GTS Portfolio Services for Economic Slowdown
SERVICESFOR A SMARTER WORLD
DI Roadshow Nordic 2009DI Roadshow Nordic 2009
2
Get more out of your server and storage environment
Olle Äng
Server Sevices and Storage & Data Services Leader
IBM Nordic
3 © 2009 IBM Corporation
IT has and increasing effect on the environment
110 million tons of carbon dioxide
Equal to the airline industryDoubling within five years
4 © 2009 IBM Corporation
Energy and cooling costs has grown 8-fold
5
10
15
20
25
30
35
40
45
50
50
100
150
200
250
300
Spending (US$B)
0
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
0
1996
Source: IDC, ”Worldwide Server Power and Cooling Expense 2006-2010”, document no 203598
Management and power a growing part of the IT budgets
Install base(M units)
IT Platform costs
Operational costs has grown 4-fold
5 © 2009 IBM Corporation
IBM Strategic Delivery Model1997 Today
CIOs 128 1
Data centers 155 7
Web centers 80 5
Networks 31 1
Applications 15,000 4,700Data centers
Strategic Locations
Web Centers Networks
A reference – IBM: Project Big Green
6 © 2009 IBM Corporation
Questions asked today: How to… …and IBM´s answers
Consolidate Servers Optimize storage Save on operational costs Minimize telephony budget Simplify mobility Manage Telecom costs Limit security operations
expense Consolidate Data centers Save on travel with Video
communications Optimize Networks Manage Infrastructure remotely Protect data remotely Implement Service Managementand Planning and Strategy on IT
Payback Period (months)
10%
50%
20%
30%
40%
0 - 3 4 - 6 7 - 12 13 - 18
Remote Managed Infrastructure
Services20%, 12-18 mo
IT Optimization Strategy and Planning
20-40%, 3-18 mo
IP telephony 20-40%, 12 mo
VIA, VIA Managed Services 15-40%, 8-18 mo
Low savings, longer payback....
High savings, Rapid paybackManaged Security Services
Up to 55%,, First year savings
Information Protection Services Up to 40%, 1-12 mo
Storage Optimization & Integration30% or more, 3-12 mo
IT Lifecycle Mgmt and Governance15-30%, 3-18mo
Network Infrastructure Optimization
10-30%, 4-12 moTEM15%, 3-9 mo
Server consolidation and virtualization30-70%, 8-24 mo
Data Center Design and Consolidation50%, 12-18 mo
Telepresence30%, 12 mo
Business of IT Workshop 15-30%, 12 mo
Savings impact
14 services generating high savings with rapid payback
Multi Vendor Services
15-30%, 6-12 mo
7 © 2009 IBM Corporation
Server Consolidation Efficiency Study
An assessment that provides the fact base required to decide for optimizing the server environment
Activities Included: Document environment Conduct Server Consolidation Workshop Deliver Server Consolidation Efficiency Study Report
705 593 Watts / Server
3.9 3.3 RackU / Server
2,698 2,720 W /m2
1,211 319 RIPS / tonne CO2
2.005 0.528 RIPs /BTU/hr
4,584 1,207 RIPs /kW
12,367 3,284 RIPs /m2
56 412 Carbon tonnes /yr
206 1,511 CO2 tonnes /yr
124,206 912,592 Heat BTU/hr
478,207 3,513,569 Adjusted kWh/yr
54 399 Total kW
10.1 73.4 30U Racks
302 2,201 Total RackU
3.9 3.3 avg RackU / Server
Alt.CaseCurrentEnergy and Climate
705 593 Watts / Server
3.9 3.3 RackU / Server
2,698 2,720 W /m2
1,211 319 RIPS / tonne CO2
2.005 0.528 RIPs /BTU/hr
4,584 1,207 RIPs /kW
12,367 3,284 RIPs /m2
56 412 Carbon tonnes /yr
206 1,511 CO2 tonnes /yr
124,206 912,592 Heat BTU/hr
478,207 3,513,569 Adjusted kWh/yr
54 399 Total kW
10.1 73.4 30U Racks
302 2,201 Total RackU
3.9 3.3 avg RackU / Server
Alt.CaseCurrentEnergy and Climate
Saving 1305Tons of CO2/yr
-4317 Treesor alternatively - 520 cars
Study Report Example
Report deliverablesRecommendations:Provide vision of what is needed to do based on both technical data and business drivers based on key recommendations.
•Vision is based on a recommended architecture only
Business case:Help understand the costs and benefits to move forward
with a server consolidation design and implementation project.
•Can help identify avenues for cutting to reduce existing IT/ costs that can open up additional funding to meet other (i.e. regulatory) requirements as well as application availability•Focus on server environment only
Roadmap:Complete a high level (flowchart picture view) of the key activities to complete a SCON project.
•Helps understand next steps to move forward with recommendations
8 © 2009 IBM Corporation
To save a thousand trees
1083 trees ...or 131 cars
101 26 servers
9 © 2009 IBM Corporation
Server Consolidation - SCON
Now introducing the CiRBA tool and methodologyFastest and Safest Path to Server Consolidation and Virtualization
VirtualizationDatabase
consolidationApp Server
ConsolidationApplicationStacking
Sprawled Multi-Platform Environment
Configuration
Business
Workload
ConsolidationStrategies
10 © 2009 IBM Corporation
Typical scenarios where Managed Services can help
Cost saving needs
Need better service levels
Need additional staff to handle server growth
Need new skill for new systems
Do not want outsourcing
Systems/sites fading out, need interim operation while staff go to new tasks
Need to run a domestically or globally distributed site structure
11 © 2009 IBM Corporation
Remote Managed Infrastructure Services (RMIS) No asset take-over No people take-over Choose from three modular service packages Standard offering modules, simple pricing process
No asset take-over No people take-over Choose from three modular service packages Standard offering modules, simple pricing process
BronzeWe monitor your system and alert your team when any issues arise
Silver We monitor your system and provide the management services you need
Gold Monitoring, management and detailed reporting to give you a comprehensive view of your infrastructure
Monitor
Notify
Manage
Report
Report
Manage
Notify
Monitor
Report
Manage
Notify
Monitor
Manage
Report
Notify
Monitor
Manage
Notify
Monitor
12 © 2009 IBM Corporation
Storage challenges of today:
Exploding and/or out-of-control storage demand
Need strategy for business data life cycle
Cost saving needs
Need better service levels (response time, availability,…)
Need additional staff to handle storage
13 © 2009 IBM Corporation
Storage Transformation Services (Novus)
Storage lifecycle
• Complexity reduction
• Operations standardization
• IT and line-of-business insight
• Strategy alignment
• Compliance risk reduction and remediation
Provides tools and methodologies to help restructure Storage usage and operations IBM now with NovusCG is ranked as #1 by Gartner Assets coupled with deep technical expertise & proven methodologies in five key areas
Provides tools and methodologies to help restructure Storage usage and operations IBM now with NovusCG is ranked as #1 by Gartner Assets coupled with deep technical expertise & proven methodologies in five key areas
Very concrete tools to provide guidance, management and monitoring (eg MCF)
Very concrete tools to provide guidance, management and monitoring (eg MCF)
SolutionLifecycle
IT - LOBInsight
ComplexityReductionStorage Strategy
Creation
Strategy
Implementation
360° Strategy
Execution
OperationsStandardization
StrategyAlignment
Correlation
A2I™
MCFMCF
EnterpriseStandardization
ProgramEnterprise
StandardizationProgramEnterprise
StandardizationProgramEnterprise
StandardizationProgram