141
Table of Contents 1. INTRODUCTION 4 1.1 PURPOSE OF THIS REPORT 4 1.2 BELA BELA LOCAL MUNICIPALITY 4 1.3 LOCATION 4 1.4 SCOPE OF THE REVIEW PROCESS 5 1.5 FORMULATION OF THE CREDIBLE IDP 5 1.6 ACTUAL IDP PROCESS IN LINE WITH THE 2008/ 09 IDP PROCESS PLAN 6 2. GUIDING IMPERATIVES: POLICY PERSPECTIVE 7 2.1 COMPULSORY REQUIREMENTS BY THE NATIONAL AND PROVINCIAL PRIORITIES AND STRATEGIES ON BELA BELA MUNICIPALITY 7 2.1.1 SPATIAL IMPERATIVES 7 2.1.2 ECONOMIC DEVELOPMENT IMPERATIVES 8 2.1.3 ENVIRONMENTAL MANAGEMENT 9 2.1.4 RURAL DEVELOPMENT CONTEXT 10 2.1.5 SERVICE DELIVERY 11 2.1.6 GOOD GOVERNANCE 12 2.2 LEGAL FRAMEWORK 13 2.2.1 THE CONSTITUTION OF THE REPUBLIC OF SOUTH AFRICA (ACT 108 OF 1996) 13 2.2.2 MUNICIPAL SYSTEMS ACT 32 OF 2000 13 3. REGIONAL CONTEXTUAL ANALYSIS 15 3.1 ROLE OF BELA BELA IN ITS REGIONAL CONTEXT 15 3.1.1 BELA BELAS POSITION IN THE REGIONAL SPACE ECONOMY 15 3.1.2 BELA BELA IN THE CONTEXT OF LIMPOMPO AND WATERBERG DISTRICT 16 3.2 BELA BELAS INTRINSIC CHARACTERISTICS AND CRITERIA FOR SUCCESS 16 4. LEVEL OF DEVELOPMENT AND POVERTY ASSESSMENT 17

1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

  • Upload
    ledan

  • View
    224

  • Download
    2

Embed Size (px)

Citation preview

Page 1: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

Table of Contents

1. INTRODUCTION 4

1.1 PURPOSE OF THIS REPORT 41.2 BELA BELA LOCAL MUNICIPALITY 41.3 LOCATION 41.4 SCOPE OF THE REVIEW PROCESS 51.5 FORMULATION OF THE CREDIBLE IDP 51.6 ACTUAL IDP PROCESS IN LINE WITH THE 2008/ 09 IDP PROCESS PLAN 6

2. GUIDING IMPERATIVES: POLICY PERSPECTIVE 7

2.1 COMPULSORY REQUIREMENTS BY THE NATIONAL AND PROVINCIAL PRIORITIES AND STRATEGIES ON BELA BELA MUNICIPALITY 7

2.1.1 SPATIAL IMPERATIVES 72.1.2 ECONOMIC DEVELOPMENT IMPERATIVES 82.1.3 ENVIRONMENTAL MANAGEMENT 92.1.4 RURAL DEVELOPMENT CONTEXT 102.1.5 SERVICE DELIVERY 112.1.6 GOOD GOVERNANCE 122.2 LEGAL FRAMEWORK 132.2.1 THE CONSTITUTION OF THE REPUBLIC OF SOUTH AFRICA (ACT 108 OF 1996)

132.2.2 MUNICIPAL SYSTEMS ACT 32 OF 2000 13

3. REGIONAL CONTEXTUAL ANALYSIS 15

3.1 ROLE OF BELA BELA IN ITS REGIONAL CONTEXT 153.1.1 BELA BELA’S POSITION IN THE REGIONAL SPACE ECONOMY 153.1.2 BELA BELA IN THE CONTEXT OF LIMPOMPO AND WATERBERG DISTRICT 163.2 BELA BELA’S INTRINSIC CHARACTERISTICS AND CRITERIA FOR SUCCESS 16

4. LEVEL OF DEVELOPMENT AND POVERTY ASSESSMENT 17

4.1 POPULATION DYNAMICS AND FUTURE GROWTH TRENDS 174.1.1 POPULATION SIZE AND GROWTH PROJECTIONS 174.1.2 POPULATION DISTRIBUTION 184.1.3 AGE COMPOSITION 184.1.4 GENDER DIFFERENTIATION 194.2 SOCIO – ECONOMIC DEVELOPMENT AND LIVELIHOODS 204.2.1 UNEMPLOYMENT AND POVERTY ANALYSIS 204.2.2 EDUCATION PROFILE AND LITERACY LEVELS 214.3 SERVICE DELIVERY: INFRASTRUCTURE PROVISION AND ACCESS TO SOCIAL

SERVICES 224.3.1 BASIC SERVICES: WATER, SANITATION, ENERGY AND REFUSE REMOVAL 224.3.2 MOVEMENT PATTERN AND ROAD INFRASTRUCTURE 234.3.3 PUBLIC HEALTH AND HIV/ AIDS 24

Page 2: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.3.4 PUBLIC SAFETY 264.3.5 SPORTS, RECREATION FACILITIES AND YOUTH DEVELOPMENT 264.4 ENVIRONMENTAL ANALYSIS IN BELA BELA 274.5 HOUSING DEVELOPMENT AND DELIVERY WITHIN BELA BELA 304.5.1 CURRENT HOUSING NEEDS, DEMAND AND PROVISION 304.5.2 PRINCIPLES ON SUSTAINABLE HUMAN SETTLEMENTS (SHS) 314.6 ECONOMIC DEVELOPMENT: SIZE AND STRUCTURE OF THE LOCAL

ECONOMY 324.6.1 TOURISM 334.6.2 AGRICULTURE 344.6.3 MINING 354.6.4 TRADE AND COMMERCE 354.6.5 SMME DEVELOPMENT AND THE SECOND ECONOMY 364.7 LAND REFORM AND RURAL DEVELOPMENT 364.8 INSTITUTIONAL AND FINANCIAL ANALYSIS 394.8.1 STRUCTURE OF THE ORGANIZATION 394.8.2 MUNICIPAL ADMINISTRATION 394.8.3 DEMOCRACY AND GOVERNANCE 43

4.8.3.1 Community Education and Participation 434.8.3.2 Interaction with community 434.8.3.3 Municipal Financial Strategy 444.8.3.4 MEC Comment 45

4.8.4 STRENGTH, WEAKNESSES, OPPORTUNITIES AND THREATS (SWOT) ANALYSIS OF INSTITUTIONAL SITUATION 46

4.9 KEY DEVELOPMENT ISSUES 474.9.1 COMMUNITY AND STAKEHOLDER PRIORITY ISSUES 47

4.9.1.1 Backlogs in the Delivery of Basic Infrastructure: Roads, Water and Sanitation 47

4.9.1.1 Backlogs in the Delivery of Public Facilities: Crime, HIV/AIDS, Education and Skills 47

4.9.1.2 Poor Access to Shelter 474.9.1.5 Economic Development and Job Creation 48

4.9.2 MUNICIPAL PRIORITY ISSUES 484.9.2.1 Ensuring the Provision of Basic Service 484.9.2.2 Institutional Development 48

5. STRATEGIC FRAMEWORK 49

5.1 INTRODUCTION 495.2 VISION AND MISSION STATEMENT 495.2.1 VISION 495.2.2 MUNICIPAL MISSION STATEMENT

485.2.3 MUNICIPAL VALUES 495.3 LOCALISED STRATEGIC GUIDELINES 515.3.1 INTRODUCTION 515.3.2 LOCALISED STRATEGIC GUIDELINES FOR SPATIAL IMPERATIVES 515.3.3 LOCALISED STRATEGIC GUIDELINES FOR ECONOMIC DEVELOPMENT 525.3.4 LOCALISED STRATEGIC GUIDELINES FOR ENVIRONMENT MANAGEMENT 53

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

1

Page 3: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

5.3.5 LOCALISED STRATEGIC GUIDELINES FOR RURAL DEVELOPMENT, POVERTY ALLEVIATION AND GENDER EQUALITY 54

5.3.6 LOCALISED STRATEGIC GUIDELINES FOR SERVICE DELIVERY, INSTITUTIONAL ARRANGEMENTS AND GOOD GOVERNANCE 55

5.4 DEVELOPMENT OBJECTIVES AND STRATEGIES 575.4.1 IDP PRIORITIES IN LINE WITH NATIONAL KPAS, LOCAL KPIS AND

PERFORMANCE TARGETS 575.4.2 DETAILED DEVELOPMENT PRIORITISES, OBJECTIVES AND STRATEGIES 58

5.4.2.1 Priority No. 1: Roads and Storm water 585.4.2.2 Priority No. 2: Electricity 595.4.2.3 Priority No. 3: Water, Sanitation and Refuse Removal 605.4.2.4 Priority No. 4: Land, Housing and Infrastructure 615.4.2.5 Priority No. 5: Local Economic Development 625.4.2.6 Priority No. 6: Good Governance 635.4.2.7 Priority No. 7: Sports, Arts, Culture, Recreational Facilities and

Cemeteries 645.4.2.8 Priority No. 8: Safety and Security 655.4.2.9 Priority No. 9: Prevention of HIV/ AIDS and Other Life –

Threatening Diseases 655.4.2.10 Priority No. 10: Education 655.4.2.11 Priority No. 11: Municipal Financial Viability 665.4.2.12 Priority No. 11: Municipal Transformation and Institutional

Development 66

6. CAPITAL INVESTMENT FRAMEWORK 67

6.1 INFRASTRUCTURE DEVELOPMENT PROJECTS 676.2 COMMUNITY AND SOCIAL DEVELOPMENT PROJECTS 686.3 ECONOMIC DEVELOPMENT AND PLANNING PROJECTS 696.4 INSTITUTIONAL DEVELOPMENT PROJECTS 716.5 DEVELOPMENT PROJECTS BY SECTOR DEPARTMENTS AND SERVICE

DELIVERY AGENCIES 726.5.1 DEPARTMENT OF TRANSPORT 726.5.2 ROAD AGENCY LIMPOPO (RAL) 726.5.3 ESKOM DISTRIBUTION 726.5.4 DEPARTMENT OF WATER AFFAIRS AND FORESTRY 736.5.4 DEPARTMENT OF LOCAL GOVERNMENT AND HOUSING 736.5.5 DEPARTMENT OF AGRICULTURE 736.5.7 LIMPOPO TOURISM AND PARKS 746.5.8 LIMPOPO BUSINESS SUPPORT AGENCY 746.5.8 DEPARTMENT OF HEALTH AND SOCIAL DEVELOPMENT 756.5.9 DEPARTMENT OF LABOUR 75

7 IMPLEMENTATION FRAMEWORK 76

7.1 FINANCIAL PLAN 767.2 MEDIUM TERM – OPERATING REVENUE AND EXPENDITURE 777.3 MEDIUM TERM – CAPITAL FUNDING AND EXPENDITURE FRAMEWORK 787.4 SPATIAL DEVELOPMENT FRAMEWORK 78

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

2

Page 4: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

7.4.1 SPATIAL DEVELOPMENT OBJECTIVES 787.4.2 SPATIAL DEVELOPMENT RATIONALE AND HIERARCHY OF NODES 797.4.3 BELA BELA SPATIAL FRAMEWORK FOR FUTURE DEVELOPMENT 80

7.4.3.1 Bela Bela Town and Urban Edge 807.4.3.2 Small Towns (Pienaarsriver, Radium and Settlers) 817.4.3.3 Settlement Areas and Villages (Rapotokwane) 817.4.3.4 Farmlands and Agriculture Developments 81

7.5 PERFORMANCE MANAGEMENT SYSTEM 827.6 LAND USE MANAGEMENT SYSTEM 837.7 Status of Sector Plans 84

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

3

LIST OF TABLESTable 1.Availability of Health Facilities in Bela Bela

24Table 2. Availability of Police Stations

25Table 3. Availability of Sports, Arts, Culture and Recreational Facilities in Bela Bela

26Table 4. Settled Land Claims within Bela Bela Municipal Area

35Table 5. Gazetted Land Claims within Bela Bela Municipal Area

35Table 6. Outstanding Land Claims within Bela Bela Municipal Area

36Table 7: Municipal Staff Compliment

38Table 8: Management Capacity for Executing the Municipal Powers and Functions

39Table 9: Core Departmental Functions, Capacity and Constraints: Budget and Treasury Department 39Table 10: Core Departmental Functions, Capacity and Constraints: Technical Services Department 40Table 11: Core Dept. Functions, Capacity and Constraints: Social and Community Services Department 40Table 12: Core Dept. Functions, Capacity and Constraints: Econ. Dev. and Planning Department 41Table 13: Financial Strategies

43Table 14: SWOT Analysis 45Table 15: Localised Strategic Guidelines on Spatial Imperative

49Table 16: Localised Strategic Guidelines on Economic Development

50Table 17: Localised Strategic Guidelines on Environmental Management

51Table 18: Localised Strategic Guidelines on Rural Development, Poverty Alleviation and Gender Equality. 53Table 19: Localized Strategic Guidelines on Service Delivery, Institutional Development and Good Governance 54Table 20: Bela Bela Municipality 2008/ 09 Preliminary Budget

74

LIST OF FIGURESFigure 1: Population Growth 2001 – 2020

16Figure 2: Population Distribution in Bela Bela Municipal Area

17Figure 3: Age Structure in Bela Bela Municipal Area.

18Figure 4: Gender Composition

18Figure 5: Employment and Unemployment Status

Page 5: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

1. INTRODUCTION1.1 PURPOSE OF THIS REPORT

Bela Bela Municipality IDP (2008/ 09) will serve as a strategic guide within all spheres of development within the municipality (please refer to Box 1). It will be based on the issues articulated by the stakeholders and will be aligned with the national and provincial development imperatives such as National Spatial Development Perspective (NSDP), Accelerated and Shared Growth Initiatives for South Africa (AsgiSA) and the Limpopo Provincial Growth the Development Strategy (PGDS).

Its objectives are as follows:• To guide decision making

in respect of servicedelivery and public sectorinvestment.

• To inform budgets andService delivery programsof various governmentdepartments and serviceagencies.

• To coordinate theactivities of variousservice delivery agencieswithin Bela Bela.

1.2 BELA BELA LOCAL MUNICIPALITY

Bela Bela Municipal Area is approximately 4000 km2 in extent. It is one of the six local municipalities that exist within Waterberg District Municipality. This local authority consists of eight municipal wards and it is considered to be a significant contributor to the economy of the district due to a number of positive factors that it entails, particularly its location and role in the regional economy brought by the cross boundary opportunities which includes the areas that fall

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

4

Box 1: Section 25 (1) of the Municipal Systems Act (MSA)(2000)

Each municipal council must, within a prescribed period after the start of its elected term, adopt a single, all inclusive and strategic plan for the development of the municipality which: a) Links integrates and coordinates plans and takes into account proposals for the development of the municipality;b) Aligns the resources and capacity of the municipality with the implementation of the plan;

Page 6: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

outside of the Limpopo Province. Part of this will be covered in detail on the next sections.

1.3 LOCATION

Bela Bela Municipality is located on the south – western region within the administrative boundaries of Waterberg District Municipality which forms part of the Limpopo Province. The municipality shares the boundaries with Modimolle Municipality to the north, Thabazimbi to the west. The municipality also shares the boundaries with Mpumalanga Province to the south east, Gauteng to the south and North – West province to the south west.

1.4 SCOPE OF THE REVIEW PROCESS

The preparation of a new IDP is based on a Process Plan, which Bela Bela Municipality adopted in terms of the Municipal Systems Act, 32 of 2000. The Plan establishes a firm foundation for the alignment of the IDP and budget preparation processes. This plan has to include the following:-• A programme specifying the time frames for the different planning steps;• Appropriate mechanisms, processes and procedures for consultation

and participation of local communities, organs of state, traditional authorities, and other role players in the IDP drafting process;

• An indication of the organizational arrangements for the IDP process;• Binding plans and planning requirements, i.e. policy and legislation; and• Mechanisms and procedures for vertical and horizontal alignment

1.5 FORMULATION OF THE CREDIBLE IDP

The National Department: Provincial and Local Government (DPLG) prepared an Evaluation Framework for credible IDPs. This Evaluation Framework is intended to serve as a tool to guide the assessment of a credible IDP and the core criteria to demonstrate municipal strategy, vision and compliance with both legislative and policy intent have been crafted to assist the assessors during the analysis process. This framework is not intended to serve the purpose of a performance measurement tool, but rather a reference tool or guideline towards establishing the quality of a credible IDP. In this 2008 – 2013 Bela Bela Local Municipality IDP process took due cognisance of the

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

5

Page 7: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Credible IDP Evaluation Framework as a guide to formulating and adopting a credible IDP. The following aspects are considered to be relevant in respect of the preparation of the credible IDP:

Consciousness by the Bela – Bela Municipality of its constitutional and policy mandate for developmental local government, including its powers and functions;

Awareness by Bela Bela Municipality of its role and place in the local, regional, provincial and national context and economy;

Awareness by Bela Bela Municipality of its own intrinsic characteristics and criteria for success;

Comprehensive description of the Bela Bela Municipal Area in terms of the environment and the spatial characteristics;

A clear strategy, based on local developmental needs; Insights into the trade-offs and commitments that are being made

regarding economic choices, establishment of Sustainable Human Settlements, integrated service delivery, etc.;

The key deliverables for the next five (5) years; Clear measurable budget and implementation plans aligned to the

SDBIP A monitoring system; Determining the capacity and capability of Bela Bela Local

Municipality; Communication, participatory and decision making mechanisms; The degree of intergovernmental action and alignment to

government wide priorities.

1.6 Actual IDP Process in Line with the 2008/ 09 IDP Process Plan

Activity Schedule Date (Process Plan)

Actual Date (when the Activity was undertaken)

Responsibility

1. PREPARATORY PHASE1.1 Preparation of the IDP Process Plan Beginning of

September 20073 September 2007 IDP Manager

1.2 Approval of the IDP Process Plan End of September 2007

6 October 2007 Mayor and Executive Council

2. ANALYSIS PHASE2.1 Municipal wide analysis and assessment of the level of development

Beginning of October 2007

1 October 2007 IDP Manager

2.2 In – depth analysis of priority issues Mid October 2007 8 October 2007 IDP Manager2.3 First IDP Steering Committee Meeting

Mid October 2007 24 October 2007 Steering Committee Members(Municipal Management Officials,Sector Departments)

2.4 First IDP Rep Forum Mid October 3 November 2007 Rep Forum Members__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

6

Page 8: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

3. STRATEGIC PHASE3.1 Preliminary Review of the Long Term Development Framework

Beginning of November 2007

1 November 2007 IDP Manager

3.2 Second IDP Steering Committee Beginning of November 2007

7 December 2007 Steering Committee Members

3.3 Second IDP Rep Forum End of November 2007

10 December 2007 Rep Forum Members

4. PROJECT PHASE4.1 Preliminary Project Review and preliminary budget allocations

Beginning of December 2007

13 December 2007 IDP Manager

4.2 Third IDP Steering Committee Mid December 2007

18 February 2008 Steering Committee Members

4.3 Third IDP Rep Forum Mid December 2007

6 March 2008 Rep Forum Members

5. INTEGRATION PHASE5.1 Integrating all reviewed activities including sector departments projects and programmes

Mid February 2008 18 February 2008 – to – 6 March 2008

Steering Committee and Rep Forum

6. APPROVAL PHASE6.1 Draft IDP tabled to council for notification

End of April 2008 18 April 2008 Planning and Infrastructure Sub – Committee

6.2 Invitation of Public Comments Beginning of May 2008

25 April 2008 – 21 May 2008

IDP Manager and Municipal Manager

6.3 Final Adoption of the IDP by Council as a legally binding document

End of May 2008 Municipal Council

2.GUIDING IMPERATIVES: POLICY PERSPECTIVE

2.1 COMPULSORY REQUIREMENTS BY THE NATIONAL AND PROVINCIAL PRIORITIES AND STRATEGIES ON BELA BELA MUNICIPALITY

2.1.1 SPATIAL IMPERATIVES

The National Spatial Development Perspective (NSDP) is a critical strategic approach that Bela Bela should align its development mandate with, due to the fact that the municipal area is strategically and advantageously located adjacent to the areas that the NSDP classify as the areas of major national economic significance in the space economy of the country. Further to that Bela Bela exists within Waterberg District Municipality which was considered by the NSDP as one of the top nineteen district municipalities in the country that experienced a great number of in-migration which was estimated at __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

7

Page 9: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

11 694 between 2001 – 2006. Waterberg District is also considered to be the one of the top 20 contributors to the national Gross Value Added (GVA) as reported by the NSDP.

The principal normative principles of the NSDP that have implications for Bela Bela and the key strategies towards its future developmental role in the national space economy include amongst others the following:- Economic growth – this requires the government spending on fixed

investments (i.e. infrastructure and service delivery) to be focused on localities of economic growth and/ or economic potential in order to gear up private sector investment and to stimulate sustainable economic activities and to create long – term employment. This has the key implications for Bela Bela since the area has enormous potential for economic development due to its locality advantages and there are a number of private investors who have approached the municipality with regards to initiating large scale investment projects which can contribute enormously on the economic growth and employment generation of the area. Based on the recommendations of the NSDP, the municipality in partnership with other government structures should therefore ensure that the current gaps that exists with due regards to the provision of adequate infrastructure (i.e. water, sanitation and energy supply etc.) are addressed since the basic infrastructure should serve as the fixed investment for realizing the principle of economic growth.

