27
1 Introduction to Public- Private Partnerships (P3) Orlando, FL May 16, 2013

1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

Embed Size (px)

Citation preview

Page 1: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

1

Introduction to Public-Private Partnerships (P3)

Orlando, FLMay 16, 2013

Page 2: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

2

What We’ll Cover

Introduction to Public Private Partnerships (P3)

• The state of Infrastructure

• What P3 is (and isn’t)

• What makes P3 different in the US than in the UK or Canada?

• What is needed for a successful P3 project?

• How is P3 valued?

• Dispelling the myths of P3

Page 3: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

3

State of our Infrastructure and its Economic Impact

• The ASCE’s “Failure to Act” (December 2012) paper states investment of $2.7 trillion is needed by 2020; likely funding available, $1.6 trillion.

• The Congressional Budget Office says combined federal, state and local spending for roads and bridges now amounts to only $160 billion.

• The investment gap between now and 2020 is $39 billion in airports, $16 billion in seaports and waterways, $846 billion in surface transportation, $107 billion in electricity, and $84 billion in drinking water and wastewater.

• “Job losses will mount annually, and by 2020 it is predicted that there will be 3.5 million fewer jobs throughout the country,” the paper said.

• “The expected impact for every household in the U.S. will be an average loss of more than $3,000 per year through 2020 in disposable personal income . . . due to job cutbacks and declining business productivity.”

Page 4: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

4

Infrastructure Deficits by Sector

Texas Florida North CarolinaRoads D C D-Bridges B- B C-Rail Transit C+ C CAviation C+ B- D+Schools D- D+ C-Drinking Water D- C B-Waste Water C- C C+Levees/Flood D- D+ DSolid Waste B+ n/a n/aPorts C C n/aEnergy B+ D n/a

Page 5: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

5Source: U.S. Census Bureau

1.0%

1.1%

0.8%

0.9%

0.8%

0.7%

1.6%

1.4%

1.3%

1.4%

0.3%

2.2%

1.2%

0.7%

0.5%

0.8%

1.7%

0.6%

0.3%

0.2%

0.6%

0.3%

0.1%

0.1%

0.3%

0.3%

0.9%

0.3% 0.4%

0.0%

0.4%

0.2%

1.0%

1.0%

1.1%

1.2%

0.0%

0.0%

0.4%

1.5%

HI1.0%

1.1%

VT-0.1%

CT0.1%

RI0.0%

DE1.0%

NJ0.3%

MD0.8%

DC2.1%

NH0.2%

0% to -0.1% 0.1% to 0.5%% 0.6% to 1.0%

MA0.6%

>1%

Population Growth Drives Demand

Page 6: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

6

What states have P3 Legislation?

Page 7: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

7

P3 Projects Around the Country

UCF Convocation Center

Washington State Dept. of Information

Dallas Omni Convention Center Hotel

FAU Innovation Village

Page 8: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

8

What is P3?

• NCPPP identifies 18 different legal and financial P3 structures (www.ncppp.org) based on who owns, finances, designs, builds, operates, or maintains the project.

Definition: A contractual agreement between a public agency and a private entity under which skills, assets, risks, and rewards are shared in the delivery of a service or facility.

Page 9: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

9

What P3 is NOT?

TANSTAAFL• Equity or debt require a return on

capital and of capital• Identify revenue streams• Target alternative funding sources• Explore level of public support

Page 10: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

10

What P3 is NOT?

“One size does not fit all”

Key to Success

Creating a P3 structure that meets the specific financial, legal, and political constraints of the client

Page 11: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

11

What makes US P3 models different?

There is no “one” P3 Model or Template to Follow

• The US has an estimated 70,000 public entities • Municipalities, school districts, universities, community colleges, courts, public

agencies, and authorities

• Local statutes, financial constraints, politics

• Wide range of projects• Income and non-income producing assets• Horizontal and vertical construction

• No uniform P3 contracts

• The exception: Military Housing• One client, the DOD• One contract form• Replicable over many projects (50 bases in 26 states)

Page 12: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

12

What makes US P3 models different?

Taxable vs. Tax-Exempt

• IRC 103(a) - statutory provision excludes earned interest on municipal bonds from federal income tax

• IRC 501(c)3 - organized and operated exclusively for exempt purposes and none of its earnings may inure to any private shareholder or individual

• 63-20 Corporations - power to issue municipal bonds, treated as debt obligations funded on behalf of, but not an obligation of a political entity

• Public use and public ownership requirement

Page 13: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

13

What makes US P3 models different?

Taxable vs. Tax-ExemptTax-exempt status can provide municipalities, public agencies, and not-for-profit institutions a 35% to 40% reduction in cost of occupancy

P3 – Private Equity Model P3 – Public/Tax-Exempt Model

Developer Private Ownership and Developer’s Equity at Risk

Fee-Developer, Limited Risk

Use Public or Private Public Only

Taxable vs. Tax-Exempt Debt

Taxable Only Taxable or Tax-Exempt

Financing Structure Conventional Bank Debt• Construction Loan• Mezzanine/Permanent Debt• Owner’s Equity• Typically 10 year refinance

Municipal Bond Market• Single Financing• Flexible Payment Structures• Up to 40-year term• Higher fixed-costs

Page 14: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

14

Case Study - Dallas Omni Hotel

• 1,001-room city-owned hotel provided necessary economic boost for under-performing 2.1 million SF convention center

• Financed by $480 million taxable hotel revenue bonds under the American Reinvestment and Recovery Act’s Build America Bonds saving the City over $3 million per year over 30 years

• Team included Matthews Southwest as developer, Balfour Beatty as design-builder, First Southwest as financial advisor, and Omni Hotels as operator

• Project delivered 3 months ahead of schedule, substantially under budget, and performing above pro-forma

Page 15: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

15

What can P3 do for Public Entities?

