1 NOAA Observing System Architecture (NOSA) Data Call Briefing Package November 15, 2002

1 NOAA Observing System Architecture (NOSA) Data Call Briefing Package November 15, 2002

Embed Size (px)

Citation preview

1

NOAA Observing System Architecture (NOSA)

Data Call Briefing Package

November 15, 2002

2

Change Record

Version Date Changes

1 11/1/02 First Issue

2 11/15/02 Added survey tree example

3

Initial Tasking

• Develop an observing system architecture– Baseline (“state today”)– Target architecture (“future state”—10-20 years)

• Base prospective observing systems on validated requirements

• Investigate system consolidation and ownership transition (e.g., buoys)

• Conduct a systemic review of all observing systems considering the following factors– Required system characteristics– Number of and types of system users– Capital asset value and recurring maintenance costs

4

Initial Scope

• Focus first on baseline observing system architecture– Begin with systemic review of all NOAA observing systems– Work closely with NOAA team developing the requirements-

based management process– Timeline for future observing system architecture

development TBD

• Address only NOAA owned and/or operated systems

• Include operational and research systems

5

NOSA Senior Steering Group

• NESDIS Greg Withee, Rob Mairs (lead)

• NMFS Bill Fox

• NOS Steve Gill

• NWS Greg Mandt (lead), Paul Moersdorf

• OAR Mike Johnson

• OMAO Beth White

• CIO Carl Staton

6

NOSA Action Group

• NESDIS Rob Mairs (lead), Howard Diamond, Lisa Botluk

• NMFS Ned Cyr, David Detlor

• NOS Steve Gill

• NWS Rainer Dombrowsky, Eric Meindl, Tim Ross

• OAR Sid Thurston

• OMAO Beth White

• OCIO Ira Grossman

• IA Michael Hales

• Contractor Support (Aerospace Corp, Veridian)

7

Initial Action Group Focus

• Analyze purpose of observing system architecture

• Establish framework, format and content of data call– Data call– Data capture/analysis– Follow-up interviews

• Discuss use of architecture tools (e.g., Ptech, Popkin, METIS)– Proper capture and visualization of various architecture

views

• Assimilate data (principles, guidelines, standards, etc.)

8

NOSA Project Schedule SummaryID Task Name Duration Start

1 Startup 11 days Mon 8/5/02

5 Architecture Framework 15 days Mon 8/19/02

9 Data Surveys 15 days Mon 9/9/02

13 NOAA Forge Setup 27 days Mon 9/16/02

20 Metis Tool Setup 47 days Mon 9/23/02

32 Data Call 88 days Mon 9/23/02

33 RFI prep 5 days Thu 10/3/02

34 Id Obs Systems & POC's 10 days Mon 9/23/02

35 Data Call Kickoff 1 day Wed 10/30/02

36 Survey Inputs 20 days Thu 10/31/02

37 Data Integration 10 days Thu 11/28/02

38 LO Interviews (as req'd) 40 days Thu 11/28/02

39 Load Data into Metis 5 days Thu 12/12/02

40 AG Review 5 days Thu 12/19/02

41 Update Data 5 days Thu 12/26/02

42 SSG Review 10 days Thu 1/2/03

43 Metis Tool Interfaces 50 days Mon 10/28/02

50 Architecture Description 65 days Thu 10/31/02

51 AD Outline 10 days Thu 10/31/02

52 Develop Overview Info 20 days Thu 11/14/02

53 Integrate Metis Models 5 days Thu 12/19/02

54 Integrate GIS info 5 days Mon 12/16/02

55 Write Extra Material 5 days Thu 12/26/02

56 Draft Review 5 days Thu 1/2/03

57 Update 5 days Thu 1/9/03

58 Final Review 5 days Thu 1/16/03

59 Publish 5 days Thu 1/23/03

60 Close-Out Phase 1 25 days Thu 1/9/03

8/19 Architecture Framework

9/9 Data Surveys

9/16 NOAA Forge Setup

10/3 RFI prep

9/23 Id Obs Systems & POC's

10/30 Data Call Kickoff

10/31 Survey Inputs

11/28 Data Integration

11/28 LO Interviews (as req'd)

12/12 Load Data into Metis

12/19 AG Review

12/26 Update Data

1/2 SSG Review

10/31 AD Outline

11/14 Develop Overview Info

12/19 Integrate Metis Models

12/16 Integrate GIS info

12/26 Write Extra Material

1/2 Draft Review

1/9 Update

1/16 Final Review

1/23 Publish

8/25 9/1 9/8 9/15 9/22 9/29 10/6 10/13 10/20 10/27 11/3 11/10 11/17 11/24 12/1 12/8 12/15 12/22 12/29 1/5 1/12 1/19 1/26 2/2 2/9 2/16August September October November December January February

Data Call Finish on Monday, Dec 2nd

Data Call Finish on Monday, Dec 2nd

9

Architecture Queries

• How much is NOAA spending on observing systems?

