MINING PLANwith progressive mine closure plan

(Submit under Rule 3L(1) & 3H of G.M.M.C.R., (Amended 25/02/2015)

of

ORDINARY SAND QUARRY LICENSE

QUARRY LEASE NO.

MINERAL – ORDINARY SAND

AREA – 9.90 HECTARE

NEAR VILLAGE - VADA,

TALUKA- KANKREJ, DIST.- BANASKANTHA

(GUJRAT)

APPLICANT

Shri Amaratlal Veerchand NaiR/o- At & Post- Shihori, Taluka- Kankrej,

Dist.- Banaskantha (Guj.)

PREPARED BYNimish Singhwi (Mining Engineer & RQP)

Reg. No. RQP/UPD/247/2003-A, Renewed up to 24/07/201715, New Glass Factory Colony Sunderwas, Udaipur-313001

Tel. No. 0294 – 2492060, 94141-10360

Page 3: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

2

INTRODUCTION

This Quarry lease Ordinary Sand of 9.90 Hect has been granted in favour of

Shri Amaratlal Veerchand Nai R/o- At & Post- Shihori, Taluka- Kankrej,

Dist.- Banaskantha (Gujrat) for 3 years.

Mining plan with progressive mine closure plan is submitting under Rule 3L (1)

& 3H of G.M.M.C.R., (Amended 25/02/2015).

The Quarry lease area (Q.L. No. ) measuring 9.90 Hect is situated in Govt.

Land of revenue located it Banas River bed, village- Vada, Taluka- Kankrej,

Dist.- Banaskantha (Gujrat).

Page 4: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

3

Chapter 1: GENERAL

a.) Name of lease holder and Address:-

Shri Amaratlal Veerchand Nai

R/o- At & Post- Shihori, Taluka- Kankrej,

Dist.- Banaskantha (Guj.)

Email- Not Available

Phone no.- NA

Fax No. NA, Mobile No. NA

b.) Status of Applicant:- An Indian Individual

c.) Mineral(s) which is/are included in the prospecting license (for fresh

grant) – Not Applicable.

d.) Mineral(s) which is/are included in the letter of Intent/lease deed-

Ordinary Sand

e.) Mineral(s) which Applicant Intends to Mine:- Ordinary Sand

f.) Name and Address of the Recognized Person

Nimish Singhwi,

Mining Engineer & RQP

Reg. No. RQP/ UDP/247/2003-A;

Renewed up to 24.07.2017

15, New Glass Factory Colony,

Sunderwas, Udaipur (Raj.)

Mobile No.: 94141-10360,

Phone no.-0294-2492060, Fax No.- 0294-2492060

Email: - [email protected]

Page 5: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

4

Chapter 2.0 LOCATION AND ACCESSIBILITY

a) Location of Lease:-

Pillars Latitude LongitudeA 23057’58.3” 71052’32.9”B 23057’49.3” 71052’43.2”C 23057’45.4” 71052’40.3”D 23057’48.0” 71052’26.3”

b) Details of QL area with location map:Table no.1: Details of the QL area

Forest Non- forestForest (specify) Area (ha) Area (ha)Nil Nil (i) Govt. land 9.90 (River bed)

(ii) Grazing land Nil(iii) Agriculture land Nil(iv) Others (specify) Nil

QL area : 9.90 HectDistrict & State : Banaskantha & GujratTaluka : KankrejVillage : VadaType of QL area : Non forest land

Whether the area falls under Coastal Regulation Zone (CRZ):-No

Existence of public road/railway line etc..:-

InfrastructureNearest Railway- Patan

Police station- Kankrej

Post Office- Kankrej

Medical Facilities- Vada

Education Facility primary school is available Vada Village and Senior Secondary at

Kankrej.

Mode of Transport of Mineral – Dumper/Truck/Tractor

(c) General location map showing area and access routes have been

attached:- Plate No. 2

Page 6: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

5

Chapter 3: GEOLOGY AND RESERVES

The fieldwork comprising of topographical survey and geological mapping and

data collection was done in phases. The contouring for the QL area was

undertaken. The mineral & the other prominent features of the area were also

marked.

a) Detail description of the topography, drainage pattern, vegetation,

climate, and rainfall data:

Topography:- Topographically the QL area comprises Riverbed which are

moderately any one.

