1 - Phase 1A New Addition 2 - Phase 1B Gym Addition, Stair No.4 & Loading Dock 3 - Phase 2B Existing Building 1st Floor Classrooms4 - Phase 2A1 Stair No. 1 & Elevator5 - Phase 3A Elec. Closet, Toilet, Faculty Dining, InstrumentStorage, Practice Rooms & Gang Toilets6 - Phase 3B 1st Offices, Main Entrance, Bus Loop, Re-roofing7 - Phase 3C 1st Music, Custodial Offices, Gym Corridor, Sitework8 - Phase 4 Cafeteria & Kitchen
Bethel Johnson Construction Documents.pdf (33) (36% of Scale); Takeoff in Active Area: All Areas; John-OSCG-Package; Bethel Schools RFP; 11/12/2018 03:41 PM
PHASE-1A APRIL 2019 TO MARCH 2020
PHASE-2B JUNE 2020 TO AUGUST 2020
PHASE-1B APRIL 2019 TO AUGUST 2020
PHASE-2A1 JUNE 2019 TO NOVEMBER 2019
PHASE-3A JANUARY 2020 TO JUNE 2020
PHASE-3B JUNE 2020 TO AUGUST 2020
PHASE-3C JUNE 2020 TO NOVEMBER 2020
PHASE-4 JUNE 2020 TO AUGUST 2020
RALPH M.T. JOHNSON CONSTRUCTION PHASING
KITCHEN MAY 4, 2020 TO AUGUST 2020
9 - Phase 1A New Addition 11 - Phase 2A-2 Existing Building 2nd Floor Renovations
Bethel Johnson Construction Documents.pdf (37) (36% of Scale); Takeoff in Active Area: All Areas; John-OSCG-Package; Bethel Schools RFP; 11/12/2018 03:43 PM
PHASE-2A2 MARCH 2020 TO JUNE 2020
PHASE-1A APRIL 2019 TO MARCH 2020
RALPH M.T. JOHNSON CONSTRUCTION PHASING