1 FY2001 CENTER SOFTWARE INITIATIVE PROPOSAL (CSIP) for the NASA Independent Verification and Validation Facility COTR: Kenneth McGill PI: Nancy Eickelmann Contract #S-54493-G September 4, 2002 Developing Risk-Based Financial Analysis Tools and Techniques to Aid IV&V Decision-Making

1 FY2001 CENTER SOFTWARE INITIATIVE PROPOSAL (CSIP) for the NASA Independent Verification and Validation Facility COTR: Kenneth McGill PI: Nancy Eickelmann

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

1

FY2001 CENTER SOFTWARE INITIATIVE PROPOSAL (CSIP)for the

NASA Independent Verification and Validation Facility COTR: Kenneth McGillPI: Nancy EickelmannContract #S-54493-G

September 4, 2002

Developing Risk-Based Financial Analysis Tools and Techniques to Aid IV&V Decision-

Making

2

Agenda

• Why we need ASK IVEY

• Consequences and Likelihood of Failure

• IV&V Yield

• Probability of IV&V Yield: Min, Max, Most Likely

• ROI and Magnitude of Return of IV&V

• What ASK IVEY can do

3

Why we need ASK IVEY

• NASA program managers are asked to quantify the ROI and evaluate the cost/benefit of applying IV&V technologies.

• This is a prediction of future events based on decisions and actions taken in the present.

• A point estimate is likely to be inaccurate, whereas a probability of yield has a history of providing a scope of potential yield and an extent of likelihood of expected yield.

4

Calculating ROI a Financial Analysis Prompt Map

Yes1 A

Financial Analysis Process Map

Create developmentcost framework:

Total CostCOQCOPQ

?

IV&V and IA analysis complete.Level of IV&V or IA designated

Create certificationcost framework

2 3

Apply Financial models formonetary quanitification

Create probabilityof yield structure

4A STOP

STOPNo

5

Consequences of Failure

Co

nse

qu

en

ces

of

So

ftw

are

Fa

ilure

S u b s t a n t i a l

H i g h R i s k ( I V & V R e q u i r e d ) I n t e r m e d i a t e R i s k ( I A R e q u i r e d )

F i g u r e 1 S o f t w a r e R i s k

1 6 3 2 6 4 1 2 8 2 5 6

I V & V

I V & V

I V & V

I n s i g n i fi c a n t

M a r g i n a l

I A

I A

I A

9 6

T o t a l L i k e l i h o o d o f F a i l u r e B a s e d o n S o f t w a r e E n v i r o n m e n t

I A G r a v e

NPG 2820 IV&V Criteria

6

Likelihood of Failure

Factors contributing to probability of software failure

Weighting Factor

Likely- hood of failure rating

1 2 4 8 16Software team complexity

Up to 5 people at one location

Up to 10 people at one location

Up to 20 people at one location or 10 people with external support

Up to 50 people at one location or 20 people with external support

More than 50 people at one location or 20 people with external support

X2

Contractor Support

None Contractor with minor tasks

Contractor with major tasks

Contractor with major tasks critical to project success

X2

Organization Complexity*

One location Two locations but same reporting chain

Multiple locations but same reporting chain

Multiple providers with prime sub relationship

Multiple providers with associate relationship

X1

Schedule Pressure**

No deadline Deadline is negotiable

Non-negotiable deadline

X2

Process Maturity of Software Provider

Independent assessment of Capability Maturity Model (CMM) Level 4, 5

Independent assessment of CMM Level 3

Independent assessment of CMM Level 2

CMM Level 1 with record of repeated mission success

CMM Level 1 or equivalent

X2

Degree of Innovation

Proven and accepted

Proven but new to the development organization

Cutting edge X1

Level of Integration

Simple - Stand alone

Extensive Integration Required

X2

Requirement Maturity

Well defined objectives - No unknowns

Well defined objectives - Few unknowns

Preliminary objectives

Changing, ambiguous, or untestable objectives

X2

Software Lines of Code***

Less than 50K Over 500K Over 1000K X2

Total

Un-weighted probability of failure score

Table 1 Likelihood of Failures Based on Software Environment

7

IV&V YIELD

• Ultimately, the yield of an IV&V program is based upon the difference between the net resource flow with IV&V and without IV&V.