Vegetation:- The vegetation is sparse with bushy and small trees outside

Quarry area.

Climate:- The area experiences wide temperature variation of as high as 400 to

420 C in summer and 100 to 150 C in winter.

Rainfall data:- The average rainfall in this area is average, and it hardlyexceeds 500-550mm.

Table no.2: Adjoining Villages (with aerial distances in Km)Towards NW Vada About 4.5 KmTowards W Tana About 4.5 KmTowards SE Amblun About 2.5 KmTowards SE Thali About 2.9 KmTowards N Balochpur About 3.2 KmTowards NE Ruppura About 1.3 Km

b) Regional Geology: Named after the Banas River. The Banaskantha district

occupied the area of 12,702 Sq. Km. The district lie in the northwestern part of

Gujrat state. To the north of this district lies Rajasthan state. On the south it is

bounded by Mehsana District and west Kachchh district.

The Regional Geology of the Banaskantha District is given below:-

Page 7: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

6

Age Supergroup group Formation Rock Type

Holecene

Ran clay formation Tidal flood depositsVarahi and katpurformation

Flood plane andchannel-feel deposits

Akhaj and juntralformation

Sand sheet and dunedeposits

Rann formation Run clay mud deposits

LowerPleistocene

Porbandargroup

Milliollite formation Calcareous gritsandstone, siltstone ,grapestone,conglomerate, ooliticlimestone

Miocene

Gaj formation Shelly limestone,foraminiferal limestone,marl, Calcareoussandstone, vanegatedclay and conglomerate

CretaceousBhuj Formation Burrowed sandstone,

clay, ferruginoussandstone,

UpperJurassic to

lowerCretaceous

Katrol Formation Burrowed sandstone,ferruginous sandstone,mottled clay,Foraminiferal Sandstone

Upperproterozoic

Intrusive body

Malani, Igneous Suite Rhyolite porphyry

Jalor graniteErinpura Granite

Granite and Granitegneiss

Lower toMiddle

proterozoic

DelhiSupergroup

Sirohi GroupReodar formation Mica schist, phyllite,

calcitic marble

Giyapura formationBiotite schist andmigmatite

Intrusive body

Sendra-Ambaji- graniteand gneiss

Granite and Granitegneiss

Phulad Ophiolite Suite

Epidirorite,hornblendeschist,amphibolite, pyrogenegranulite and gabbro

Kumbhalgarhgroup

Todgarh/Basantgarhformation

Marble, Biotite schist,QuartziteCalc-gneiss, calc-schist,calc-biotite schist

Page 8: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

7

Local Geology

Recent formations are fluvial sand. This sand is developed in bank of BanasRiver.

Group System Rock Type

Quaternary Recent and sub Recent Soil, Alluvium, Fluvial Sand

The sand deposition of Kankrej Taluka is mainly due to the flood of Banas River.

c) Detail description of geology:-

Ordinary Sand is found in the Banas River bed. Having a thickness of sand is

3.0m. This bed is presently dry and water flows only during the rainy season.

River flow NE to SW direction.

d) Details of pit/ Trench already carried out:-

Nil

e) The Surface Plan of the QL area has been prepared on a scale of 1:2000

with contour interval of maximum of 10meter depending upon the

topography and size of the area duly marked by grid lines showings all

features indicated:- Attached plate No. 4

g) The base Map for Surface Geological plans & Geological section has been

prepared on the scale of 1:2000:- Attached as plate No. 4

h) Detailed Calculation of Reserves:-

(i) The project proponent shall strive to adopt zero waste mining concepts by

reducing the quantum of reject through technological innovation or finding its

use through perspective buyer.

(ii) The depth of proved category is taken 3m.