• What observing systems are associated with each NOAA strategic goal?

• Display all observing systems owned by a particular line office.

• What observing systems are supporting our ability to measure the heat content of the ocean (or other scientific query)?– What additional observing systems do we need to answer

this particular question?

• Display all organizations that own buoys.

10

Architecture Queries(continued)

• Display all requirements not being met by current observing systems.

• Display all observing systems that a certain stakeholder deems important.

• Display all observing systems that measure a particular environmental parameter.

• Display the acquisition costs of all observing systems associated with a certain strategic goal.

• Display the geographic coverage of a particular observing system.– How does this coverage compare with stated requirements?

11

Architecture Queries(continued)

• Display the NOAA network locations that observe a particular environmental parameter?– Do other US organizations operate similar systems?– How do they compare to the NOAA system?– Could NOAA use their data? If so, what is the justification

for this NOAA-operated system?– How does this NOAA observing system fit within the global

system for this parameter (e.g., GCOS, GOOS, World Weather Watch, etc.)?

• How much does NOAA pay to acquire data from non-NOAA sources? What would it cost to deploy a NOAA-operated system to observe the same parameters?

12

Observing System

NOAA Observing System Architecture (NOSA) Primary Information Flows

Element

Element

Element

Element

Element

Element

Modeling/Data Assimilation

System (M/DAS)

Report Generation

System (RGS)

Info Dissemination System (IDS)

Users

Data/Info Archival System

(D/IAS)

Environmental Phenomena

13

Entity Relationship Diagram (ERD)

Larger System

Observing System

Data Handling System

Human

Environmental Phenomenon

Environmental Parameter

Sensing Element

Sensor

Platform / Station

part of

measures

is a

contains

characterizes

provides data to

Observation Control System

is controlled by

Location

located at

MobileFixed

is

Space

Air

Ground

Ocean

Space

Air

Ground

Ocean

Basic Service Requirement

< drives

provides data directly to

Userprovides info to is type

of

Stake-holder

has

Operator operated by

situated on

Support

supported by

Owner

owned by

Stakeholder Requirement

< drives< drives

Processing Element

RemoteIn Situ

is type

14

NMFS Observing Systems

FISHERY INDEPENDENT SYSTEMS POC PRIORITYFISH SURVEYS NMFS ST2

OCEANOGRAPHIC/ECOSYSTEM SURVEYS NMFS ST2 MARINE MAMMAL/PROTECTED RESOURCE SURVEYS NMFS PR (DONALD KNOWLES)

HABITAT ASSESSMENTS NMFS HC (ROLAND SCHMITTEN)

FISHERY DEPENDENT SYSTEMSCOMMERCIAL STATISTICS NMFS ST1 (JOHN HOEY)

RECREATIONAL STATISTICS NMFS ST1 (DAVE VANVORHEES)NATIONAL OBSERVER PROGRAM NMFS ST2 (VICKI CORNISH)

SOCIOECONOMICS NMFS ST1 (MARK HOLLIDAY)VESSEL MONITORING SYSTEM NMFS EN (DALE JONES)

15

NOS Observing SystemsSYSTEMS POC PRIORITY

NWLON NOS OPS (STEPHEN GILL) 1PORTS NOS OPS (STEPHEN GILL) 2NCOP NOS OPS (STEPHEN GILL) 3CORS NGS (ERIKA WILSON) 4SWMP NERRS (MAURICE CRAWFORD) 5NS&T NCCOS (JAWEED HAMEEDI) 6

