Upload
rhoda-barber
View
212
Download
0
Embed Size (px)
Citation preview
1
Nick Yamasaki Chair, TSG-S
04 December 2008
Review of TSG-S Activities in 2008
2
1. In general, in addition to ordinary work re requirements, architecture, project management, security and OAM&P, TSG-S greatly contributed to cross-TSG discussion and coordination. (host joint meeting, lunch-time meeting, joint meeting hosted by the other group, etc)
2. Combining WG2 (Architecture) and WG5 (OAM&P) , both groups are with less participants
3. Hosted Joint Strategy Session for IMT-Advanced Initiatives, that leaded to Osaka Future Workshop
4. Input Presentation in Osaka Workshop “TSG-S System and Service Aspects” proposing drafting of Vision Document
5. Clif Barber served Secretary for the Workshop6. TSG-S 3GPP2 Vision Ad-Hoc reactivated by direction from SC7. UMB-1 Release Guide8. WG1/3 met, but WG2/4 did not meet in September9. Number of new Work Items proposal decreasing10. WG4 published 9 documents in spite of limited resources
TSG-S (Overview)
3
1. Stage1 / SRD Publication : 31 DocsS.R0006-000-A v2.0 Wireless Features Description (3 Docs) S.R0106-A v1.0 Packet-Switched Video Telephony - Stage 1 S.R0125-000-0 v1.0 VoIP Supplementary Services Descriptions (21 Docs)S.R0126-0 v1.0 System Requirements for Femto Cell SystemsS.R0128-0 v1.0 HRPD and WiMAX Inter-Technology Handoff - Stage 1 Require
ments S.R0129-0 v1.0 HRPD/1xRTT and 3GPP E-UTRAN (LTE) Interworking and Inter-T
echnology Handoff - Stage 1 RequirementsS.R0130-0 v1.0 Interworking and Inter-Technology Handoff for UMB and UTRA/
E-UTRA Technologies - Stage 1 Requirements
S.R0131-0 v1.0 IMS Centralized Services - Stage 1 Requirements S.R0136-0 v1.0 System Requirements for MSC Pool
WG1 (Chair : Alex Gogic)
4
2. SC Level Document Publication : 2 Docs - SC.P4004-0 v1.0 UIM ID Manufacturer’s Code Assignment Guidelines an
d Procedures - SC.P4002-0 MEID GHA Assignment Guidelines and Procedures
3. Working on - Joint Discussion re Femto Equipment ID with WG4 - Correspondence with CDG ETO re FEID - V&V disposition : S.R0126 Femto Cell SRD
S.R0106-A PSVT Stage 1 S.R0006-A Parts 000, 807, 808 - Coordination for collaboration with OMA re Device Management - Coordination with TR45.8 for Clarification of Document Status
WG1
5
3. Other Activities - WG1 Hosted Joint Meetings - Moving Forward with MEID and EUIMID due to ESN Exhaust - Joint Meeting with TSG-C on Femto Cell issue - Joint Meeting with TSG-C on UMB Enhancement - Joint Meeting to address Emergency Callback
- Other TSG Hosted Joint Meetings - Joint meeting re Femto Architecture hosted by TSG-X - Joint meeting re Common IMS Issues hosted by TSG-X MMD - Joint TSG Femto AdHoc hosted by TSG-X ERA - Joint meeting re IMS Centralized Services hosted by MMD
- Preparation of Presentation on Common IMS Requirements Overview for submission to the 3GPP/3GPP2 Workshop on Common IMS
- Common IMS Requirements input to 3GPP SA/SA1 - Contribution to TSG-S Presentation in Osaka Workshop - Coordination with TIA TR45.8 - Document Status Table
WG1
6
1. Combined with WG5 since May 2008 Co-Chairs : Scott Marin (Architecture) Randy Scheer (OAM&P)
2. Specifications/Reports Publication : 3 Docs
S.R0124-0 v1.0 Ultra Mobile Broadband Network Architecture ModelS.S0028-D v1.0 OAM&P for cdma2000 (Overview, 3GPP R7 Delta Specificatio
n, 3GPP2 Network Resource Model IRP)S.S0093-0 v3.0 cdma2000 Network Performance Measurement Types
WG2
7
3. Other Activities - Co-host joint TSG Femto Cell AdHoc meetings - Progress and synchronize a working version of the S.R0135(Femto NAM) bas