Integrated development – the developmental mandate that the local and provincial government has the responsibility to fulfill is complex and diverse. This principle requires that all the separate and diverse elements that exists with regards to accomplishing this developmental mandate should be combined and co – ordinated into a more complete or harmonious whole. Bela Bela should therefore strive for achieving all aspects of integrated development in terms of the institutional arrangements, spatial planning perspective and even beyond its boundaries of jurisdiction (i.e. national, provincial and regional level).

Integration in terms of the institutional arrangements means taking into account the often disparate sectoral concerns, initiatives, policies and other service delivery requirements when planning for development and adopting an inclusive and participatory approach to the developmental issues to ensure economic, environmental and social sustainability. Integration in terms of the spatial perspective requires Bela Bela to overcome the spatial distortions of apartheid, future settlement and economic

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

8

Page 10: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

development opportunities should be channeled into activity corridors and nodes that are adjacent to or that link the main growth centres. Infrastructure investment should primarily support localities that will become major growth nodes in South Africa and the SADC region to create regional gateways to the global economy. Integration beyond the boundaries of the area’s jurisdiction takes into account the fact that Bela Bela is one of the different regions within the country which have different economic potential and the spatial variations with other regions while at the same time being tightly interlinked to those regions. The interlinkages can either be very symbiotic, mutually beneficial, highly exploitative or even parasitic relationships. Bela Bela as the region should well understand its interlinkages with other regions and that should also inform the development it initiates instead of living in denial and planning development that is too locally orientated as if such interlinkages does not exist. This would also ensure that the regional and national wide spatial forms become more conducive for social and economic inclusion and the strategic coordination, interaction and alignment in terms of directing fixed public and private investments becomes possible.

Equity – the gap between urban and rural as well as the nature of services that exists within still depict the inequalities such that the urban residents in many instances are privileged with the availability of a range of social and economic opportunities and facilities. The principle of equity in this context requires the efforts to be made in order to address past and current social inequalities and these should focus on people, rather than places. The NSDP further states that in localities where there are both high levels of poverty and demonstrated economic potential, this could include fixed capital investment beyond basic services to exploit the potential of those localities. In localities with low demonstrated economic potential, government should, beyond the provision of basic services, concentrate primarily on human capital development by providing education and training, social transfers such as grants and poverty-relief programmes. It should also reduce migration costs by providing labour-market intelligence to give people better information, opportunities and capabilities, to enable them to gravitate - if they choose to - to localities that are more likely to provide sustainable employment and economic opportunities.

In addition to the above principles the NSDP further emphasize that there is a need for a more efficient national space economy, which should be harmonized between the NSDP, PGDS, IDPs and SDFs. This therefore implies the PGDS should be informed by the NSDP in order

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

9

Page 11: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

for the IDPs and SDFs at the local level to be able to fully comply with both these strategies.

2.1.2 ECONOMIC DEVELOPMENT IMPERATIVES

The Accelerated Shared Growth Initiative of South Africa (ASGISA) is a national economic strategy with the target that is set by the National Government which is to halve poverty by 2014 within the country. The specific projects that are considered to have an impact on ASGiSA within Limpompo are a water reticulation project for Mokopane – Vaalwater – Marken and Dilokong Platinum Corridor which aim to integrate development located around the planned De Hoop Dam. Although there are no specific projects from Bela Bela which appear on the ASGiSA strategy document, there are overarching principles which have the key implications for Bela Bela such that ASGiSA’s targets intends to ensure the creation of employment opportunities, improving the living standards and increasing access to basic services which is the mandate for the government at the local level. Further to that the Accelerated and Shared Growth Initiative for South Africa (AsgiSA) brings the social development and economic development and growth commitments together in a systemic manner. It identifies infrastructure development and local economic development programs which are both focused as a local government level, as one of the critical initiatives that can facilitate investment and improve growth prospects.

The Provincial (Limpopo) Growth and Development Strategy (PGDS) has a target to increase the economic growth of the province by 9% from 2001 – 2010 and by 12% from 2010 – 2020. The approach that the strategy intends to use in order to meet these is to position the province for international competitiveness and investments that should be mainly capitalize on the development of economic clusters which are considered to have the potential within Limpopo. These clusters include mining, agriculture (horticulture and food processing – red and white meat), logistics, forestry and tourism. In terms of Bela Bela, it should be noted that the most relevant cluster is tourism which is considered to be the sunrise sector within the area.

In addition to the above, the state of the nation which was addressed by the President in 2007 identified the key priority which has the implications for economic development and these are:- Job Creation, Eradication of poverty and addressing inequalities; To promote the growth of the small and medium business sector; To speed up the process of skills development; To implement detailed programmes to respond to the challenges of

the second economy;__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

10

Page 12: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

To implement programmes to build a social security net to meet the objectives of poverty alleviation;

Implementation of the Expanded Public Works Programme: job creation, training, youth maintenance of public buildings.

Youth: development of young entrepreneurs, and integration of youth development into the mainstream of government work including linking unemployed graduates to employment opportunities and youth co-operatives programme.

Coordinate and align all anti-poverty programmes to maximize impact and avoid wastage and duplication;

2.1.3 ENVIRONMENTAL MANAGEMENT

Ensuring the environmental sustainability is the seventh millennium development goal. This goal was supported by the recommendations that the principles for sustainable development which ensures that the environmental resources are adequately protected should be integrated into the country’s policies and programmes. The national framework for sustainable development in South Africa emphasize that one of the strategic priorities for sustainable development is to “sustain the ecosystems and the use of resources” as well as to “respond appropriately to emerging human development, economic and environmental challenges”. Further to that section 24 of the Constitution entrenches environmental and emphasize that ‘everyone has the right, to an environment that is not harmful to their health or well being and to have the environment protected, for the benefit of the present and future generation to appreciate and value. This therefore enforced a number of legislation and other measures that:- “Prevent pollution and ecological degradation; Promote conservation; and Secure ecologically sustainable development and use of natural

resources whilepromoting justifiable economic and social development”

In addition to the above it is important to note that the environment is a holistic concept of which humans are an integral component. In order to ensure sustainable development we must understand and adequately consider the impact on it will or may have on the environment. Sustainable development extends beyond the protection of plants and animals. Environmental protection and sustainability is about balancing the needs and aspirations of people in terms of basic socio-economic considerations with the capacity of the natural/ physical environment to accommodate these needs and aspirations. Sustainable development address issues of conservation (of renewable and non-renewable resources) as well as managing the influence that

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

11

Page 13: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

people have on the environment. Sustainable development in Bela-Bela Municipality therefore requires the balancing of environmental, economic and social development needs and strategies.

2.1.4 RURAL DEVELOPMENT CONTEXT

There are key approaches that were prepared at a national level to address rural development which have the key implications for Bela Bela Municipal Area. The Integrated Sustainable Rural Development Strategy (ISRDS) was prepared at a national level with a concern of the massive poverty, poor level of infrastructure, lack of basic services and weak human capital in rural areas. The strategy acknowledged the fact that the rural areas are not homogenous such that the notion of the area that is classified as rural can range from the commercial farmlands, subsistence farms, small villages and even nature reserves which have the different plus contradictory functions as well as different development needs.

The key recommendations that the Integrated Sustainable Rural Development Strategy makes which has the implications for the development of the area that are classified as rural within Bela Bela Area includes amongst others the following:-

Human Resource Development and Capacity Building – this would be intended to address the low skills base that exists amongst the large number of the population who reside within the rural areas.

Land Reform – implementing land reform effectively within the farmlands is considered to be the critical component of the Integrated Sustainable Rural Development Strategy since the farmworkers are considered to be the most vulnerable margin of the population in rural areas. The important aspects on land reform are beyond the distribution of land to the African communities or improving security of tenure but it should also promote sustainable commercial agriculture by the new emerging African farmers especially those who were the farm workers. In addition to that the state of the nation address identified land reform as one of the key priorities particularly land redistribution, restitution and implementation of the communal land rights act.

Community based income generation projects – are also considered to be the important elements for rural development subject to the determining factors such as the natural resources and economic opportunities to make these projects viable. These projects can include amongst others the communal irrigation schemes, small – scale community based agro – processing, roadside market stalls for sales of crafts or fruits to the tourist etc.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

12

Page 14: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

ISDRS further emphasize that rural development should be supported by the adequate level of infrastructure and in order for rural development to be sustainable the community should participate when projects are conceived and they should have ownership over them to allow for the bottoms up approach. The ISDRS further states that the IDP process at a local municipal level is critical in co – ordinating rural development with municipal budget and commitment of the line function departments and other sources. It is also important that when analysing the achievements in terms of rural development, the focus should be more at the efficiency and effectiveness of the initiatives rather than an illustration of the expenditure on infrastructure.

2.1.5 SERVICE DELIVERY

The South African Constitution obliges the municipalities to ensure that planning and provision of sustainable basic services must be provided to the citizens. This obligation is also given effect by the Municipal Systems Act of 2000, which prescribe the process to be followed by the municipality to employ a mechanism for service delivery in its area of jurisdiction and give priority to the basic needs of the local communities. The district councils also have a specific role and responsibility with regards to assisting and supporting the local municipalities in terms of service delivery, this support includes planning and allocation of funding for the local municipalities following a set of structured procedure which is titled as MIG (Municipal Infrastructure Grant). In order for the district municipalities to organize and equip themselves for assisting the local municipalities with service delivery there is a need for the district wide sector plans to be prepared. These plans may include amongst others the Water Services Development Plan (WSDP), Electricity Sector Development Plan (ESDP) and Disaster Management Plan (DMP). In case of Waterberg District the sector plans that have been prepared include Integrated Transport Plan, Disaster Management Plan, Integrated Waste Management Plan, Integrated Environmental Management Plan and a District Local Economic Strategy.

The state of the nation address identified some of the key priorities for service delivery which includes amongst others the following:-

To expand access to such services as water, electricity and sanitation i.e. Water for all by 2008, Sanitation for all by 2010, and electricity for all by 2012.

To improve the health profile of the population; To intensify the housing programme; To improve the safety and security of all citizens and communities; Address all indigence;__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

13

Page 15: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

2.1.6 GOOD GOVERNANCE

The principle of good and fair governance requires that the planning process that is involved in the comprehensive IDP must be democratic, legitimate and participatory. The integrated development planning process in nature is centrally important in terms of government function since the issues that directly affect the lives of the people are interrogated and it should be characterised by fairness and transparency. The following criteria’s can be outlined in order to ensure that the principles and norms of good and fair governance are adopted in a constructive manner:-

Accessible participatory structures – should be created to allow interested and affected parties to express their concern or support on different issues within all spheres of development in the public life.

Decision making – decisions that should be made should be at the public domain with written reasons available to any interested party on request. Hence no decision will be undertaken behind closed doors.

Accessibility of information – the affected parties have the right to access information pertaining all the draft recommendations of the IDP before it reaches the stage of adoption.

The principles of good and fair governance should therefore promote the IDP process that is co – operative and the powers and functions of the municipality are exercise towards the interest of the poor.

In terms of the state of the nation address (2007) the key priorities that were identified which has the implications for good governance can be highlighted as follows:-

Public Service Training; Public Sector legislative compliance, importance of auditing. Five Year Local Government Strategic Agenda – strengthening

ward committees, deployment of skilled personnel to public sector, capacity enhancement.

Alignment of instruments across spheres of government. Roll out of anti corruption campaigns. Roll out of the batho pele campaign at local government, intensify

outreach activities including izimbizo and setting up of Multi-Purpose Community Centres.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

14

Page 16: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

2.2 LEGAL FRAMEWORK

2.2.1 THE CONSTITUTION OF THE REPUBLIC OF SOUTH AFRICA (ACT 108 OF 1996)

In terms of chapter 7 of the national constitution, local government has a key developmental role to play in order to improve the lives of the communities on the ground. Section 152 states that the objects of local government are –

to provide democratic and accountable government for local communities;

to ensure the provision of services to communities in a sustainable manner;

to promote social and economic development; to promote a safe and healthy environment; and to encourage the involvement of communities and community

organizations in the matters of local government.

A municipality must therefore strive, within its financial and administrative capacity, to achieve the above stated objectives. Further to that section 153 states that a municipality must structure and manage its administration, and budgeting and planning processes to give priority to the basic needs of the community, and to promote the social and economic development of the community; and participate in national and provincial development programmes.

2.2.2 MUNICIPAL SYSTEMS ACT 32 OF 2000

In terms of Chapter 5 of the Municipal Systems Act, 2000 (MSA) the preparation of the Integrated Development Plan (IDP) by the Bela Bela Municipality within its area of jurisdiction is considered to be a legal requirement. Section 23 of MSA recalls that the municipality must seize a developmental orientated approach in its planning in order to ensure the previously discussed section 152 and 153 of the national constitution are adhered to.

Further to that section 24 states that municipality should undertake its planning in co – operative governance meaning that Bela Bela municipality must participate in national and provincial development programmes and if the responsible organs of the state require Bela Bela Municipality to comply with their planning requirements (i.e. in terms of national and provincial legislation), the municipality should be consulted and implementation of such legislation should be __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

15

Page 17: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

reasonable to the time limits of the IDP as stipulated by section 25 of MSA.

Section 25 specifies that the municipality must prepare the IDP which will be adopted as the single, inclusive and strategic plan for the development of the municipality. This plan should link, integrate and co – ordinates plans and take into account proposals for the development of the municipality. Further to that the IDP plan should align resources and capacity of the municipality with the implementation of the plan, it should also form the policy framework and general basis on which annual budgets must be based and it should be compatible with national and provincial development plans and other binding legislations.

Section 26 of the Municipal Systems Act, 2000 stipulates that an Integrated Development Plan must reflect:-

the municipal council’s vision for the long term development of the municipality with special emphasis on the municipality’s most critical development and internal transformation needs;

an assessment of the existing level of development in the municipality, which must include an identification of communities which do not have access to basic municipal services;

the council’s development priorities and objectives for its elected term, including its local economic development aims and its internal transformation needs;

the council’s development strategies which must be aligned with any national or provincial sectoral plans and planning requirements binding on the municipality in terms of legislation;

a spatial development framework (SDF) which must include the provision of basic guidelines for a land use management system for the municipality;

the council’s operational strategies;

applicable disaster management plans;

a financial plan, which must include a budget projection for at least the next three years;

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

16

Page 18: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

and the key performance indicators and performance targets determined in terms 35 of section 41.

Section 34 of MSA stipulate that the municipality is required to conduct the annual review of the IDP and this should be done taking into account an assessment of the performance measurements of the municipality in terms of section 41.

3.REGIONAL CONTEXTUAL ANALYSIS3.1 ROLE OF BELA BELA IN ITS REGIONAL CONTEXT

3.1.1 BELA BELA’S POSITION IN THE REGIONAL SPACE ECONOMY

Whereas Bela Bela exists within the administrative boundaries of the Limpopo Province, it can be argued that its position and role in the space economy is tightly interlinked with the spheres of influence from the regions that fall outside of the Limpopo administrative boundaries. As previously indicated, Bela Bela shares its administrative boundaries with the Gauteng and Mpumalanga Provinces. The economic characteristics and spatial variations of these two provinces differ substantially to each other and to the province of Limpopo to a larger extent.

Gauteng is the most dominant province in the country in economic terms, with the Gross Domestic Product (GDP) that accounts for 33% in the sub – national African economy. The composition of Gauteng’s GDP is mainly built of tertiary sectors (i.e. Transport/ Communication, Finance/ Real Estate and Other Business Services), manufacturing industries and mining (i.e. secondary and primary sector). On the spatial perspective Gauteng is the smallest province in the country in __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

17

Page 19: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

terms of geographical size, 97% of it is urbanised and it is currently experiencing environmental degradation due to industrial and manufacturing industries (i.e. deterioration of air quality through gaseous emissions), bio – diversity destruction and habitat loss due to population pressure (<500 people per ha) and it generates the highest volumes of waste which accounts for approximately 80% of the total waste generated in the country.

Bela Bela Central Business District (CBD) is directly linked with the major cities of Gauteng through the National (N1) Route which connects the area with Pretoria at the approximate distance of 100 km and Johannesburg which is approximately 170 km from Bela Bela CBD. This spatial linkage presented a number of opportunities for Bela Bela, such that it has become a fast growing getaway to the tourism market of Gauteng who are mainly attracted to the natural environment that is less congested by human activity and the nature-based tourism products. Further to that Gauteng has been the primary location for the major investments in the country and Bela Bela’s location in close proximity to Gauteng has made it highly attractive for major private investments.

Mpumalanga is ranked as the fourth province with the high GVA in the country but unlike Gauteng, this province is 61% rural and the dominant economic sectors are mining, energy and manufacturing. Bela Bela shares its borders with Mpumalanga province and it is directly linked to it through the Provincial (R516) Routes. In terms of tourism Mpumalanga is considered to be the third most visited province in the country (following Gauteng and Western Cape). The tourism status of this province and its close proximity to Bela Bela is also a contributing factor towards the growth of the tourism industry in Bela Bela since the visitors easily commute between these three regions (i.e. Gauteng, Mpumalanga and Bela Bela).

3.1.2 BELA BELA IN THE CONTEXT OF LIMPOMPO AND WATERBERG DISTRICT

According to Provincial Growth and Development Strategy, the economic potential of the Limpopo Province is mainly centred on the five economic clusteres and these includes mining, agriculture (horticulture and food processing – red and white meat), logistics, forestry and tourism. At the administrative level, Limpopo province comprises of 5 District Municipalities and Bela Bela exists within the Waterberg District’s area of jurisdiction.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

18

Page 20: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Waterberg District is predominantly rural and the key pillars for development within this district are mainly centred on these economic sectors which include agriculture, mining and tourism. There are massive tourism attractions that cut across Bela Bela, Modimolle and Lephalale areas and these include Makapan’s Valley, World Heritage Site, Nature Reserves, hot-springs, fauna and flora. Bela Bela is already boasting an extensive and well known tourism network with key attractions and facilities that exists in it as well as its competitive edge through its proximity to Gauteng.

However there are key area of concern and weakness in terms of the space economy of Waterberg District such as the high clusters of poor which indicates a ‘mismatch’ between where people are located and where economic activities were taking place. This was also exacerbated by the demand of specialised skills in key sectors of the economy since the skills base is relatively low amongst the poorer communities. The other level of hardships that is currently experienced by Waterberg District’s areas is the provision of sufficient water supply to cater for future economic growth and development.

3.2 BELA BELA’S INTRINSIC CHARACTERISTICS AND CRITERIA FOR SUCCESS

The policy analysis and the regional context has to a larger extent indicate an awareness by Bela Bela Municipality of its role and place in the regional, provincial and national economy context. The key intrinsic characteristics as previously indicated arise out of the opportunities and benefits that the Bela Bela obtain due to its position and unique characteristics in the economically functioning system of its surroundings. The brief criteria for success can be outlined as follows:-

Bela Bela should live up to its potential as the decent and accessible prime tourist getaway destination;

and a prestigious investment location that is environmentally friendly and sustainable;

The investments should be compacted within the urban fabric so that;

Urban sprawl could be prevented and discouraged; Habitat and natural resources should be adequately protected to

sustain the areas intrinsic characteristics

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

19

Page 21: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.LEVEL OF DEVELOPMENT AND POVERTY ASSESSMENT

4.1 POPULATION DYNAMICS AND FUTURE GROWTH TRENDS

4.1.1 POPULATION SIZE AND GROWTH PROJECTIONS

The total size of Bela Bela’s population is currently estimated at 55 844 individuals. This is based on census 2007 which also estimate that there are approximately 14 290 households within Bela Bela. The officials from Statistics South Africa indicated that this figure also takes into account Rapotokwane Village which was incorporated into the municipality from Dr J.C. Moroka Municipality (Mpumalanga Province).

Figure 1 below illustrates the estimated population projection when the information from BMR is taken into account.

Figure 1: Population Growth 2001 - 2020

Source: BMR Growth Rates

HIV/ AIDS is continuously having an impact on population growth and the DBSA database estimated approximately 14 333 individuals would be infected in Bela Bela by 2006. The high growth ratio takes into account other main factors such as in – migration, which can result in further increase of the population within Bela Bela. It would be recalled from the 2007/ 08 IDP that there are a number of people who __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

20

0

1000020000

30000

40000

5000060000

70000

80000

Low Growth ScenarioHigh Growth Scenario

Low Growth Scenario 52094 55502 57988 60832 63815High Growth Scenario 52094 55502 61658 69358 75183

2001 2006 2010 2015 2020

Page 22: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

have relocated from Gauteng to Bela-Bela Town (specifically in the Warmbaths Extensions) to get away from the busy life of Gauteng.

They still have offices in Gauteng, but due to the development of technology they do not need to go to the office every day and therefore choose to live in areas such as Bela-Bela Town, further away from the city. The second factor is the increase of people entering the property market to such an extent that the number of home owners increases. There was also an increase in people who bought weekend/holiday homes in resorts, estates, etc, of which some also opted for permanent residency specifically in the Estate developments. It can be assumed that the real growth rate for permanent residence in Bela-Bela Municipal area might even be higher than anticipated BMR growth rates up to the year 2020 as indicated in Figure 1 above.

4.1.2 POPULATION DISTRIBUTION

Population in Bela Bela is unevenly distributed amongst eight wards, with ward seven accommodating more people (22%) than other wards within the municipality. Ward seven shares borders with the Mpumalanga Province and comprises of areas such as settlers and parts of Bela Bela Extensions. Ward two accommodated approximately 17% of the population which makes it the second most populated ward within the municipal area, it also comprises of many parts of Warmbath Extensions. The third ward with a high number is ward eight (16%) which shares the borders with the Gauteng Province and includes areas such as Pienaarsriver and Rus de Winter.