Page 9: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

8

Proved Reserve –

Table: Proved ReservesMineralized

zoneArea (m2)

Depth(m)

MineralVol.(m3)

Bulk Den.MT/m3

MineralSand(MT)

99000 3 297000 2.68 795960Total 795960

Page 10: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

9

Chapter 4: MINING

a) Briefly describe the existing as well as proposed method for excavation

with all design parameters indicating on plans /sections:-

Proposed Mining Method:- Extraction of sand will be done through loading

by JCB. Mineral will be removed in 1-3 m layer only forming in one slice

/strips. Mineral will be loaded in Trucks/Dumper/Tractor.

Bench will advanced parallel to the banks of the River. Height of slices /strips

will be 1-3m, Mining activities will be carried out in a manner so that there is

no obstruction to the movement of water flow and Roads in the QL area for

movement of the Trucks/Dumper/Tractor after minerals loading will be towards

both sides through approach roads connecting to tar roads. No mining will be

done in rainy season. No Ordinary sand mining shall be done within 500m

meter distance from any irrigation dams (check dams), French wells, erosion

structure and bridge on national Highway.

The slice /strips Parameters shall be for mineral 1. Height – 1-3m

2. Width - width shall be more than the

bench height or 3 times of widest m/c

used.

(b) Proposed year wise development for next three years

First Year - During the first year of Mining Plan the Lessee will excavate one

slice /strip of (R.L. 81-79) shall be advance in the northwest direction. About

139590 MT Ordinary Sand shall be excavated.

Table No.6 a: slice /strip wise Ordinary Sand excavation along sectionAt

Sectionslice /strip

at R.L.Length

X Width(m2)

Depth(m)

TotalExcavation

m3

Sp.Gr.MT/m3

TotalMineral Sand

(MT)

PP'QQ' 81-79 26043 2.00 52086 2.68 139590TOTAL 139590

Page 11: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

10

Second Year - During the second year of Mining Plan the Lessee will

excavate one slice /strip of (R.L. 81-79) shall be advance in the southeast

direction. About 139590 MT of Ordinary Sand shall be excavated.

Table No.6 b: slice /strip wise Ordinary Sand excavation along sectionAt

Sectionslice /strip

at R.L.Length

X Width(m2)

Depth(m)

TotalExcavation

m3

Sp.Gr.MT/m3

TotalMineral Sand

(MT)

PP'QQ' 81-79 26043 2.0 52086 2.68 139590TOTAL 139590

Third Year - During the third year of Mining Plan the Lessee will excavate

one slice /strip of (R.L. 81-79) shall be advance in the southeast direction.

About 139590 MT of Ordinary Sand shall be excavated.

Table No.6c: slice /strip wise Ordinary Sand excavation along sectionAt

Sectionslice /strip

at R.L.Length

X Width(m2)

Depth(m)

TotalExcavation

m3

Sp.Gr.MT/m3

TotalMineral Sand

(MT)

PP'QQ'RR' 81-79 26043 2.0 52086 2.68 139590TOTAL 139590

Table No.7: Year wise production of mineralsYear Total

tentativeexcavation

(MT)

Topsoil

(MT)

ROM (MT) Ore/ WasteRatioOre

(Ordinary Sand)(MT)

Subgrade(MT)

First year 139590 -- 139590 -- 1:0Second year 139590 -- 139590 -- 1:0Third year 139590 -- 139590 -- 1:0

Total 418770 -- 418770 --

c) Salient features of working:-

The mining method shall be open cast Semi-Mechanized mining.

The faces would be advanced in all directions. The slice /strip shall be taken 1-

3m height. Haul road & slice /strip ramp shall be made of 1 in 16 gradient & the

width of the road shall be more than 6m. The loading shall be done by JCB in

the Trucks/Dumper/Tractor. The mineral is soft in nature & directly dig gable

so no drilling & blasting is required.

Page 12: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

11

c) Utilization of mineral:- Sand will be used in construction, Buildings,

Bridges and other infrastructure.

d) Plantation Proposals

Native plants like Neem, Pipal, Mango and other local species will be planted

near the River. A suitable combination of trees that can grow fast and also have

good leaf cover shall be adopted to develop the greenbelt. It is proposed to 200

plants per year of native species along with some fruit bearing and medicinal

trees during the plan period outside of the lease area.