ed on PDS discussion consensus - Joint Development with TSG-X MMD on S.P0137-0 Common IMS Impact to
3GPP2 Specifications - OAM&P Specifications Development aligned with Femto NAM and UMB
NAM Development - Much of the O&M work handled via conference calls - Recommended WG5 meeting contributions be frozen from further update, b
ut should be retained, not be deleted - So-called Consultant for other TSGs in terms of OAM&P
4. Working on- UMB NAM
- Femto NAM - Common IMS Impacts to 3GPP2 Specifications - All-IP NAM - OAM&P related specifications
WG2
8
1. Work Items Processed 15 New Work Item Worksheets ( 3GPP2-00207 ~)
2. SC Level Document Publication : 5 Docs
SC.R1005-0 v1.0 3GPP2 Drafting RulesSC.R1002-0 v3.0 Publication Numbering GuidelinesSC.R2005-002-0 v1.0 System Release Guide for the UMB-1 Release
of the cdma2000 System SpecificationsSC.R2005-002-0 v2.0 System Release Guide for the UMB-1 Release
of the cdma2000 System SpecificationsSC.R2005-002-0 v3.0 System Release Guide for the UMB-1 Release
of the cdma2000 System Specifications
WG3 (Chair : Eileen McGrath)
9
3. Other Activities - Lunch-time Meeting
- Release Planning for UMB-1 Release Docs (4 times )- Drafting Rules - 3GPP2 Vision Document- Revision of SC.P1002 to codify Multi-part documents revision practice
- Release Planning
- Contributed to TSG-S Presentation in Osaka Workshop - 3GPP2 Vision Document Outline Work started from WG3 - Steady Activity for Work Planning together with PMT Manager - TSG-S PMT sponsored teleconference on UMB-1 Release - Guardian for “Rules” and “Procedures” - Mediator for other TSGs
WG3
10
1. Document Publication : 9 Docs
S.S0055-A v4.0 Enhanced Cryptographic Algorithms
S.S0078-A v4.0 Common Security Algorithms S.S0078-B v1.0 Common Security Algorithms S.S0086-B v2.0 IMS Security Framework S.S0109-0 v2.0 Generic Bootstrapping Architecture (GBA)
Framework S.S0109-A v1.0 Generic Bootstrapping Architecture (GBA)
Framework S.S0114-0 v2.0 Security Mechanisms Using GBA S.S0114-A v1.0 Security Mechanisms Using GBA
S.S0127-0 v1.0 CAVE Based IMS Security
WG4 (Chair : Anand Palanigounder)
11
2. Other Activities - Very Active in Joint Discussion with other Groups - TSG-X MMD and TSG-X ERA on Common IMS and Femto architectures - TSG-X PDS and TSG-A to review security architecture for UMB-HRPD inter-
working - TSG-X MMD/TSG-S joint meeting on Common IMS - TSG-X PDS to help progress some of the outstanding issues with respect
to eHRPD security architecture - Coordinate the further development 1x femto security architecture with
TSG-X MMD - TSG-S WG1 on Femto Equipment Identifier (FEID) - TSG-C WG2.2 to review the proposed changes in C.S0067-A(HRPD secu
rity)
- Working on - HRPD Security - Femto Security, including Femto AP authorization (FEID Format)
WG4
12
- C.P5003-0 3GPP2 Vision for 2009 and Beyond - Chair : Jane Brownley Vice Chair : Clif Barber Editor : Eileen McGrath - The Ad-Hoc work started in August and met on Monday and Tuesday ev
enings 5:00-7:00PM. - One Conference Call held in November. - The latest meeting was held 6:00-8:00AM on Monday, 1st December
2008! ( 7 companies , 15 persons ) - Major Contributions : LGT, ALU, Qualcomm, KDDI - Now in TSG Review by 13 February 2009 - Comment Resolution : 16 February 2009 - To be input to SC Meeting in Shanghai in Feb. - To identify future target areas for 3GPP2
3GPP2 Vision Ad-Hoc
13
I greatly appreciate Vice Chairs, Secretary, WG/Ad-Hoc Chairs and all the participants
in TSG-S for continuous support!
and
Thanks for Sponsoring TSG-S Team Building next year, in advance!
Merry Christmas & Happy New Year!
Nick Yamasaki, TSG-S Chair
Many Thanks !