Figure 2: Population Distribution in Bela Bela Municipal Area

Population Distribution By Wards

3483

5647 6122 5788 6257

13984

1002910843

020004000

60008000

1000012000

1400016000

Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8

Source: *1Statistics South Africa (2001) covering ward 1 – 7 *2Municipal Demarcation Board covering ward 8

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

21

Page 23: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

The other wards that exist within the municipal area with different population densities include ward four (10%), ward three (9%), ward five (9%) and ward one (6%) which includes areas such as Radium. The total number of households within the municipality is estimated at 14 551.

4.1.3 AGE COMPOSITION

The age composition or structure determines the kinds of economic activities within the locality. Different age groups have different economic needs and different spending patterns. According to the DBSA 2006 statistics, Bela Bela is dominated by the youthful population with the largest age group being the children between the ages 0 – 15 constituting 35% of the entire population. This is followed by the youth between 15 – 35 age group constituting 34% of the total population. The adults ranging from the ages of 35 – 64 constitute of 25% of the population and the aged (over 65) accounts for 6% of the total population.

Figure 3: Age Structure in Bela Bela Municipal Area.

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

Population Breakdown By Age

Pop. Number 6,628 6,138 5,508 4,372 4,852 4,280 4,121 3,469 2,655 2,092 1,979 1,619 1,371 1,228 725 613 560 111

0 - 4 5 - 9 10 - 14 15 -19 20 - 24 25 - 29 30 - 34 35 - 39 40 - 44 45 - 49 50 - 54 55 - 59 60 - 64 65 - 69 70 - 74 75 - 79 80 - 84 85 +

Source: DBSA 2006

This trend in age composition obliges the government departments and the municipality to ensure that a large percentage of the budget is allocated to social development facilities in order to meet the needs of a youthful population and ensuring that people falling within this age acquire relevant skills and grow up to become responsible adults. The creation of more job opportunities should also be one of the key aspects of the developmental agenda by the municipality in partnership with the sector departments such as the Department of Education.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

22

Page 24: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.1.4 GENDER DIFFERENTIATION

With reference to figure 4 below, the gender composition within Bela Bela indicates a slight imbalance between the males and females. The DBSA 2006 statistics revealed that approximately 51% of the population within Bela Bela comprises of females while 49% comprises of males. Nevertheless this confirms with the national trends that a higher proportion of women are found in the dominatory rural area than men. This in many instances, especially by the African communities is attributed by the fact that men are generally attracted to places such as the bigger cities (i.e. Johannesburg etc.) that presents the employment opportunities sometimes regardless of the nature of work involved.

Figure 4: Gender Composition

49%

51%

MalesFemales

Source: DBSA 2006

In addition to the above, it can also be suggested that there is a need for a developmental agenda that should pro – actively target women empowerment within Bela Bela Municipal Area.

4.2 SOCIO – ECONOMIC DEVELOPMENT AND LIVELIHOODS

4.2.1 UNEMPLOYMENT AND POVERTY ANALYSIS

It was previously indicated that the age composition of population in Bela Bela comprises of children who are under the age of 15 and who are not accounted as the labour force. The active labour force is estimates at 24 976 individuals who are between the ages of 18 – 64. Figure 5 below indicates that approximately 33% of the active labour force is unemployed.

Figure 5: Employment and Unemployment Status

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

23

Page 25: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

8213

16763

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Employed Unemployed

Source: *1Statistics South Africa (2001) covering ward 1 – 7 *2Municipal Demarcation Board covering ward 8

Although the employment figure is currently at 67%, Bela Bela still needs more efforts to develop a better economically functioning environment that should create more job opportunities and that is critical since the dependency ratio is quite high based on the structure of the population (i.e. dominance of the population group that is dependant on the active labour force to provide for their needs).

Further to the above discussed unemployment profile and with reference to figure 6 below, approximately 17% of the households has no source of income which implies that they are living below the poverty datum line. Further to that 8% of the households is dependant on an income which is below R 4800 per annum (i.e. R 13 per day), the household that is dependant on one breadwinner who earn within this income bracket is living below the poverty datum line i.e. the poverty datum line criteria stipulates that 1 person should at least live with one dollar per day.

Figure 6: Annual Household Income

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

24

Page 26: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

2346

1197

32802988

2121

1194

662225 70 41 24 5

0

500

1000

1500

2000

2500

3000

3500

Source: *1Statistics South Africa (2001) covering ward 1 – 7 *2Municipal Demarcation Board covering ward 8

The developmental agenda by the municipality in targeting poverty does not only lie within the vigorous efforts to create employment opportunities. The most poverty – stricken households must also be assisted within the short term through the welfare grants, indigent policy and the provision of other basic essential services such as housing. The municipality has an indigent policy in place and the households that qualify to be registered as the indigents must have an income that does not exceed R 1 100 pm (R 13 200 per annum). The policy is currently benefiting 3 732 households. Based on the above demographics, approximately 6823 households (47% of the total households) households earns less than R 800 pm (R 9 600 per annum) and this therefore indicates that this policy still has a major role to play in terms of short term relief to all the poverty stricken households.

4.2.2 EDUCATION PROFILE AND LITERACY LEVELS

Education plays a pivotal role on community development. It provides a set of basic skills for development, creativity and innovative abilities within individuals. The South African Constitution provides that everyone has a right to education, which includes Adult Basic Education. The education profile in Bela Bela is another area of concern such that approximately 16% of the adult population (18 – 85+) can be considered as illiterate since they did not obtain any schooling.

The majority of the population (28%) had obtained education to the secondary level and approximately 17% of the population comprises of the matriculants who can be classified as semi – skilled. They are a relatively few people who can be considered as skilled and who were __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

25

Page 27: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

able to reach the tertiary level of education, these individuals’ accounts for 7% of the population.

Figure 7: Level of Education

5758

8516

2700

9916

5985

2531

0

2000

4000

6000

8000

10000

12000

No Schooling Some Primary CompletePrimary

Some Secondary Matriculants Tertiary

Source: *1Statistics South Africa (2001) covering ward 1 – 7 *2Municipal Demarcation Board covering ward 8

There are various factors that may have contributed to the situation of low education profile in Bela Bela such as the people not having any funding to further their education and this can also be exacerbated by the fact there are no tertiary institutions within the municipal area thus further limiting further education to only the few who can be considered as privileged.

The 2007/ 08 IDP indicated that there is a lack of infrastructure at some of the schools which, makes it difficult to maintain proper hygiene and provide quality education to the children. The following infrastructural needs that were identified for some specific schools:-

• Provision of electricity to seven schools;• Provision of water to five schools;• Provision of sanitation to three schools; and• Ensure that FET institutions are accessible to local learners who

want to further their studies.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

26

Page 28: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.3 SERVICE DELIVERY: INFRASTRUCTURE PROVISION AND ACCESS TO SOCIAL SERVICES

4.3.1 BASIC SERVICES: WATER, SANITATION, ENERGY AND REFUSE REMOVAL

The provision of equitable basic infrastructure especially water and sanitation is central to the developmental local government mandate. Figure 8 below reflects that the extent to which Bela Bela have access to basic infrastructural services. It should also be noted that the figure below presents the data that was sourced as secondary research which ultimately mean there are some households that have been provided with infrastructure and it might have not been captured on this figure and therefore the information that is presented on figure 8 below will be assessed against the infrastructure services that the municipality has provided.

Figure 8: Access to infrastructure services within Bela Bela Municipal Area

96% 95%

79%

96%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Water Sanitation Electricity Refuse

Source: Census 2007

With reference to figure 8 above, approximately 96% (13 718 HH) of Bela Bela households have access to water at the appropriate standard. The remaining 4% (571HH) currently makes use of Dam, Water Vendor, Rain Tank and Other sources which are not considered to be hygienic for human consumption. The municipality estimates the backlogs to at approximately 775 households which lack access to water at the appropriate standard. The backlogs mainly exist in ward 8 and informal settlements.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

27

Page 29: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

In terms of sanitation, figure 8 indicates that there are 95% (13 574HH) of Bela Bela household have access to sanitation at the appropriate standard. The remaining 5% (715HH) do not currently have the appropriate sanitation facilities. The backlog as estimated by the municipality is approximately 855 households which do not have access to the sanitation facilities at the appropriate standard.

According to figure 8 above, approximately 79% (13 161HH) of Bela Bela households have access to electrical services at the appropriate standard. The remaining 21% (1 129HH) currently makes use of Paraffin, Candles and other sources of energy. The municipality’s estimate the backlogs to be at approximately 800HH.

Figure 8 indicates that approximately 96% (13 718HH) of Bela Bela households use the appropriate means in terms of refuse removal such that 77% of the households refuse is removed by the municipality and 19% use their own refuse dump. Approximately 4% (571HH) are considered to have no refuse removal. Based on the municipal information the households that encounter the backlog are estimated at approximately 1000HH.

4.3.2 MOVEMENT PATTERN AND ROAD INFRASTRUCTURE

The roads play a pivotal role in terms of economic development such that all major economic developments are located along the roads of strategic importance and thus they provide a key link between consumers and suppliers as well as between components parts manufactures and finished product manufactures. The road hierarchy within Bela Bela can be classified in four categories and it is through this hierarchy that one can be able to rank the strategic importance of the roads as well as their impact on the economy. This identification of roads that are of strategic importance should ultimately inform the level commitment that local and provincial government should have in terms allocating the budget in order meet the infrastructure needs for these roads since this is in line with the government mandate of creating an enabling environment for economic development. The road hierarchy within Bela Bela can be broadly classified as follows:-

Principal Trunk Distributors – the national (N1) route is the most dominant road within the municipal area. It can be considered as the principal distributor in terms of the volume of traffic it carries and linkages that Bela Bela has with bigger cities (i.e. Gauteng, Polokwane) due to its existence.

Major Arterial Distributors – these include P1/ 4 (R101) which is mainly used by tourist and it link Bela Bela with Modimolle, Radium, Pienaarsriver and Gauteng; P20/ 1 links Bela Bela with

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

28

Page 30: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Thabazimbi; and P85/ 1 (R516) which link the town of Bela Bela with Settlers. These routes provide linkages between the economic growth points within the municipality as well as to other economic growth points that fall out of the municipal jurisdiction.

District Distributor Routes – these are include D936 which links with P85/ 1 (R 516) from Codrington to Settlers, D626 which links Piernaarsriver and Rus de Winter Dam to Rapotokwane. These routes provide linkages between the emerging growth points.

Local Access Routes – are the lowest order of small access roads that provide direct access to the settlements and properties within the municipal area. In many instances these roads a competency of the local municipality in terms of maintenance and upgrade.

The N1 route is in a relatively good condition; however a concern can be noted by other major arterial routes which are currently in a bad condition and require substantial upgrading and maintenance. These include parts of P85/ 1 (R516), P1/ 4 (R101) and P20/1. In terms of the local access roads in urban areas, the current condition of these roads requires substantial maintenance since the infrastructure is too old. In addition to that there is a need for a pedestrian friendly environment especially in town since the majority of the residents walk by foot within the Central Business District.

4.3.3 PUBLIC HEALTH AND HIV/ AIDS

Bela Bela municipal area is currently serviced with two hospital, six clinics and two mobile clinics. Table 1 below is an indication of accessibility to these two hospitals by the settlement areas within the municipal area and the location of other health facilities (i.e. clinics and mobile clinics) in relation to these settlement areas. As evident from the table 1 below the majority of the health facilities are clustered within Bela Bela Town and this can be considered to be logically acceptable given the fact that it has a largest concentration of population which implies a greater demand for the health service.

Table 1.Availability of Health Facilities in Bela BelaSettlement Level of Service

Bela Bela CBD and Township

Two Hospitals (-20km distance to settlements)

Two Clinics (-5km distance to settlements)

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

29

Page 31: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

One Clinic (+5km distance to settlements)

One Mobile Clinic (- 10km distance to settlements)

One Mobile Clinic (+10km distance to settlements)

Pienaarsriver Two Hospital (+20km distance to settlements)

One Clinic (+5km distance to settlements)

Radium Two Hospital (+20km distance to settlements)

Settlers Two Hospital (+20km distance to settlements)

One Clinic (-5km distance to settlements)

Rus de Winter Two Hospital (+20km distance to settlements)

One Clinic (+5km distance to settlements)

An application of a 5 km radius from each clinic suggests that a number of settlements are not well provided with health facilities such that Pienaarsrivier, Radium and Rust de Winter are located quite far from the health facilities i.e. beyond the twenty kilometers of reach from hospitals and beyond five kilometers from clinics. The need for the provision of either mobile or immovable clinics would need to be determined within these settlements.

The statistics prepared by the Development Bank of Southern Africa indicates a drastic increase in the number of people affected with HIV/ AIDS within Bela Bela. According to the projections, the number of the people affected by the HIV/ AIDS epindemic increased from 7 810 to 14 333 from the period 2001 – 2006. Figure 9 below is an indication of the increased in the number of HIV/ AIDS orphans due to the AIDS endemic within Bela Bela.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

30

Page 32: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Figure 9: Impact of HIV/ AIDS on Orphanage Source: DBSA 2006

The detrimental impact of HIV/ AIDS will be beyond than placing the social development institutions at a pressure to make necessary provisions for accommodating the HIV/ AIDS orphans who are currently increasing at a rapid pace, such that the impact of HIV/ AIDS has a severe impact to the social and economic development of the area and it can lead to the following situations:-

Low and/ or zero population growth rate, thus affecting the sustainability of projects that are based on certain population projections.

A significant number of households will suffer a loss of income when the economically active member/ breadwinner dies of AIDS pandemic.

Families of HIV/ AIDS victims will be forced to divert their income, which could have been used for other socio – economic activities to conduct burial ceremonies as the African cultures encourages expensive funerals.

The economy of Bela Bela in particular will be negatively affected, as income will be lost due to absenteeism caused by ill health, and the necessary training of new incumbents.

On the financial perspective the increase in the number of orphans and object poverty will eventually force the government to spend more on social activities than on capital infrastructure, which propels economic development. This will also impact negatively on the ability of the municipality as investments rely heavily on the availability of capital infrastructure.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

31

0

200

400

600

800

1,000

1,200

1991

1996

2001

2006

Total orphans Total AIDS orphans Total non-AIDS orphans

Page 33: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.3.4 PUBLIC SAFETY

Bela Bela is currently serviced with three police stations to cater for public safety. These facilities are located within three different areas (i.e. Bela Bela Town, Piernaarsriver and Rus de Winter) within the municipality as indicated in the table below.

Table 2. Availability of Police StationsLocation Level of Service

Bela Bela (Warmbath) Town

Main Station

Pienaarsriver Main StationRus de Winter Main Station

The need and location of future public safety facilities should be informed by the crime statistics and the good road network to ensure that the emergencies are attended to efficiently.

4.3.5 SPORTS, RECREATION FACILITIES AND YOUTH DEVELOPMENT

Sports and recreation facilities play a major role in the overall social development of the society such that these activities provide moral discipline and keep the youth out of the street. The ever – increasing crime and other social ills (i.e. teenage pregnancies, drug abuse etc.) gave rise to the importance of these activities and they should be viewed as the productive alternative that the youth can engage itself with. The existing facilities can be described as follows:-

Table 3. Availability of Sports, Arts, Culture and Recreational Facilities in Bela Bela

Location Facilities Constraints/Challenges

Bela Bela Township

Bela Bela Community Hall i.e. Performing Arts and Culture.

Sporting amenities i.e. Netball, Volleyball, Basket Ball and Tennis Court.

SUNFA “stadium” Moloto Str

The Hall is multi – functional because it is also booked for special events and it is not always readily available for sports, arts, culture and recreational activities.

The sporting amenities indicated on the column for facilities are the only sporting code facilities available at the municipal level and they is a lot of pressure they encounter due to overuse as a result the facilities are deteriorating very quickly.

The long distance travelled by individuals who stay in the remote parts of the township.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

32

Page 34: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

“stadium” Bela Bela High

Stadium Community Park

The condition on the football grounds (stadium) is not satisfactory.

The parks do not have the ablution facilities and lights.

Bela Bela Town No Facilities Lack of FacilitiesPienaarsriver Community Hall Lack of FacilitiesRadium No facilities Lack of facilitiesRus de Winter and Rapotokwane

Community Hall Lack of facilities

As evident from table 3 above, Bela Bela can be considered to be underprovided with facilities of sports, arts, culture and recreation. The majority of the settlement areas lack these facilities at the basic level and the existing facilities that are located within Bela Bela Township encounter an enormous pressure since they are currently overused.

The Youth Summit which was hosted to target youth development should therefore be taken seriously as it presented the challenges and drafted the recommendations that should inform youth development within the spheres of entrepreneurship, sports, arts and culture. This therefore presents a mandate by Bela Bela Municipality and other government structures to ensure that facilities for youth development are provided in an equitable manner as a means to develop the youth into respectable and responsible leaders of tomorrow.

4.4 ENVIRONMENTAL ANALYSIS IN BELA BELA

It is critically important that the sustainability of the environmental is mainstreamed within all the aspect of physical development within Bela Bela Municipal Area. As depicted on map 1 below, Bela Bela has a number of Nature Conservation Areas, these are the Rust de Winter Nature Reserve situated on the southern border which is ± 2 500 ha in extent, the Enkeldoornspoort Nature Conservation Area in the south-eastern corner of the Municipal Area, Mabula Game Reserve, Bonwa Phala Game Reserve, Kunkuru Game Reserve, Sondela Nature Reserve, Mabalingwe Game Reserve, the Bothasvley Nature Conservation Area adjacent to the N1 National Road between Bela-Bela and Pienaarsrivier and the Het Bad Nature Reserve in the central area of Bela-Bela Local Municipality. The whole of the western part of the Bela-Bela Local Municipal Area is classified as a Conservation area as well as the area directly surrounding the Bothasvley Nature Conservation

Map 1. Conservation/ Flora & Fauna Map

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

33

Page 35: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

While Bela Bela is at an advantageous position in terms of the environment since there are no heavy industries and soil degradation and erosion is minimal, it very important that the municipal ensures, with its available resources that the sensitive environments (as depicted on map 1 above and wetland areas next to Bospoort and Klein Kariba River) are adequately protected in line with the requirements of environmental management as discussed above 2.1.3. The potential risks that can be highlighted as this stage include the poor management of landfill sites, inadequate sanitation systems, informal settlements, veld fires, chemical spills and/or other hazardous accidents, droughts and physical development that is not conducive for the sustainability of the sensitive environment.

The adequate protection of high potential agricultural land (in terms of the soil classification) is also an important environmental element within Bela Bela given the pressure that the area is currently experiencing with due regards to the range of developments (i.e. upmarket estates and tourism initiatives) that can compromise this potential. Map 2 below is an illustration of the different agricultural potential classification within the farmlands of Bela Bela.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

34

Page 36: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Map 2. Agricultural Potential within Bela Bela in terms of the soil classification

The above discussed issues are at the broad strategic level and it is important that the municipality considers these as a baseline when evaluating the credibility of the EIA’s for the development of applications that are submitted on an on-going basis. At the project evaluation level, the municipality relies on the environmental impact assessment (EIA) as a tool for decision – making that entails a process of identifying, analysing and evaluating the positive and negative environmental affects of a proposed development and its alternatives. The municipality should also have an Environmental Management Plan that can address; vegetation, water, fuel and sewage treatment, with specific reference to the following:

Waste management• Solid waste;• Litter; and

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

35

Page 37: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

• Hazardous waste.

Soil Management• Drainage;• Earthworks;• Quarries & Borrow Pits; and• Excavation, Spoil sites, Batching sites, and stockpiles.

Impact and Mitigation measures• Noise and dust control;• Records; and• Restoration and Rehabilitation.

The additional Strength, Weakness, Opportunities and Threats (SWOT) can be summarized as follows:-

STRENGTH WEAKNESSES1. Bela-Bela Municipality is not an industrial

area and the possibility of industrial effluent is minimal.

2. Financial resources to sustain refuse removal contracts.

3. More land available for development.4. Safe and sustainable environment.5. No soil degradation and erosion.

1. Lack of contingency plans for environmental protection for future developments.

2. Inability to implement by-laws that regulate waste disposals.

OPPORTUNITIES THREATS1. Collaboration with Phomolong waste

management group.2. Involvement of schools in waste and

environmental awareness.3. Collaboration with business to make

available resources to deal with environmental control.

4. Formation of waste site committee(s) to regulate the safety of waste dumping site(s).

5. Establishment of waste sorting and recycling plant at a proposed site in Pienaarsrivier.

1. Lack of control at the dumping site which attracts human scavengers.

2. Risk of infection for people interacting with refuse at the dumping site.

3. Inappropriate waste disposal methods (which includes burning of waste and the disposal of medical waste in an irresponsible manner).

Bela-Bela Local Municipality has the responsibility to consider this legislation, principles and policies on environmental management where applications for land development are considered for implementation.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

36

Page 38: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.5 HOUSING DEVELOPMENT AND DELIVERY WITHIN BELA BELA

4.5.1 CURRENT HOUSING NEEDS, DEMAND AND PROVISION

Based on the municipal housing waiting list the current housing need and demand within Bela Bela is currently estimated at 2100 for the low income earners and 400 for the middle income earners. The Department of Local Government and Housing in partnership with Bela Bela Local Municipality are currently playing an important role in terms of housing provision for the low – income group who earn between R0 – R 3 500 pm. The current housing projects that are targeting to address housing backlogs for the people within this income category can be listed as follow:- Bela Bela Extension 7 – 350 residential stands Radium – 350 residential stands Pienaasrsriver – 68 residential stands The service provider has been recently appointed to unblock the

blocked projects i.e. Lesedi project (280), Hostel (30), Pienaarsrivier (50) and Spa Park (70).