Programme for Plantation

Sr.No.

Year ofPlantation

Target ofPlantation

Assumedsurvival

Replenishmentof Casualties

Total

1 First year 200 160 -- 1602 Second year 200 160 40 2003 Third year 200 160 40 200

e) Extent of Mechanization- Initially Dumper/Trucks/Tractors will also

arrange on hire basis. Later the applicant will go for own mechanization.

The mining method shall be open cast Semi-mechanized mining.

(i) Loading Equipment

Type Nos Bucket Capacity inCu. m.

Make MotivePower

H.P.

JCB /Excavator 2 0.5 M3 Escort Diesel 76HP

(ii) Haulage and Transport Equipment

a. Haulage within the QL hold

Type Nos Make Motive Power

Dumper/Trucks/ Tractors 8 Ashok Leyland Diesel

Where the Dumpers are fitted with exhaust conditioner should be indicated

Page 13: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

12

b. Transport from mine head to the destination

The mineral produced from the pit shall be first brought at a spot outside the pit by

JCB /Excavator, The excavated mineral directly loaded into the trucks & dumper by

excavator for it onwards transportation.

(iv) Miscellaneous Operations

a. Operations:- A Miscellaneous operations like maintenance of haul and access

roads, dust suppression by water spraying field etc. shall be done.

b. Machineries Deployed

Type NOS SizeCapacity

Make MotivePower

H.P.

Water tanker with sprinklerarrangement with tractor

1 5000liter Local Diesel engine

Page 14: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

13

Chapter 5: DRAINAGE PATTERN

a) Minimum and maximum depth of water table based on observations

from nearby wells and water bodies:-

The Ground water table is 7m (in rainy season) to 10m (in Dry Season).

b) Indicate maximum and minimum depth of Workings:-

The working level in next three year is likely to reach 3m, so it is not likely to

touch the Ground water table in dry season.

c) Quantity and quality of water likely to be encountered, the pumping

arrangements and places where the mine water is finally proposed to be

discharged:-

There is scarce chance of this water entering into the Pits. If rainwater do get

collected in pits and remain there for a considerable period of time, it takes

about two to three months to percolate down the ground. Normally work at

bottom of the pit remains suspended in the months following the rains.

d) Described regional and local drainage pattern also indicate annual rain

fall, catchments area, and likely quantity of rain water to flow through the

QL area:-

General topography of the QL area is comprises river bed which is moderately

any one. Area is having 500-550mm rainfall all in a year. During rainy season,

catchment water flows in the river. During dry period the Sand is excavated

which gets replenished to some extent during the rainy period. No mining

activates will be carried out during rainy season.

Page 15: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

14

Chapter 6. STACKING OF MINERAL REJECTS/SUB GRADE

MATERIAL AND DISPOSAL OF WASTE

During the mining of Some Cobbles shall also in QL area with Ordinary sand.

The Cobble shall again put in the River bed. So No dump external Dump is

proposed.

The project proponent shall strive to adopt zero waste mining concepts by

reducing the quantum of reject through technological innovation or finding its

use through perspective buyer.

Page 16: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

15

Chapter 7: USE OF MINERAL

Ordinary Sand is used in construction of Buildings, Bridges and other

infrastructure.

Page 17: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

16

Chapter 8: OTHER

Describe briefly the following

a) SITE SERVICES

Water SupplyWater supplied used for mining work, spraying, watering the plants and drinkingpurposes.

First AidPrimary First aid facility is proposed at the mine office.

Mine officeTemporary mine office is proposed outside the Quarry lease area.

Rest ShelterTemporary rest shelter is proposed outside the Quarry lease area.

Latrines and UrinalsMoveable urinal and latrine are proposed outside the Quarry lease area.

b) EMPLOYMENT POTENTIAL

The mine owner shall employ Mine official (Mines Manager, Forman) in accordance with

the provision of the MMR 1961 & Mining engineer under MCDR 88. The workers to be

employed shall be semi-skilled and unskilled. Most of them will come from the nearby

villages. With the increase in the production additional man power shall be required.