TOPOGRAPHIC CHANGE PROGRAM CSC LC-CAP CSC LHAB CSC/NCCOS L

COASTAL MAPPING PROGRAM NGS LCORAL REEF MONITORING/MAPPING NCCOS L

BENTHIC HABITAT MAPPING PROGRAM CSC LBENTHIC SURVEILLANCE PROGRAM NCCOS L

HYDROGRAPHIC SURVEYING PROGRAM OCS LESI OR&R L

NATIONAL MARINE SANCTUARY MONITORING NMS LBIOEFFECTS SURVEY PROGRAM NCCOS L

16

NESDIS Observing Systems

SYSTEMS POC PRIORITYClimate Reference Network (CRN) NCDC (MIKE HELFERT) H

Defense Meteorological Satellite Program (DMSP) IPO (JEFF BACHMANN HGeostationary Operational Environmental Satellite (GOES) I-M OSD (STEVE KIRKNER) HGeostationary Operational Environmental Satellite (GOES) N-Q OSD (STEVE KIRKNER) H

Marine Optical Buoy (MOBY) ORA (DENNIS CLARK) HNational Polar-orbiting Operational Environmental Satellite (NPOESS) IPO (JOHN CUNNINGHAM) H

NPOESS Preparatory Project (NPP) IPO (JOHN CUNNINGHAM) HPolar Orbiting Environmental Program (POES) OSD (WALLY BANNOURA) H

QuikSCAT ORA (PAUL CHANG) H

17

NWS Observing Systems

SYSTEM POC PRIORITYAutomated Surface Observing System (ASOS) TIM ROSS 1

WSR-88D DAVID HELMS 2Cooperative Observer Program (COOP) ANDY HORVITZ 3

Radiosonde Balloon System JOSEPH FACUNDO 4Radiosonde Replacement System (RRS) JOSEPH FACUNDO 5

Meteorological Data Collection & Reporting System (MDCRS) DAVID HELMS 6National Lightning Detection Network (NLDN) JOSEPH FACUNDO 7

Regional Hydrology Systems TIM ROSS/REGIONAL FOCAL POINTRegional Surface Systems TIM ROSS/JOHN BRADLEY

National Data Buoy Center (NDBC) Moored Buoys W/OPS52 (ERIC MEINDL)

Coastal-Marine Automated Network (C-MAN) W/OPS52 (ERIC MEINDL)NWS Voluntary Observing Ship (VOS) Program W/OPS52 (ERIC MEINDL)

18

OAR Observing SystemsClimate Atmospheric Systems

SYSTEM OFFICE POCAtmospheric Baseline Measurement Network ARL Richard Artz

Carbon Cycle Flask Network CMDL James ButlerHalocarbon Cycle Network CMDL Thayne Thompson

Solar and Thermal Radiation Network (STAR) CMDL Ellsworth DuttonTotal Column Ozone Network CMDL Robert EvansBalloon Ozonesonde Network CMDL John Barnes

Background Aerosol Monitoring Network CMDL Betsy Andrews

Integrated Surface Irradiance Study Network ISIS (Level 1) ARL Detlef MattSurface Radiation Network (SURFRAD) ISIS (Level 2) ARL John Augustine

Trans-Pacific profiler network (TPPN) AL Ken GageRonald H. Brown C-band Radar ETL Michelle RyanRonald H. Brown Wind Profiler ETL Daniel Law

ETL Flux System ETL Chris FairallETL Cloud Radars ETL Wynn Eberhard

Airborne Aerosol Lidar ETL Alan BrewerGround-based Profiling Radiometers ETL Marian KleinBoulder Atmospheric Observatory ETL Daniel Wolfe

19

OAR Observing SystemsClimate Ocean Systems

SYSTEM OFFICE POCENSO Observing System (TAO/TRITON) PMEL Michael Mcphaden

ENSO OS Tide Gauges JIMAR Mark MerrifieldENSO OS Drifting Buoys AOML Craig Engler

OAR VOS AOML Steve CookPIRATA array PMEL Michael Mcphaden

Argo Profiling Floats OAR Steve PiotrowiczOcean Reference Stations CICOR Robert Weller

Oceanic Carbon Dioxide monitors PMEL Richard FeelyThermohaline circulation AOML Molly Barringer

Arctic buoys AO John Calder

20

OAR Observing SystemsWeather & Air Quality Observing Systems

SYSTEM OFFICE POC

Atmospheric Integrated Research Monitoring Network (AIRMoN) ARL Richard ArtzNational Acid Deposition Program ARL Richard Artz