The other projects that are still at the proposal stage include SPA Park, Bela Bela Extension 8 (900 residential stands) and Bela Bela Extension 9, the remainder of portion 25 of the farm Het Bad 465 KR, GholfBaan Park, Appiesdoring park(erf 1067 Warmbath Ext 5) and part of the remainder of erf 655 Warmbath Proper.

The need for the provision of housing to the middle income group (i.e. especially those who fall within the income category ranging from R 3 501 – R 7 000 pm) is also critically important since it was noted that there are individuals who fall on this category and are registered on the municipal housing waiting list since they requires assistance with regards to accessing shelter.

The need for middle income housing may also be exacerbated by the fact that housing development that is driven by the private developers is mainly accessible and affordable to the upper income earners i.e. the minimum value for the houses provided by the private developers is in many instances more than R 500 000. The municipality is currently conducting an audit on all serviced municipal vacant sites in order to verify the availability of land that can be used to cater for middle income housing. The areas being audited include Bela-Bela Extensions, Jinna Park and Spa Park.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

37

Page 39: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.5.2 PRINCIPLES ON SUSTAINABLE HUMAN SETTLEMENTS (SHS)

The notion of sustainable human settlement (SHS) refers to an integrated approach to housing provision for the residents of Bela Bela (especially those who are classified as the low income group). At the concept level the requirements of sustainable human settlement are precise and unambiguous in terms of the level in which housing should be provided for the residents within the Bela Bela area and these can be briefly summarized as follows:-

The focus on the provision of housing should not only be on housing delivery but also on housing development with a greater positive impact for the residents to be able to sustain their livelihood within that particular locality. This implies that the future housing delivery and development that takes place within Bela Bela should be incorporated within the vicinity of social facilities and economic opportunities to make it easier for the community to easily commute in order to obtain the services and employment opportunities. This requirement is intended to address the legacies of the past whereby individuals (especially the less privileged) were subjected to poor living conditions with the serious lack of amenities to sustain their livelihoods within those settlements.

The provision of housing should be an integrated approach to development using the delivery of shelter as a primary focus but including amongst other things basic service delivery (i.e. potable water, appropriate sanitation and access to electricity), obtaining or upgrading of land tenure rights, ease access to adjacent community and economic services, job creation plus skill transfer (i.e. during construction stages) and the outcomes should also build self esteem by the end users.

Housing delivery and development within Bela Bela occurs in two different forms. The first regards the state funded, low cost housing in which the Department of Local Government and Housing serves as the developer. The second pertains to private sector developments targeting mainly the upper income groups. Bela Bela Spatial Development Framework (adopted in 2006) should be the pillar in terms of informing the realization of sustainable human settlements through the implementation of these housing projects.

In line with the SDF the municipality has embarked on facilitating housing delivery within the areas that are earmarked for opportunity for future housing within the SDF growth nodal points (i.e. Bela Bela Town, Pienaarsriver and Radium) and these areas are within the __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

38

Page 40: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

urban fabric plus housing delivery is integrated to the delivery of services and reasonable proximity to the adjacent social and economic opportunities. There has been challenges in terms of achieving all the expectations by the sustainable human settlement concept in the past to such an extent that the concern was raised especially for housing delivery within Bela Bela Town (Main Growth Point) that the majority of these low cost housing projects still focus on extending the black townships which now perpetuate disintegration by income groups while in the apartheid era disintegration was perpetuated through racial segregation.

Despite these challenges which includes the limited availability of land within the existing central business district (CBD) and financial viability (i.e. high cost of land within the CBD) which might be a substantial sacrifice to achieve the low cost housing there, the municipality is however aiming to achieving this through creative ways such as through residential densification within the few vacant patches of land parcels that are located within the CBD and are considered by the SDF to be ideal for future housing development.

4.6 ECONOMIC DEVELOPMENT: SIZE AND STRUCTURE OF THE LOCAL ECONOMY

Bela Bela’s contribution to the GDP of Waterberg District is estimated at 9% and it is considered to be one of the largest contributors to the economy of Waterberg District Municipality. The sectors that have a massive contribution to the economy are the tertiary sector (i.e. which includes tourism as the most dominant sector), primary sector (i.e. agriculture which has experienced a severe decline of approximately 40% since 1980) and there are secondary sectors which has improved drastically and these includes trade, commerce, manufacturing and construction. The graph below is an indication of various contributions towards the economy of Bela Bela.

Figure 10: The composition of Bela Bela’s Gross Domestic Product (GDP), 2005

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

39

Page 41: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

15%

0.10%

9%6%

21%

17%

34%

18%12%

10%

0% 5% 10% 15% 20% 25% 30% 35% 40%

Agriculture

Mining

ManufacturingElectricity

Construction

Wholesale

Transport

FinanceCommunity Services

Government Services

Source: Quantec & UE calculations

Figure 10 above is an indication of the performance of Bela Bela in the Waterberg Economy. It should also be noted that figure 10, uses the traditional model of economic indicators which does not specifically group the tourism activities as one sector. The indicators that are closely associated with tourism in the context of figure 10 above includes Transport (34%) and Wholesale (17%) which accounts for a 51% contribution to the economy of Bela Bela.

4.6.1 TOURISM

It is commonly emphasized that tourism is one of the largest and fast growing industry and with the potential to become the focal point of the emerging economy. In economic terms Bela Bela is one of the success stories in tourism within Waterberg District and the rest of Limpopo. The area gained popularity mainly from its natural hot springs coupled with its strategic location with due regards to its proximity to Gauteng and the massive private investments in tourism facilities and hospitality enterprises such as 68 cozy accommodations (i.e. game lodges, nature reserves, hotels, guesthouses) and other places of interest. This ultimately made Bela-Bela one of the prime inland resort destinations in South Africa.

In addition to that there is an initiative by Gauteng Provincial Government (i.e. The Dinokeng Integrated Tourism Initiative) which should stimulate flows of new visitors into the southern tip of Limpopo province with various secondary benefits for Bela-Bela Municipality. There are plans for huge new reserves which will offer a big five, as well as a circuit of cultural centres. The relevance of the Dinokeng project is that Rust De Winter Village, Rust De Winter Nature Reserve and the section of the Limpopo province situated to the east of Pienaarsrivier, were an integral part of the feasibility study and have been included as key development sites. The nature reserve will be incorporated into the Big Five Reserve and two up-market lodges will be located along the western shore of the Dam.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

40

Page 42: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

The key challenge lies to the fact that the benefits of this sector has not sufficiently mainstreamed Broad Based Black Economic Empowerment (BBBEE) and its success has not reflected any impact to deepen prosperity by the emerging SMMEs since it has mainly been private sector or investor driven. The vision and objectives have been set for Bela Bela. The tourism vision which would aim at driving Bela-Bela’s tourism industry and make Bela-Bela a tourist destination of choice can be highlighted as follows:-

• Make Bela-Bela an up-market high quality tourist destination;• Create an eco-tourism model that will serve as a catalyst for development;• Apply sustainable development principles when considering

infrastructure developments;• Community participation in tourism development must be a priority;• Contribute to job creation and poverty eradication;• Offer a rewarding experience for the visitors and creates a

positive image for the development of Bela-Bela as a brand;• Adds a variety to local life and widens opportunities for culture and recreation; and• Ensure a continued gathering of intelligence data to be more

innovative for the improvement of Bela-Bela tourism in the future.

Based on the tourism vision of Bela-Bela, it is anticipated that by 2010, the following objectives must be achieved:• Establishment of guest houses in Bela-Bela to provide additional accommodation;• Promote and develop existing cultural heritage sites to attract more tourists;• Promote a new dimension of tourism in the townships of Bela-Bela;• Development of Bela-Bela Dam to increase the number of visitors to the area;• Improvement of signage along the roads around Bela-Bela;• Promote historical walking trails around Bela-Bela;• Establishment of home crafts industry;• Promote SMME’s development through BEE initiatives within the tourism sector;• Promotion and protection of Bela-Bela as a brand;• Provide tourism related training to local people to increase level

of local people participation in the local tourism;• Development and maintenance of infrastructure to promote

Local Economic Development;

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

41

Page 43: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

• Strong partnerships between the tourism industry and community, including such things as aspects of education, agriculture, manufacturing, production and environment; and

• A more sustainable tourism industry that is less vulnerable to external economic fluctuations;

• Optimize employment opportunities across Bela-Bela at all skill levels and improve tourism related jobs.

The opportunity that exists for the local tourism industry and broader community to benefit include the unstructured tours of visitors to Bela-Bela. A range of tourism products can be coordinated to appeal to visitors, by building upon the area’s points of difference and generate growth from developing traditional art and crafts. The following are opportunities that exist within local tourism industry:

• Maximum collective strengths that can be achieved by bundling the core attractions and additional services;

• Employment opportunities and economic benefits for the local community;• Provision of business support information;• Investment attraction;• Infrastructure development (Bela-Bela facelift);• Training (Tourism related);• Tour guiding;• Value chain – diversify the market;• Improve and enhance craft market, safety and cleanliness;• Organised township tourism association to promote community

based tourism development, such as township tours;• Identify and develop tourism desk for municipality to guide local

tourism development;• Extended trading hours by local businesses; and• Provision of foreign exchange facilities.

4.6.2 AGRICULTURE

The agricultural sector in Bela Bela should also be considered as economically important particularly because it provides rural residents work as farm labour. However, this sector in many cases it is characterized by very working conditions and wages are notoriously low with the existence of underemployment. Nevertheless in economic terms the agricultural sector has extensive backward and forward linkages, thereby contributing tremendously tawards the overall development and existence of other sectors. This relates mainly to the inputs received from various sources to the agricultural sector (backward linkages) as well as output from the agricultural sector to various other sectors and users (forward linkages).

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

42

Page 44: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

In terms of the weather conditions, Bela Bela comprises of temperatures between 20-29°C, with the average rainfall between 520-650 mm per annum. There are black and red clay soils of medium to high potential in the Springbok flats. Sandy, red soils and wetlands cover the rest of the area. Vegetable crops include the following: Squash butternut, Squash hubbarb, Onions, Watermelons, Cabbage assorted, Sweet Corn, Pumpkin Grey, Pumpkin White, Beetroot, Carrots, and Peppers. Fruit types include the following: Grapes, Citrus, and Peaches. Other crops include: Maize, Cotton, Millet, Tobacco, Lucerne, Cowpeas, Groundnuts, Wheat, Jugebeans, Chinabeans and Sunflower.

Due to the various crops produced, production systems vary widely. Although the trend is changing the whole industry is still characterized by a high unskilled labour input and a serious lack of middle management capacity. In the commercial estate farming the competitiveness of commercial production will be enhanced through appropriate skills development programmes at all levels and through infrastructure development. Access to water for irrigation is particularly important, but feeder roads to production areas and arterial roads to markets are just as important.

In terms of the livestock in Bela-Bela municipality there are three livestock projects occupying 19,841 hectares of land. As it stands currently, agriculture is gradually declining due to changing from traditional farming and crop planting to game farming. This has left a large number of people without jobs. There are however still agricultural activities taking place within Bela-Bela.

4.6.3 MINING

The contribution of the mining sector towards local economic development of Bela-Bela is not highly significant. The previous research undertaken as part of the 2007/ 08 IDP Review revealed that the mineral occurrences that exists in Bela Bela for mining resources and precious metals (i.e. diamond and gold) is of a very low grade and potential to such an extent that it cannot be considered probable that these minerals can be mined within the next 20 – 50 years. Other metals that are found on a limited scale and include manganese, copper, tin, and cobalt. The supply of calcite, refractory clay and fluorspar is sufficient. The distribution of limestone industrial mineral is small, with a medium scale supply of sandstone and clay which is used to manufacture the bricks within the area.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

43

Page 45: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.6.4 TRADE AND COMMERCE

The performance of Bela Bela in terms of trade and commerce can be considered to be at its infancy stages with the main CBD that is still developing with a wide range of retail outlets, business services and financial institutions. The number of businesses within Bela Bela is increasing with an increase in the number of players in major retailing (i.e. motor retailing) as well as the large construction and building material supplies.

4.6.5 SMME DEVELOPMENT AND THE SECOND ECONOMY

The SMME sector has a potential to revive stagnating economies and reduce poverty. Unfortunately there are no records of the SMME’s contribution to the economy of Bela Bela as most of the activities cut across economic sectors while some are aligned to survivalists involving vending at taxi ranks and along pavements. Most of the SMMEs and second economy activities are in trade and wholesale, arts and craft, utility services and transports. These activities can be mainstreamed to the existing well performing first economy e.g. mainstreaming the arts and craft street vendors to the existing tourism market. This would require the vigorous efforts by the municipality, local and provincial government to come up with the creative ways of supporting the development of SMME.

4.7 LAND REFORM AND RURAL DEVELOPMENT

A total of 56 land claims were lodged within Bela Bela through the Land Claims Commission in 2001. The majority of these claims are still under investigation and there are two claims that have been settled within three farms as indicated in table 4 below. The size of these farms in total accounts for 5 381, 6 ha in extent.

Table 4. Settled Land Claims within Bela Bela Municipal AreaCLAIMANT

NO. OF CLAIMS

NO. OF HOUSEHOLDS

TOTAL NO. OF BENEFICIARIES

PROPERTIES RESTORED

SIZE OF LAND IN EXTENT

SETTLEMENT DATE

P/ River Community (Moretele)

2 101(68 – Male Headed HH)

(43 – Female Headed HH)

369 PTN 1 and 13 Vaalboschbult

1966, 0998 ha

9/3/ 2004

Ga Mashung Matlala

2 Hakdooringfontein 85 JR (Remainder)

777, 8554 ha

2637, 6946

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

44

Page 46: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Kliprand 76 JR (Portion 1, 2 and 3)

ha

There are ten (10) claims which have been gazetted to date and table 5 below is detailed indications of these land claims and the period through which each claim was published.

Table 5. Gazetted Land Claims within Bela Bela Municipal AreaCLAIMANT KRP PROPERTY

DESCRIPTION/ FARM NAME

GAZETTE NO.

PERIOD

Sindane Family 891 Boomfontein 666 KS 620 of 2003 2003/03/14Bela Bela Community

2441 Cyferfontein 434 KR 3269 of 2003 2004/11/07

Droogesloot 476 KROlievenfontein 475 KRRietspruit 527 KR

Letlakaneng Community

744 Turfontein 499 KR 3167 of 2003 2003/11/07

Rus De Winter 178 JR 29689 of 2007Mathole Family 900 Middelkopye 33 JR 29689 of 2007Moikanyane CP 6277 Tambotiepan 175 JR 29689 of 2007Matsemela E 11505 Vaalboschbult 39 JR 29689 of 2007

There are remaining land claims (42) are still under investigations; table 6 below is the details of all these claims which are currently outstanding.

Table 6. Outstanding Land Claims within Bela Bela Municipal AreaKRP NO. PROPERTY

DESCRIPTION

CLAIMANT NAME

STATUS OF CLAIM

SIZE OF LAND IN EXTENT

2441 Turfontein 499 KR

Lethlakaneng Community

Negotiations 2487,3905 ha

1606 Cyferfontein 434 KR & others

Bela Bela Community

Negotiations 1715, 3695 ha

1634 Kliplaatdrift 43 JR

Ramorula Community

Further Research 2128 ha

1509 Buiskop 464 KR

Buiskop Community

Further Research 2487, 3905 ha

335 Diepdrift Mookgopong Community

Further Research 2123 ha

6276 Driefontein 553 KQ

Mokitlane Mosehlane

Further Research 4432, 56 ha

1798 Hartebeesfontei Seama Community Further Research 2122, 33 ha__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

45

Page 47: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

n 558 KQ958 Unclear Bjatladi Phase 2 Further Research 3242, 44 ha12008 Uitvlugt 79 JR Sindane

CommunityFurther Research 3241, 123 ha

9160 Drooglaagte 485 KR

Moneki Makgai Community

Further Research 2134, 234 ha

1632 Unclear Dilokweng Community

Further Research 2314, 23 ha

461 Groothoek 99 KS

Manaileng Further Research 3456, 56 ha

6274 Prague 7734 LR Chokwe Community

Further Research 4432, 56 ha

7856 Zandfontein 31 JR

Matlala TK Further Research 3242,44 ha

7311 Unclear Nasser L Further Research 2122, 34 ha10563 Unclear Olifant DJ Further Research 3212, 34 ha8249 Unclear Motlapodi

CommunityFurther Research 2341, 123 ha

7314 Unclear Mogotlane MR Further Research 2134, 234 ha7313 Unclear Dikobala MH Further Research 3000 ha1073 Unclear Manaka KK Further Research 3456, 56 ha8247 Platreef, Mapela

(Unclear)Masenya MP Further Research 4432, 56 ha

8246 Unclear Hassim MH Further Research 2122, 33 ha10990 Erf 169 Piet

Potgietersus (Unclear)

Bryat IE Further Research 3242, 44 ha

6275 Unclear Teffo WR Further Research 3242, 44 ha11173 Witfontein 526

KQMahlangu JP Further Research 2218, 5298 ha

6275 Eldarado 388 LQ

Bangwato Ba Sekgathe Community

Further Research 2487, 3905 ha

7847 Zandfontein 31 JR

Matlala TK Further Research 2979, 9362 ha

9928 Unclear Mosam AH Further Research 35, 874 ha1502 Unclear Monyamane MD Further Research 52, 36985 ha7315 Bellevue 577 &

OthersMatlala Dichoneng Tribe

Further Research 68, 874 ha

9175 Unclear Johannes Ramaru Further Research 1933 ha12181 Unclear ME Chauke Further Research 28552 ha10545 Louwiskraal

1104 MSMaake MM Further Research 1187 ha

1797 Erf 1650 (Unclear)

Ahmed Hassim Further Research 2123 ha

8243 Mooimei- Mokitlane MS Further Research 2487, 3905 ha__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

46

Page 48: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

siesfontein 536 LR

10317 Unclear Hassim I Further Research 2123 ha10893 Strikkloof Matlou MH Further Research 2487, 3905 ha5249 Unclear Kekana MJ Further Research 1715, 3695 ha6512 Unclear Maretela

CommunityFurther Research 2123 ha

741 Kalkfontein 140 JR

Nokaneng Community

Further Research 2487, 3905 ha

11265 Elsjeskraal 613 KR

Bagatla a Mmakau of Mokgoko

Further Research 1715, 3695 ha

1631 Mantsole 40 JR Ntshodisane MI Further Research 1987, 5455 ha

4.8 INSTITUTIONAL AND FINANCIAL ANALYSIS

4.8.1 STRUCTURE OF THE ORGANIZATION

Bela Bela Local Municipality (NP 366) is a Category B Municipality as established in terms of Chapter 2 of the Municipal Structures Act 1998. The Municipality functions under the Collective Executive system consisting of three (3) Executive members of whom one is the Mayor. The Council consists of 15 councilors including the members of the Executive Committee. Out of the 15 councilors, 8 are ward elected councilors. There are three portfolio Committees of the municipality, which can be outlined as follows:-

Economic Development, Planning and Infrastructure Budget, Treasury and Good Governance and Transformation Social and Community Services

The communication strategies that the municipality is currently using include the Integrated Development Planning (IDP) Representative Forum, Mayoral Imbizo, Monthly Ward Committee Meetings and Communication Surveys (i.e. through Suggestion Boxes).

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

47

Page 49: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.8.2 MUNICIPAL ADMINISTRATION

The municipality has a staff compliment of 333 full time and part-time staff as provided in the revised Organogram. The full time staff is currently at 280 employees. The municipal organogram makes provision for a Municipal Manager, 5 Senior Managers (Head of Departments) and 16 Middle Managers (Divisional Heads). The figure below is an adopted Section 57 organogram.

Figure 11: Status of Section 57 positions within Bela Bela as at 1 July 2007

Table 7: Municipal Staff ComplimentLevel of Employment Number of

Employees%

Senior Managers including MM

6 2%

Middle Managers 16 5%Technical/ Professional Staff 37 11%Other Staff (clerical, labourers etc.)

274 82%

Grand Total 333 100%

Table 8: Management Capacity for Executing the Municipal Powers and Functions

Managerial Level Management Accountability

Subordinate Management (Divisional Heads/ Managers)

Municipal Manager Head of Administration

I CommunicationsII Internal Auditing

Head of Departments (5)(Section 57 Managers)

1. Budget and Treasury

I Budgeting and Financial ReportingII ExpenditureIII Revenue

2. Technical Services I Water and SanitationII Roads and StormwaterIII Electrical Services

3. Social and I Sports, Art, Culture, Cemeteries and Special

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

48

Municipal Manager

Filled

Manager Corporate Services

Manager Social and Community Services

Filled

Manager Technical Services

Filled

Budget and Treasury Department (CFO)

Manager Economic Development and Planning

Filled

Page 50: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Community Services

ProgrammesII Protection and Emergency ServicesIII Municipal Health

4. Economic Development and Planning

I Integrated Development PlanningII Local Economic Development (Vacant)III Town Planning and Housing

5. Corporate Services I Human ResourcesII Information Technology (IT) and Records ManagementIII Council Administration and Legal Services

Table 9: Core Departmental Functions, Capacity and Constraints: Budget and Treasury Department

Divisions Functions Number of Staff Constraints that compromises Service Delivery

Total Man

Profess.