Considering the Semi-Mechanized mining the organizational set up proposed is given

below:

Mines Manager - 1

Mines Mate/Mines Foreman - 1

Watchmen - 1

Skilled Labours - 3

Unskilled Labours - 7

The labour manpower will be engaged on contractual basis as and when required.

Page 18: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

17

CHAPTER 9.0 ENVIRONMENT BASE LINE INFORMATION

The QL area is characterized by the typical topography having moderately any

one. The land use pattern is given in the following table:-

Table: Existing Land use pattern within the QL AreaSr. No. *All the areas are given in Hectares Govt. Land Total

1 Pits & Quarries ---- ----2 Top soil Dump ---- ----3 Dumps ---- ----4 Stack Yard ---- ----5 Sub Grade stack Yard ---- ----6 Infrastructure ( Work shop, administrative Building) ---- ----7 Roads ---- ----8 Railway ---- ----9 Green Belt ---- ----

10 Tailing Pond ---- ----11 Effluent Treatment Plant ---- ----12 Mineral Separation Plant ---- ----13 Township ---- ----14 Non Utilized 9.90 9.90

Total 9.90 9.90

9.1.1 Water regime and presence of water reservoir- The average rainfall is

500-550mm. The Ground water table is 7m (in rainy season) to 10m (in Dry

Season). The nearest sources of drinking water are wells from where the potable

water is fetched and stored.

9.1.2 Quality of Air, ambient noise level and water:-

The source to pollute air shall be the generation of dust and machinery

undertaking the semi-Mechanized mining operation. But the level of dust

concentration shall be practically of very low order.

9.1.3 Flora & Fauna: -

No Flora & Fauna exist in the Quarry lease area.

Page 19: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

18

9.1.4 Climatic condition

The area experiences wide temperature variation of as high as 400 to 420 C in

summer and 100 to 150 C in winter. The avg. Rainfall is 500-550mm Most of the

rain falls during the period of July to September.

9.1.5 Human settlement

The population in and around this area is very thin. The nearest human

settlement area is the various village having population is shown in plate no. 1,

is enclosed.

The adjoining villages are:

Sr. No. Village Population Distance from QL Area1. Vada 450 About 4.5 Km2 Tana 400 About 4.5 Km3 Amblun 550 About 2.5 Km4 Thali 700 About 2.9 Km5 Balochpur 450 About 3.2 Km6 Ruppura 250 About 1.3 Km

9.1.6 Public Building, Places of Worship and Monument:-

No Public Building, National Monument, place of Worship, Sanctuary,

National Park, exists 500m radius in and around the Quarry lease area.

9.1.7 Indicate any sanctuary is located in the vicinity of QL hold:-

No National Park/sanctuary falls within 10Km. of the Quarry lease area.

9.2 Impact Assessment:-

Impact of mining activities on the environment will be both biotic and abiotic:

9.2.1 Land area:-

As a result of mining activities there shall be less effect on present landscape.

Page 20: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

19

9.2.2 Air Quality: - The source to pollute air is the generation of dust and

machinery undertaking the semi-mechanized mining operation. But the level of

dust concentration is practically of very low order.

Approach road shall be sprinkled with water at regular intervals for controlling

fugitive emission during vehicular movement.

Speed of vehicles shall be restricted below 20Km/hour on Kaccha Roads in

order to control fugitive emissions.

Vehicles shall not be overloaded and sand transportation shall be done only

through covered trucks so that no spillage of sand takes place.

Vehicles used in mining and transportation shall be maintained well so as keep

Vehicular emissions in control.

Ambient air quality shall be monitored at site and the nearest human habitation

and it shall conform to the norms prescribed by MoEF, Govt. of India.

9.2.3 Water Quality:- The mineral produce are not likely to pollute the water

quality by any way.

The Depth of excavation/Mining shall be restricted to 3m or water level at site,

whichever is less.

The project proponent shall obtain necessary of the competent authorities for

withdrawal of requisite quantity of water required for the project.

