Upload
brice-ray
View
225
Download
0
Embed Size (px)
Citation preview
1
PENDING:
2
PENDING:
3
PENDING:
4
PENDING:
PERISHABLE TRANSFER CENTRE(PTC)
- Supplier Manual -
ÆON GLOBAL SCM Sdn. Bhd.(1025615-V)
Ver. 1-1 (Effective Date: 06th Dec 2013)
PENDING:
Agenda
6
1. PTC Overview2. Requirements 1) PTC General Rules 2) Documentation 3) Packing Specifications(Cartons) 4) Packing Specifications(Palletize) 5) Delivery Booking 6) Transportation 7) Unloading3. Summary - PTC Reject Cases /Cases Penalty imposed 4. Contact List5. Supplier’s Acknowledgement
PENDING:
Overview
7
PTC located at Bandar Puchong. Monday to Saturday, 07:00 to 19:00, exclude peak season. Manage AEON warehouse facility
– Cross Dock (XD) & Consolidation (CS). Cross dock & Consolidation items are an amalgamation of store demand
and will be dispatched in 24 hours upon receiving at PTC. No stock held in PTC. Cater for existing AEON stores and subsequent new stores.
Distribution Centre Store Code (PTC Code)
Receiving Hours Office Hours
PTCXD () 07:00 – 19:00
(Monday to Saturday)09:00 – 18:00
CS ()
PENDING:
PTC Location
8 100 ㎞
: DC : Store
5 ㎞
Klang Valley
KL RDCHC
CDC
PCPENDING:
PTC Address & Contact
9
Address:AEON Perishable Transfer Centre (PTC)c/o Cold Chain Network (CCN)No. 3, Jalan Perindustrian PuchongBandar Metro Puchong47160 Puchong, Selangor Darul Ehsan
Telephone (Hunting Line):03 – 8060 4764
Fax:03 – 9207 2007
GPS:3.040369,101.6040453.040369N 101.604045E3°02’25''N 101°36’14''E
PENDING:
10
Logistics & Information Flow
Supplier
AEON KL RDC
AEON Store
(Ordering & PO Data) (Accept PO & Create DO)
(Payment Advice)(Confirm Payment)
(RN Generated)
Logistic Flow
IT Flow
B2B SystemAEON HQ PENDING:
11
Supplier Delivery Process
1
Security check by Guards
3 Register lorry & drivers to KL RDC Office
4 Unloading & Merchandises Inspected
5 Receive “Receiving Note”
6
Arrive RDC 30 min before delivery time
2
Inspection by our Security before leaving
DrivingLicense
RN
DO
RegistrationForm
AppendixP-1
* For the Details, Please refer each “Process Guideline”
AppendixP-2
AppendixP-3
AppendixP-4
AppendixP-4
RegistrationForm
RegistrationForm
RegistrationForm
RegistrationForm
- Document -PENDING:
12
Lorry Dimension (Horizontal)
XX m
XX m
XX m XX m
W1
W2
H1H2
PENDING:
13
Lorry Dimension (Vertical) - Type A
Cooling Unit
XX mL1
XX m L2
14
Lorry Dimension (Horizontal) - Type A
LorrySize L2 L1
5 Tone
13 Tone
20 Tone
____ Tone
15
Lorry Dimension (Horizontal) - Type A
Cooling Unit
XX m
H1XX m
H2XX m
H3
16
Lorry Dimension (Horizontal) - Type A
LorrySize H3 H2 H1
5 Tone
13 Tone
20 Tone
____ Tone
17
PC Tray DimensionType A~ 33 Ltr
Type B~ 16 Ltr
Dimension:155mm(H) X 410mm(W) X 630mm(L)
Dimension:85mm(H) X 410mm(W) X 630mm(L)
18
Cart Rack with Thermo Cover
Dimension:____mm(H) X ____mm(W) X ____mm(L)
Material:____
Weight (Empty):____kg
Weight (With Thermo Cover):____kg
19
Cart Rack with Thermo Cover
From Front View
20
Cart Rack with Thermo Cover (Sample)
From Top View
Too bigempty space
Too bigempty space
21
Cart Rack with Thermo Cover (Request)
From Top View
Empty space just nice
Empty spacejust nice
22
Delivery Material Comparison
Cart Rack with Thermo Cover
23
Lorry Dimension (Vertical) - Type B
XX m
XX m
L1
L2PENDING:
L3
XX m
24
Lorry Dimension (Data)
Lorry Size W1 W2 H1 H2 L1 L2
4 tone
10 tone
13 tone
18 tone
20 tone
PENDING:
25
PTC Volume Growth
OCT 2013 NOV 2013 DEC 2013 JAN 2014 FEB 2014 MAR 2014 APR 20140
50000
100000
150000
200000
250000
300000
350000
400000
450000
PTC Growth Chart
D&D Growth PTC Total Volume
Chinese New Year Festive
AchievedTarget
VolumeStabilized
PCStarted
26
D&D Volume Growth Summary
OCT2013
NOV2013
DEC2013
JAN2014
FEB2014
MAR2014
D&D VolumeGrowth
RM 30,000
PCVolumeGrowth
RM35,000
TotalPTC
Volume
RM 100,000
RM 383,000
27
D&D Volume Growth Schedule
SupplierCode Supplier Name
OCT2013
NOV2013
DEC2013
JAN2014
FEB2014
MAR2014
40541 NESTLE PRODUCTS SDN BHD RM 30,000
30430SUSU LEMBU ASLI MARKETING SDN. BHD.