Lidar Instruments ETL Alan BrewerETL Profilers/Radar ETL Andreas Muschinski

Microwave Radiometers ETL Marian KleinNOAA Wind Profiler Network (NPN) FSL Douglas Van De Kamp

Global Positioning System Integrated Precipitable Water Sensor Network GPS-IPW FSL Seth Gutman

21

OAR Observing SystemsOcean Observing Systems

SYSTEM OFFICE POCGLERL CoastWatch GLERL Songzhi Liu

Autonomous vertical profiler GLERL Nathan HawleyDeep Ocean Assessment and Reporting of Tsunamis (DART) PMEL (Transitioning to NWS)

Fisheries Oceanography Coordinated (FOCI) Drifters/Moorings PMEL Allen MacklinAcoustic monitoring hydrophones PMEL Chris Fox

Long term Ecosystem Observatory LEO NURP Al KalvaitisAquarius NURP Steven Miller

22

NOSA Data Flow

NOAAForge

EATOOL

LO1

LO2

LON

. . .

. .

SURVEYS

ARCHDESC

GIS TOOL

DOORS

Requirements

System Characteristics

DOORS Dynamic Object Oriented Requirements SystemEA Enterprise ArchitectureGIS Geospatial Information System

23

Survey Forms in NOAA Forge

Observing System Form (one per Observing System type)

Platform/Station Form (one or more per OS)

Sensing Element Form (one or more per OS)

Environmental Parameter Form

(one or more per SE)

Geospatial Database

Processing Element Form (one or more per OS)

Data Handling System Form (one or more per OS)

NOTE: At least one of each survey form type is required to be filled out for each Observing System. See example on next slide.

24

Survey Tree Example

XYZ Observing System (XOS)

PT105 Floating Buoy Platform

Temperature Sensing Gage

Dry Bulb Temp

Geospatial Database

Observation Processor Unit

XYZ Data Handling System

Wet Bulb Temp

XYZ Weather Station Geospatial Database

Anemometer

Wind Speed

Wind Direction

Forward Scatter Meter

Visibility

Environmental Parameter

Surveys

Environmental Parameter

Surveys

Sensing Element Surveys

Sensing Element Surveys

25

NOAA Forge Collaboration Environment

• https://class1.nesdis-hq.noaa.gov/

• Login here (or add new users)

• NOSA will use this tool to collect basic information about each Observing System

26

Adding NOSA Project Members

• One account per individual• Preferred name is last name only• Name with no spaces• Identify the organization

• Hit Register button to complete New User setup

27

Starting NOSA Project

• Your personal page will look like this

• Click here to enter the NOSA project

• That is where you will start filling out survey forms

28

• Click on “Survey” to start working on your surveys

• Click on “Survey” to start working on your surveys

29

Creating New Survey Templates

• Currently existing survey documents

• Currently existing survey documents

• Survey templates

• Survey templates

30

Survey Document Administration

• Identify as Active, Inactive, Deleted, or Completed

• Identify as Active, Inactive, Deleted, or Completed

• Add members to survey document (allows editing)

• Add members to survey document (allows editing)

31

• Survey Questions• Survey Questions

• Survey Page (most surveys have more than one page)

• Survey Page (most surveys have more than one page)