• Identify new revenue streams • Housing, Parking, Retail• Mixed Use, Economic Development

• Create new tax or fee revenue• Hotel/Motel and Rental Car Tax• User fees and surcharges• TIF Districts

• Access alternative funding sources• Government grants• EB5, New Markets Tax Credits

• Monetize under-utilized assets• Sale or Lease

• Operational savings can increase financing capacity

• Not subject to voter referendums or capital budget allocations

Closing Funding &

Timing Gaps

Page 16: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

16

Case Study - Florida Atlantic University

• 1,216-bed apartment style on-campus student housing village by BB Capital Group

• FAU established a Direct Support Organization (DSO) to be the nominal owner of the facility authorized to issue tax-exempt debt

• Waterfall: cash flow from existing student housing flows to new housing enhancing debt, then from new housing to FAU for any purpose

• Strong revenue projections allowed FAU to clear $12 million from the housing bond sale to support other on campus infrastructure.

• BB Capital invests through a junior debt piece of $3.4 million

Page 17: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

17

What can P3 do for Public Entities?

• Transfer risk to the party best able to control it • Design risk• Construction risk • Schedule risk• Operating risk• Revenue risk• Financing & interest rate risk• Political risk

• Takes advantage of private sector efficiencies and innovations in construction, scheduling, and financing

• Provides efficiencies in long-term operations and maintenance (“life-cycle”)

• Presents opportunity to combine public and private uses in mixed-use developments to leverage economic development

RiskTransfer

Page 18: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

18

How is a P3 Proposal Valued?

• Public Sector Comparator (PSC)• The “benchmark” of standard public procurement• Costs of procurement and long-term operations

• Value for Money (VfM)• Discount rate, “Time Value of Money” includes

inflation, interest rates, and risk• What is the value to the public-sector of each risk is

transferred?• Design and construction costs• Private sector procurement costs• Value of alternative financing• Value full life-cycle costs (O&M)

How do we know if a P3 is the best approach?

“Up to 60% of P3 savings may come from risk transfer”

Page 19: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

19

How is a P3 Proposal Valued

Value for Money (VfM)

Page 20: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

20

What are the keys to success?

What is needed for a successful PPP

• An essential facility needed today• A political champion, leader• Statutory environment (competitive procurement

process, transparency, etc.)• Detailed contract (business plan with clear VfM)• Existing or proposed revenue streams

• New tax, user fee revenue, or grants• Lease agreement• New revenue through economic development

• Stakeholder support• Selection of “best value” partner and team

Page 21: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

21

Case Study - WA Dept. of Information

• Delivered through a 63-20 Corp for the State of Washington

• Lease/Leaseback 35-year term

• Allowed state to avoid substantial front-end costs

• Mission Critical facility

• LEED® Platinum, 480,000 SF, 6-story building

• $225 million total development budget

• Developer Wright Runstad provided a maximum lease price for the state

• First new building on state campus in over 2 decades

Page 22: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

22

Frequently Asked Questions

• “I can borrow at lower rates than you can.”• General obligation debt (G.O.), tax-exempt

financing vs. conventional private debt and equity• Small premium for accelerating delivery, reducing

construction cost, and lowering interest rate risk

• “I will lose control of the project.”• P3 is collaborative, transparent, and “open book”

• “Off-balance sheet is not off-credit.”• Not considered “debt,” but a moral obligation

• “Private partners make excessive returns”• Transparent, “open book” process• Transfer of risk to the party best able to manage it• Revenue sharing provisions• Contract rebalancing provisions• Alignment of interests

Dispelling the Myths

Page 23: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

23

When should P3 be considered?

• The P3 process begins with the “need” and the “concept”

• Identify and quantify the funding gap

• Explore solutions to bridge the gap

• The public sector may not be aware of all available funding and delivery options

• Staff may not have the expertise to deliver a “once in a generation” facility

• Could overlook a more efficient financial, scheduling, and operational solution

As Early asPossible

Page 24: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

24

What are Potential P3 Projects?

Education• K-12 – schools, administration, sports • Higher Education - administration,

athletics, student unions, housing, healthcare, parking, laboratories, and multi-use economic development

Healthcare (Public and Non-Profit)• Ambulatory care clinics• Housing, MOB for staff physicians• Parking, central plants• Multi-use economic development

Justice• Jails, detention centers• Courthouses

Energy Retrofit• Financed through savings• Lighting, HVAC, building envelope,

water, renewable energy, “net-zero”

Municipal• Civic centers, city hall, administration• Libraries, parking • Police, fire, health, and public safety• Mission Critical facilities

Public Assembly• Convention and conference centers• Performing arts• Arenas and stadiums• Headquarter hotels

Page 25: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

25

So What?

P3 and the Delivery of your Essential Facilities

• Close a Funding Gap

• Close a Timing Gap

• Transfer Risk

• Provide for Future Life-Cycle Costs

“You can’t solve a facilities problem with just a construction solution”

Page 26: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

26

How to Increase Infrastructure Investment?

• Remove legislative impediments to P3 and other forms of alternative delivery that will provide greater speed to market and greater risk transfer

• Assemble top-flight P3 government advisory resources from the private sector (e.g., Partnerships BC, Infrastructure Ontario)

• Prioritize projects that have the best P3 potential and issue RFP’s with people authorized to drive the procurement

• Require demonstration that P3 has been explored before traditional appropriation or bond financing is requested

• Create/fund infrastructure banks to backstop critical projects

• Increase federal loan/backstop programs and modify them to include P3 (i.e., MAP-21)

Page 27: 1 Introduction to Public-Private Partnerships (P3) Orlando, FL May 16, 2013

27

Q & A