RM35,000
30368COTRA ENTERPRISE SDN. BHD.
30694 TEIK SENN (M) SDN. BHD.
30759PERMANIS SANDILANDS SDN BHD
31100F & N DAIRIES (MALAYSIA) SDN. BHD.
32352MAMEE-DOUBLE DECKER DISTRIBUTION (M) S/B
39845JULIE'S MARKETING SDN BHD
41947 LUCKY FROZEN SDN BHD
44415PIKZERN MARKETING SDN BHD
28
D&D Volume Growth Schedule
SupplierCode Supplier Name
OCT2013
NOV2013
DEC2013
JAN2014
FEB2014
MAR2014
44660MAX FOOD ENTERPRISE (M) SDN BHD
45357DUTCH LADY MILK INDUSTRIES BERHAD
45829GD MARKETING SDN BHD
48216PERNIAGAAN LO SAM
52477MALAYSIAN YOGHURT COMPANY SDN. BHD.
53449FDP MARKETING SDN. BHD.
53457POK BROTHERS SDN. BHD.
55611LADANG ANGLO NUBIAN SDN BHD
29
PTC Project – Logistic Flow
PC (Metro Prima) PC (Bdr. Puchong)PTC AEON Store
Option A:
Option B:
30
PTC Delivery Material Comparison
Hand CarryCargo Cover
Cart Rack + Thermo Cover
Picture
Price/Unit
PC Tray Capacity
Weight/Unit
Average Usage/Store/Trip
31
32
33
34
35
36
37
38
39
40
PENDING:
41
PENDING:
42
PENDING:
43
PENDING:
44
PENDING:
45
PENDING:
46
PENDING:
47
PENDING:
48
PENDING:
49
PENDING:
50
Motor cycle
Car
6-4 Requirement – Transportation
Freezer Lorry
Canvas Lorry
Open Lorry
Trolley/Hand Carry
51
PENDING:1-3 PTC Access Route
PTC
52
PENDING:1-5 PTC Traffic Flow
53
PENDING:
54
PENDING:
55
PENDING:
56
1-1 PTC General Rule
Ref Details
1PTC is not liable for any missing documents or un-collected stocks after issuance to driver or in the event driver refuses to collect.
2Anyone should be on proper dress and should bring ID, passport or driving license. (Please refer 1-2)
3Prohibited to approach to other area than waiting area, designated bay & designated toilets.
4Smoking & eating are prohibited in PTC compound, except at the designated area.
5Not allowed to bring bags, empty boxes and something you can put something into it.
6 Dispute about our classification of damage are not allowed.
7 Follow designated route to get to PTC (Please refer 1-3, 1-4)
8 Follow PTC Traffic rules (Please refer 1-5 ).
9Park lorries so that the lorries doesn’t block the traffic in PTC compound and along PTC entrance.
10 Suppliers follow PTC staffs’ instructions in PTC (incl. the surroundings).
PENDING:
57
1-2 PTC Dress Code
N GO K
RDC Visitor Pass
Shirts Tied-in
No Bags
Shoes
NO RDC Visitor Pass
Shirts Tied-OUT
Bags
Sandals
Long PantsShort Pants
PENDING:
58
PENDING:
59
PENDING:
60
PENDING:
61
PENDING:
Requirement – Liquidated Damage
Ref Cases
1 As per mentioned in ‘Distribution Centre Usage Agreement’ in Clause 4.2.
2 As per mentioned in ‘General Agreement’ in Clause 13.
62
Contact List (Current)
Category Person In Charge Telephone Fax E-Mail
PTC
General Inquiry 03 – 8913 108309:00 to 19:00 03 – 8913 1094
PTC AEON Office03 – 8927 388003 – 8927 387909:00 to 18:00
03 – 8927 3855 [email protected]
AEON
Merchandise & Ordering
AEONMerchandiser 03 – 9207 2005 03 – 9207 2006
*Respective merchandiser
B2B B2B Helpdesk03–2161 1088
Mon to Fri09:00 to 18:00
03 – 2161 0108 [email protected]
Other Inquiry [email protected]
PENDING:
Supplier are required to submit the undersigned acknowledgement of the AEON PTCSuppliers Manualby 30th Sept 2013.
FAX : 03 – 9207 2006
Email:[email protected]
63
PENDING:
Supplier’s Acknowledgement