MAC Project

Page 2: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

2

BASF Mexicana

Content

1 │ Master Plan2 │ Budget3 │ New Sustainable Building4 │ BASF Materials5 │ LEED Certification

Page 3: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

3

BASF Mexicana

Master Plan

NovOctSepAugJulJunMayAprFeb Mar

2011

Equipments InteriorsCivil constructionDismantling & Reinforcement

Elevator # 1

Carpet

Elevators

Illumination

Civil construction

Site security system

Air conditioning (HVAC)

IT

Furniture's

Fire Protection

Reinforcement

MAC Project

Construction release

Front (Glass/Windows)

Engineering

Cafeteria

Electrical installation

Ph

ase

1P

has

e 3

Ph

ase

4P

ha

se

2

Elevator # 2

Dismantling

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Project execution:

Starting date: Feb. 14th

Completion date: Nov. 30th

Building occupation: Dec. 16th

19 Contractors bring support

More than 180 workers at site

Big opening: March 13th

Page 4: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

4

BASF Headquarters major renovation

23 year old building; construction @ 80´s.

Voluntary participation: Rigorous LEED process

BASF Demonstrates Leadership, Design, Innovation and environmental stewardship.

Participate in the new way buildings are designed and operate; enabling an environmental and socially responsible, healthy and appropriate environment to improve the quality of life

BASF Mexicana

Sustainable Building

Page 5: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

5

Advantages

Natural light throughout

Occupancy Increases (from 290 to 340 workstations)

Increase conference rooms (from 8 to 21)

Show room (BASF Products) & Branding throughout building

Technology; Wireless capabilities everywhere & ATM Machine

Special collaboration areas (casual Collision)

Water treatment plant implementation

Many BASF Products used in the construction.

BASF Mexicana

Sustainable Building

Page 6: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

BASF Mexicana

BASF Products at MAC

EB, Masterseal I600®, Waterproof system in roofs. EB, Ucrete®, System for kitchen floor. EB, Sonolastic NP1™, Seal for glass and concrete. EB, Sonoshiel HL5000™, Impermeable sealant for green roof. EB, Thorolastic ™, Interiors & exteriors painting system. EB, Enviroseal™, Seal for concrete elements. EB, Cemento Tolteca® from CEMEX.

EC, Water Borne Paint ¨Reflex Silver¨ for metal doors. EC, R-M system & Clear DC5600 / Solvent.

ED / KT, Carpet SHAW with Nylon fibers BASF & Dispersions from Altamira.ED, Paint from COREV Customer with ED resins, Interiors. ED, FANDELI, sand paper with ED products. ED, Paint from COMEX Customer, exteriors and Interiors.

Page 7: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

7

BASF Mexicana

LEED

First LEED certification in Latin America in restoration

BASF MAC OfficesLEED Certification

En

erg

y u

se

35%

20%

30%

Wat

er u

se

CO

2 E

mis

sio

ns

95%

Rec

ycli

ng

Annual Savings:1.7 million lts water

250,000 kWh 476 tons CO2

Page 8: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

8

BASF Mexicana

BASF - Before

Page 9: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

9

BASF Mexicana

The New BASF Building

Page 10: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

10

BASF Mexicana

BASF - Before

Page 11: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

11

BASF Mexicana

BASF - Before

Page 12: 1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

12