1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Embed Size (px)

Citation preview

Page 1: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

1

FoCal

Status of Silicon Pad detector Array: Design and Tests

1.Review of results from last test beam2.Plan for the test beam for 2015

11 March 2015

Page 2: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Test and Characterization of a Prototype Test and Characterization of a Prototype Silicon-Tungsten Electromagnetic CalorimeterSilicon-Tungsten Electromagnetic Calorimeter

VECC, Kolkata :: Sanjib Muhuri, Shuaib Ahmed Khan, Tapan K. Nayak, Rama Narayana Singaraju, Satyajit Jena

BARC, Mumbai :: Sourav Mukhopadhay, Vinay B. Chandratre, Maneka Sukhwani

and BEL, Bangalore

Published in

“Nuclear Instruments and Methods in Physics Research A 764(2014)24–29.

Page 3: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Silicon Pad 5x5 Arrays Each pad: 1cm2

Laboratory set up:

Layout of a 5*5 array of 1cm*1cm Silicon Detector

28 October 2014 Sanjib Muhuri, IWAD 2014, VECC 3

Page 4: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Laboratory set up and results

28 October 2014 Sanjib Muhuri, IWAD 2014, VECC 4

PMT1

PMT 2

Source- Sr90

Very thin scintillator to get 2 fold triggers

Arrangement for the laboratory experiment

Page 5: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Development of the mini prototype

Test Beam set up:

Arrangement at T10

28 October 2014 Sanjib Muhuri, IWAD 2014, VECC 5

Page 6: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Results From Test Beam Experiment:

28 October 2014 Sanjib Muhuri, IWAD 2014, VECC 6

Responses from am minimum ionizing particle

Page 7: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Responses from electron

ADC ADC

28 October 2014 Sanjib Muhuri, IWAD 2014, VECC 7

Page 8: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Actual Signal pions & electrons

4 GeV

pions

electrons

Satisfactory Signal to noise separation

28 October 2014 Sanjib Muhuri, IWAD 2014, VECC 8

Page 9: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Longitudinal Shower Profile Reconstruction

28 October 2014 Sanjib Muhuri, IWAD 2014, VECC 9

Page 10: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

To check The Linearity of the detector…

28 October 2014 Sanjib Muhuri, IWAD 2014, VECC 10

Shows good linear behavior with respect to the simulation

Page 11: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

36 element Silicon Pad detector

1 sq cm silicon pads in 6×6 array.320 microns. common n. Bias applied negative to p type pads. Signals from p type pads through capacitors.

Bonding diagram for pads .

Page 12: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Detector assembled on the PCB

Bias resistors and coupling capacitors

40 pin connector for signals

Wire bonds from padsGuard ring position one corner

Before wrapping in a black sheet and Al foil

Guard rings left floating

Page 13: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

PMT1

PMT2

Detector

FEE Board

Translator Board

Testing

2 fold from PMTs is trigger to DAQ.Same backplane PCB made for 25 elements.MANAS/ANUSANSKAR readout.

31 1 X

15

23

20

?

29

5

11

X

X28

0

18

2625

X

7

?

22 21

27 30

19

24

17

16

14

13

12 10

9

8

4

?

Numbers inside the squares are DAQ channels. 4 channels left out(marked as X), since we can only read 32. 3 channels bad on FEE board. Fig needs minor corrections .

Test Setup Mapping of Pads to DAQ Channels for one position

Backplane PCB

Page 14: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

RMS study with Bias 4 detector pcbs can be connected to one backplane PCB. Read by 2 FEE boards. 2 detector PCBs are read by one FEE(64 channels). Connected only detector PCB to backplane PCB. So only 32 channels (0 to 31) show higher RMS compared to other 32(32 to 63) RMs is high at bias 0v and decreases with increasing bias voltage. Stabilizes >45V. Few times rms has gone bad for some channels. Mean adc values have gone down to zero. See next 2 slides

@0V@30V @45V

@60V @70V @80V

Page 15: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

@0V @30V

@45V@60V

On 21.08.13

Pedestal Study-1

Mean ADC values for some channels have gone down- channels above colored circles. Suspect humidity- The silicon gels have gone pale.

Page 16: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

@0V @30V

@45V@65V

0n22.0813

Pedestal Study-2

Mean ADC values for all channels have normal values. None close to zero Kept the detector inside desiccators with new silicon gels over night. Humidity in the lab also more due to rains..

Page 17: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

First signals

Page 18: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Status and plans for the test beam (PS and SPS)

• A new PCB for Silicon pad detectors is being made• Pad detectors to be mounted on the PCB• Prepare the readout with MANAS and ANU chips• Prepare the tower

• Present tower design is 4 Si-pad detectors in each plane• Tests can be done with single Si-pad detector in each

plane or with 4 Si-pad detectors in each plane• We have 25 tungsten plates (10 cm x 10 cm)• We can organize properly to gain maximum information

during the tests

• Provision for inserting MAPS detector in between ….

Page 19: 1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015

Arrangement for the Test Beam – Oct 2015

4 Pad detectors: each 6x6 arrayEach pad: 1cm x 1cm

4 tungsten plates: each 10cm x 10 cm