1 March 2012 Agenda 1.Fit Test: Chris H./Tom will review ‘fit test’ with CAD. 2.JR Field Test a) Summary of JR port calls and schedule (Bob) b) Summary of who will attend JR field test (Bob) 3.Summary of status with Yoshi and contract between IODPMI and MOHR (Chris H.) 4.Status on manual 5.Review of Pettigrew contract with IODP-MI for sea test (Tom) 6.Reserving pump from Mohr (Tom—cost) 7.Software development by Eric/Polito for T2P—update 8.Deployment plan for April 5 test (Pettigrew) 9.Remaining Tasks 10.Calendar of upcoming events

1 March 2012 Agenda 1.Fit Test: Chris H./Tom will review ‘fit test’ with CAD. 2.JR Field Test a)Summary of JR port calls and schedule (Bob) b)Summary of

Embed Size (px)

Citation preview

Page 1: 1 March 2012 Agenda 1.Fit Test: Chris H./Tom will review ‘fit test’ with CAD. 2.JR Field Test a)Summary of JR port calls and schedule (Bob) b)Summary of

1 March 2012 Agenda1. Fit Test: Chris H./Tom will review ‘fit test’ with CAD. 2. JR Field Test

a) Summary of JR port calls and schedule (Bob)b) Summary of who will attend JR field test (Bob)

3. Summary of status with Yoshi and contract between IODPMI and MOHR (Chris H.)

4. Status on manual5. Review of Pettigrew contract with IODP-MI for sea test (Tom)6. Reserving pump from Mohr (Tom—cost)7. Software development by Eric/Polito for T2P—update8. Deployment plan for April 5 test (Pettigrew)9. Remaining Tasks10. Calendar of upcoming events

Page 2: 1 March 2012 Agenda 1.Fit Test: Chris H./Tom will review ‘fit test’ with CAD. 2.JR Field Test a)Summary of JR port calls and schedule (Bob) b)Summary of

TasksTask # Action Due Owner Additional Status3.05 Manufacture T2P tips 3-Jan-12 Donnie B In Progress3.06 Calibrate T2P pressure transducers 6-Jan-12 Peter P Donnie B Overdue3.07 Pressure test T2P 13-Jan-12 Donnie B Overdue4.00 MDHDS Field test – Schlumberger (2) 4-Apr-12 Tom P4.03 Reserve wire line rental one day 22-Dec-11 Bob A In Progress4.04 Manufacture modified ERS 8-Mar-12 Dave H Chris H In Progress4.06 Develop deployment plan for testing 23-Mar-12 Tom P Coming up soon4.07-10 Delivery of components to Schlumberger 3-Apr-12 All4.11 Assemble MDHDS (on site at 9am) 3-Apr-12 Tom P Peter P, Donnie B

4.12 Lead deployment of the T2P, MDHDS, ERS, MFTM and wire line at the Genesis Rig at Schlumberger Sugarland.

4-Apr-12 Tom P

4.13 Develop labview script for data acquisition 4-Apr-12 Eric M Gerry I4.14 Direct deployment on the rig 5-Apr-12 Tom P4.15 Demonstrate the ability of the MDHDS, ERS, and MFTM to

operate as expected under field conditions5-Apr-12 Tom P

4.16 Rebuild spring compression tool 2-Apr-12 Tom P4.17 Developing a stop for lifting the tool out of bore 2-Apr-12 Tom P5.00 Deliverables 15-Apr-12 All5.01 Parts List for MDHDS (outer barrel) 29-Feb-12 Tom P5.02 Engineering Drawings of MDHDS 15-Apr-12 Tom P5.03 Parts List for MDHDS (inner barrel & tether assembly) 29-Feb-12 Peter P Donnie B Completed5.04 Parts List for T2P 29-Feb-12 Peter P Donnie B Completed5.05 Deployment Manual for MDHDS (outer barrel) 29-Feb-12 Tom P5.06 Deployment Manual for MDHDS (inner barrel & tether assembly) 29-Feb-12 Peter P Donnie B Completed5.07 Deployment Manual for T2P 29-Feb-12 Peter P Donnie B Completed5.08 MFTM Manual/Parts List 29-Feb-12 Gerry I In Progress5.09 ERS Manual/Parts List 29-Feb-12 Chris H Completed

Page 3: 1 March 2012 Agenda 1.Fit Test: Chris H./Tom will review ‘fit test’ with CAD. 2.JR Field Test a)Summary of JR port calls and schedule (Bob) b)Summary of

TasksTask # Action Due Owner Additional Status6.00 MDHDS JR Field Test 1-Jun-12 Peter F Bob A6.01 Identify personnel for testing deployment 24-Jan-12 Peter F Gerry I Completed6.02 Coordinate with Peter Blum to have rig access en route to site 1-Feb-12 Peter F In Progress6.03 Coordinate with Peter Blum medical forms and paperwork 1-Feb-12 Bob A In Progress6.04-7 Travel arrangements to Curacao 1-Feb-12 All In Progress6.08 Coordinate early exit of personnel with Peter Blum Peter F Canceled6.09 UT Deliver components to TAMU (MDHDS inner barrel, tether

assembly, T2P & tools)15-Apr-12 Peter P

6.10 LDEO Deliver components to TAMU (MFTM & ERS) 15-Apr-12 Gerry I6.11 Pettigrew Deliver components to TAMU (MDHDS outer barrel) 15-Apr-12 Tom P6.12 Yoshi payment to Pettigrew for ship time 15-Jun-12 Yoshi K7.00 Closeout TBD Peter F

Page 4: 1 March 2012 Agenda 1.Fit Test: Chris H./Tom will review ‘fit test’ with CAD. 2.JR Field Test a)Summary of JR port calls and schedule (Bob) b)Summary of

Upcoming DatesDate Event

15-Mar-12 Phone Meeting

29-Mar-12 Phone Meeting

3-5-Apr-12 MDHDS Field test – Schlumberger

12-Apr-12 Phone Meeting

26-Apr-12 Phone Meeting

10-May-12 Phone Meeting

29-May-12 Phone Meeting

1-Jun-12 MDHDS JR Field Test

1-Jul-12 Closeout