Vac

Budgeting and Financial Reporting

Compiling financial statements and executing budgetary controls

Compliance with MFMA reporting formats

Ensuring implementation of GAMAP/ GRAP

1 2 0 2 Staff shortages due to vacant positions to assist senior and middle management.

Expenditure Management

Payment of Municipal Expenses Preparing monthly bank reconciliation Administering Asset Register Managing stores

9 2 3 1 Clerical vacancy

Revenue Management

Supervise the Revenue staff Verify daily revenue, direct payments

into bank accounts via. Cashiers, debit orders and through Post Office

Reconcile revenue with bank statements, taking into consideration the amounts for revenue paid into banks and accounts of other divisions e.g. Traffic

Handling enquiries on accounts through telephonic, correspondence and in person.

Balancing the trial balance and ledger accounts

Balancing evaluation roll Certifying documents for payment etc. Contract – Loan agreements

18 2 4 4 Vacancies in the availability of Junior Staff (Cashiers)

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

49

Page 51: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Table 10: Core Departmental Functions, Capacity and Constraints: Technical Services Department

Divisions

Functions Number of Staff Constraints that compromises Service Delivery

Total

Manag

Profess.

Vacancies

Water and Sanitation

Provision of water, sewerage and sanitation.

Reticulation of water, sewerage pipeline

Maintenance of water and sewerage network

Water and sewer purification

52 2 2 12 Vacancies are mainly the Junior Staff i.e. Machine Operators and General Assistants

Roads and Stormwater

Construction and maintenance of roads and stormwater.

Render Project Management Services and upkeep of Municipal Buildings.

Coordinate mechanical services.

22 2 1 8 Staff shortages due to vacancies on the building services section.

Electrical Services

Provision, distribution, Maintenance of electrical connections with the Municipal Area.

Render electric services to support municipal construction projects.

25 2 4 29 Staff shortages due to the many vacancies for electrical assistants and other labourers.

Table 11: Core Departmental Functions, Capacity and Constraints: Social and Community Services Department

Divisions Functions Number of Staff Constraints that compromises Service Delivery

Total

Manag

Profess.

Vacancies

Sports, Arts, Culture, Cemeteries and Special Programmes

Develop and promote sports, arts and culture.

Provide Parks, Recreation and Cemetery Services i.e. maintenance and upkeep of cemeteries, parks and municipal facilities

Provide Library Services which includes procurement and issue of library material

50 2 1 16 Staff shortages due to vacant positions for clerical work and general works.

Protection and Emergency Services

Providing registration and licensing services.

Promote traffic safety and law enforcement.

Render fire fighting and

19 2 8 11 Staff shortages due to vacant positions for professional officers to assist

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

50

Page 52: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

disaster management services

Render security services.

middle management.

Municipal Health

Render environmental health services.

Render landfill management services.

Render refuse and waste management services.

37 2 1 8 Staff shortages due to vacant positions on the waste management section.

Table 12: Core Departmental Functions, Capacity and Constraints: Economic Development and Planning Department

Divisions Functions Number of Staff Constraints that compromises Service Delivery

Total

Manag.

Profess

Vacancies

Integrated Development Planning (IDP)

Managing the development, approval and implementation of the IDP.

Monitoring the performance of the Municipality through PMS requirements.

Compiling and monitoring the implementation of strategic, operational and activity plans to give effect to the IDP.

Compiling and submitting progress performance reports on all the development initiatives, projects, programmes and activities taking place within Bela Bela (i.e. Quarterly, Mid - yearly and Annual Reports).

Developing and Implementing policies and procedures to manage and co – ordinate all approved public participation

1 2 0 1 Staff shortages due to vacant positions to assist senior and middle management (i.e. Professional Officer).

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

51

Page 53: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

and communication projects, programmes and activities.

Local Economic Development (LED)

Marketing of Bela Bela.

Co – ordinating investments proposals

Liaison with investors Promotion of tourism Supporting the LED

projects Providing incentives

for the SMMEs./Support SMME Development

2 1 1 2 Significant staff shortages due to vacant positions from middle management to professional officer.

Town Planning and Housing

Ensuring the implementation of the town planning requirements within the development taking place in Bela Bela Municipal Area.

Render land use, Building and Housing administration.

Render survey and demarcation of sites.

Decision – making in terms of spatial and physical planning.

5 2 3 3 Staff shortages due to the structure of the organogram which does make provisions for the Junior Planners to assist senior and middle management with the workload.

Table 13: Core Departmental Functions, Capacity and Constraints: Corporate Services Department

Divisions Functions Number of Staff Constraints that compromises Service Delivery

Total

Manag

Profess

Vacancies

Human Resource

Render acquisition of staff.

Administer employees benefits.

Render administration, labour and legal relations.

Render training and development services.

Render organisational development services.

5 2 3 0 Fully staffed

Information Technology (IT)

Render record management services.

Render information

15 2 0 2 Staff shortages due to vacant positions for the

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

52

Page 54: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

and Records Management

technology services. Provide auxiliary

services.

Professional Officers.

Council Administration and Legal Services

Oversee the drafting and updating of by-laws.

Compilation of council agendas.

Provide legal services.

3 2 0 3 Vacancies for Professional Officers and a Typist.

It should be noted there are 16 additional staff which is not captured on the above tables and that includes the Section 57 managers (5), Personnel in the office of the Municipal Manager (5), Personnel in the office of the Mayor (2) and Personal Assistants to Section 57 Managers (4).

4.8.3 DEMOCRACY AND GOVERNANCE

4.8.3.1 Community Education and Participation

Section 16 (1) of the Municipal Systems Act requires municipalities to develop a culture of municipal governance that compliments formal representative government with a system of participatory local government. As such, Bela Bela Municipality has adopted a ward committee system and established such structures in all 8 municipal wards. In terms of the structure of the ward committees, each committee must have 10 members which gives a total of 80 members, however the exact number of the ward committees is not currently available since there has been a decrease in number of members within each committee. The ward committees represent diverse interests and serve as the main means for public participation in the IDP and municipal affairs generally. There are training workshops which have been planned for 2007/ 08 financial year.

4.8.3.2 Interaction with community

Section 6(3) b of the Constitution stipulates that the municipality must take into account the language usage and the preference of their communities in communication. The White Paper on Local Government suggests mechanisms, which include forums, focused research and focused stakeholder groups as communication tools. Transparency and reciprocal information flow are the tenets put forward by the government and transparency has been given more prominence through Acts such as the Promotion of Administrative Justice Act and the Access to Information Act.

In this instance, the Bela Bela Municipality prepared and adopted a Communication Strategy. The municipality is also intending to __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

53

Page 55: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

establish a newsletter for the municipality so that communities will be kept informed. It should be noted that the IDP Representative Forum is also a legislative requirement that promote public participation by the community on the affairs of the municipality.

4.8.3.3 Municipal Financial Strategy

One of the challenges facing Bela Bela Municipality is to ensure that credit control measures are put in place. The second priority is to broaden the basis of revenue and not to restrict income to only assessment rates, sewerage, waste removal water and electricity charges. The 2007/ 08 IDP noted the following strategies which are followed in order to address the above priorities:

Table 14: Financial StrategiesSTRATEGY INCOMe

SOURCE DESCRIPTION OF STRATEGY IMPACT ON REVENUE

COST OFIMPLEMENTATION

Improve billingSystem

- Design more user- friendly invoices in consultation with community;- Send out in- voices at least five working days before the end of each month;- Install prepaid meters in all residential areas and phase conventional meters out over the following ten years.

Incr

ease

rev

enue

None

Ensure accessibility of pay-points to all members of the community.

- Install pay points in close proximity of the community facilities;- Provide accessibility for tax-payers and consumers to pay via the Internet.- The Absa Kiosk has been installed and is fully functional. A function is going to be added to enable the community to pay their traffic fines at the kiosk.

R60 000.00 to erect pay points.

R 200 000 to enable ABSA kiosk to be fully functional.

Ensure registrationof all liable levy payers.

Ensure effective communication between trade departments and income Division;Ensure that all relevant information is correctly captured on the data information system.

None

Consumer and Water Meter Audit

Undertake a study of all electricity and water meters on the ground. Compare the information on the system with the actual audit.

R 140 000

Reduce Water and Electricity Losses

Currently water loss is at 23% and electricity at R1.2m.

R 1 500 000

Contract Management

Ensuring that all municipal houses have lease contract. Establish a contract register. Process the lease contract timeously.

None

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

54

Page 56: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

All

levi

ed In

com

e

Implementation of Property Rates Act

Entering into contracts with all stakeholders that have build properties on municipal land. Negotiate for sale or transfer of land.

R700 000

Ensure the effectiveimplementation ofthe Credit ControlPolicy

- Appoint external consultants to assist Council with the first phase of implementation;- Train employees in managing the credit Control policy- Implementation of Credit and Debt Management Control Policy.

Outstanding debts to be reduced with 15% per financial year.

- None – Consultants will be remunerated out of additional revenue received. - R30 000.00 to train employees.- R 400 000 for credit and debt management policy implementation

Data cleansing to ensure thatconsumer details on the system are correct

Opening of accounts, Cleansing of a debtors age analysis and suspense account.

Contribute to 15% decreasein outstanding debts

R30 000.00 for collectingCosts

Ensure a positive cash flow.

- Reduce the Accumulated Deficit by budgeting for a surplus per financial year over the following ten years;- Approve budgets of all financial years, based on actual cash flow.

To avoid the bank overdraft and to change the negative cashbook balance to a positive amount which will result in a situation that the bank balance will not be overdrawn.

None.

Improving the effectiveness of a vendingMachine.

Cas

h po

wer Upgrading vending machine for cash power Increase

revenue.Reduce electricity losses.

4.8.3.4 MEC Comment

The MEC’s comments on the 2007/08 Integrated Development Plan for Bela Bela included the following concerns:-

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

55

Page 57: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

The IDP document was not packaged in a standardized format to enable an objective and credible assessment of the IDP process and content issues.

There was no clear indication of the availability and non – availability of sector plans and programmes on the document.

The limited attention on implementing structures and measures to promote Good Governance e.g. implementation of anti – corruption strategies and establishment of audit committees.

A total of sixteen sector plans were not included on the IDP document and these are the Municipal Institutional Plan, Risk Management Plan, 5 – year capital investment plan, Local Economic Development Plan, Tourism Strategy, Integrated Waste Management, Environmental Management, Air Quality Management Plan, Health Plan, Educational Plan, Housing Plan, HIV/ AIDS Plan, Social Crime Prevention Strategy, Poverty Alleviation and Gender Equity Plan, Integrated Transport Plan and Organizational PMS.

4.8.4 STRENGTH, WEAKNESSES, OPPORTUNITIES AND THREATS (SWOT) ANALYSIS OF INSTITUTIONAL SITUATION

The current institutional situation reflects an immense improvement and stability in terms of staffing arrangements within Bela Bela Local Municipality. This is evident from the SWOT analysis table below which reflects a significant number of strengths against the weaknesses that are currently in existence within the arrangements that the municipality has undertaken in terms of Municipal Administration.

Table 15: SWOT Analysis

Strengths Weaknesses

1. All senior management positions are filled and senior staff members are well trained and experienced.

2. Well developed sense of teamwork amongst senior management members.

3. Good potential amongst middle management for staff capacitating.

4. Senior and Middle Management are computer literate.

5. Fairly good computer programs.

6. Contingency plan in place for equipment breakdown.

1. Staff shortages in many departments

2. Lack of skills/ capacity at the lower levels.

3. Service providers do not always respond on time for emergencies.

4. Lack of adequate funds for training

5. Lack of sufficient internet connection

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

56

Page 58: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

7. Business plan for capacity building in place.

8. Enough computers available for senior management.

OPPORTUNITIES THREATS

1. Staff development through training.

2. Potential to contribute to job creation through LED/IDP/EPWP projects and learnership programmes.

3. Internal redeployment/ placement and better utilisation of staff with improved morale and job satisfaction.

4. Conducting the staff audit

1. Delays in service delivery

2. Delays in programmes/ projects with implementation

3. Possible failure to respond to emergencies

4.9 KEY DEVELOPMENT ISSUES

It is important to note that integrated development planning is not and cannot be a panacea for all problems facing the municipality and its people. As a result, one of the distinguishing features of integrated development planning is its focus on strategic areas of intervention and concern with interventions with a high impact using the limited resources available to the municipality. This focus is intended to achieve faster and appropriate delivery of services and create an enabling framework for social and economic development. Based on the assessment of the current situation, Bela Bela Municipality has identified the following as key development issues from 2007/ 08 and 2008/ 09.

4.9.1 COMMUNITY AND STAKEHOLDER PRIORITY ISSUES

4.9.1.1 Backlogs in the Delivery of Basic Infrastructure: Roads, Water and SanitationThe infrastructure issue which was raised during the 2007/ 08 IDP review was that the condition of roads within all the wards are considered to be inaccessible during the rainy season and the storm water drainage also needs to be improved. The additional infrastructure backlog issues that has been identified during the 2008/ 09 analysis phase is the lack of access to water and sanitation at the appropriate RDP standard by approximately 775 households in ward 8 (i.e. KwaLitho) and informal settlements (i.e. “JZ”). There are also major arterial routes (i.e. controlled by Dept. of Transport) which are in a very bad condition and these include P85/ 1 (R516), P1/ 4 (R101) and P20/ 1.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

57

Page 59: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.9.1.1 Backlogs in the Delivery of Public Facilities: Crime, HIV/AIDS, Education and Skills

The crime rate in Bela-Bela Municipality is reaching alarming proportions and must be reduced. Although the crime statistics are not readily available, the residents meetings held with the community has reflected that Public Safety is a key area of concern within specific parts of the municipal area and these will need to be addressed.

The number of people infected and affected by HIV/AIDS within Bela Bela is considered to be increasing and this requires urgent attention. With reference to the HIV/ AIDS statistics in sub section 4.3.3, it is evident that a lot needs to be done by Dept of Health in association with the municipality in order to avoid the impact that this epidemic will have on the social and economic development of Bela Bela.

In terms of education the 2007/ 08 IDP review noted that there are 20 schools on private properties (farms) and the key issues was that these schools are too far from the settlements and the children have to travel long distances to attend their classes. These schools comprises of 67 classrooms and 1062 learners. The lack of tertiary institutions with Bela Bela was also considered to be limiting a factor in terms of ensuring that the population is skilled and therefore the facilitation and establishment of FET institution within Bela-Bela was identified as the priority issue.

4.9.1.2 Poor Access to ShelterThe number of residents who require housing within Bela Bela still remains high and the municipality should on an on – going basis ensure the availability of serviced land in all wards for housing and infrastructure purposes. Based on the housing waiting list the housing backlog is currently estimated at 2100 for low income earners and 400 for middle income earners.

4.9.1.5 Economic Development and Job CreationThe need to revive the economy and improve unemployment was also identified as a critical issue during the 2007/ 08 IDP review. It was also indicated that tourism is the economic mainstay of the Bela Bela Municipality, however, due to a declining economy and an increase in unemployment, the market is unable to absorb the growing labour force.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

58

Page 60: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

4.9.2 MUNICIPAL PRIORITY ISSUES

4.9.2.1 Ensuring the Provision of Basic Service

The municipality committed itself to the provision of the following basic services:- Bulk water supply and sanitation – upgrading of bulk water supply

and sewer purification plant at Bela-Bela. Solid Waste Management – There are no dumping sites at

Pienaarsrivier, Vingerkraal, or Rapotokwane. Electricity supply – Upgrade bulk electricity supply and network.

4.9.2.2 Institutional DevelopmentThe reconstruction of municipal building which was damaged by the fire was also made a priority since it was the critical and unavoidable institutional issue for the municipality to function appropriately.

5. STRATEGIC FRAMEWORK5.1 INTRODUCTION

The strategic framework presents the long-term development vision, the associated localized strategic guidelines, objectives and strategies as ranked by priority. The latter serves as guidelines for specific actions that the municipality will undertake and embark upon to __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

59

Page 61: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

ensure the implementation of projects. For practical purpose the performance indicators’ formulations are based on the action plans identified in this phase.

5.2 VISION AND MISSION STATEMENT

5.2.1 VISION

This vision is guided by the constitutional imperatives, which generally requires all local government structures to be developmental in nature and continuously strives to ensure safety in the interest of the public and the environment while also ensuring that communities are empowered to become prosperous in both social and economically terms.

5.2.2 MUNICIPAL MISSION STATEMENT

Bela Bela Municipality commits itself to the following mission in pursuit of the above – mentioned vision and developmental agenda. The mission of Bela Bela can be generally outlined in Box 2 below:-

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

60

It is the vision of Bela-BelaIt is the vision of Bela-Bela Local Municipality to strive for the Local Municipality to strive for the development of the municipality to development of the municipality to

be safe, prosperous and well be safe, prosperous and well maintained.maintained.

BOX 2: IN ORDER TO ACHIEVE THIS BELA BELA MUNICIPALITYBOX 2: IN ORDER TO ACHIEVE THIS BELA BELA MUNICIPALITY NEEDS:NEEDS:

• The combined efforts of all the residents of theThe combined efforts of all the residents of the municipality regardless of race, age and gender;municipality regardless of race, age and gender;

•• The assistance of departments in the other two spheres ofThe assistance of departments in the other two spheres of government;government;

•• The Municipal Council of Bela-Bela as the driving forceThe Municipal Council of Bela-Bela as the driving force towards it all; andtowards it all; and

To capacitate, support, establish and monitor sustainableTo capacitate, support, establish and monitor sustainable

Page 62: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

5.2.3 MUNICIPAL VALUES

Bela Bela Municipality commits itself to adhere to the municipal core policies and values which are:-

Accountability

Fairness

Effectiveness

Commitment

Honesty and Sincerity

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

61

Page 63: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

5.3 LOCALISED STRATEGIC GUIDELINES

5.3.1 INTRODUCTION

The localized strategic guidelines assist in terms of considering the relevance and application of policy guidelines in the local context and give direction to the development of strategies that ultimately result in the identification of projects for local development. The idea behind the development of localized strategic guidelines is to ensure that planning takes into cognizance all relevant policies and legislations which are adapted for local conditions.

5.3.2 LOCALISED STRATEGIC GUIDELINES FOR SPATIAL IMPERATIVES

The spatial issues that are considered to be the challenges in Bela Bela include the concentration of economic resources in the former white areas, spatial disparities, development of informal settlements and service backlogs (i.e. within the nodes). It is important to note that at the planning stages Bela Bela has made efforts to address these spatial related challenges which include the preparation and adoption of the Spatial Development Framework (SDF). The SDF serves as the local base plan that the municipality uses for spatial guidance since it is prepared taking into account all the relevant spatial policies and legislations and it is made to suit the local conditions and needs.

The SDF of Bela Bela therefore indicates the broad direction of future development, desired pattern of land-use, urban edges, special development areas and areas that need conservation. The SDF should also be the mechanism that is used to discourage urban sprawl, discourage land invasions, provision for development of rural and urban areas, promoting environmental sustainable, ensure land use integration, equality and efficiency. In addition to the SDF the municipalities are supposed to prepare the Land Use Management Schemes (LUMS) which is a detailed guidance and a control mechanism for land use at the local level to support the implementation of the SDF.

Table 16: Localised Strategic Guidelines on Spatial Imperative

Policy and Legislative Principles Localised Strategic Guidelines

The NSDP’s Economic Growth principle requires the government spending on fixed investments to be focussed on localities of economic potential in order to sustain and stimulate economic activities and create long –

Bela Bela should ensure that the capacity of existing infrastructure (water, electricity, roads etc.) is sufficient within the identified economic growth points (Bela Bela Urban Areas, Radium, Pienaarsriver and Settlers) and the government

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

62

Page 64: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

term employment. should invest in fixed investments (infrastructure and public facilities) within these areas.

The NSDP principle on Integrated Development requires Bela Bela to overcome the spatial distortion of the apartheid, future settlements to be channelled within the nodes and activity corridors which links to the main growth points.

The location of new housing projects should be located within existing urban areas in order to optimise the utilisation of existing infrastructure (e.g. roads, schools, water, clinics, etc.). The new land development (commercial investments) should promote the compaction of the urban area(s) within the Bela Bela Municipality. All social, economic, institutional, physical and environmental issues should be considered during planning processes.

5.3.3 LOCALISED STRATEGIC GUIDELINES FOR ECONOMIC DEVELOPMENT

Bela Bela Municipality should maximize its potential for social development and economic growth in order to develop the community by creating an enabling environment to attract external investment and give impulse to local capital for economic growth. In order for local government to achieve a strong emphasis on economy as the core of development, the municipality should:-

• Formulate policies and guide Integrated Economic Development;• Co-ordinate government’s economic development programmes;• Provide infrastructure for business in previously disadvantaged communities;• Facilitate sustainable community projects;• Facilitate access to funding and training for SMME’s;• Develop incentives for local investment; and• Maintain a rural focus.

Bela Bela Municipality prepared and adopted the Local Economic Plan in 2005, which highlighted the economic opportunities within Bela Bela and made recommendations regarding the current economic situation. One of the crucial recommendation by the LED plan was that in order for the economy to grow and the residents to benefit, there should be a change in focus by the community in terms of depending on subsidies, grants and social hand outs to alleviate poverty but the individuals should starts realising creativity and entrepreneurial as the key to empowerment and this include pursuing the BEE in the dominant and successful sectors within the municipality.

