PER-005 UpdateImpact on Operators

System Operator ConferenceApril 17-19 and May 1-3, 2012

Columbia, SC

Margaret StambachManager, Training Services

SERC Reliability Corp.

Page 2: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

2

Learning Objectives

At the conclusion of this training session, you should be able to:• State the requirement and effective date for PER-005,

Requirements 1 & 2• Explain PER-005 R1& R2 impact on operators• List the features of task verification• Identify what constitutes a task modification

Page 3: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

3

Outline of Topics

• FERC Order 742 – approved standards & effective dates• PER-005 R1 and R2• Meaning of Reliability-Related Task• Procedures for Task Verification• When Must a Task Be Modified and Operators Re-

Verified?

Page 4: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

4

• In other reliability-related action today, FERC: Issued a final rule (RM09-25-000) approving two

proposed Personnel Performance, Training, and Qualifications (PER) Reliability Standards requiring Reliability Coordinators, Balancing Authorities, and Transmission Operators to establish training programs for their system operators. The rule directs NERC to take action with respect to operator training but does not require NERC to modify the two standards

November 18, 2010NEWS RELEASE

Page 5: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

5

FERC Order 742Which Two Standards Are Approved?

• PER-005-1 System Personnel Training Applicable entities:

– RCs– BAs– TOPs

• PER-004-2 Reliability Coordination - staffing Applicable entity:

– RCs

Significant change over previous training standard, PER-002

Page 6: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

6

Implementation TimelineSystem Personnel Training Standards

Only R3 in Effect Right Now

Page 7: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

7

R1 & R2 – the “Real Meat” of PER-005 – Go into Effect in One Year! (4-1-13)

Entities must use a “systematic approach” to develop a training program based on the job tasks that you perform Sounds simple,

but……

Page 8: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

8

There Are many “Pieces” to a Systematic Approach to Training (SAT)

• Develop a list of “reliability-related” job tasks

• Develop learning objectives for each task

• Design training courses to meet those learning objectives

• Implement the training program (using appropriate methods like classroom, simulation, field trips, etc)

• Evaluate the training program and correct any deficiencies.

Page 9: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

9

Where Do We Stand?

Most responsible entities have already developed their lists of “reliability-related” (RR) Tasks.

And just what is an RR Task?

One Suggestion::“A task that, when not completed, or completed incorrectly or not completed in a timely manner, could result in an actual or potential SOL or IROL violation, unintended loss of firm load, cascading outages, uncontrolled system separation, or other BES Emergency.”

Page 10: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

10

Example of BA RR Task:

Monitor ACE and respond to loss of supply or DCS event by applying operating reserves within allowable time frames

If reserves are not applied in a timely manner following loss of generation, the reliability of the Bulk Electric System is at risk!

Page 11: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

11

Does the Development of a List of RR Tasks Affect You as an Operator?

……. Not really! As an operator, you still perform all the tasks necessary to protect the system, whether there is a task list or not!

……. But what about PER-005 R2?

Page 12: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

12

PER-005, REQUIREMENT 2: Task Verification of Performance

Your entity must verify your ability to perform each task on the list at least one time, so this requirement does affect you….

Page 13: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

13

• Tasks that are performed frequently could be observed by a qualified evaluator and documented as complete if you perform the task successfully.

• Tasks that are performed infrequently may require checkout on a simulator or in the classroom with table-top exercises to assure your capability to perform the task.

PER-005, REQUIREMENT 2: Task Verification of Performance

Page 14: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

14

PER-005, REQUIREMENT 2: Task Verification of Performance

Task Verification should involve:

• Acceptable level of accomplishment for each task.

• Written Task Verification Guide – with content/plan for the activity.

• Observation check lists.

• Qualified Trainer/Evaluator.

Page 15: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

15

Acceptable Level of Accomplishment

• This is the measurable outcome (action) associated with a task and its standards for completion.

• What does the System Operator need to demonstrate or discuss and how well?

• Example: Make the correct decision to approve, postpone or modify an equipment outage request.

Page 16: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

16

Written Guide for Task Verification

• Guide contains:• Evaluator & operator activities• Task objectives• Training content• Resources (equipment, material, etc.)• References

• Useful document for both evaluator and operator being verified on a task.

Page 17: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

17

Observation Checklists

• Operator must be checked off as successfully completing each step of the task.

• Checklist can be part of Task Verification Guide.

• Document evidence that System Operator has achieved the objective of each task and can perform said task satisfactorily!

Page 18: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

18

Qualified Task Evaluator

• Experienced and knowledgeable staff must verify task performance.

• Evaluators should have both: • Competence at performing the

reliability-related tasks.• Skill in communicating and

guiding others.

Page 19: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

19

Task Verification Guide Example(Performance Check List)

Page 20: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

20

OJT Guide – Example 1

Task Verification Guide Example 2(Check List is Q/A)

Page 21: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

21

PER-005, REQUIREMENT 2: Task Verification of Performance

PER-005 R2.1 also provides for task modification or the addition of new tasks. Within 6 months of a new or modified task, you must be verified on that task.

Page 22: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

22

PER-005, REQUIREMENT 2: What Constitutes “Modification” to an RR Task?

A modification to an existing R-R task occurs as a result of a significant change to the way a task is performed (steps) or the knowledge requirements (objectives) for task performance. For example……..

Page 23: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

23

PER-005, REQUIREMENT 2: What Constitutes “Modification” to an RR Task?• New tools, applications, equipment needed to perform task.

• New procedures that change how a task is performed.

• New NERC Standards that change how the task is performed

• Job scope changes

• Change in task to close a performance gap

• Change in task as a result of a mitigation plan following review of an event.

Page 24: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

24

Where Do we Stand With Task Verification?

On Track to Meet April 1, 2013 Effective Date?

Page 25: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

25

Summary

• PER-005 R1 requires a training program be developed based on a systematic approach. R2 requires each operator be verified on each RR task at least once. Both R1 & R2 are effective April 1, 2013.

• PER-005 R2 has the biggest impact on operators, since each operator must be verified that they are capable or performing each RR task successfully.

Page 26: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

26

Summary, continued

• Task verification should include: acceptable level of accomplishment, a written guide, operator check-sheets, qualified evaluator.

• An RR task should be modified when there are new tools, new procedures, new standards, changes in job scope, changes to close a performance gap, changes triggered by mitigation plans

Page 27: 1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services

2012 System Operator Conference

27

Questions?