12
ENCOCORP S.A.R.L. COMPANY PROFILE

1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

  • Upload
    lammien

  • View
    230

  • Download
    2

Embed Size (px)

Citation preview

Page 1: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

ENCOCORPS.A.R.L.

COMPANY PROFILE

Page 2: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

COMPANY OVERVIEW

We are the ENGINEERS & CONTRACTORS CORPS operating since 1977 specialized in the construction of industrial projects like power, petrochemical and similar plants, providing the following basic services:

1. EPC - Tank Farms of unit sizes up to 170,000 m3

2. EPC - Heavy Structural Steels3. PC - Piping Networks & Processes4. C - Industrial Plants

ENCOCORP

Page 3: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

ENCOCORP

`

NOTE:

FINANCE & ACCOUNTING

PMV - MAINTENANCE

QUALITY ASSURANCE & CONTROL

DRAFTING

ACCOUNTING

LOGISTICS & PROCUREMENT

MANAGER

PROCUREMENT

PURCHASING

COST CONTROLCONSTRUCTION MANAGEMENT PROPOSALS

ESTIMATION

PLEMICOR

REV PAGECOMPANY ORGANIZATION CHART

ADMINISTRATION & OFFICE MANAGER

ESTIMATION & CONTRACTS

MANAGER

FINANCE & ACCOUNTING

MANAGERPROJECTS MANAGERENGINEERING

MANAGER

ENGINEERING

PUBLIC RELATIONS DESIGN

PLANNING

DATE

00 1/1 15-May-14

CONSTRUCTION ESTIMATION LOGISTICS & PROCUREMENT

QUALITY MANAGER

AUDIT

INSURANCES

PROCUREMENT

LOGISTICS

HEALTH & SAFETY

HUMAN RESOURCES

MANAGING DIRECTOR

ADMINISTRATION

COMPANY ORGANIZATION CHART

Page 4: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

COMPANY HUMAN RESOURCES & EQUIPMENT

ENCOCORP

LIST OF MANPOWER QTY LIST OF EQUIPMENT QTYSite Manager 2 Warehouses of 8,000 sqm 1Site Construction Manager 2 Camp 1Administrator Manager 1 Cars 20Planning Engineer 1 Bending Machine new 1Mechanical Engineer 1 Bending Machine old 1Site Engineer 2 Compressor 12Safety Officer 2 Generator 26Male Nurse 1 Profile bending machine 1Warehouse Supervisor 2 Electrode & Flux oven 5Material Controller 1 Diesel Tanker 2Secretary 1 Crane 220 Ton 1Office Boy 1 Crane 110 Ton 1Camp boss 1 Crane 75 Ton 1Site Supervisor 2 Crane 50 Ton 5Fabrication Foreman 2 Crane 35Ton 2Erection Foreman 4 Crane 25Ton 1Welding Foreman 2 Crane 15Ton 1Electrician 10 Overhead Crane 10Ton 9Plumber 2 Scissor Lift 8Painting Inspector 1 GenieManlift27mtr 3Welder 65 JCB 1Ass. Welder 15 Hydraulicworkshoppress 1Labours 35 AirlesspaintingMachine 6Equipment Mechanic 5 LatheMachine 2Painter / Blaster 35 CNCMachine 2Driver / operator 15 Dieselweldingmachine600A 14Tank Fitter 30 Forklift3T,5T&10T 3Pipe Fitter 20 Tractorwelding1000A 4Time keeper 2 DoubleGirthwelding1000A 8Grinder 25 AutoBlastingMachine 2Scaffolders / Rigger 15 ManualHandBlastingMachine 6Steel Fabricator 2 HookupElectricalDrill 3

305 BandsawMachine 4Tigweldingmachine 3PlateBavellingMachine(GBC) 2BoomTruck 1Truck 3Multifunctionironwork 2

Page 5: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

LATEST PROJECTS EXECUTEDProject Country Contract

value U.S.$

Project Description Client Year

ROYALCOMMISSION-STEELSTORAGETANKS K.S.A 2,214,000 FABRICATION,PAINTING &ERECTIONOF2*2000m3 &

2*3000m3POTABLEWATERSTEELTANKS (FIXEDROOFTANKS) AZMEEL 2016

MISCWORKS&SERVICES K.S.A 4,000,000 Various Clients MISC 2015

PORTTERMINAL CONTAINER CRANESK.S.A ,KUWAIT,ADEN&UAE

20,000,000 ERECTIONOFCONTAINERCRANES STS, RMG&RTG LIEBHERRCONTAINERCRANES 2010-2015

RASALKHAIRPOWER&DESALINATIONPLANT K.S.A 27,000,000 FABRICATION,PAINTING &ERECTIONOF6*170,000M3POTABLE

WATERSTEELTANKS (FIXEDROOFTANKS)MessesALRASHID-RTCC 2011-2015

EASTERNPROVINCEWTSPHASE II-STORAGETANKS K.S.A 21,000,000

DESIGN,FABRICATION& ERCTIONOFSTEELWATERTANKS3N°140,000M3;4N°50,000M3;1N° 30,000M3(FIXEDROOFTANKS)

YUKSELINSAAT AS 2009-2010

SHOAIBAIII IWPPPROJECT-STORAGETANKS K.S.A 8,300,000 DESIGN,FABRICATION &ERECTIONOF2N° 140,000M3STEEL

WATERTANKS (FIXEDROOFTANKS)ALRASHIDTRAD.&CONTR.CO.LTD 2009-2010

SHOAIBAIII IWPPPROJECT-PIPINGUNIT20 K.S.A 4,400,000 BOPHIGHPRESSUREPIPINGINSTEAMTURBINEHALL SIEMENSAGPG 2008

SHOAIBAIII IWPPPROJECT-EGSYSTEM K.S.A 4,500,000 40"CRUDEOILPIPELINEWITHPUMPHOUSE&LOADINGARMS+YARDFUELPIPINGTOBOILERHOUSE SIEMENSAGPG 2008

SHOAIBAIII IWPPPROJECT-FGD K.S.A 4,500,000 ASSEMBLY&ERECTIONOF3N° FLUEGASDESULPHURIZATION(FGD)UNITS SIEMENSAGPG 2007

SHOAIBAIII IWPPPROJECT-TANKS K.S.A 31,500,000 SUPPLYOF3N° CRUDEOILTANKSOF134,000M3/EACH(FLOATINGROOFTANKS) &4N° TANKSOFDIFFERENTSIZES SIEMENSAGPG 2006-2008

KINGABDULAZIZINTERNATIONALAIRPORT(KAIA) K.S.A 3,750,000 JET-A1 (AVIATIONFUEL)PIPINGNETWORK ALMABANI-GENERAL

CONTRACTORS 2007-2008

PP9(BLOCKF)POWERPLANTPROJECT K.S.A 15,300,000 SUPPLYOFFUELSTORAGETANKS(FLOATINGROOFTANKS) BEMCO 2006-2008

RABIGHOLEFINPLANTPROJECT K.S.A 5,100,000 ERECTIONOFSPHERICAL&ATMOSPHERICTANKS JGC/ARAMCO 2006-2007

ENCOCORP

Page 6: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

ENCOCORP

PREVIEW OF SOME OF THE LATEST PROJECTS

Shoaiba III IWPP - TANKS• Description: EPC of 3 Crude Oil Storage Tanks, 134,000 m3 each• Year: 2006-2008• Work Quantification: 9,000 Tons

Page 7: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

ENCOCORP

Page 8: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

ENCOCORP

PREVIEW OF SOME OF THE LATEST PROJECTS

Shoaiba III IWPP – FGD Ducts & Fuel Pipeline• Description: Heavy Lifting, Erection & Welding works• Year: 2007-2008

Page 9: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

ENCOCORP

Page 10: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

PREVIEW OF SOME OF THE LATEST PROJECTS

Shoaiba I Phase III – Desalination Plant• Description: E&C of 2 Water Storage Tanks, 140,000 m3 each• Year: 2009-2010• Work Quantification: 5,000 Tons

ENCOCORP

Page 11: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

PREVIEW OF SOME OF THE LATEST PROJECTS

Ras Al Khair– Desalination Plant• Description: E&C of 6 Water Storage Tanks, 170,000 m3 each• Year: 2011-2014• Work Quantification: 18,000 Tons

ENCOCORP

Page 12: 1- ENCOCORP COMPANY PROFILE overview we are the engineers ... 40" crude oil pipeline with pump house & loading arms ... assembly & erection of 3 n °flue gas desulphurization (fgd)

PREVIEW OF SOME OF THE LATEST PROJECTS

King Abdullah Economic City Port – Terminal Container Port• Description: Erection of Container Cranes• Year: 2013-2014• Work Quantification: 8 Ship-To-Shore & 36 Rubbed-Tire-Gantry Cranes