Table 17: Localised Strategic Guidelines on Economic Development

Policy and Legislative Principles Localised Strategic Guidelines

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

63

Page 65: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

The Limpopo PGDS target is to increase economic growth of the province by 9% from 2001 – 2010 and 12% by 2010 – 2020 through capitalizing on existing economic clusters and positioning the province for international competitiveness.

The leading sectors within Bela Bela (which are the distinguished features of Limpopo PGDS) is Tourism and Agriculture. Bela Bela should therefore capitalize on investing these economic clusters in order to grow its economy, create an enabling environment for the entrance of SMMEs, BEE and Job Creation.

Maintaining Local Context Identifying the potential of rural areas and developing projects in line with the local capacity

Ensuring sensible forms of redistribution Providing infrastructure for business in previously disadvantaged areas

Achieving complementary between large and small projects

Inter – linking projects i.e. ensuring where possible that output of large projects benefit the development of smaller projects

Creating a conducive environment Security of persons and property and maintaining the existing infrastructure

Facilitating sustainable community projects Taking a leading role in identification, facilitation and implementation of projects in consultation with stakeholders and experts in the field elated to projects

Developing incentives for local municipal investment

Maintaining the current infrastructure and providing economic related incentives such as rebates

Support SMME through facilitation of access to funding and training

Establishing an SMME support centre. Ensuring joint ventures between large service providers and SMMEs. Providing incentives for the utilization of SMME service and products

5.3.4 LOCALISED STRATEGIC GUIDELINES FOR ENVIRONMENT MANAGEMENT

Although there is a plethora of legislation addressing environmental issues in South Africa, the National Environmental Management (NEMA) incorporates all the principles governing environmental issues and should serve as the basic planning principle. The fact that different municipalities will have different developmental objectives (e.g. Metropolitan Areas in Gauteng and district municipalities in the predominantly rural Limpopo Province) makes it more imperative to adhere to the basic planning principles. A key principle that governs the relationship between development and nature is the belief that what benefits us today, should also benefit future generations. This principle should be regarded as the economic law of the exploitation of natural resources.

It was previously indicated in section 4.4, that Bela Bela has a number of nature reserves, flora & fauna and other environmental significance areas which require environmental protection and therefore the importance of localizing the environmental issues within Bela Bela becomes quite critical. The table below is the localized environmental strategic guideline.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

64

Page 66: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Table 18: Localised Strategic Guidelines on Environmental Management

5.3.5 LOCALISED STRATEGIC GUIDELINES FOR RURAL DEVELOPMENT, POVERTY ALLEVIATION AND GENDER EQUALITY

The groups that can be considered to be most vulnerable in terms of poverty related issues are the women, children, disabled, aged and the rural residents or farm workers. These social categories constitute a large percentage of the community and are mostly located in the previously disadvantaged areas. Since development is about changing people’s lives, it is important that through this IDP process one is able to channel resources with a goal of ensuring that poor people’s lives will be improved, hence they should be made less poor, rather than to make them more comfortable in poverty. The strategies must be in line with the policies and principles adopted nationally to curb poverty. However, these strategies need to be concretized according to local conditions. Furthermore, projects must comply with IDP

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

65

Page 67: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

objectives, strategic guideline and operational strategies. Finally, the projects need to be integrated to produce a holistic approach to poverty alleviation by integrating the provision of social infrastructure with economic growth.

Gender issues, like poverty alleviation, should constitute the core of the IDP. These issues originated as result of the historical trend to regard women as inferior and marginalized them from mainstream economy and politics. The unfortunate situation is that while the majority of the population is still reeling from the effects of apartheid, women suffered more than their male counterparts. The gender issue is about transforming the society to be gender conscious when developmental issues are considered. The relationship between gender and poverty can be summarized as a problem of power relations between men and women. Women, particularly in the rural areas, still do not have “access to, and control over social, political and economic resources”. The IDP process should ensure that gender issues are mainstreamed throughout the planning process. The solution to the poverty problem should start with the identification of the contributing factors of which the marginalization of women is certainly one. During the analysis phase, an in-depth analysis revealed the core of the problem, the affected social grouping and the location, as well as the impact of underdevelopment on women. Inability to access water, results in women having to walk long distances to fetch water and inaccessible health facilities becomes an enormous burden for women who are responsible for their children’s health.

The instrumental government structures with programmes and projects to tackle poverty issues include the Department of Local Government and Housing, Agriculture, Health and Welfare and Land Affairs. There are also international agencies that are directing their efforts to rural areas in order to alleviate poverty and these include the UN Food Program and IFAD (International Fund for Agricultural Development). The local municipality can then play a facilitating role to evaluate the effectiveness of these initiatives (e.g. effectiveness of land reform projects in creating emerging black commercial farmers) and offer supports that might be deemed necessary.

Table 19: Localised Strategic Guidelines on Rural Development, Poverty Alleviation and Gender Equality.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

66

Page 68: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

5.3.6 LOCALISED STRATEGIC GUIDELINES FOR SERVICE DELIVERY, INSTITUTIONAL ARRANGEMENTS AND GOOD GOVERNANCE

In order for service delivery and socio-economic development to be sustainable, a municipality should integrate the various sectors and dimensions, such as planning and delivery of housing, transport and basic infrastructure, public facilities sectors taking into account the spatial, environmental and economic dimensions which also form part of the overall development agenda of the municipal goals.

The backlogs in terms of service delivery were exacerbated by a number of factors such as separate development which was inflicted by the apartheid planning (i.e. characterized by spatial separation of settlements with a concentration of basic household infrastructure in the white areas and no, or less, services in the black communities). An example is Bela-Bela where there is Bela-Bela for Africans,

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

67

Page 69: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Warmbaths for Whites, Jinnah Park for Indians and Mountain View for Coloureds.

With this background, local government institutions are now faced with the reality of transforming themselves to meet the new constitutional objective which is to become developmentally orientated. This role requires the local government institutions (i.e. municipality) to organize and manage themselves in fulfilling this service delivery role and that is where the municipal institutional arrangements become important. In the past local government institutions were faced with straightforward technical roles but now local government is required to adopt a developmental approach, achieve integration and make decisions about service delivery that are at the public domain in order to be classified as the good governance.

Table 20: Localized Strategic Guidelines on Service Delivery, Institutional Development and Good GovernancePrinciples and norms Localised strategic

guidelinesTransform existing organizational arrangements and cultures.

Reviewing the municipal organizational structure in line with the demand and required capacity for service delivery.

Provide a democratic and accountable government to the people.

Mainstreaming public participation in the affairs of the municipality i.e. IDP Rep Forums, Mayoral Imbizo, Community satisfaction surveys etc.

Provide sustainable service delivery. Ensuring that the development process undertaken by the local and provincial government structures is integrated.

Establish a performance management system to inform institutional reforms and organizational development.

Ensuring that the municipality has a PMS framework in place in order to manage the performance of the municipality in service delivery

Ensure demographic representation in the institution.

Development and revision of the equity plan that also shows a balanced representation of the municipal demographics and ensure that recruitment of staff is consistent with the employment equity plan of the municipality

Ensure gender representation. Recruitment to be consistent with the Employment Equity plan of the municipality.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

68

Page 70: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

69

Page 71: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

5.4 DEVELOPMENT OBJECTIVES AND STRATEGIES

5.4.1 IDP PRIORITIES IN LINE WITH NATIONAL KPAS, LOCAL KPIS AND PERFORMANCE TARGETS

National KPAs (Key Performance Areas)

IDP Priorities Performance Targets

Key Performance Indicators(KPIs)

KPI 1: Service Delivery and Infrastructure Development

Roads and Stormwater Revamp and upgrade 60% of the municipal roads and stormwater infrastructure by 2014

Decent Roads and Stormwater infrastructure by 2014

Electricity Eradication of the backlogs for Housing (2500HH) by 2014, Electricity (800HH) by 2012, Water (775HH) by 2008 and Sanitation (800HH) by 2010

Access to basic services by all households (14 290HH) within Bela-Bela

Water and SanitationLand and Housing

KPI 2: Local Economic Development

LED Strategy Reduction of Unemployment by 30% (2 464) and 5% Economic Growth by 2014

Decrease in unemployment from 33% (8 213) to 23% (5 750) by 2014. Establishment of new sustainable businesses and retention of existing ones.

Tourism and SMME DevelopmentInvestment AttractionSupport Economic Development Initiatives

KPI 3: Municipal Financial Viability

Sound Financial Management 100% compliant with MFMA, GAMAP and GRAP by 2009/10

Financial Viability and Sustainability. Unqualified Auditor’s Opinion

Financial Strategy implementation Expand the financial base of the municipality by 10% annually.

KPI 4: Municipal Transformation and Institutional Development

Work Place Skills Plan Capacity and Capability of the Institution to perform its functions service delivery to improve by 20% annually

Improved Service Delivery and Municipal Institution to be accredited with good ethics/ values.

Employment equityOrganizational arrangement and developmentStrategic Planning and Performance ManagementAnti – Corruption Strategy 100% Corruption free institution by 2009/ 10Risk Management Strategy Efficient and Effective internal controls within

the institution by 2009/ 10KPI 5: Governance Communication Improvements 100% compliance with Chapter 4 of the

Municipal Systems Act (Community Participation) by 2008/ 09

Public involvement in the affairs of the municipality. The ward committees and councilors understand the local government systems

Community Participation and Education

Promoting the image of the Municipality.

Strengthened relations of the municipality with stakeholders and the Media by 2008/ 09.

Good image of the Municipality.

Promoting Batho-Pele principles. Enhance customer care by 50% by 2009/10. Improved customer care.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

70

Page 72: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP Promoting effective decision – making

Improving the understanding of local government system for councilors and CDWs by 2008/ 09

Effective decision – making.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

71

Page 73: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP 5.4.2 DETAILED DEVELOPMENT PRIORITISES, OBJECTIVES AND STRATEGIES

5.4.2.1 Priority No. 1: Roads and Storm waterDEVELOPMENT OBJECTIVE

WELL DEVELOPED, UPGRADED, IMPROVED AND MAINTAINED ROADS AND STORMWATER INFRASTRUCTURE WITHIN BELA BELA MUNICIPAL AREA.

Municipal Strategies Proposed Projects Location Intended Outcome

Responsibility/ Driver

1. To improve the condition of the municipal controlled roads and ensure proper maintenance.

Paving of access roads in Bela Bela Township and access road to the cemetery.

Resealing of the roads in the CBD Rehabilitation of main road in Rapotokwane Rehabilitation of roads in Industrial Area and

Spa Park. Completion of Koot van der Merwe Street in

Golfbaanpark. Refurbishing of Rails and Catwalk Paving of access roads in Bela Bela

Township i.e. Extension 5, 6 and 7 Upgrading of all internal roads within

Masakhane (Radium) Upgrading of internal streets in Rapotokwane Proper maintenance of access roads in Bela

Bela Ext. 5 Removal of stockpile at Leseding Extensions

Bela Bela TownshipRapotokwaneBela Bela CBDIndustrial AreaGolfbaanparkSpa ParkMasakhane (Radium)

Well – maintained and functional roads.

Bela Bela Local Municipality

2. To improve and upgrade the drainage systems in the township.

Construction of proper stormwater drainage in areas that are prone to flooding.

Bela Bela CBD (i.e. Van der Merwe Street or next to Public Works)Bela Bela Township Rapotokwane

Fully functional stormwater system.

Bela Bela Local Municipality

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

72

Page 74: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP 5.4.2.2 Priority No. 2: Electricity

DEVELOPMENT OBJECTIVE

ELIMINATED BACKLOGS OF 800 HH WITHOUT THE POWERSUPPLY BY 2012, IMPROVED QUALITY OF ELECTRICITY SUPPLY, UPGRADED BULK ELECTRICITY SUPPLY AND NETWORK.

Municipal Strategies Proposed Projects Location Intended Outcome

Responsibility/ Driver

1. Eradicate electricity backlog by 2012 through utilizing the municipal capital budget.

Electrification of houses of 800HH. Electrification of 500 stands in Spa

Park Replacing streetlights in

Pienaarsriver and CBD. Replacement of meter boxes Installation of 90 streetlights in

Radium Installation of Bus – coupler at

municipal substation

Bela Bela Extension 7, 8 and 9.

Radium Pienaarsriver Bela Bela CBD

Improve access to basic services

Bela Bela Municipality

2. Apply for other source of funds to upgrade Electricity network by 2008/09.

Upgrading of Bela Bela Township Electrical network.

Replacing HT cables in town Upgrade of switchgear and building

at the main substation Upgrade Noodhulp line Extention of electrical store Upgrade of streetlights in the CBD Recovery Plan – Metering Audit Recovery Plan – Replacing of

conventional meters Re-spraying and and painting of

meter boxes and subs

Bela Bela CBD Effective power supply which can cope with future developments

Bela Bela Municipality

3. Liase with Eskom in order to upgrade bulk electricity supply

Installation of High Mast streetlights in Bela Bela Ext. 6 & 7

Replacement of meter boxes Purchase of 5 MVA 11/ 22kv step

up transformer Replace 44 relays Servicing of 80 mini – subs

Municipal Wide Efficient Power Supply to cope with future developments

Bela Bela Municipality

4. Improve the quality of Electricity Supply through conducting a research to investigate the most efficient Electricity Supply e.g. Solar Energy

Installation of new Electricity and Water Distribution Control System for Water and Electricity Losses

Municipal Wide Financially viable and efficient Energy supply

Bela Bela Municipality

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

73

Page 75: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

5.4.2.3 Priority No. 3: Water, Sanitation and Refuse RemovalDEVELOPMENT

OBJECTIVEIMPROVED ACCESS TO SAFE AND HEALTHY WATER, SANITATION AND ENVIRONMENT BY THE RESIDENTS OF BELA BELA MUNICIPAL AREA AND WELL PROVIDED REFUSE REMOVAL SERVICES.

Municipal Strategies Proposed Projects Location Intended Outcome Responsibility/ Driver

1. Eradication of water backlog by 2008. Service of new residential sites

Servicing of households that encounter a backlog

Construction of taps within the yards in Bela Bela Extension 7

Temporal provision of water to informal settlements

Bela Bela Ext. 8 Radium Rapotokwane Bela Bela Ext. 7

Improve access to basic services

Bela Bela Municipality

2. Upgrading of bulk water supply at Bela-Bela. High Pressure Tower Radium Fully functional water supply system

Bela Bela Municipality

3. Eradicate sewer backlog by 2011. Sewer Pump Station Servicing of households that

encounter a backlog Temporal provision of sewer

(toilets) in Bela Bela Ext. 7

Bela Bela Ext. 8 Radium Rapotokwane Bela Bela Ext. 7

Improve access to basic services

Bela Bela Municipality

4. Reduction of unaccounted for Water Installation of new Electricity and Water Distribution Control System for Water and Electricity losses

Municipal Wide Proper utilization of water as an resource

Bela Bela Municipality

5. Addressing the refuse removal backlog in 2008/ 09 financial year

Purchase 350 refuse bins for additional units in Radium and Bela Bela Ext. 8

Purchase Refuse Removal Truck and Tractor

Refuse removal awareness programme for Rapotokwane

Bela Bela Ext. 8 Radium Rapotokwane

Improved environmental health.

Bela Bela Municipality

6. Addressing the littering and dumping on the open spaces within Bela Bela Township

Purchase and installation of the mass refuse removal containers within

Bela Bela Township Improved environmental health and cleaning ness

Bela Bela Municipality

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

74

Page 76: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP Bela Bela Township

Mechanisms should be put in place to avoid illegal dumping

5.4.2.4 Priority No. 4: Land, Housing and InfrastructureDEVELOPMENT OBJECTIVE

(A) TO ADDRESS THE CURRENT HOUSING BACKLOG INCLUDING ERADICATION OF THE CURRENT INFORMAL SETTLEMENTS BY 2010, CATERING FOR ALL INCOME CATEGORIES AND HOUSING TYPOLOGIES. (B)TO FACILITATE FOR THE ACQUISITION OF SECURITY OF TENURE FOR ALL RESIDENTS (WITHOUT SECURED TENURE) OF THE MUNICIPALITY BY 2009. (C) TO CREATE AN EFFECTIVE SYSTEM OF LAND USE MANAGEMENT AND ORDERLY DEVELOPMENT WITHIN THE WHOLE MUNICIPAL AREA.

Municipal Strategies Proposed Projects Location Intended Outcome Responsibility/ Driver

A 1. Apply the “Breaking New Ground(BNG) in Housing Delivery” Policy/ A Comprehensive Plan for the Development of Sustainable Human SettlementsA 2. Identify Strategically located land within the municipality in line with the Principles of the National Spatial Development Perspective and the Spatial Development Framework to accommodate the current Housing Backlog

Middle income housing on the remainder of Erf 655, Warmbath.

Bela Bela CBD Reduced backlogs in respect of middle income housing

Bela Bela Municipality and Department of Local Government and Housing (DLGH: Housing Unit)

A 3. Engage other spheres of government and private sector (banks and property developers) to assist with planning, infrastructure provision and housing delivery for different income categories and housing options or typologies.A 4. Put mechanisms in place to deal with the emergence or mushrooming of new informal settlements timeously.

ABSA Housing Middle Income Housing Project

Housing Project in Bela Bela Extension 8 (900 sites)

Housing Project in Radium (150 sites)

Bela Bela CBD Bela Bela Township Radium

Reduced backlogs in respect of low and middle income housing

Bela Bela Municipality, Department of Local Government and Housing (DLGH) and Private Financial Institutions (i.e. ABSA bank).

B 1. Conduct an audit on all land occupied without any secured tenure, and facilitate for the issuing of title deeds for the affected residents

Land Audit and issuing of title deeds

Municipal Wide Improved security of tenure by the residents affected

Bela Bela Municipality

C1. Ongoing revision, implementation, monitoring, and evaluation of the Spatial Development Framework informed by current realities and policy frameworks.C2. Finalize Development and monitor implementation of the Land Use Scheme C3. Development of the By-Laws to enforce the implementation of the Land Use Schemes.

Revised SDF Finalization and

implementation of LUMS Promulgation and

implementation of LUMS

Municipal wide Spatial development is well co – ordinated

The municipality is able to update the property rates database

Land administration is easily administered

Bela Bela Municipality and DLGH: Spatial Planning Unit

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

75

Page 77: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

5.4.2.5 Priority No. 5: Local Economic DevelopmentDevelopment objectives TO CREATE A CLIMATE CONDUCIVE TO LOCAL ECONOMIC DEVELOPMENT, REDUCE THE LEVEL OF UNEMPLOYMENT

BY 5 % BY 2011; REDUCE THE LEVELS OF POVERTY BY 5% BY 2011 AND TO ENSURE THAT THE LOCAL ECONOMY GROWS AT A RATE OF 5 % PER ANNUM.

Municipal Strategies Proposed Projects Location Intended Outcome Resp./ Driver1. Promotion of Tourism as a key driver of the local economy

Annual Tourism Festival Tourism Development Plan and Marketing Strategy Tourism Survey Initiate Community and Township Based Tourism (e.g.

Skills and Training) Identification of sports days for 2010 awareness campaign. Positioning the town in terms of tourism e.g. Tourism

Routes and Getaway Routes

Municipal Wide Job creation Economic growth Stakeholders share a

common local economic development vision

Increased number of emerging previously disadvantaged entrepreneurs.

Bela Bela Municipality and DLGH: LED Unit

2. Facilitate the establishment of co-operatives for various sectors.

Supporting the initiatives by LIBSA and SEDA on the Establishment of co – operatives.

Municipal Wide Poverty eradication LIBSA, SEDA and Bela Bela Municipality

3. Support SMME’s Development. SMME Development Programmes SMME Training and Workshops Mainstreaming the existing SMMEs to the tourism industry

and facilitate the establishment of new small enterprises that compliment the existing tourism enterprises.

Municipal Wide Poverty eradication SEDA, LIBSA and Bela Bela Municipality

4. Support Community Economic Development where the beneficiaries are the local communities

Informal Trading Facilities (Market Stalls and Hawkers Shelters)

Formalization of Flea Market Support of Community Based Projects

Municipal Wide Poverty eradication SEDA, LIBSA and Bela Bela Municipality

5. Review and implement the LED plan.

Revised LED Plan and Strategy LED Summit

Municipal Wide Holistic approach towards Economic Growth of Bela Bela.

DLGH: LED Unit and Bela Bela Municipality

6. Revive the Business Forum. LED Business Forum Municipal Wide Sound stakeholder engagement and interaction for Economic Growth in Bela Bela.

Bela Bela Municipality

7. Intensify Human Capital Development

Entrepreneurship training and workshops amongst the SMMEs and local business

Municipal Wide Business retention and growth SEDA, LIBSA and Bela Bela Municipality

8. Develop and maintain infrastructure in areas with economic development

Township Regeneration Strategy (Bela Bela Township and Extension, Jinna Park and Spa Park)

Bela Bela Township, Jinna

Economic Synergies Bela Bela Municipality,

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

76

Page 78: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP potential and high levels of poverty and Spa Park Waterberg District9. Identify and plug the leaks in the local economy

Revitalization of existing nodes/ activity streets (Sun Valley Business Area, Jinna Park Business Area and Mathokwa Street)

Sun Valley, Jinna Park and Mathokwa Street

Fully functional Economic regions

Bela Bela Municipality, Waterberg District

10. Support the retention and expansion of existing business.

Engage LIBSA, SEDA, Productivity SA in undertaking initiatives to support the retention and expansion of businesses

Municipal Wide Economic Growth Bela Bela Municipality et. al.

