Page 1: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

1JSW Energy Limited of 149RWPL MOPR – JULY - 14

INNOVATION AND BEST PRACTICES

July ’15

Page 2: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

2JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Contents

APC Reduction Initiatives

Heat Rate Improvement Initiatives

O&M Practices

Page 3: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

3JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

APC Reduction Initiatives

Page 4: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

4JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Running 3 CW Pump for four units

Original Scheme: Four CW Pumps are to be kept in operation for condenser cooling and auxiliary cooling water requirements of four units in the plant.

Observations: In normal running with four CW Pumps in operation, Discharge pressure : 0.21-0.23 MPa. Cooling water range : 7.5°C around Subcooling: Upto 2°C intermittently specially in winter season

Analysis & Trial Run: Flow through the CW Pumps reduced by throttling the valves at the condenser inlet. Once the valves were closed up to 70 %, one out of the three pumps was stopped. The three pumps were operating at a discharge pressure of 0.18-.19 MPa. Increase in the cooling water range across the condenser from 7.6 °C to 9.5 °C. However no effect on vacuum and other parameters were observed. Improvement in Cold water temperature with reduction in water loading in Cooling tower.

Result: Energy Saving of 4600 kWh per hour with eight units in operation. Two standby CW Pumps instead of one for four units.

Page 5: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

5JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Running 2 ACW Pump for four units

Original Scheme: One ACW Pump (motor rating 180 kW, capacity 1400 m³/hr) is being provided for each unit for auxiliary cooling water.

Observations & Modification: Rerouting the ACW water to Plate Heat Exchanger from Generator Air cooler return (instead

of ACW Pump discharge as per original scheme). Common discharge header of ACW Pump of two units. Successful trial conducted in unit #7 & #8

Sketch: ACW System Modification

Result: Energy Saving of 160 kWh per hour. Increase in redundancy of the system. Change in logics of Standby pumps of ACW system accordingly.

Page 6: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

6JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

VFD Installation in LP Drip Pump

LP drip pump was operating with discharge control valve opening of 30 to 40%.

One stage of LP drip pump was removed and achieved a benefit of `9.2kwh per hour.

In other pump, a VFD was installed and achieved saving of 18.2 Kwh per hour per Unit.

Benefits:-

Net power saving of 18.2 Kwh per hour per LP Drip pump achieved.

Page 7: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

7JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Optimization of ESP

Earlier the ESP operation was on manual mode and KV and mA remains same across the

load variation as well as SPM variation.

ESP operation put on Opacity control mode.

Benefits :

Reduction in ESP power consumption by putting ESP in Opacity control mode for controlling

the SPM under limit.

Reduction in ESP power consumption from 400 KW to 100 KW per unit.

Page 8: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

8JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Heat Rate Improvement

Initiatives

Page 9: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

9JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

De-superheating water sourcing

De-superheating water sourcing after HPH-1 boiler feed water instead of HPH-2 inlet,

The De-superheating water temperature shall be 240 Deg C instead of 165 Deg C.

Benefits:-

Improvement in cycle efficiency by way of regenerative feed water heating and

ultimate reduction in heat rate by 2 kcal/kwh.

Page 10: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

10JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

O & M Practices

Page 11: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

11JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Online Performance Monitoring System

Online real time Performance Monitoring System developed in house: Turbine Heat Rate Boiler Efficiency Heaters Performance Heat rate deviation Economizer Steaming Turbine Cylinder Efficiency Cooling Tower Performance

MS Excel with inbuilt steam table synchronized with DCS data

Benefits: Availability of real time performance of the system

Page 12: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

12JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Regular monitoring of APC and GAP Analysis

Major equipment / system Auxiliary Power Consumption being monitored:

Boiler Fans Boiler Feed Pump Condensate Extraction Pump Cooling Tower ESP CW Pump BOP System: Lignite Handling system, Ash handling system, Main Air compressors etc

Benefits: Equipment/system unit wise comparison available on specific power basis. Identification of high energy consuming equipment on daily basis.

Page 13: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

13JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

In House Helium Leak detection System

Helium Leak detector system procurement from M/s Agilent Technologies, USA along with the Helium gas

Identifying air ingress across Condenser and other negative pressure areas Air ingress zones in VAM system

Benifits: Vacuum Improvement in the system System used in running units, hence problem identified prior to shutdown

Page 14: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

14JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

APH Bypass Arrangement

APH Bypass Arrangement made to avoid Sulphur corrosion

Both Primary Air and Secondary Air by-pass arrangements have been provided.

Benefits : -

APH tube life enhancement.

Faster cooling of boiler

Page 15: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

15JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

LOTO-Lock out and Tag out

Adopted Lock Out and Tag out system in isolation of equipment / system.

Fool proof method which enhance safety performance.

Benefits:-

Improved Safety performance.

Page 16: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

16JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Furnace Water Wall Corner Refractory Modification

OEM design Breaker at the Furnace water wall corners are eliminated.

Three tubes at each corner on all the water wall throughout the height are covered with Refractory

A case of confidence on experience than struggling with original design.

Benefits:

The elimination of frequent corner tubes failures.

Elimination of casting of intricate corner breaker.

Page 17: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

17JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Reduction in Bed Ash Conveying Pipe Line Erosion

The bed ash conveying pipe line are getting eroded very fast.

Many modification in the system and operation philosophy

D- pump operation changed from time mode to level probe mode

Conveying time optimization 300 sec to 150sec

Discharge conveying pressure cut off 0.5Ksc to 1.4Ksc to ensure the dense conveying.

The 90º composite elbow has been changed to Drum type (Damru Bends).

Pipe line thickness survey to identify the erosion points.

Ensured dense phase conveying

Benefits :

The life of the conveying pipe lines improved.

Improvement in ambient air quality.

Reduction in dumper unloading.

Page 18: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

18JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Keeping HP heater 2 in service while boiler lit up

Keeping HPH-2 in service during any kind of Unit lit up (Cold, Warm, Hot or Very Hot Start Up) after

HP Bypass in service and HP bypass pressure more than 0.1 MPa

Benefits :

Increase in Economizer I/L FW temp by 40-60 Deg C (i.e. from 70-80 Deg C to 120 - 140 Deg C).

Increased life of ECO tubes due to Reduction in Cold-end Corrosion of ECONOMISER

Increased life of APH Tubes due to reduction in Cold End Corrosion of APH tubes due to increased

Flue Gas temp at APH I/L.

Reduction in Oil consumption during lit up..

Energy Saving of 18.6 GCal per lit up.

Page 19: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

19JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Link Canal Height increase at Mohangarh Pump House

In Mohangarh Pump House earlier sump level was maintaining 3.5 - 4.5 meter.

For utilizing main Canal head, link canal side wall height increased by 1m.

Now Sump level maintaining between 4.5 - 5.5 meter sump level resulted in increased

pump suction head.

Benefits :

Reduction in frequent operation of Link Canal Gate.

Increase in station water delivery by 30-40 m3/hr.

Page 20: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

20JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

Page 21: 1 JSW Energy Limited of 149 RWPL MOPR – JULY - 14

21JSW Energy Limited of 149RWPL MOPR – JULY - 14RWPL- Barmer

THANK YOU