12
PAUL DUCKITT 7 Milan House Eboracum Way York Y031 7SS 07926028087 or 07917689005 PROFILE With over twenty five years in the building trade I have seen a good many changes. My sites reflect the best of these and those qualities help make for a smooth running, well thought of, happy and above all safe working environment. After a short spell in the printing industry after leaving school, I worked for fourteen years at building restoration specialists William Anelay ltd. This work took me all over the British Isles and many of these often high profile projects won awards. I joined Bullock in 2004 as a senior general foreman and after successfully completing a scheme in Wakefield with just myself and a T.L.O I was made up to Site Manager. Key Achievements Achieving one of Bullocks highest Considerate Constructor scores recently. This was achieved by rejuvenating a waste area for our site compound, recycling work material and reinstating some old toilet blocks for site use. We also installed bat and bird boxes and made good use of eco cabins. Helping to procure extra works to run alongside existing program, due to happy client. Eliminating risk of delays by imaginative programming, such as considering weather and environmental impacts. My last two schemes received a 100% tenant satisfaction score. Helping give our region a solid reputation for quality within the company. Solid health and safety record. So far in 2014 my scores are as follows. (Average) Internal H&S 99%/ External H&S 100%/ External Asbestos audit 100%. Up to date SMSTS First aider Pasma trained Asbestos Reg 4 CSCS Gold Advanced Scaffolding INTERESTS Fellwalking. I take an annual trip up to the Scottish highlands and climb Munros (mountains over 300ft) and have walked in Europe and even the Canadian Rockies. I play in a band and organise two one- day music festivals in my home town of York.

1. Main CV pics

Embed Size (px)

Citation preview

Page 1: 1. Main CV pics

PAUL DUCKITT7 Milan HouseEboracum Way

York Y031 7SS

07926028087 or 07917689005

PROFILE

With over twenty five years in the building trade I have seen a good many changes. My sites reflect the best of these and those qualities help make for a smooth running, well thought of, happy and above all safe working environment. After a short spell in the printing industry after leaving school, I worked for fourteen years at building restoration specialists William Anelay ltd. This work took me all over the British Isles and many of these often high profile projects won awards. I joined Bullock in 2004 as a senior general foreman and after successfully completing a scheme in Wakefield with just myself and a T.L.O I was made up to Site Manager.

Key Achievements

Achieving one of Bullocks highest Considerate Constructor scores recently. This wasachieved by rejuvenating a waste area for our site compound, recycling work materialand reinstating some old toilet blocks for site use. We also installed bat and bird boxes and made good use of eco cabins.

Helping to procure extra works to run alongside existing program, due to happy client.

Eliminating risk of delays by imaginative programming, such as considering weather and environmental impacts.

My last two schemes received a 100% tenant satisfaction score. Helping give our region a solid reputation for quality within the company. Solid health and safety record. So far in 2014 my scores are as follows. (Average)

Internal H&S 99%/ External H&S 100%/ External Asbestos audit 100%. Up to date SMSTS First aider Pasma trained Asbestos Reg 4 CSCS Gold Advanced Scaffolding

INTERESTSFellwalking. I take an annual trip up to the Scottish highlands and climb Munros (mountains over 300ft) and have walked in Europe and even the Canadian Rockies.I play in a band and organise two one- day music festivals in my home town of York.

Page 2: 1. Main CV pics

EMPLOYMENT EXPERIENCE

Site Manager, Bullock 2007 to present Organising and planning all aspects of both internal and external works to a high standard, in budget and on time. Creating an enviably high health and safety record and enjoying excellent relationships with my site team and theClient. Creating imaginative solutions and running an effective and happy team.

Site Manager, Quarmby Special Projects

2006 to 2007 Overseeing all aspects of health and safety on a new build development of city centre flats.

Senior General Foreman, Bullock 2004 to 2006 Working collaboratively with a site team, ensuring the smooth running of an internal works programme in centralLeeds.

William Anelay Ltd 1990 to 2004 I worked for fourteen years on a remarkable number of diverse and award winning restoration projects. My responsibilities ranged from overseeinga small team carrying out pointing works, fitting stone staircases in a castle tower to working alongside Archaeologists. The last project I oversaw was the strengthening of a Norman church tower, due to mining works in the area.

Trainee, National Trust, Beningbrough Hall

1988 to 1900 Learning all aspects of ground works ata large working National trust property,including brickwork, drainage, tarmac and gardening.

Printer,York city Printers 1987 to 1988

Trainee, Ashbank centre, York 1986 to 1987 Learning silk screen printing techniques

EDUCATION

Burnholme Secondary Modern 1980 to 1985 G C S Es English/Maths/History B+ Art and design A

Here is a brief summary of my working career so far.

Page 3: 1. Main CV pics

After leaving school I worked on a course for a year with the National Trust learning brickwork and ground management at Benningborough Hall near York. After attending Askham Bryan College I started work for the next 14 years with the restoration specialists William Anelay Ltd. Clients included Landmark Trust, National Trust, National Lottery Funded and private clients and was fortunate enough to be involved in a large number of high profile and very different contracts.

William Anelay Ltd

Corbolton Hall, Ireland – Installing stone staircases using old fashioned chain and pulley system.

Harewood House, Leeds – Assisting in replacing roof on main house and replacing stone in the stable block.