Necessary arrangement shall be made at stockpiles to prevent silt and sediments

flowing into water body.

Domestic waste water if any generated at site should be disposed off through

septic tank-soak pit.

Water shall be required in mining to cater for drinking purposes, dust

suppressing at faces and on haul roads, and plantation. Total water requirement

in the mine will be about 2.0-3.0KLD for drinking, spraying and plantation.

Page 21: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

20

9.2.4 Noise Level:- Generation of noise is practically under limit.

Noise level in and around the Quarry License area shall be kept well within the

standard by providing noise control measure including Engineering control like

acoustic insulation, hoods, silencers, enclosures etc. on all sources of noise

generation Ambient noise level shall conform to the standards prescribed under

the Environment (Protection) Act & Rules, 1986.

9.2.5 Water Regime:- The average rainfall in the area is low it’s hardly exceeds

500-550mm. The Ground water table is 7m (in rainy season) to 10m (in Dry

Season). In river it is 5m-7m. The nearest sources of drinking water are wells

from where the potable water is fetched and stored.

9.2.6 Surface subsidence :-

Mining method is proposed is open cast semi-mechanized mining.

9.2.7 Socio-Economics:- by having an economic activity near the villages, the

socio and demographical profile of the local habitants will get positive impact,

by direct and indirect jobs.

9.2.8 Historical Monuments: No historical monument 500 m radiuses or

building is present in the Quarry lease area.

Page 22: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

21

CHAPTER 10.0 PROGRESSIVE MINE CLOSURE PLAN

The Proposals of the Progressive Mine Closure are based on the Geology and

Topography of the region, are given below:

Mined Out Land

Table: Mined Out Land (Hectare)Particular Present At the end of Mining

PlanAt the end of Life ofMine

Broken Up Area Nil 7.8131 NilBack Filled Area Nil Nil NilWater Reservoir Nil Nil NilReclaimed Area Nil Nil Nil

*All the area are in Hectare

Land Use Pattern-

The present land use pattern is as indicated in the following Table:-Table: Present land use pattern

Sr. No. *All the areas are given in Hectares Govt. Land Total

1 Pits & Quarries ---- ----2 Top soil Dump ---- ----3 Dumps ---- ----4 Stack Yard ---- ----5 Sub Grade stack Yard ---- ----6 Infrastructure ( Work shop, administrative Building) ---- ----7 Roads ---- ----8 Railway ---- ----9 Green Belt ---- ----

10 Tailing Pond ---- ----11 Effluent Treatment Plant ---- ----12 Mineral Separation Plant ---- ----13 Township ---- ----14 Non Utilized 9.90 9.90

Total 9.90 9.90

Land reclamation & Tree plantations:- There shall be No reclamation

proposed. The plantation shall be plant on the banks of the river.

Page 23: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

22

Proposed Land pattern during next three years

Table: Proposed Land use pattern during next three yearsSr. No. *All the areas are given

in HectaresGovt. Land Total

1 Pits & Quarries 7.8131 7.81312 Top soil Dump ---- ----3 Dumps ---- ----4 Mineral Stack Yard ---- ----5 Sub Grade stack Yard ---- ----6 Infrastructure (Work shop, administrative

Building) ---- ----

7 Roads ---- ----8 Railway ---- ----9 Green Belt ---- ----

10 Tailing Pond ---- ----11 Effluent Treatment Plant ---- ----12 Mineral Separation Plant ---- ----13 Township ---- ----14 Non Utilized 2.0869 2.0869

Total 9.90 9.90

Disaster Management and Risk Assessment

The proposed workings are by opencast Semi-Mechanized mining method. There are

not expected high risks accidents like land slide, subsidence, fire, seismic activities

etc. if any in case of accident a well-equipped First Aid station shall be available at

mine site for giving first aid to injured persons.

Care and Maintenance during Temporary Discontinuance

In case of temporary discontinuance of work, the mine workings will be in the watch

of the Security Guard employed for the purpose. Before entering the labour into mine

workings or faces during the resumption of work, the workings and faces are proposed

to be inspected by Authorized person.

Page 24: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

23

CHAPTER 11.0 FINANCIAL ASSURANCE

Financial Assurance/Surety may be submitted to Asst. Geologist, Banaskantha, before

execution of Quarry lease agreement, as per Rule 3K of G.M.M.C.R., (Amended

25/02/2015).

Date :-Place:- Udaipur

Nimish SinghwiRQP. NO. RQP/UDP/247/2003-A

Renewed up to 24.07.2017

Page 25: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

24

Shri Amaratlal Veerchand Nai

R/o- At & Post- Shihori, Taluka- Kankrej, Dist.- Banaskantha (Guj.)

CONSENT LATTER/UNDERTAKINGS/CERTIFICATE FROM THEAPPLICANT

1. Mining Plan in respect of Vada Ordinary Sand Mine (Q.L. No. ) located at

Banas Riverbed over an area of 9.90Hect. Under Rule 3L (1) & 3H of

G.M.M.C.R., (Amended 25/02/2015) has been prepared by RQP Shri Nimish

Singhwi, RQP No. RQP/UDP/247/2003-A.

I request the “The Assistant Geologist, Banaskantha (Gujrat).” to make

further correspondence regarding any regarding of Mining plan/scheme of

Mining with the said recognized person at his following address:

Nimish Singhwi,

Mining Engineer & RQP

Registration No.: RQP/UDP/247/2003-A;

Renewed up to 24.07.2017

15, New Glass Factory Colony,

Sunderwas Udaipur (Raj).

Mobile No.: 94141-10360

Email- [email protected]

We hereby undertake that all modification/updating as made in the said

Mining plan with progressive mine closure plan by the said recognized person

be deemed to have been made with our knowledge and consent and shall be

acceptable on us and binding in all respects.

2. It is certified that the Progressive Mine Closure Plan of Ordinary Sand mine

located at Banas Riverbed of Shri Amaratlal Veerchand Nai over an area of

9.90 Hect complies, with all statutory Rules, Regulations, Orders made by the

Central Government or State Government, Statutory organizations, Court etc.

Page 26: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

25

which have been taken into consideration and Wherever any specific

permission is required, the Applicant will approach the concerned authorities.

The information furnished in the Progressive Mine Closure plan is true and

correct to the best of our knowledge and records.

3. The provisions of mines Act, Rules and Regulations made there under have

been observed in the Mining plan over an area of 9.90Hect belonging to

Ordinary Sand Mine and where specific permissions are required the applicant

will approach the D.G.M.S. Further standards prescribed by D.G.M.S. in

respect of miners’ health will be strictly implemented”

Date :-Place:-

Amaratlal Veerchand NaiR/o- At & Post- Shihori, Taluka-

Kankrej, Dist.- Banaskantha (Guj.)

Page 27: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

26

NIMISH SINGHWI Mobile: 094141-10360 (M)Mining Engineer & RQP 099298-43552 (M)

[email protected]

Mining & Environmental Consultant____________________________________________________________________________________________________________

Address: 15, New Glass factory colony, near AIM computer,Udaipur (Raj.)- 313001

CERTIFICATE FROM RQP

The provisions of Rule 3L (1) & 3H of G.M.M.C.R., (Amended 25/02/2015)

have been observed in the preparation of the Mining Plan with progressive mine

closure plan for Ordinary Sand mine (Q.L. No. ) located at Banas River bed over an

area of 9.90 hect of Shri Amaratlal Veerchand Nai R/o- At & Post- Shihori,

Taluka- Kankrej, Dist.- Banaskantha (Guj.) State and whenever specific permissions

are required, the applicant will approach the concerned authorities of Assistant

Geologist, Banaskantha (Guj.).

The information furnished in the Mining plan with progressive mine closure

plan is true and correct to the best of our knowledge.

Place:Date: Udaipur

Nimish Singhwi,Mining Engineer & RQP

RQP No. RQP/UDP/247/2003-A

Page 28: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

27

Page 29: 1 MINING PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 MINING PLAN with progressive mine closure plan (Submit under Rule 3L(1) & 3H of G.M.M.C.R.,

28