32

Asking for Clarification

• Don’t forget to hit this button to submit your question or comment

• Don’t forget to hit this button to submit your question or comment

• Enter your question or comment here

• Enter your question or comment here

33

NOSA Project Schedule SummaryID Task Name Duration Start Finish

1 Startup 11 days Mon 8/5/02 Mon 8/19/02

5 Architecture Framework 15 days Mon 8/19/02 Fri 9/6/02

9 Data Surveys 15 days Mon 9/9/02 Fri 9/27/02

13 NOAA Forge Setup 27 days Mon 9/16/02 Tue 10/22/02

20 Metis Tool Setup 47 days Mon 9/23/02 Tue 11/26/02

32 Data Call 88 days Mon 9/23/02 Wed 1/22/03

33 RFI prep 5 days Thu 10/3/02 Wed 10/9/02

34 Id Obs Systems & POC's 10 days Mon 9/23/02 Fri 10/4/02

35 Data Call Kickoff 1 day Wed 10/30/02 Wed 10/30/02

36 Survey Inputs 20 days Thu 10/31/02 Wed 11/27/02

37 Data Integration 10 days Thu 11/28/02 Wed 12/11/02

38 LO Interviews (as req'd) 40 days Thu 11/28/02 Wed 1/22/03

39 Load Data into Metis 5 days Thu 12/12/02 Wed 12/18/02

40 AG Review 5 days Thu 12/19/02 Wed 12/25/02

41 Update Data 5 days Thu 12/26/02 Wed 1/1/03

42 SSG Review 10 days Thu 1/2/03 Wed 1/15/03

43 Metis Tool Interfaces 50 days Mon 10/28/02 Fri 1/3/03

50 Architecture Description 65 days Thu 10/31/02 Wed 1/29/03

51 AD Outline 10 days Thu 10/31/02 Wed 11/13/02

52 Develop Overview Info 20 days Thu 11/14/02 Wed 12/11/02

53 Integrate Metis Models 5 days Thu 12/19/02 Wed 12/25/02

54 Integrate GIS info 5 days Mon 12/16/02 Fri 12/20/02

55 Write Extra Material 5 days Thu 12/26/02 Wed 1/1/03

56 Draft Review 5 days Thu 1/2/03 Wed 1/8/03

57 Update 5 days Thu 1/9/03 Wed 1/15/03

58 Final Review 5 days Thu 1/16/03 Wed 1/22/03

59 Publish 5 days Thu 1/23/03 Wed 1/29/03

60 Close-Out Phase 1 25 days Thu 1/9/03 Wed 2/12/03

8/19 Architecture Framework

9/9 Data Surveys

9/16 NOAA Forge Setup

10/3 RFI prep

9/23 Id Obs Systems & POC's

10/30 Data Call Kickoff

10/31 Survey Inputs

11/28 Data Integration

11/28 LO Interviews (as req'd)

12/12 Load Data into Metis

12/19 AG Review

12/26 Update Data

1/2 SSG Review

10/31 AD Outline

11/14 Develop Overview Info

12/19 Integrate Metis Models

12/16 Integrate GIS info

12/26 Write Extra Material

1/2 Draft Review

1/9 Update

1/16 Final Review

1/23 Publish

8/25 9/1 9/8 9/15 9/22 9/29 10/6 10/13 10/20 10/27 11/3 11/10 11/17 11/24 12/1 12/8 12/15 12/22 12/29 1/5 1/12 1/19 1/26 2/2 2/9August September October November December January February