5.4.2.6 Priority No. 6: Good GovernanceDevelopment objective TO PROMOTE EFFECTIVE AND EFFICIENT PUBLIC PARTICIPATION IN MUNICIPAL AFFAIRS

AS WELL AS TO IMPROVE AND PROMOTE EFFECTIVE DECISION MAKING.Municipal Strategies Proposed Projects Location Intended Outcome Responsibility/

Driver1. To improve the communication needs. Establish internal and external

communication systems i.e. intranet and newsletter.

Municipal Wide Public involvement in the affairs of the municipality

The ward committees and councilors understand the local government systems

Bela Bela Municipality

2. To inform the community about service delivery.

To improve and maintain the content of the Imbizo’s, pamphlets, official notices, etc.

Municipal Wide Public involvement in the affairs of the municipality

The ward committees and councilors understand the local government systems

Bela Bela Municipality

3. To promote the image of the Municipality.

To forge closer ties with stakeholders i.e. Business Forum, CTA, NGOs, CBO, CDWs and other structures.

Municipal Wide Strengthened relations of the municipality with stakeholders

Good image of the Municipality.

Bela Bela Municipality

4. To promote Batho-Pele principles. Establishment of the call centre and customer care service

Municipal Wide Improved customer care.

Bela Bela Municipality

5. To promote effective decision – making On – going training of councilors and CDWs on local government matters

Acquisition of an electronic legal library.

Municipal Wide The councilors and CDWs understand the local government system

Bela Bela Municipality

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

77

Page 79: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

5.4.2.7 Priority No. 7: Sports, Arts, Culture, Recreational Facilities and CemeteriesDEVELOPMENT OBJECTIVE

TO DEVELOP AND IMPROVE ACCESS TO THE SPORT, RECREATIONAL, ART AND CULTURAL FACILITIES WITHIN BELA BELA MUNICIPAL AREA.

Municipal Strategies Proposed Projects Location Intended Outcome Responsibility/ Driver1. To improve and maintain the existing sports, recreational and other community facilities and promotion of different sporting codes.

Provision of ablution facilities and fencing in Moloto/RCC parks

Improve conditions at Halls and LAPA Purchase of Equipment, Tables and Chairs

for Jinna Park and Spa Park

Bela Bela Township and Spa Park

Sport and recreational facilities are kept in good state.

Bela Bela Municipality

2. Allocate or seek funds in order to develop sporting and recreational facilities

Multi – purpose sport ground Multi – purpose sport courts Multi – purpose sport complex in Extension 6 Multi – purpose sport complex in Radium Multi – purpose sport complex in Pienaarsriver Multi – purpose sport complex in Spa Park Soccer Stadium Multi – purpose community centre

Bela Bela Township

Pienaarsriver Rapotokwane Radium Spa Park

Improved access to sports and recreational facilities.

Bela Bela Municipality

3. Allocate or seek funds in order to develop Arts and Culture Facilities

Community Hall in Radium Community Hall in Extension 6

Radium Bela Bela

Township

Improved access to arts and cultural facilities.

Bela Bela Municipality

4. Exploit 2010 Fifa Soccer World Cup Tournament Opportunities

Establish fan – park Engage youth in legacy development games Facilitate demo/ coaching clinics (sessions) by

some top international squad or players

Municipal Wide

Bela Bela accrue benefits from the major sporting events i.e. 2010

Bela Bela Municipality and Office of the Premier

5. Improving the resourcefulness of the Library

Purchase IT equipment and books for the library Bela Bela Township

Well resourced library

Dept. of Sports, Arts and Culture/ Bela Bela Municipality

6. Expanding access to Library services to peri – pherial areas.

Mobile Library for peri – pherial Areas Municipal Wide Improved access to library facilities

Dept. of Sports, Arts and Culture/ Bela Bela Municipality

7. Provision and maintenance of community cemetery facilities

Fencing of cemetery and provision of ablution facilities at Radium

Radium Well maintained cemetery

Bela Bela Municipality

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

78

Page 80: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

5.4.2.8 Priority No. 8: Safety and SecurityDEVELOPMENT OBJECTIVE

TO PROVIDE SUPPORT TO THE SAFETY AND SECURITY PROGRAMMES INTENDED TO REDUCE THE LEVELS OF CRIME AND TO FACILITATE THE CONSTRUCTION OF PUBLIC SAFETY FACILITIES WHICH WOULD REDUCE THE SERVICE BACKLOGS.

Municipal Strategies Proposed Projects Location Intended Outcome

Responsibility/ Driver

1. Promote the reduction of crime in Bela Bela Municipal Area

Promote response time to reported incidents.

Advocate for increase in number of police officers

Municipal Wide Reduced level of crime

SAPS and Bela Bela Municipality

2. Improve access to safety and licensing services

Facilitate the establishment of satellite Police Station in Bela Bela Township (Ward 3) and Radium i.e. Ward 1.

Satellite Police Station at KwaLitho Launching Community Policing Forum

(CPF). Upgrading the existing test station

Municipal Wide Reduced level of crime and efficiency in the licensing services.

SAPS and Bela Bela Municipality

5.4.2.9 Priority No. 9: Prevention of HIV/ AIDS and Other Life – Threatening DiseasesDEVELOPMENT OBJECTIVES

TO SUPPORT THE PROGRAMMES INTENDED TO PREVENT LIFE – THREATNING DISEASES AND PROJECTS INTENDED TO REDUCE BACKLOGS IN TERMS OF PUBLIC HEALTH FACILITIES.

Municipal Strategies Proposed Projects Location Intended Outcome

Responsibility/ Driver

1. Support the initiatives for the prevention of life-threatening diseases such as TB, Cancer, HIV/ AIDS etc.

Support the initiatives to prevent life – threatening diseases

Municipal Wide Reduction of the life – threatening diseases

Dept of Health and Bela Bela Municipality

5.4.2.10 Priority No. 10: EducationDEVELOPMENT OBJECTIVE

TO FACILITATE THE DELIVERY OF EDUCATION FACILITIES IN ORDER TO ADDRESS THE BACKLOGS IN TERMS OF THIS SERVICE.

Municipal Strategies Proposed Projects Location Intended Outcome

Responsibility/ Driver

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

79

Page 81: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP 1. Facilitate the provision of additional schools 1. Secondary school in Radium

2. Additional School for Bela Bela Central3. Additional classrooms for Pienaarsriver

Radium Improved access to basic education facilities

Department of Education and Bela Bela Municipality

2. Liaise with the Department of Education for financial allocations for the tertiary institution.

2. Establish Further Education and Training College (FET)

Municipal Wide Improved skills based within the youth of Bela Bela.

Department of Education and Bela Bela Municipality

5.4.2.11 Priority No. 11: Municipal Financial ViabilityDevelopment Objectives

TO MANAGE AND USE THE PUBLIC FUNDS IN AN EFFICIENT AND ACCOUNTABLE MANNER

Municipal Strategies Proposed Projects Location Intended Outcome Responsibility/ Driver

1. Sound Financial Management 1. Implementation of GAMAP/ GRAP.

N/A Efficient Financial Management

Bela Bela Municipality

2. Financial Recovery Plan 2. Debt Recovery3. Investments4. Cost Recovery

N/A Efficient Financial Management

Bela Bela Municipality

5.4.2.12 Priority No. 11: Municipal Transformation and Institutional DevelopmentDevelopment Objectives

TO PERFORM LOCAL GOVERNMENT SERVICE DELIVERY FUNCTIONS EFFICIENTLY AND EFFECTIVELY

Municipal Strategies Proposed Projects Location Intended Outcome Responsibility/ Driver1. Implementation of Work Place Skills Plan Employee Capacity Building N/A Skilled Labour Bela Bela Municipality/ SALGA2. Implementation of the employment equity Employment Equity Plan N/A Address inequalities in

respect of race, gender and people with disabilities

Bela Bela Municipality

3. Organizational arrangement and development Review the organisational structure

N/A Capacitating the institution for performing the service delivery functions effectively.

Bela Bela Municipality

4. Anti – Corruption Strategy Anti – corruption operational plan

N/A Corruption free institution Bela Bela Municipality

5. Risk Management Strategy Risk Management Plan N/A Efficient and Effective internal controls within the institution.

Bela Bela Municipality

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

80

Page 82: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

81

Page 83: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP 6. CAPITAL INVESTMENT FRAMEWORK6.1 INFRASTRUCTURE DEVELOPMENT PROJECTS

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

Programme key performance areas hod responsibleCapital Projects Infrastructure Development Technical Services

PRIORITY NO.1: ROADS & STORMWATERPROJECT NO.

PROJECT DESCRIPTION LOCATION COSTS 2008/ 09 2009/ 10 2010/ 11 FUNDER

BRS01 Completion of Koot van der Waalt Street in Golfbaanpark.

Golfbaanpark

R 1 800 000 R 1 800 000 - - Bela Bela Municipality

BRS02 Refurbishing Rails and Catwalks Bela Bela Township

R 120 000 R 120 000 - - Bela Bela Municipality

BRS03 Paving of access roads in Bela Bela Township. i.e. Extension 5, 6 and 7

Bela Bela Township

R 7 820 000 R 2 500 000 R 3 160 000 R 2 160 000 MIG

BRS04 Construction of proper stormwater drainage in areas that are prone to flooding i.e. Bela Bela Township.

Bela Bela Township

R 5 503 000 R 2 477 000 R 3 026 000 - MIG

BRS05 Removal of Stockpile at Leseding Extension

Leseding Extension

R 600 000 R 600 000 - - Bela Bela Municipality

BRS06 Resealing of the roads in the CBD and Provision of stormwater drainage

Bela Bela Town

R 12 000 000 R 1 050 000 - - MIG

PRIORITY NO. 2: ELECTRICAL SERVICESBES01 Replacing 3854m of obsolete HT

cable Bela Bela Town

R 2 535 100 R 500 000 - - Bela Bela Municipality

BES02 Upgrading of Bela Bela Township Electrical network.

Bela Bela Township

R 500 000 R 300 000 - - Bela Bela Municipality

PRIORITY NO. 3: WATER, SANITATION AND REFUSE REMOVALBWS01 VIP Toilets at Witlaagte Rapotokwan

eR 3 270 000 - R 2 500 000 - MIG

BWS02 Refurbishment of Pump Stations R 750 000 R 150 000 - - Bela Bela Municipality

BWS03 Completion of the Reservoir at Radium

Radium R 1 680 000 - R 1 680 000 - MIG

BWS04 Sewer Pump Station at Radium Radium R 2 000 000 R 2 000 000 - - MIGBWS05 Completion of Sewer Purification Bela Bela R 1 500 000 - R 650 000 R 850 000 MIG

82

Page 84: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

6.2 COMMUNITY AND SOCIAL DEVELOPMENT PROJECTS

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

Programme key performance areas hod responsibleCapital Projects Social Development Community Services Manager

PRIORITY NO. 7: SPORTS, ARTS, CULTURE, RECREATIONAL FACILITIES AND CEMETERIESPROJECT NO.

PROJECT DESCRIPTION

LOCATION COSTS 2008/ 09 2009/ 10 2010/ 11 FUNDER

BWS08 Provision of ablution facilities at the Roman Catholic Church Park and fencing thereof

Bela Bela Township

R 73 000 R 73 000 - - Bela Bela Municipality

Programme key performance areas hod responsibleCapital Projects Infrastructure Development Technical Services

PRIORITY NO. 3: WATER, SANITATION AND REFUSE REMOVAL (CONT.)PROJECT NO.

PROJECT DESCRIPTION LOCATION COSTS 2008/ 09 2009/ 10 2010/ 11 FUNDER

BWS06 Phase 2: Sewer Purification Bela Bela Town

R 7 000 000 - - R 7 000 000 MIG

BWS07 Purchase 350 refuse bins for additional units in Radium and Bela Bela Ext. 8

Radium and Bela Bela Township

R 60 000 R 60 000 - - Bela Bela Municipality

83

Page 85: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

6.3 ECONOMIC DEVELOPMENT AND PLANNING PROJECTS

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

Programme key performance areas hod responsibleCapital Projects Housing Delivery, Spatial Planning and

Economic Growth and DevelopmentManager: Economic

Development and PlanningPRIORITY NO. 4 LAND, HOUSING AND INFRASTRUCTURE

PROJECT NO.

PROJECT DESCRIPTION LOCATION COSTS 2008/ 09 2009/ 10 2010/ 11 FUNDER

BLH01 Middle income housing on the remainder of Erf 655, Warmbath.

Bela Bela Town

R 1 209 000 R 1 209 000 - - Private Sector

BLH02 ABSA Middle Income Housing Project

Bela Bela Township

R 100 854 972

R 5 689 800 R 23 707 500

R 71 457 672 ABSA/ DLGH and Bela Bela Municipality

BLH03 Housing Project in Bela Bela Extension 8 (900 sites)

Bela Bela Township

R 25 339 600 R 25 339 600 - - DLGH

BLH04 Housing Project in Radium (150 sites)

Radium R 6 972 600 R 1 125 000 R 5 847 600 - DLGH

BLH05 Land Audit and issuing of title deeds

Bela Bela Town and Township

- - - - DLGH

BLH06 Revised SDF Municipal Wide

R 200 000 - R 200 000 - Bela Bela Municipality

Programme key performance areas hod responsibleCapital Projects Economic Development and Growth Manager: Economic

Development and PlanningPRIORITY NO. 5 LOCAL ECONOMIC DEVELOPMENT

PROJECT NO.

PROJECT DESCRIPTION LOCATION COSTS 2008/ 09 2009/ 10 2010/ 11 FUNDER

BLED01 Instigate Community and Township Based Tourism Initiatives

Bela Bela Township

- - - - -

BLED02 Identification of sports days for 2010 awareness campaign.

Municipal Wide

- - - - -

84

Page 86: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

Programme key performance areas hod responsibleCapital Projects Economic Development and Growth Manager: Economic

Development and PlanningPRIORITY NO. 5 LOCAL ECONOMIC DEVELOPMENT

PROJECT NO.

PROJECT DESCRIPTION LOCATION COSTS 2008/ 09 2009/ 10 2010/ 11 FUNDER

BLED03 Positioning the town in terms of tourism e.g. Tourism Routes and Getaway Routes

Municipal Wide

- - - -

BLED04 Mainstreaming the existing SMMEs to the tourism industry and facilitate the establishment of new small enterprises that compliment the existing tourism enterprises.

Municipal Wide

- - - -

BLED05 Support of Community Based Projects

Municipal Wide

- - - -

BLED06 Revised LED Plan and Strategy

Municipal Wide

- - - - DLGH: LED Unit and Bela Bela Municipality

BLED07 LED Business Forum Municipal Wide

- - - -

85

Page 87: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

6.4 INSTITUTIONAL DEVELOPMENT PROJECTS

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

Programme key performance areas hod responsibleCapital Projects Institutional Development All

PRIORITY NO. 11 MUNICIPAL TRANSFORMATION, INSTITUTIONAL DEVELOPMENT AND FINANCIAL VIABILITYPROJECT NO.

PROJECT DESCRIPTION DEPARTMENT RESPONSIBLE

COSTS 2008/ 09 2009/ 10 2010/ 11 FUNDER

BTIF06 Replacing tools and equipment for electrical division

Technical Services R 29 000 R 29 000 - - Bela Bela Municipality

BTIF07 Equipment (Small generator, Sewer Rods, Trailer for mobile generator and sludge pumps)

Technical Services R 64 000 R 64 000 - - Bela Bela Municipality

BTIF08 Bush Cutters X6 Social & Community Services

R 67 000 R 67 000 - - Bela Bela Mun.

BTIF09 4X Dixon Ride – on lawn mowers

Social and Community Services

R 330 000 R 330 000 - - Bela Bela Municipality

Programme key performance areas hod responsibleCapital Projects Institutional Development All

PRIORITY NO. 11 MUNICIPAL TRANSFORMATION, INSTITUTIONAL DEVELOPMENT AND FINANCIAL VIABILITYPROJECT NO.

PROJECT DESCRIPTION DEPARTMENT RESPONSIBLE

COSTS 2008/ 09 2009/ 10 2010/ 11 FUNDER

BTIF01 Employee Capacity Building

Manager: Corporate Services

- - - - -

BTIF02 Employment Equity Plan Manager: Corporate Services

- - - - -

BTIF03 Review the organisational structure

Manager: Corporate Services

- - - - -

BTIF04 Anti – corruption operational plan

Manager: Corporate Services

- - - - -

BTIF05 Financial Recovery Plan Chief Financial Officer - - - - -

86

Page 88: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

6.5 DEVELOPMENT PROJECTS BY SECTOR DEPARTMENTS AND SERVICE DELIVERY AGENCIES6.5.1 DEPARTMENT OF TRANSPORT

Strategies by Department of Transport Proposed Projects Location Amount Financial Year1. Regravelling of the District gravel roads by 2011/ 12 Regravelling D180 Bela Bela to Modimolle R 5 096 000 2011/ 122. Regravelling of the District gravel roads by 2012/ 13 D928 – Rooiberg – D794 Rooiberg R 2 500 000 2012/ 133. Regravelling of the District gravel roads by 2012/ 13 D4426 – Kroomdraai. Kroomdraai R 5 250 000 2012/ 133. Regravelling of the District gravel roads by 2013/ 14 D180 Radium R 2 500 000 2013/ 144. Regravelling of the District gravel roads by 2013/ 14 D1905 Lehau R 2 700 000 2013/ 145. Regravelling of the District gravel roads by 2013/ 14 D1118 Vlakplaats R 2 600 000 2013/ 146. Regravelling of the District gravel roads by 2013/ 14 D536 Klippan R 1 500 000 2013/ 147. Regravelling of the District gravel roads by 2013/ 14 D522. Vaalwal R 2 043 000 2013/ 14

6.5.2 ROAD AGENCY LIMPOPO (RAL)Strategies by Road Agency Limpopo (RAL)

Proposed Projects Location Amount Financial Year

1. Upgrading of the key gravel roads into tar roads

D1897 (P1/3 to NW/ Cyferskuil) Radium R 6 000 000 2008/ 09

2. Upgrading of the key gravel roads into tar roads

D2533/ D1000 Mabalingwe - -

3. Upgrading of the key gravel roads into tar roads

D180, D178 Bela Bela to Alma R 20 000 000 2010/ 2011

2. Maintenance of the main roads P20/1, P184/ 1, D2536 (Bridge Construction), (P1/3) to (D1944) D626, P1/3, D48, D1944, D936, D1070, P1/4 to D1070, P55/1 to P85/1, D599, D180/ D908 and Settlers to Marble Hall P85/2

Bela Bela to Koedoeskop, Settlers to Modimolle, Pienaarsriver to Dinokengs to Zwartkop, Witwal, Rooikop.

- -

6.5.3 ESKOM DISTRIBUTIONStrategies by Eskom Projects by Eskom Location Amount Financial Year1. Improving the level of infrastructure for energy usage 1. Building new substation, installing

new transformers to existing substations, constructing new power lines and upgrading existing powerlines.

Municipal Wide R 360 000 000 2007 – 2009

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

87

Page 89: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

6.5.4 Department of Water Affairs and ForestryStrategies by Dept. of Water Affairs and Forestry

Projects by Dept. of Water Affairs and Forest.

Location Amount Financial Year

1. Eradication of the Water backlogs through developing new borehole system in Bela Bela

Borehole system Rapotokwane R 2 900 000 2011/ 2012

2. Upgrading of sewer plants Bela Bela Ext. Sewer Purification Plant

Bela Bela Town R 4 340 000 2011/ 2012

3. Upgrading of sewer plants New Sewer Purification plant in Radium

Radium R 1 040 000 2011/ 2012

6.5.4 DEPARTMENT OF LOCAL GOVERNMENT AND HOUSINGStrategies by DLGH Projects by DLGH Location Amount Financial YearEradication of informal settlements and fast tracking the housing delivery. Addressing the housing demand which is estimated at 3 077 in Bela Bela.

Delivering 1 436 housing units.

Municipal Wide R 59 927 434 2007 – 2012

6.5.5 DEPARTMENT OF AGRICULTURE

Strategies by the Dept. of Agriculture Projects by Dept. Agriculture

Location Amount Financial Year

1. Redistribution of agricultural land by 2013 - Transfer the state land to occupants

Municipal Wide - 2008 – 2013

2. Development of Agri – Tourism destination - Rus De Winter Rus De Winter - -3. Fast – tracking the transition programme through LRAD

- Development of infrastructure in Rus De Winter for LRAD projects

Rus De Winter - -

4. Massification of agricultural projects - Erection of vegetable pauchase at Radium

- Provision of water reticulation at Radium and Rus de Winter.

