Upload
jon
View
29
Download
0
Embed Size (px)
DESCRIPTION
1. Personal info. 26 years-old Spanish Engineering degree at ETSEIB-UPC, Barcelona Specialization on Nuclear Engineering European Master of Science in Nuclear Engineering by ENEN Working experience at DFEN-UPC. Miguel DAPENA FEBRER. GOTP - Port Plug Engineering. - PowerPoint PPT Presentation
Citation preview
December 2009 1Miguel Dapena
TORE SUPRA
AssociationEuratom-CEA
1. Personal infoMiguel DAPENA FEBRER
– 26 years-old– Spanish– Engineering degree at ETSEIB-UPC, Barcelona
• Specialization on Nuclear Engineering– European Master of Science in Nuclear Engineering by ENEN– Working experience at DFEN-UPC
– Location: CEA-Cadarache, IRFM/SIPP/GIPM– Start date: January 2009– Training supervisor: Sophie SALASCA– Subjects:
• Nuclear Safety• Radioprotection• Neutronics• Nuclear Engineering for PPE
GOTP - Port Plug Engineering
December 2009 2Miguel Dapena
TORE SUPRA
AssociationEuratom-CEA
2. Activities on 2009Descending-design approach for safety requirements analysis
• From January to April• Presented at IRFM• Internal report EditeX
Objectives, Objectives, PrinciplesPrinciples
Gu
idel
ines
Gu
idel
ines RequirementsRequirements
Design
As independent as possible on that one beneath
Abs
trac
tion
leve
l
DESCENDING DESIGN Method
System engineering Method
Functionaldesign
Systemsdesign
Componentsdesign
Functional requirements System
requirements Component requirements
December 2009 3Miguel Dapena
TORE SUPRA
AssociationEuratom-CEA
2. Activities on 2009Visiting researcher at ITER Organization
• Integrated on Nuclear Safety & Environment Division• Official dates April 2010 – April 2011
Application of Nuclear Pressure Equipments directive (ESPN)System 1st meeting Expectations 2nd meeting
H&CD 11-May-09
Possible for Plug and “transmission lines” ICRH & LHRH 29-Sep-09Possible for Plug and “transmission lines” ECRH 29-Sep-09
Possible for most of the equipment DNB 5-Oct-09
Possible for most of the equipment HNB 5-Oct-09
FW/BL Modules 12-May-09 Good perspectives for Blankets 5-Oct-09
BL Manifolds 15-May-09Difficult. It does not seem to be possible 5-Oct-09
Diagnostic PP 20-May-09Possible for Plugs. Difficult for interspace equipment 6-Oct-09
TBM 2-Jun-09 Very preliminary design -Tritium Plant 2-Jun-09 Only pumps excluded 6-Oct-09Vacuum&Fuelling - More detail needed 6-Oct-09
TCWS 2-Jun-09Just some equipment excluded (pumps) 6-Oct-09
ELM&VS coils 4-Jun-09 Good perspectives for coils 29-Sep-09
December 2009 4Miguel Dapena
TORE SUPRA
AssociationEuratom-CEA
2. Activities on 2009Visiting researcher at ITER Organization
Collaboration on Preliminary Safety Report (RPrS)
Vol.1 Ch. 5 Building-by-building description
Vol.1 Ch. 5 Building-by-building description …..
Vol.1 Ch. 5 Description of major systems and equipment
OLD layout
NEW layout
Referred to the building itself:
• Relative location/size in relation to the platform and other buildings, as well as rooms description
• Functions to be performed; mechanical loads, HVAC, seismic, etc
• Codes & standards
Referred to each system:
• Relative location/size in relation to the buildings; arrangement, interfaces
• Functions to be performed; operational modes, design conditions, operational limits, etc
•Safety relevant subsystems and components; SIC
•Hazards; materials, stored energy, etc
Cross-reference
December 2009 5Miguel Dapena
TORE SUPRA
AssociationEuratom-CEA
2. Activities on 20093. Collaboration with ENEA-Frascati (Italy)
• June/July• Neutronic analyses on High Resolution Neutron Spectrometer• Internal report EditeX (pending to upload)
December 2009 6Miguel Dapena
TORE SUPRA
AssociationEuratom-CEA
2. Activities on 20093. Collaboration with ENEA-Frascati (Italy)
• June/July• Neutronic analyses on High Resolution Neutron Spectrometer• Internal report EditeX (pending to upload)
December 2009 7Miguel Dapena
TORE SUPRA
AssociationEuratom-CEA
2. Activities on 20094. Nuclear safety and Radio Protection seminars
• IAEA Fundamental Safety Principles• Dose calculation basics
December 2009 8Miguel Dapena
TORE SUPRA
AssociationEuratom-CEA
3. Courses & Conferences
2. ANIMMA (Marseille)
3. ICONE (Brussels)
4. FZK Summer School (Karlsruhe)
1. Some subjects of Master Fusion INSTN (France)
December 2009 9Miguel Dapena
TORE SUPRA
AssociationEuratom-CEA
5. Activities for 2010
2. Courses at INSTN
3. Conferences
4. Collaboration with ITER Diagnostics and Neutronics
1. Further neutronic analyses on HRNS and Port Plug components