PROJECT RISKS

IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs

AUGUST 5, 2015

Page 2: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

2

Project Risks

Project risk is defined by PMI as an uncertain event or condition that, if it occurs, has a positive or negative effect on a project’s objectives'.

Good Project Risk Management depends on supporting organizational factors, clear roles and responsibilities, and technical analysis skills.

* Uncertain means that there is a probability between 1-99% that the event could occur.

Page 3: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

3

Risks vs Opportunities

Page 4: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

4

Risk Management Process (Maria’s point of view)

Page 5: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

5

Risk Management Process

Project Risk Management is the identification, assessment, and prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability and/or impact of unfortunate events or to maximize the realization of opportunities.

Project risk management in its entirety, includes the following:• Planning risk management• Risk identification• Performing qualitative risk analysis• Performing quantitative risk analysis• Planning risk responses• Monitoring and controlling risks

Probability

Low Medium High

Impact

CriticalSubstantial

management required

Must monitor and manage

risks

Extensive management

crucial

ModerateMay accept

risks but monitor them

Management effort useful

Management effort

required

Minor Accept risksAccept risks but monitor

themMonitor and manage risks

Page 6: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

6

Project Risks Samples

Client related1

Team related2

Others3

• Scope Creep (also called requirement creep, function creep and feature creep) in project management refers to uncontrolled changes or continuous growth in a project’s scope. This can occur when the scope of a project is not properly defined, documented, or controlled. It is generally considered harmful.

• Client Delays, e .g. is the time that the client delays before doing something.

• Shared Resources: resources assigned are not dedicated and have operational responsibilities during some period of time.• Distributed team, a team of people using technology to work on the same stuff from different places.

• E.g. collaboration with 3rd part teams (Platform team).• …

Page 7: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

7

Risk Treatment

Page 8: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

8

• Involve & collaborate with customers as early as possible.

• Have a clear project vision and understand customers objectives.

• Know client’s expectations.

• Document all agreements: docs, emails, meeting minutes. And keep it in one place!

• Ongoing communication is critical.

• Document all communications.

• Agree on timelines and milestones.

Client Related Risks and the way they can be mitigated

Scope Creep

Client Delays

Page 9: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

9

• Constant communication is critical (standups, calls and etc).

• Scope, decisions and changes should be documented and shared (control the source).

• Everything (task, issue, action) should has an OWNER.

• Make sure everyone knows the goal.

• Define calendar.

• Agree on the resource requirements with resource managers.

• Identify contingency plan for resources.

• Define milestones. Scope should be mapped to the milestones.

• Manage key metrics.

Team Related Risks and the way they can be mitigated

Shared Resources

Distributed team

Page 10: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

10

Risk Categories

Scope1

Estimates2

Schedule3

Resources4

Communication0

*BA Lead point of view

Page 11: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

11

Examples of Risks

*BA Lead point of view

• QA Effort is underestimated• Assumptions are no longer valid• Schedule is not adjusted with critical path• No alignments in plans

• Project started but not fully staffed • Wrong people assigned to the project • Demotivation• Conflict with other projects (shared resources)• Customer don’t have resources for the project

• Customer doesn’t respond in time• Customer doesn’t speak English well• SMEs are not available• No regular status meetings• No standard project reporting• Different time zones

• No Scope Freeze• Scope Owner is not defined• Uncertain requirements • No process for Scope Changes • Lack of requirements traceability