34

NOSA Project Details – Page 1ID Task Name Duration Start Finish

1 Startup 11 days Mon 8/5/02 Mon 8/19/02

2 Kickoff Meeting 1 day Mon 8/5/02 Mon 8/5/02

3 Architecture Workshop 1 day Wed 8/14/02 Wed 8/14/02

4 Task Planning 10 days Tue 8/6/02 Mon 8/19/02

5 Architecture Framework 15 days Mon 8/19/02 Fri 9/6/02

6 Define arch elements 5 days Mon 8/19/02 Fri 8/23/02

7 Define arch relations 5 days Mon 8/26/02 Fri 8/30/02

8 Define element attributes 5 days Mon 9/2/02 Fri 9/6/02

9 Data Surveys 15 days Mon 9/9/02 Fri 9/27/02

10 Develop survey forms 5 days Mon 9/9/02 Fri 9/13/02

11 Test survey forms 5 days Mon 9/16/02 Fri 9/20/02

12 Update survey forms 5 days Mon 9/23/02 Fri 9/27/02

13 NOAA Forge Setup 27 days Mon 9/16/02 Tue 10/22/02

14 Load survey into NOAA Forge10 days Mon 9/16/02 Fri 9/27/02

15 Register NF users 2 days Wed 9/25/02 Thu 9/26/02

16 Beta Test Kickoff 1 day Wed 10/2/02 Wed 10/2/02

17 Beta Test 5 days Thu 10/3/02 Wed 10/9/02

18 Collect Lessons Learned 4 days Thu 10/10/02 Tue 10/15/02

19 Update NF surveys 5 days Wed 10/16/02 Tue 10/22/02

20 Metis Tool Setup 47 days Mon 9/23/02 Tue 11/26/02

21 Basic Training 5 days Mon 9/23/02 Fri 9/27/02

22 Define Arch Questions 7 days Mon 9/30/02 Tue 10/8/02

23 Refine NOSA Data Model 10 days Mon 9/30/02 Fri 10/11/02

24 Metamodel Dev Workshop 3 days Tue 10/22/02 Thu 10/24/02

25 Generic NOSA Model 1 day Fri 10/25/02 Fri 10/25/02

26 Key Questions 5 days Mon 10/28/02 Fri 11/1/02

27 Design Queries 5 days Mon 11/4/02 Fri 11/8/02

28 Design Reports 5 days Mon 11/11/02 Fri 11/15/02

29 Database Interface Trg 2 days Mon 10/28/02 Tue 10/29/02

30 DBIF Design & Test 5 days Wed 10/30/02 Tue 11/5/02

31 Load Prelim Data 15 days Wed 11/6/02 Tue 11/26/02

8/5 Kickoff Meeting

8/14 Architecture Workshop

8/6 Task Planning

8/19 Architecture Framework

8/19 Define arch elements

8/26 Define arch relations

9/2 Define element attributes

9/9 Data Surveys

9/9 Develop survey forms

9/16 Test survey forms

9/23 Update survey forms

9/16 NOAA Forge Setup

9/16 Load survey into NOAA Forge

9/25 Register NF users

10/2 Beta Test Kickoff

10/3 Beta Test

10/10 Collect Lessons Learned

10/16 Update NF surveys

9/23 Basic Training

9/30 Define Arch Questions

9/30 Refine NOSA Data Model

10/22 Metamodel Dev Workshop

10/25 Generic NOSA Model

10/28 Key Questions

11/4 Design Queries

11/11 Design Reports

10/28 Database Interface Trg

10/30 DBIF Design & Test

11/6 Load Prelim Data

7/28 8/4 8/11 8/18 8/25 9/1 9/8 9/15 9/22 9/29 10/6 10/13 10/20 10/27 11/3 11/10 11/17 11/24 12/1 12/8 12/15 12/22July August September October November December

35

NOSA Project Details – Page 2ID Task Name Duration Start Finish

32 Data Call 88 days Mon 9/23/02 Wed 1/22/03

33 RFI prep 5 days Thu 10/3/02 Wed 10/9/02

34 Id Obs Systems & POC's 10 days Mon 9/23/02 Fri 10/4/02

35 Data Call Kickoff 1 day Wed 10/30/02 Wed 10/30/02

36 Survey Inputs 20 days Thu 10/31/02 Wed 11/27/02

37 Data Integration 10 days Thu 11/28/02 Wed 12/11/02

38 LO Interviews (as req'd) 40 days Thu 11/28/02 Wed 1/22/03

39 Load Data into Metis 5 days Thu 12/12/02 Wed 12/18/02

40 AG Review 5 days Thu 12/19/02 Wed 12/25/02

41 Update Data 5 days Thu 12/26/02 Wed 1/1/03

42 SSG Review 10 days Thu 1/2/03 Wed 1/15/03

43 Metis Tool Interfaces 50 days Mon 10/28/02 Fri 1/3/03

44 GIS Tool Reqts 10 days Mon 10/28/02 Fri 11/8/02

45 Develop GIS Interface 20 days Mon 11/11/02 Fri 12/6/02

46 Test GIS Interface 5 days Mon 12/9/02 Fri 12/13/02

47 DOORS Tool Reqts 20 days Mon 10/28/02 Fri 11/22/02

48 Develop DOORS Interface 20 days Mon 11/25/02 Fri 12/20/02

49 Test DOORS Interface 10 days Mon 12/23/02 Fri 1/3/03

50 Architecture Description 65 days Thu 10/31/02 Wed 1/29/03

51 AD Outline 10 days Thu 10/31/02 Wed 11/13/02

52 Develop Overview Info 20 days Thu 11/14/02 Wed 12/11/02

53 Integrate Metis Models 5 days Thu 12/19/02 Wed 12/25/02

54 Integrate GIS info 5 days Mon 12/16/02 Fri 12/20/02

55 Write Extra Material 5 days Thu 12/26/02 Wed 1/1/03

56 Draft Review 5 days Thu 1/2/03 Wed 1/8/03

57 Update 5 days Thu 1/9/03 Wed 1/15/03

58 Final Review 5 days Thu 1/16/03 Wed 1/22/03

59 Publish 5 days Thu 1/23/03 Wed 1/29/03

60 Close-Out Phase 1 25 days Thu 1/9/03 Wed 2/12/03

61 Prepare Outbriefing 10 days Thu 1/9/03 Wed 1/22/03

62 Present Briefing 5 days Thu 1/23/03 Wed 1/29/03

63 Plan Phase 2 10 days Thu 1/30/03 Wed 2/12/03

10/3 RFI prep

9/23 Id Obs Systems & POC's

10/30 Data Call Kickoff

10/31 Survey Inputs

11/28 Data Integration

11/28 LO Interviews (as req'd)

12/12 Load Data into Metis

12/19 AG Review

12/26 Update Data

1/2 SSG Review

10/28 GIS Tool Reqts

11/11 Develop GIS Interface

12/9 Test GIS Interface

10/28 DOORS Tool Reqts

11/25 Develop DOORS Interface

12/23 Test DOORS Interface

10/31 AD Outline

11/14 Develop Overview Info

12/19 Integrate Metis Models

12/16 Integrate GIS info

12/26 Write Extra Material

1/2 Draft Review

1/9 Update

1/16 Final Review

1/23 Publish

1/9 Prepare Outbriefing

1/23 Present Briefing

1/30 Plan Phase 2

9/15 9/22 9/29 10/6 10/13 10/20 10/27 11/3 11/10 11/17 11/24 12/1 12/8 12/15 12/22 12/29 1/5 1/12 1/19 1/26 2/2 2/9 2/16 2/23September October November December January February

36

Expanded NOSA Project ScheduleID Task Name Duration Start Finish

1 Startup 11 days Mon 8/5/02 Mon 8/19/02

2 Kickoff Meeting 1 day Mon 8/5/02 Mon 8/5/02

3 Architecture Workshop 1 day Wed 8/14/02 Wed 8/14/02

4 Task Planning 10 days Tue 8/6/02 Mon 8/19/02

5 Architecture Framework 15 days Mon 8/19/02 Fri 9/6/02

6 Define arch elements 5 days Mon 8/19/02 Fri 8/23/02

7 Define arch relations 5 days Mon 8/26/02 Fri 8/30/02

8 Define element attributes 5 days Mon 9/2/02 Fri 9/6/02

9 Data Surveys 15 days Mon 9/9/02 Fri 9/27/02

10 Develop survey forms 5 days Mon 9/9/02 Fri 9/13/02

11 Test survey forms 5 days Mon 9/16/02 Fri 9/20/02

12 Update survey forms 5 days Mon 9/23/02 Fri 9/27/02

13 NOAA Forge Setup 27 days Mon 9/16/02 Tue 10/22/02

14 Load survey into NOAA Forge10 days Mon 9/16/02 Fri 9/27/02

15 Register NF users 2 days Wed 9/25/02 Thu 9/26/02

16 Beta Test Kickoff 1 day Wed 10/2/02 Wed 10/2/02

17 Beta Test 5 days Thu 10/3/02 Wed 10/9/02

18 Collect Lessons Learned 4 days Thu 10/10/02 Tue 10/15/02

19 Update NF surveys 5 days Wed 10/16/02 Tue 10/22/02

20 Metis Tool Setup 47 days Mon 9/23/02 Tue 11/26/02

21 Basic Training 5 days Mon 9/23/02 Fri 9/27/02

22 Define Arch Questions 7 days Mon 9/30/02 Tue 10/8/02

23 Refine NOSA Data Model 10 days Mon 9/30/02 Fri 10/11/02

24 Metamodel Dev Workshop 3 days Tue 10/22/02 Thu 10/24/02

25 Generic NOSA Model 1 day Fri 10/25/02 Fri 10/25/02

26 Key Questions 5 days Mon 10/28/02 Fri 11/1/02

27 Design Queries 5 days Mon 11/4/02 Fri 11/8/02

28 Design Reports 5 days Mon 11/11/02 Fri 11/15/02

29 Database Interface Trg 2 days Mon 10/28/02 Tue 10/29/02

30 DBIF Design & Test 5 days Wed 10/30/02 Tue 11/5/02

31 Load Prelim Data 15 days Wed 11/6/02 Tue 11/26/02

32 Data Call 88 days Mon 9/23/02 Wed 1/22/03

33 RFI prep 5 days Thu 10/3/02 Wed 10/9/02

34 Id Obs Systems & POC's 10 days Mon 9/23/02 Fri 10/4/02

35 Data Call Kickoff 1 day Wed 10/30/02 Wed 10/30/02

36 Survey Inputs 20 days Thu 10/31/02 Wed 11/27/02

37 Data Integration 10 days Thu 11/28/02 Wed 12/11/02

38 LO Interviews (as req'd) 40 days Thu 11/28/02 Wed 1/22/03

39 Load Data into Metis 5 days Thu 12/12/02 Wed 12/18/02

40 AG Review 5 days Thu 12/19/02 Wed 12/25/02

41 Update Data 5 days Thu 12/26/02 Wed 1/1/03

42 SSG Review 10 days Thu 1/2/03 Wed 1/15/03

43 Metis Tool Interfaces 50 days Mon 10/28/02 Fri 1/3/03

44 GIS Tool Reqts 10 days Mon 10/28/02 Fri 11/8/02

45 Develop GIS Interface 20 days Mon 11/11/02 Fri 12/6/02

46 Test GIS Interface 5 days Mon 12/9/02 Fri 12/13/02

47 DOORS Tool Reqts 20 days Mon 10/28/02 Fri 11/22/02

48 Develop DOORS Interface 20 days Mon 11/25/02 Fri 12/20/02

49 Test DOORS Interface 10 days Mon 12/23/02 Fri 1/3/03

50 Architecture Description 65 days Thu 10/31/02 Wed 1/29/03

51 AD Outline 10 days Thu 10/31/02 Wed 11/13/02

52 Develop Overview Info 20 days Thu 11/14/02 Wed 12/11/02

53 Integrate Metis Models 5 days Thu 12/19/02 Wed 12/25/02

54 Integrate GIS info 5 days Mon 12/16/02 Fri 12/20/02

55 Write Extra Material 5 days Thu 12/26/02 Wed 1/1/03

56 Draft Review 5 days Thu 1/2/03 Wed 1/8/03

57 Update 5 days Thu 1/9/03 Wed 1/15/03

58 Final Review 5 days Thu 1/16/03 Wed 1/22/03

59 Publish 5 days Thu 1/23/03 Wed 1/29/03

60 Close-Out Phase 1 25 days Thu 1/9/03 Wed 2/12/03

61 Prepare Outbriefing 10 days Thu 1/9/03 Wed 1/22/03

62 Present Briefing 5 days Thu 1/23/03 Wed 1/29/03

63 Plan Phase 2 10 days Thu 1/30/03 Wed 2/12/03

8/5 Kickoff Meeting

8/14 Architecture Workshop

8/6 Task Planning

8/19 Architecture Framework

8/19 Define arch elements

8/26 Define arch relations

9/2 Define element attributes

9/9 Data Surveys

9/9 Develop survey forms

9/16 Test survey forms

9/23 Update survey forms

9/16 NOAA Forge Setup

9/16 Load survey into NOAA Forge

9/25 Register NF users

10/2 Beta Test Kickoff

10/3 Beta Test

10/10 Collect Lessons Learned

10/16 Update NF surveys

9/23 Basic Training

9/30 Define Arch Questions

9/30 Refine NOSA Data Model

10/22 Metamodel Dev Workshop

10/25 Generic NOSA Model

10/28 Key Questions

11/4 Design Queries

11/11 Design Reports

10/28 Database Interface Trg

10/30 DBIF Design & Test

11/6 Load Prelim Data

10/3 RFI prep

9/23 Id Obs Systems & POC's

10/30 Data Call Kickoff

10/31 Survey Inputs

11/28 Data Integration

11/28 LO Interviews (as req'd)

12/12 Load Data into Metis

12/19 AG Review

12/26 Update Data

1/2 SSG Review

10/28 GIS Tool Reqts

11/11 Develop GIS Interface

12/9 Test GIS Interface

10/28 DOORS Tool Reqts

11/25 Develop DOORS Interface

12/23 Test DOORS Interface

10/31 AD Outline

11/14 Develop Overview Info

12/19 Integrate Metis Models

12/16 Integrate GIS info

12/26 Write Extra Material

1/2 Draft Review

1/9 Update

1/16 Final Review

1/23 Publish

1/9 Prepare Outbriefing

1/23 Present Briefing

1/30 Plan Phase 2

8/25 9/1 9/8 9/15 9/22 9/29 10/6 10/13 10/20 10/27 11/3 11/10 11/17 11/24 12/1 12/8 12/15 12/22 12/29 1/5 1/12 1/19 1/26 2/2 2/9August September October November December January February