• If the resources saved (e.g., reduced rework) or returns gained (e.g., improved customer satisfaction or increased safety) are greater than the resources consumed to save/gain these resources, we have a net benefit.

• Should the resources saved be less than the resources consumed, we

have a net cost.

8

Cost of Poor Quality

• Defect Leakage– If discovered internally

• defect management• rework• retesting

– If discovered externally• technical support• complaint investigation• defect notification

9

Stephen Knox“Modeling the Cost of Software

Quality,”Digital Technical Journal, (Fall

1993)

0

10

20

30

40

50

60

Co

st a

s a

Pe

rce

nt o

f D

eve

lop

me

nt

1 2 3 4 5 SEI CMM Level

Prevention Appraisal Int Failure Ext Failure TCoSQ

10

Raytheon Cost of Poor Quality

Haley and Dion

0

10

20

30

40

50

60

70

Pe

rce

nta

ge

of to

tal p

roje

ct co

st

Year

CMM level 3Start of intiative CMM level 1

TCoSQ

PreventionRework

Appraisal

Cost ofConformance

Rework

87 88 89 90 91 92 93 94 95 96

11

How Process Maturity Levels Affect IV&V

LEVEL 1INITIAL

UNPREDICTABLE &POORLY CONTROLLED

LEVEL 2REPEATABLE

CAN REPEAT PREVIOUSLY

MASTERED TASKS

LEVEL 3DEFINED

PROCESSCHARACTERIZED,

FAIRLY WELLUNDERSTOOD

LEVEL 4MANAGED

PROCESS MEASUREDAND CONTROLLED

LEVEL 5OPTIMIZED

FOCUS ON PROCESSIMPROVEMENT

KEY PROBLEMS:•CONFIG. MGMT.•PROJECT MGMT.•SOFTWARE QA•PROJECT PLANNING•EASTIMATING•COST•SCHEDULE

KEY PROBLEMS:

•PROPER TRAINING

•DEVELOPMENT OF PRACTICE & PROCEDURES

•STANDARDS

•ORGANIZATION

KEY PROBLEMS:

•ACCURATE PROJECT MEASUREMENT

•OBJECTIVE PROCESS ANALYSIS

•QUANTITATIVE QUALITY PLANS

•PRIORITIES:

- DECIDING WHAT TO IMPROVE FIRST

- BALANCING THE PROCESS AND THE ORGANIZATION

KEY PROBLEMS:

•CHANGING TECHNOLOGY

•PROBLEM ANALYSIS

•PROBLEM PREVENTION

•ORGANIZATIONAL OPTIMIZATION

KEY PROBLEMS:

•STILL HUMAN INTENSIVE PROCESS

•DIFFICULT TO MAINTAIN OPTIMUM ORGANIZATION

•DIFFICULT TO MAINTAIN TOOLS & PRACTICES AT STATE OF THE ART

IV&VSOMEWHAT

UNPREDICTABLE

UNABLE TO ESTIMATE

NON-TECH %

IV&V

IV&V

IV&V

IV&V

NON-TECH UP TO 25%

NON-TECH UP TO 15%

NON-TECH UP TO 6-8%

NON-TECH UP TO 3-4%

MATURITY

12

Cost of Leakage GrowsOver Time

• Relative cost of fixing a problem found in design/coding, testing, or after release are:– 1:20:82 (Remus, 1983)– 1:13:92 (Kan, 1989)– 10:100:1000 (Coyle, 1999)

13

Cost of Rework in Each Phase• Reworkproduct design =

leakagerequirements * cost-to-fixnominal * 10

• Reworkprogramming = leakagerequirements * cost-to-fixnominal * 100+ leakagedesign * cost-to-fixnominal * 10

• Reworkintegration = leakagerequirements * cost-to-fixnominal * 1000+ leakagedesign * cost-to-fixnominal * 100+ leakageprogramming * cost-to-fixnominal * 10

• Reworkdeployment = leakagerequirements * cost-to-fixnominal * 10000+ leakagedesign * cost-to-fixnominal * 1000+ leakageprogramming * cost-to-fixnominal * 100

14

Rework at Deployment

• Tremendous cost

• rework plus– product recall– technical support– field visits– cost factor may be over 10,000

15

Leakage: An Example• Reworkproduct design =

49r * cost-to-fixnominal * 10 = 490

• Reworkprogramming = 39r * cost-to-fixnominal * 100 = 3,900+ 113d * cost-to-fixnominal * 10 = 1,130

• Reworkintegration = 26r * cost-to-fixnominal * 1000 = 26,000+ 49d * cost-to-fixnominal * 100 = 4,900+ 418p * cost-to-fixnominal * 10 = 4,180

• Reworkdeployment = 8r * cost-to-fixnominal * 10000 = 80,000+ 16d * cost-to-fixnominal * 1000 = 16,000+ 56p * cost-to-fixnominal * 100 = 5,600 142,200

16

CMM Maturity and Leakage

• There is some evidence to suggest organizations with increased maturity have reduced rework costs

• Knox: Percent of Budget to Rework:– Level 1: 55%

– Level 2: 45%

– Level 3: 35%

– Level 4: 20%

– Level 5: 6%

17

IV&V and Defect Leakage

• Application of IV&V can reduce leakage to subsequent phases

• The goal of the financial model is to propose a range of potential savings

• Specific parameters will need to be established empirically

18

Timing of benefits for IV&V

• Full In-Phase IV&V– prevention of errors starting at requirements - can

potentially bar any errors from leaking through

• Partial IV&V– prevention of errors at point of insertion - no errors from

this phase will leak

• Endgame IV&V– discovery of errors at the end of development - can

potentially bar any errors from leaking to deployment

• Audit Level IV&V

19

Rework and Return from IV&V By Maturity Level

Maturity Level IV&V Insertion

1 2 3 4 5

Full In-Phase IV&V(0% Rework)

0550,000(55% )

0450,000(45% )

0350,000(35% )

0200,000(20% )

060,000(6% )

IV&V @Requirements Only(22% Rework)

121,000429,000(43% )

99,000351,000(35% )

77,000273,000(27% )

44,000156,000(16% )

13,20046,800(47% )

IV&V @ DesignOnly(7% Rework)

38,500511,500(51% )

31,500418,500(42% )

24,500325,500(33% )

14,000186,000(19% )

4,20055,800(5% )

IV&V @Programming Only(7% Rework)

38,500511,500(51% )

31,500418,500(42% )

24,500325,500(33% )

14,000186,000(19% )

4,20055,800(5% )

End-Game IV&V,(28% Rework)

154,000396,000(40% )

126,000324,000(32% )

77,000273,000(27% )

56,000144,000(14% )

16,80043,200(4% )

20

Components to Return on Investment

• Cost of IV&V

• Expected Return– cost savings - measured as hours of rework

• Likelihood of Returns– how effective is the organization at minimizing

rework?– how effective will IV&V be?

21

Independence…

• An organization independent from the developers study the artifacts of software production [IEEE Std. 1012-1998].

• This requires:- Technical independence. Members of the IV&V team may not be

personnel involved in the development of the software. - .Managerial independence. The responsibility for IV&V belongs to

an organization outside the contractor and program organizations that develop the software.

- Financial independence. Control of the IV&V budget is retained in an organization outside the contractor and program organization that develop the software.

• IV&V is often perceived as testing the code after the development is completed …..NASA IV&V is full life cycle activities

22

IV&V is NOT SQA

• IV&V is a full life cycle set of acivities that are applied to defect prevention, defect detection, and certification. NASA IV&V conforms to IEEE Standard 1012-1998.

• IV&V and Software Quality Assurance (SQA) are not redundant activities. SQA as defined by DOD-Std 2168 defines 10 activities of SQA that are complemented by IV&V activities. There are 32 types of activities conducted by IV&V, of these 32, 22 are unique to IV&V and 10 are complemented by SQA.

23

Ask Ivey Prototype

What ASK IVEY can do…

24

Ask Ivey Input Screen

25

Ask Ivey Pull Down Menu

26

Ask Ivey Numeric Entry

27

Ask Ivey On-Line Report

28

Ask Ivey Printed Report

29

Ask Ivey On-Line Help

30

Questions?

Ask Ivey…