn lane for school access; andSW 24th Avenue: two-lane roundabout

Alternative Intersection DesignSW 46th Boulevard: Roundabout with internal school site traffic circulation modifications or traffic signal; andSW 24th Avenue: traffic signal

24

Page 25: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Intersection AlternativeSW 46th Boulevard (Kimball Wiles)

25

Tower RoadTower Road

N

HailePlantation

HailePlantation

Kimball Wiles

Elementary

KanapahaMiddle School

Page 26: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Intersection AlternativeSW 24th Avenue (Two-lane Roundabout)

2626

Tower RoadTower Road

N

HailePlantation

Tower24

CVSWalgreens

Page 27: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Intersection Alternative

How do we resolve the design selection with intersection design alternatives (roundabouts throughout the corridor or signals at 46th and 24th

Avenues)?Modify the VISSIM model to include signals at these two intersectionsCompare modified VISSIM model with original for no signalsPresent results and improvement options for the two intersections 27

Page 28: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

28

Right-of-way Requirements

Page 29: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Roadway improvement needsIntersection improvement needsStormwater Management Facility needs

Right-of-way Requirements

29

Quantify cumulative Right-of-Way needsEstimate cost of Right-of-Way needs

Page 30: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

30

Project Costs

Page 31: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Project Construction Costs

Estimate Project Construction CostsUpdate 2005 roadway construction cost estimateUpdate Stormwater Management cost estimateCoordinate with Utility Entities to define preliminary relocation costCoordinate with Utility Entities to better estimate the $6m magnitude of construction costInclude preliminary Right of Way cost requirementsQuantify cumulative Project Cost

31

Page 32: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

How to Accomplish Step #1?

Consultant fees remaining on project $103,520

Use remaining fees to re-evaluate four key issues to complete Step #1

Roadway design cannot move forward until direction is received on the four (4) key issues

32

Page 33: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Proposed Steps

Step #1: Proceed with re-evaluating four (4) key issues as described by obtaining Commission authorization to use remaining fees as follows:

$35,554 with CHW for stormwater;$55,383 with HNTB for traffic; $10,339 for geotechnical testing; and $2,264 with CHW reporting back to Commission

$103,520 Total33

Page 34: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Proposed Steps

Step #2: Return to Commission to present Key Issues, Results, Options and Recommendations:

Stormwater management alternatives;

Intersection alternatives;

Right of Way requirements and preliminary cost Estimate; and

Updated preliminary estimated project construction costs

34

Page 35: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

Proposed Steps

Step #3: Implement Selected Options as Directed by the Commission

35

Page 36: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues

36

The Project Team requests the

Alachua County Commission:Authorize staff to:

Proceed with re-evaluating four (4) key issues using remaining project fees:

Stormwater ManagementDesign Alternatives for two IntersectionsRight of Way Requirements

Project Costs Present key issue results and recommendations and discuss the projects final course with Commission

Page 37: 1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues