MfDR Community of Practice MfDR Community of Practice First Annual Meeting – Africa First Annual Meeting – Africa
RegionRegion
Report of the SHIPDET Program Report of the SHIPDET Program
Africa – Asia Pacific CoP Experience and Africa – Asia Pacific CoP Experience and Possible LinkagesPossible Linkages
By: Mbayani SaruniBy: Mbayani SaruniMinistry of Planning - TanzaniaMinistry of Planning - Tanzania
December 12th, 2007: Jinja Uganda
22
SHIPDET ReportSHIPDET Report
• CoP-MfDR Asia-Pacific region has a well established training program on M&E called the Shanghai International Program for Development Evaluation (SHIPDET)
• Objective: to enhance the M&E capacity of CoP – MfDR members
• Held twice a year (spring and fall) for three years• Target group:
– Spring program focus on Chinese participants– Fall program targeting Asian-Pacific CoP members, with few
from outside the region
• First participants from outside the region to participate
33
Program ComponentsProgram Components
Three components:• Intensive training on the establishment of
results-based M&E system; • Field trip and video conference on real
case studies of results-based evaluation in the Zhejiang Multicities Development Project, supported by the World Bank; and Suzhou Creek Project in Shanghai supported by Asia Development Bank (ADB)
• CoP-MfDR Asia Pacific Annual Meeting
44
The Training ProgramThe Training Program
• Second intake: Was held at AFDC from 22Second intake: Was held at AFDC from 22ndnd October October to 3to 3rdrd November 2007 November 2007
• Nearly 60 participants from 19 countriesNearly 60 participants from 19 countries• Purpose: Purpose: to study, and discuss globally-recognized to study, and discuss globally-recognized
M&E theories and methodologies, and to share M&E theories and methodologies, and to share experiences.experiences.
• Resources persons were drawn from different Resources persons were drawn from different institutionsinstitutions
• Some of the topics covered:Some of the topics covered:– Ten steps to build “Result -Based M&E system”;Ten steps to build “Result -Based M&E system”;– The role of evaluation; and The role of evaluation; and – Different models to conduct and report evaluation data Different models to conduct and report evaluation data
and findings.and findings. • Accompanied with case studies, some of which were Accompanied with case studies, some of which were
practical (practical (Zhejiang Multicities Development Project)Zhejiang Multicities Development Project)
55
2. The Legal Framework2. The Legal Framework
• Visited WB-Financed Zheijiang Multi-city Visited WB-Financed Zheijiang Multi-city Development Project in Hangzhou, the capital Development Project in Hangzhou, the capital city of Zheijiang province city of Zheijiang province
• Aim: Aim: to get a feel for the actual process of to get a feel for the actual process of project design, plan, implementation, project design, plan, implementation, monitoring and evaluation processesmonitoring and evaluation processes
• 8 Components including water treatment plant 8 Components including water treatment plant and road constructionand road construction..
• All the project components were successfully All the project components were successfully implemented and rated Satisfactory by IEGimplemented and rated Satisfactory by IEG
• Discussion with evaluators (IEG) in Washington Discussion with evaluators (IEG) in Washington through video conference about _ among through video conference about _ among others- the evaluation methodologies usedothers- the evaluation methodologies used
Field VisitField Visit
66
CoP- MfDR Asia-Pacific Region CoP- MfDR Asia-Pacific Region Annual MeetingAnnual Meeting
• This was the second Annual Meeting held after This was the second Annual Meeting held after the trainingthe training
• 18 papers were submitted from different 18 papers were submitted from different countries for discussion on the country countries for discussion on the country experience on MfDRexperience on MfDR
• Given time constraint, only 8 were presented Given time constraint, only 8 were presented and I happen to be among themand I happen to be among them
• Presented the case of MKUKUTA Monitoring Presented the case of MKUKUTA Monitoring system in Tanzania (MMS) system in Tanzania (MMS)
• Also reviewed the first year progress of CoP Also reviewed the first year progress of CoP MfDR activities since it was launched in 2006; MfDR activities since it was launched in 2006; andand
• Approved the Action Plan for 2008.Approved the Action Plan for 2008.
77
3. Mandate of the Bank (cont.)3. Mandate of the Bank (cont.)
• Strong technical and administrative personnel Strong technical and administrative personnel are key to a successful project implementation; are key to a successful project implementation;
• Strong stakeholder support is essential for a Strong stakeholder support is essential for a successful project;successful project;
• Government willingness and commitment is the Government willingness and commitment is the key; key;
• Accountability is vital;Accountability is vital;• Evaluations that are placed on a shelf provide no Evaluations that are placed on a shelf provide no
return on investment;return on investment;• The demand for evidence based data for The demand for evidence based data for
decision-making is crucial; anddecision-making is crucial; and • Need for the champion and active country Need for the champion and active country
participation: participation:
Lesson learned (replicate?)Lesson learned (replicate?)
88
• Low level MfDR capacity, varying between Low level MfDR capacity, varying between countries; countries;
• Language barriers; Language barriers; • The existence of many different M&E The existence of many different M&E
frameworks within the same agency/country; frameworks within the same agency/country; • Data/information problem: Availability, Data/information problem: Availability,
Accessibility, Timeliness, Reliability:Accessibility, Timeliness, Reliability:• Inactive country participation: some country Inactive country participation: some country
resist MfDR resist MfDR
Challenges (Common to all)Challenges (Common to all)
99
2. The Board of Governors (1)2. The Board of Governors (1)
• Capacity Building:Capacity Building: Either request to participate in Either request to participate in SHIPDET or establish M&E training centre. Two or three CoP SHIPDET or establish M&E training centre. Two or three CoP members can cross the border for the purpose of enhancing members can cross the border for the purpose of enhancing their knowledge on M&E and sharing experience; their knowledge on M&E and sharing experience;
• Dialogue on MfDR tDialogue on MfDR through which, we can learn important hrough which, we can learn important lessons on how to design and implement results-based M&E lessons on how to design and implement results-based M&E techniquestechniques– Annual Meetings Annual Meetings – Online DiscussionsOnline Discussions– Cross-PostingCross-Posting– HLF - 3HLF - 3
• South-South Cooperation: South-South Cooperation: Some countries in Asia-Pacific Some countries in Asia-Pacific region (e.g. Singapore and Malaysia) have made substantial region (e.g. Singapore and Malaysia) have made substantial progress in MfDR. South-South Cooperation is therefore progress in MfDR. South-South Cooperation is therefore needed to assist countries in developing the MfDR. needed to assist countries in developing the MfDR.
Potential for LinkagesPotential for Linkages
1010
ChallengesChallenges
• Need to get prepared for the HLF – 3 Need to get prepared for the HLF – 3 with concrete proposals on how to with concrete proposals on how to improve aid relevance and improve aid relevance and effectiveness. effectiveness.
• Note: Financial support is not the Note: Financial support is not the only means to end our problems – we only means to end our problems – we should play our role to achieve the should play our role to achieve the resultsresults
The Way ForwardThe Way Forward
1111