St Helens Church, Skipwith, York – Strengthening Norman Church Tower after movement due to nearby mining works. Working alongside York Archaeological Trust.

St Magnus Cathedral, Orkney – Huge repointing project spread over a number of years.

Blackwell Museum, Windermere – Converting important Baillie Scott designed school into contemporary art gallery opened by Prince Charles.

Quarnmby Special Projects Working for 1 year overseeing different aspects of new build on city centre

flats at Centenary Square, Bradford. Overseeing all aspects of Health & Safety.

Page 4: 1. Main CV pics

Bullock Construction Ltd

Ten years’ experience in the Social Housing Sector.

Leeds South Homes, Leeds – Kitchen, bathrooms, rewires and windows & doors.

WDH, Wakefield City Centre Flats – Kitchen, bathroom, rewires.Creating new flats from disused communal areas and installing new binchutes.

County Durham - Environmental/Landscaping

External Wall Installation

Page 5: 1. Main CV pics

External Wall Installation/Decra Roofing System

External Rooflines, Ground Works, Flag Roofing System and Fencing.

As you can see, apart from my time with Quarmby, I have spent the last 24 years working for only 2 companies which I feel shows dedication and appreciation on behalf of my employers.

I recently achieved one of the highest Considerate Construction scores in the company and as another example of my competent Health & Safety achievement the

Page 6: 1. Main CV pics

last three safety audits (internal and external) have all achieved the 100 percent pass rate.

Below are examples of photographs I have taken demonstrating good practice on a current roofing scheme in Nottingham.

Example of PPE and professionalism

Example of high standard of safety and cleanliness

Doing the work

correctly

Using scaffold with green tags, brick guards, protection, chutes, gates, tied ladders, signage and information boards.

Please see example of Considerate Constructors Report

Page 7: 1. Main CV pics

Please see example of Client Health and Safety Report

Page 8: 1. Main CV pics

HEALTH & SAFETY SITE INSPECTION REPORT 27/8/13

Site Management

Paul DuckittRef No:

HS060813

Project / Site Details and scope of work:

82715B -

Re-roofing, Shildon

Contractor Bullock Activities Re-roofing

Address(es) 36 Auckland Wynd, Shildon

Ops NamesCraig Whitehead – Fourways

Ian Gosney - Ultegra

EXECUTIVE SUMMARY

There were no non-conformances

When actions are completed the dates are to be entered, once all actions are complete the nominated manager is to sign off the report, scan and return to the Health and Safety Team

Severity of issue Qty

Major Non-com 0

Minor Non-com 0

Comments / Observations 0

Applicable Standards = 35

Standards met = 35

Safety Performance = 100%

Ref IssueN/A

G Y R Ref IssueN/A

G Y RObs Obs

WELFARE HOUSEKEEPING

1.1 Signage 7.1 Any STF Hazards

1.2 Barriers / Site Security 7.2 Tenant Hazards

1.3Welfare arrangements suitable and sufficient

7.3 Material Tidiness

1.4 1st aid facilities adequate 7.4 Storage of Equipment / Material

1.5 Asbestos policy adhered to 7.5 Use of dust sheets N/A

OPERATIVES 7.6 Fire haz ignition / fuel source N/A

2.1 Induction ELECTRICAL

2.2 Qualified for task (check 8.1 Work equip suitable and in / N/A

Page 9: 1. Main CV pics

special competences) good condition

2.3 Uniform / ID 8.2 RCD used if 240v N/A

2.4 BSC Course / Handbook 8.3 All WE in date for PAT N/A

2.5 Attitude of Op 8.4 Use of extension leads N/A

DOCUMENTATION 8.5 STW isolation in place N/A

3.1Site office H&S Doc’s (inc F10)

PPE – Worn correctly (or available) / Serviceable

3.2 RA / MS on site 9.1 Footwear

3.3 RA / MS signed for by Op’s 9.2 Hi visibility clothing

3.4 Op abiding by RA / MS 9.3 RPE

COSHH 9.4 Goggles

4.1 CA / MSDS on site 9.5 Ear protection N/A

4.2 CA signed for by Op’s 9.6 Gloves

4.3 Suitable containers 9.7 Head protection

4.4 Correct use / PPE WORKING AT HEIGHT

4.5 Adequate ventilation N/A 10.1 Ladders / Hop up’s S&S / type

4.6 Spillage kits available N/A 10.2 Ladder tags in date

HOTWORK 10.3 Safe use

5.1 PTW system in placeN/A

10.4 Scaffold / Mobile tower S&S

5.2 Fire extinguisher availableN/A

10.5 MEWP safe use N/A

5.3 Is it safe to hot workN/A

WASTE

VEHICLE 11.1 Waste stored in adequate area

6.1 Safe parking No BullockVehicles on

Site

11.2 Is waste segregated

6.2 Smoking sign / evidence 11.3 Is waste disposed of correctly

6.3 Vehicle checks MISCELLANEOUS

6.4 Contents/Store (Haz mat) 12.1

6.5 Fire extinguisher available 12.2

6.6 Waste carriers licence 12.3

6.7 Spillage kit available 12.4

Page 10: 1. Main CV pics
Page 11: 1. Main CV pics

Please see Example of Internal Audit Report

Page 12: 1. Main CV pics