14
1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007 Presented at IEEE 802.21 session #22 Big Island Authors or Source(s): Vivek Gupta Abstract: Closing Plenary

1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

Embed Size (px)

Citation preview

Page 1: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

1

IEEE 802.21 MEDIA INDEPENDENT HANDOVER

DCN: 21-07-0347-00-0000

Title: 802.21, Session #21, Big Island Closing Plenary

Date Submitted: September, 2007

Presented at IEEE 802.21 session #22 Big Island

Authors or Source(s):

  Vivek Gupta

Abstract: Closing Plenary

Page 2: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

2

IEEE 802.21 presentation release statementsThis document has been prepared to assist the IEEE 802.21 Working Group. It is

offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.

The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.21.

The contributor is familiar with IEEE patent policy, as outlined in Section 6.3 of the IEEE-SA Standards Board Operations Manual <http://standards.ieee.org/guides/opman/sect6.html#6.3> and in Understanding Patent Issues During IEEE Standards Development http://standards.ieee.org/board/pat/guide.html> 

Page 3: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

3

Agenda

• 802.21 Specification Timeline

• SB Comment Resolution Update

• October Ad Hoc Update

• Ad hoc teleconference update

• Liaison update (802.11, 802.16, IETF)

• Future Locations

Page 4: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

4

Revised 802.21 Timeline (July 2007)

• IEEE 802.21 ECSG formed – March 2003

• IEEE 802.21 WG formed – March 2004

• Requirements development – September 2004

• Call for Proposals – October 2004

• Harmonized Single Proposal Confirmed by the WG – May 2005

• Ongoing WG Comment Resolution started – July 2005

• WG Comment Resolution completed – January 2006

• Start of WG Letter Ballot – March 2006

• Start of IEEE 802 Sponsor Ballot –(July-07)

• IEEE 802 Draft Standard sent to RevCom – March 2008• Ongoing Interaction with Other Standards Organization (3GPP,

3GPP2, IETF, 802.11, 802.16, 802.3) - adoption of it depends on the timeline of work items within these groups

Page 5: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

5

Plan to meet 802.21 Timeline

• Start of IEEE 802 Sponsor Ballot – (July 2007)

• For RevCom Approval in March 2008• => Draft Approval Rating > 90% (minimum), preferably >95%

• SB #1: • Starts Aug-17, Ends Sept 16: Return Ratio: 78% Approval Ratio 62%• Comment Resolution for SB #1 (Sep-Nov) =>Recirculation

• SB #1 (recirculation 15 days): • Starts Dec??, Ends Dec??: Return Ratio: ??%, Approval Ratio: ??%• Comment Resolution for SB #1 (Jan meeting) =>Recirculation

• SB #1 (recirculation 15 days): • Starts Feb ??, Ends Feb ??: Return Ratio: ??%, Approval Ratio: ??%• Comment Resolution for SB #1 (March) => RevCom Approval

Page 6: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

6

SB Voting Summary

• No of Members: 165

• Received Votes: 129

• Approve: 71

• Disapprove: 43 with Comments, 2 without Comments

• Abstain: 13

• Approval ratio = 71/(43+71) = 0.62

• Return ratio = 129/165 = 0.78

Page 7: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

7

SB Comment Resolution Progress

Section Start # End # Resolved # Total Comments

1-4 1 106 106 106

5 107 181 40 74

6 182 273 91

7 274 424 150

8 425 508 83

Annex 509 648 139

• Total: 648 Comments

• Includes Editorials (Total: 127)

• Many Duplicate comments ~100

Page 8: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

8

October 2007 Ad hoc Meeting

• Motion the 802.21 WG to hold an ad hoc meeting if required in October 2007

• Moved By: Marc• Seconded By: Qiaobing

• Yes: 13• No: 03• Abstain: 08

• Result: Motion passesFrom July 2007 San Francisco Meeting

Page 9: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

9

October 2007 Ad hoc Meeting

• Week of Oct 29: - 7 - 09

• Week of Oct 22: - 5 - 09

• Location:• Santa Clara, CA – 7 9• New Jersey – 9 7• Budapest, Hungary – 6 3• Helsinki, Finland – 7 2

• Week of Oct 29, New Jersey

Page 10: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

10

Teleconferences

• Oct 16 and Nov 1: 9 PM EST: MRPM SG

• Oct-11 and Nov 6: 9 PM EST: Security SG

• SB Comments:• Oct 2: 9PM EST• Oct 18 9PM EST• Oct 25: 9PM EST

Page 11: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

11

Future Sessions

Page 12: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

12

Future Sessions - 2007

• Plenary: Nov 11th – 16th,2007, Atlanta• Co-located with all 802 groups

Page 13: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

13

Future Sessions - 2008

• Interim: Jan 13th – 18th , 2008 (Taipei, Howard Plaza Hotel)• Meeting co-located with all 802 groups

• Plenary: March 16th – 21st ,2008, Orlando, Florida• Co-located with all 802 groups

• Interim: May 11th – 16th , 2008 (Jacksonville)• Meeting co-located with 802.11/15/18/19/20/22

• Plenary: July 13th – 18th,2008, Denver, Colorado• Co-located with all 802 groups

• Interim: Sept 7th – 12th ,2008, (Minneapolis ??)• Meeting co-located with 802.11/15/18/19/20/22

• Plenary: Nov 9th – 14th,2008, Dallas, TX• Co-located with all 802 groups

Page 14: 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0347-00-0000 Title: 802.21, Session #21, Big Island Closing Plenary Date Submitted: September, 2007

14

Future Sessions - 2009

• Interim: Jan ????• Meeting co-located with 802.11/15/18/19/20/22

• Plenary: March Rome???• Co-located with all 802 groups

• Interim: May ????• Meeting co-located with 802.11/15/18/19/20/22

• Plenary: July ????• Co-located with all 802 groups

• Interim: Sept ????• Meeting co-located with 802.11/15/18/19/20/22

• Plenary: Nov ????• Co-located with all 802 groups