Page 12: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

12

TRANSPARENT PROCESSES

COMMUNICATION PLAN ACTION ITEMS ESCALATION CHAIN SCOPE

MANAGEMENTTEAM

MANAGEMENT

*BA Lead point of view

Page 13: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

13

Risk Management

IDENTIFY

EVALUATE

PRIORITIZE

PLAN ACTION

IMPLEMENT

MEASURE, CONTROL & MONITOR

Risk Management should be ONGOING

Page 14: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

14

PM’S AND TEAM LEADSCOLLABORATION.EFFECTIVE 2-WAY

Page 15: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

15

Roles and Responsabilities

PROJECT MANAGERFocus on the PROJECT

Schedule, Budget, Resources, Client, Escalations, Risks, Alignment

BA LEADFocus on PRODUCT

Specifications & Requirements

DEV LEADFocus on ARCHITECTURE

and DELIVERYTech Specifications,

Development

QA LEADFocus on QUALITY

Test Plan, Test Cases, Execution

ENGINEER LEADFocus on

INFRASTRUCTURE and SUPPORT

Configuration and Support

Page 16: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

16

Page 17: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

17

HOW TO RUIN YOUR PROJECT?

BE PRIDE

PANIC

RAISE RED FLAGS

KEEP ONESELF TO ONESELF

BE FORMAL

FOCUS ON THE NEGATIVE

BE AN EGOIST

Page 18: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

18

2

1

3

TYPES OF THE CONFLICTS

ONE TO ONE

• PM vs Lead

• Lead vs Lead

• Architect vs BA

SUPER STAR• Architect vs Everyone

• “I KNOW EVERYTHING”

MANY TO MANY• BA vs DEV vs QA

• Stream vs Stream

Page 19: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

19

WHY COOPERATION IS IMPORTANT?

DELIVER ON TIME WITH QUALITY

WIN-WINEVERYBODY LOSE IF PROJECT FAILS

DON’T NEED TO ASK FOR IT – TEAM IS WORKING ON IT ALREADY

YACHT IN THE STORM

REMEMBER THE GOAL

Page 20: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

20

HOW TO ESTABLISH THE CONTACT?

Agree about the rules in advance1

Don’t try to change – try to understand

2

Listen and hear3

Respect4

Give-and-take5

Page 21: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

21

DON’T OVERKILL

Individuals and interactions over processes and tools

Page 22: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

22

DELEGATE

DIVE INTO DETAILS WHEN NECESSARY

TRUST BUT CHECK

MICROMANAGEMENT

YOUR LEADS ARE EXPERTS IN THEIR AREAS

BUILD TRANSPARENT PROCESSES

Page 23: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

23

HELP EACH OTHER

Don’t be silent1

Ask for help if needed2

Be a human3

Don’t wait - help4

Page 24: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

24

FEEDBACK

BE OPEN

NEGATIVE EMOTIONS

BE CONSTRUCTIVE

KNOW YOUR TEAM MOOD

MOTIVATE

Page 25: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

25

BENEFITS

Proactive teamV

Safe your timeV

Work with importantV

Team supportV

Page 26: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

26

COMMUNICATION

CLEAR RESPONSIBILITIESFEEDBACK

Page 27: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

27

AND ANSWERSQUESTIONSREAL CASES

Page 28: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

28

• …

• …

• …

CONSTANT CHANGES

WHAT IS WRONG? HOW IT CAN BE SOLVED?

• …

• …

• …

• Legacy system to be decommissioned but still up-an-running

• One system to be replaced with many from different vendors

• Customer doesn’t have limited budget or schedule

• Fuzzy scope

SITUATION

Page 29: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

29

• …

• …

• …

SCOPE AND SCHEDULE

WHAT IS WRONG? HOW IT CAN BE SOLVED?

• …

• …

• …

• Previous delivery with another vendor failed

• Wrong people at wrong places

• Internal process slows down the delivery and re-cap

• Duplicated scope

SITUATION

Page 30: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

30

• …

• …

• …

ESCALATION DOESN’T WORK

WHAT IS WRONG? HOW IT CAN BE SOLVED?

• …

• …

• …

• New market

• Customer is access point to the whole Group

• Wrong people at wrong places

• Limited schedule

SITUATION

Page 31: 1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015

31

• …

• …

• …

NO COMMUNICATION WITH PM

WHAT IS WRONG? HOW IT CAN BE SOLVED?

• …

• …

• …

• Junior PM

• South Africa

• Joined venture

• Open scope

SITUATION