RadiumRus De Winter

- -

5. Implementation of commodity focus approach - Cluster farmers according to commodition to ease market access.

Municipal Wide - -

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

88

Page 90: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

6.5.7 LIMPOPO TOURISM AND PARKS

Strategies by Limpopo Tourism and Parks Projects by Limpopo Tourism and Parks

Location Amount Financial Year

1. Enhancing tourism potential in specific tourism zones

Development of infrastructure in Rus De Winter for the Nature Reserve

Rus De Winter - -

6.5.8 LIMPOPO BUSINESS SUPPORT AGENCYStrategies by Limpopo Business Support Agency Intended Outcome Financial Year1. Co– operative Development: 1.1 Facilitate the establishment of 50 co – operatives

in all sectors1.2 Facilitate the registration of 100 co – operatives1.3 Fund 10 new co – operatives1.4 Facilitate the development of 60 co – operatives

1.1 Established co – operatives are operating 12 months after establishment1.2 A minimum of 25% registered co – operatives are functional within 6 months of

registration1.3 50% funded co – operatives performance show an increase in turnover.1.4 Assisted co – operatives performance turnover.1.5 100 co – operatives comply with the co – operatives Act1.6 250 new jobs created and 75% sustain all existing jobs

2008/ 09

2. Business incubations: 2.1 Incubate 255 SMMEs for the financial year

2008/09

2.1 Incubated SMMEs are able to sustain themselves 12 months after incubation period

2.2 Incubated SMMEs equitably shared amongst by branches2.3 255 new jobs created and sustain 75% all existing jobs2.4 Compliance with relevant legislations

2008/ 09

3. Capacity Development: 3.1 Offer capacity building to 3000 learners

3.1 Learners start their own business or are placed within 12 months training3.2 National equity target are met viz. 85% black, 54% women and 4% disabled of which

20% should be youth3.3 60% should be business management skills, 25% technical skills, 10% quality

management system

2008/ 09

4. Business Advisory Services: 4.1 Assist 5000 general enterprises in the year 2008/ 09 2008/ 09

5. Business Information Dissemination: 5.1 Run 40 awareness campaign/ road shows5.2 Conduct 80 workshops/ seminars5.3 Conduct 20 visits to learning institutions5.4 Participate in 140 for SABC and 60 community radio talk shows

-

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

89

Page 91: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP 5.6 Distribute 200 000 copies of LIBSA marketing collateral.

6. Corporate Governance: 6.1 Adhere to financial regulation6.2 Comply with Labour relations

6.3 Comply with other relevant legislations

-

6.5.8 DEPARTMENT OF HEALTH AND SOCIAL DEVELOPMENTStrategies by Dept. of Health and Social Projects by Dept. of

Health and SocialLocation Intended

OutcomeResponsibility/ Driver

1. Improving accessibility to health facilities 2. Building of clinics at Bela Bela, Radium and Pienaarsriver

Pienaarsriver, Bela Bela and Radium

Improved access to basic health services

Department of Health and Social Welfare

2. Improving the quality of health facilities based on the model prescribed for the Department

3. Extension of Warmbaths Hospital

Bela Bela CBD Improved quality of services for the residents of Bela Bela Municipality

Department of Health and Social Welfare

3. Improving quality of health care Extending working hours in health facilities (i.e. for clinics in Bela Bela and KwaLitho)

Employing/ training more staff

Improve customer care

Municipal Wide Improved quality of services for the residents of Bela Bela Municipality

Department of Health and Social Welfare

6.5.9 DEPARTMENT OF LABOUR

Strategies by Dept. of Labour Projects by Dept. of Labour

Location Intended Outcome Responsibility/ Driver

1. Facilitate the provision of Skills Development Programmes

Provision of skills for the unskilled labour involved in LED and IDP capital projects

Municipal Wide The skilled labour force will have more opportunities in the job market.

Department of Labour

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

90

Page 92: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

7 IMPLEMENTATION FRAMEWORK7.1 FINANCIAL PLAN

Table 21: Bela Bela Municipality 2008/ 09 Preliminary Budget

Tabled Budget for the year 2008/ 09INCOME Amount ®Equitable Share 21,519,000 Municipal Infrastructure Grant 8,343,000 Other Grants 1,735,000 Rates and Taxes 35,000,000 Electricity Sales (Conventional) 17,500,000 Electricity Sales (Pre-paid) 11,000,000 Refuse Removal 5,000,000 Water Sales 8,500,000 Sewer 5,000,000 Interest on Arrears 1,000,000 Other Revenue 6,221,297 Total Revenue 120,818,297

OPERATING EXPENDITURE Amount ®Salaries, Wages and Allowances 39, 435 746General Expenses 52, 357 953Repairs and Maintenance 6, 378 502Capital Charges 6, 547 302Contribution to Capital Outlays 12, 503 000Contribution to Funds 3, 439 182Total Expenses 120, 661 685Total Revenue -120, 818 297NETT Surplus/ (Deficit) -156, 612

CAPITAL PROJECTS 2008/ 09 Amount ®Technical Services R 11 927 000Social and Community Services R 551 000Total R 12 478 000

SUMMARY OF SOURCES OF FUNDS Amount ®Contributions from Revenue 112, 475 297Municipal Infrastructure Grant (MIG) 8, 343 000Total 120, 818 297

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

91

Page 93: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

7.2 MEDIUM TERM – OPERATING REVENUE AND EXPENDITURE

SCHEDULE 2(a) Current Year Budget Year

Budget Year +1

Budget Year +22007/08

        2008/09 2009/10 2010/11OPERATING EXPENDITURE BY GFS Approved

BudgetAdjusted Budget

Full Year Forecast

Budget Budget Budget

  R'000 R'000 R'000 R'000 R'000 R'000  B C D E F G             Executive & Council 8,896,584 8,896,584 6,366,50

06,665,72

56,972,34

9Finance & Admin 25,281,82

325,281,82

328,613,7

0129,958,5

4531,336,6

38Planning & Development 1,799,196 1,799,196 4,133,74

84,328,03

44,527,12

4Health 1,941,521 1,941,521 1,478,24

01,547,71

71,618,91

2Community & Social Services 3,314,116 3,314,116 2,451,63

92,566,86

62,684,94

2Housing     0 0  0Public Safety 2,319,327 2,319,327 3,250,45

13,403,22

23,559,77

0Sport and Recreation 894,840 894,840 1,247,21

51,305,83

41,365,90

2Environmental Protection     0  0  0Waste Management 4,180,749 4,180,749 8,027,47

28,404,76

38,791,38

2Waste Water Management 1,774,197 1,774,197 2,164,48 2,266,21 2,370,46

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

92

Page 94: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

3 4 0Road Transport 15,376,48

315,376,48

323,228,4

7924,320,2

1725,438,9

47Water 11,088,24

911,088,24

911,680,4

3712,229,4

1812,791,9

71Electricity 23,137,92

723,137,92

727,494,3

2028,786,5

5330,110,7

34                  

OPERATING EXPENDITURE BY VOTE

100,005,012

100,005,012

0 120,136,684

125,783,109

131,569,132

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

93

Page 95: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

7.3 MEDIUM TERM – CAPITAL FUNDING AND EXPENDITURE FRAMEWORK

The purpose of the medium-term Capital Funding and Expenditure Framework is to set out to a three year framework for money planned for capital investment projects required to achieve the objectives set by this IDP. This ensures that the IDP objectives are directly linked to the approved Municipal Budget. In terms of this IDP 2008/09 Financial Plan an internally funded amount of R 4, 160 000 is planned for the Capital Budget subject to the finalization of the budget. An additional amount of R 8, 343 000 is sourced from MIG (Municipal Infrastructure Grant) and it will also assists in funding the Capital projects. Capital investment projects, however, require substantially more than the amount available. It is clear from these figures that the financial requirements for capital investment projects far outweigh the availability of capital funding, particularly from internal sources. This necessitates sourcing external funds for capital investment projects in the Bela Bela Municipality to achieve some of what this IDP sets out to do.

7.4 SPATIAL DEVELOPMENT FRAMEWORK

Bela Bela adopted the Spatial Development Framework in November 2006. The purpose of the Spatial Development Framework is to give direction and to guide decision-making and action over a multi-year period aimed at the creation of integrated and habitable cities, towns and residential areas. This plan which is indicative in its nature showing desired patterns of land-use, directions of growth, urban edges, special development areas and conservation areas should also form the basis for the land-use management system to be compiled by local governments. This plan is a legal requirement by the Municipal Systems Act (Act 32 of 2000) and forms part of the IDP.

7.4.1 SPATIAL DEVELOPMENT OBJECTIVES

The development of Bela Bela SDF was informed amongst others by the three key objectives. The basic principle is to promote development and land-uses which will contribute to efficiency, sustainability and viable communities over the long term to stimulate economic activity in a sensible manner. These can be briefly highlighted as follows:-

7.4.1.1. Ensure protection of the natural environment and optimal usage of limited natural resources in Bela-Bela:

• Delineation of the urban edge to limit ad-hoc, non-structured development;__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

94

Page 96: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

• Promote “in fill” development in open spaces in the Bela-Bela Town area in order to promote densification of the urban area;

• Identify desired directions of growth within the Municipal area;• Rectify past environmental impacts; and• Define environmental sensitive areas, nature conservation areas

and areas where certain land-uses should be avoided in order to protect the environment.

7.4.1.2 Ensure sustainable economic growth of Bela-Bela Local Municipality:• Identify land-uses which can contribute to the economic development of the area;• Increase the economic viability of Bela-Bela Town by supporting

the densification and incorporation of mixed land-uses within urban areas;

• Identify a hierarchy of business centres, [i.e. the Central Business District (CBD) and neighbourhood centres];

• Identify areas in which the intensity of land development could be increased or reduced;

• Develop the Bela-Bela Local Municipality area as an attractive, unique and preferred tourism destination by:- Promoting and supporting the development of new tourism

destinations;- Promote the Dinokeng Tourism Initiative;- Develop a tourist support and supply system to promote local crafters and suppliers;

• Protect and manage areas with significant natural resource base from human settlement development, e.g. agricultural, mineral and ecological potential;

• Identify criteria for evaluating land development applications with respect to economic viability with respect to infrastructure etc, and

• Use existing infrastructure and land more optimally.

7.4.1.3 Creating sustainable human settlements and quality urban environments for all communities:

• Ensure that affordable and sustainable services and infrastructure are available for all communities that promote the optimum utilization of scarce resources;

• Ensure the supply of serviced sites for residential (i.e. all socioeconomic categories) and non-residential uses;

• Identify special development areas to redress past imbalances;• Promote different housing and tenure options that increase

choice in the municipal area while contributing to residential densification;

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

95

Page 97: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

• Promote the establishment of economic activities and job opportunities within urban areas and discourage development outside these areas;

• Prohibit illegal land occupation;• Ensure equitable access to natural and non-natural resources; and• Built habitable and safe communities where homes area safe

and places of work are productive.7.4.2 SPATIAL DEVELOPMENT RATIONALE AND HIERARCHY OF NODES

The Limpopo Province developed a Provincial Spatial Rationale in 2002 which identified a settlement hierarchy for the whole province. This settlement hierarchy is not based on individual settlements only, but settlement clusters for priority development nodes. Settlement clusters therefore indicate priority development areas/nodes in which primarily first order settlements (three types of growth points) and second order settlements (population concentration points) are identified. Growth points are therefore the highest order in the settlement hierarchy, with Population Concentration Points being the second order in the settlement hierarchy.

First order settlements (Growth Points) are individual settlements (e.g. towns/villages) or a group of settlements located relatively close to each other where meaningful economic, social and institutional activities, and in most instances a substantial number of people are grouped together. These growth points seem to have a natural growth potential, but do not develop to their optimum potential due to the fact that capital investments are made on ad hoc basis without any long-term strategy for the growth point and/or the area as a whole.

The three categories of growth points are described in terms of their relative importance (priority) in the hierarchy:

O Provincial Growth Point (PGP). A provincial growth point is the highest order in the hierarchy and therefore also the most important type of growth point. All the PGP’s have a sizable economic sector providing jobs to many local residents. They have a regional and some a provincial service delivery function, and usually also a large number of social facilities (e.g. hospitals, tertiary educational institutions). All of them have institutional facilities such as government offices as well as local and/or district municipal offices. The majority of these provincial growth points have a large number of people. The only Provincial Growth Point identified in the Bela-Bela Local Municipal Area is Bela-Bela Town.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

96

Page 98: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

O District Growth Point (DGP). These growth points already have a meaningful economic sector with some job creation, various higher order social facilities such as hospitals and/or health centres, and some accommodate tertiary educational institutions. Most of these district growth points have regional government offices and in many instances also district and/or local municipal offices. Most of the district growth points have a large number of people grouped together. There is no District Growth Point in the Bela-Bela Local Municipal Area.

O Municipal Growth Point (MGP). In terms of the various categories of growth points the municipal growth points have a relatively small economic sector compared to the district, but more specifically the provincial growth points. Municipal growth points serving mainly the farming areas often have a sizable business sector providing a meaningful number of job opportunities. These growth points usually have a few higher order social and institutional activities. In most instances these growth points have a reasonable number of people. Pienaarsrivier is the only Municipal Growth point identified for the Bela-Bela Local Municipal Area.

The other low order nodes of the Municipality consist of the settlements/towns of Settlers, Rust de Winter, Radium, Vingerkraal, Tsakane, Rapotokwane, as well as farms and smallholdings.

7.4.3 BELA BELA SPATIAL FRAMEWORK FOR FUTURE DEVELOPMENT

7.4.3.1 Bela Bela Town and Urban Edge

Bela-Bela Town is the primary provider of social services and bulk infrastructure for the Local Municipal Area. It is important to promote the development of Bela-Bela Town as a compact integrated town. An urban edge has been identified and growth should be stimulated in the undeveloped areas within the urban edge.

The necessity to define a clearly demarcated and functional urban edge for Bela-Bela Town is clear if the amount of urban sprawl that has already taken place is taken into consideration. It is a well known fact that a compact, well-planned town can be serviced easily and more cost effectively. In order to ensure a compact town specific guidelines need to be set out for future development that will take place in the urban edge.

A substantial volume of ad-hoc development leading to urban sprawl has already taken place around Bela-Bela Town. Enormous pressure exists for this unsustainable urban form to further escalate if it can __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

97

Page 99: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

not be contained and linked to a strategy of intensifying and compacting the urban areas. The first step in promoting a compact town and infill development in Bela-Bela Town is to identify a definite urban edge with an indication of priority or “preferred” areas for future urban development.

7.4.3.2 Small Towns (Pienaarsriver, Radium and Settlers)

Pienaarsrivier was identified as a Municipal Growth Point according to the Limpopo Province Spatial Rationale. After Bela-Bela Town, Pienaarsrivier is the second most important growth point in the Bela-Bela Local Municipal Area and it is important to develop this node as such, based on the local economic growth potential.

Settlers is a relatively small agricultural town within the Springbok Flats Area with a substantial agricultural potential, specifically for cash crop farming. The existing town has a farmer’s co-operative which service the farming community, an agricultural school, as well as a combined primary/high school. There are also a few small businesses, a community hall, etc. to serve the local community. Settlers is also very well located in terms of important provincial roads

No major future development is envisaged for Settlers. New residential development (if any) must follow a formal township application procedure as the town is located in an area with relative high agricultural potential. The town is surrounded by arable land, used for cash crop farming.

Radium is a very small town in close proximity to the N1 National road, but adjacent to Road P1/3 almost halfway between Bela-Bela Town and Pienaarsrivier.

7.4.3.3 Settlement Areas and Villages (Rapotokwane)

Rapotokwane is a village which does not have an economic base and is a dormitory settlement with people working as migrant laborers elsewhere or in the surrounding areas and farms. It is proposed that the village be provided, as far as possible, with basic municipal infrastructure. No expansion of the village is proposed, but rather upgrading with formalization and “in-fill” planning as far as possible to address the existing problems and improve the quality of life of the village’s residents. There are approximately 141 vacant erven which is adequate for normal population growth (with no influx).

Vingerkraal is an informal settlement which is situated within the farm and isolated from an economic activity and basic infrastructure within the municipal area. It is proposed that the option for the __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

98

Page 100: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

relocation of this community to one of the existing economically viable nodes be determined and considered by Council prior to a final decision on this matter.

7.4.3.4 Farmlands and Agriculture Developments

High potential agricultural land irrespective if currently used for cash crop farming or not, should be protected against future sterilization of this land by settlement development or any alternative land-uses. Township development at existing nodes such as Bela-Bela Town, Pienaarsrivier town and others should be sensitive for high-potential agricultural land even though it might be excluded from the Subdivision of Agricultural Land Act (Act No 70 of 1970). It can therefore be concluded that the importance of agricultural development within the municipal area as a contributor to local economic develop should not be ignored, but rather be developed to it’s optimal potential.

7.5 PERFORMANCE MANAGEMENT SYSTEM

7.5.1 OVERVIEW

A performance Management System refers to the processes and systems for measuring, monitoring, reviewing, assessing performance, and then initiating steps to improve performance within the organization by focusing on departments, managers, supervisors and individual workers. PMS is a legal requirement and it is enforced by the Municipal Systems Act (MSA), Municipal Finance Management Act (MFMA), Municipal Planning and Performance Management Regulations (2001).

The system is intended to continuously monitor the performance of municipalities in fulfilling their developmental mandate. Central to the system is the development of key performance indicators as an instrument to assess performance.

7.5.2 POLICIES AND LEGISLATIVE FRAMEWORK FOR PERFORMANCE MANAGEMENT

The framework for Performance Management is informed by the following policy and legislation on performance management:

• The Constitution (1996)• The Batho Pele White Paper (1998)• The White Paper on Local Government (1998)• The Municipal Systems Act, Act 32 of 2000• Municipal Planning and Performance Management Regulations (2001)__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

99

Page 101: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

• Municipal Financial Management Act 56 of 2003 (MFMA)

The Municipal Systems Act, No. 32 of 2000, states that a municipality must:

Develop a Performance Management System Set targets, monitor and review performance based on indicators

linked to their Integrated Development Plan (IDP) Publish an Annual Report on performance for the councilors, staff,

the public and other spheres of Government Conduct an internal audit of performance before tabling the report Have their annual performance report audited by the Auditor-

General Involve the community in setting indicators and targets and

reviewing municipal performance

The Local Government: Municipal Planning and Performance Management Regulations, 2001, Section 7(2) require that the Municipality, in developing its Performance Management System, must ensure that the system:

Complies with all the requirements set out in the Municipal Systems Act

Demonstrates how it is to operate and be managed from the planning stage up to the stages of performance review and reporting

Clarifies the roles and responsibilities of each role player, including the local community, in the functioning of the system

Clarifies the processes of implementing the system within the framework of the Integrated Development Planning process

Determines the frequency of reporting and the lines of accountability for performance

Relates to the Municipality’s Employee Performance Management processes

Furthermore, Section 43 of the Regulations prescribes the following seven general key performance indicators:

The percentage of households with access to basic level of water, sanitation, electricity and solid waste removal

The percentage of households earning less than R1,100-00 per month with access to free basic services

The percentage of the municipality’s capital budget actually spent on capital projects in terms of the IDP

The number of local jobs created through the municipality’s local, economic development initiatives, including capital projects

The number of people from employment equity target groups employed in the three highest levels of management in compliance with a municipality’s approved employment equity plan

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

100

Page 102: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

The percentage of a municipality’s budget actually spent on implementing its workplace skills plan

Financial viability with respect to debt coverage; outstanding debtors in relation to revenue and cost coverage

The objective of institutionalizing a Performance Management System (PMS), beyond the fulfilling of legislative requirements, is to serve as a primary mechanism to monitor, review and improve the implementation of the Municipality’s IDP. In doing so, it should fulfill the following functions:

• Promote accountability• Guide decision-making and resource allocation• Guiding development of municipal capacity-building programmes• Creating a culture of best practice, share learning among Municipalities• Develop meaningful intervention mechanisms and early warning system• Create pressure for change at various levels• Contribute to the overall development of a Local Government system

7.6 LAND USE MANAGEMENT SYSTEM

In 2007, Bela Bela Municipality initiated a municipal wide land use management scheme in order to manage and control land use within Bela Bela Area of jurisdiction. Land-use Control and Management within Bela-Bela Local Municipal area is complex as a single and uniform land-use management system (specifically a land-use/zoning scheme for the total municipal area) is not yet in place. Currently applications for land-use change can be lodged in terms of different sets of legislation, resulting in the responsibility to administer and approve these applications by different government levels

The Spatial Development Framework operates as an a broad and indicative plan indicating the desired patterns of land-use, directions of growth, urban edges, priority development areas and areas where stricter land-use control should be enforced. This plan has a legal effect of guiding and informing land development and management. The detail administration of land development and land-use changes should be dealt with by a Land-Use Management System (LUMS) for the whole municipal area to be compiled by the Municipality.

A direct link must exist between the Spatial Development Framework Plan, the LUMS, the municipality’s budget and the capital expenditure framework because:

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

101

Page 103: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

⇒ the rights recorded in the scheme determine the value of land which influence the rates and income of the municipality; and

⇒ any new development or change in land-use has to be adequately serviced by infrastructure and the capital expenditure framework will indicate where the municipality is able to allocate funds for the upgrading of infrastructure.

A LUMS include a land-use or zoning scheme recording the land-use and development rights and restrictions applicable to each property (i.e. farm portion or erf). The scheme should be binding and only amended where required for a particular development and to meet certain requirements, with the most important being conformity with the Spatial Development Framework Plan. The latter influences the contents of the Scheme. A zoning or land-use scheme has a binding effect on land development and management.

7.7 STATUS OF SECTOR PLANS

7.7.1 BELA BELA WATER SERVICES DEVELOPMENT PLAN (WSDP)

Water and Sanitation is the competency of Bela Bela Municipality. The municipality is currently having the draft plan (WSDP) and it is assisted by the private service provider in finalizing it. This plan will be critical in terms of informing planning and decision – making regarding the sustainable utilization of water and sanitation resources and equitable provision of these services to the community of Bela Bela.

7.7.2 BELA BELA COMMUNICATION STRATEGY

Bela Bela Municipality prepared and adopted the Communication Strategy in August 2007. The purpose of the communication strategy is to enable the municipality, both Council and Management, to communicate in an efficient, co-ordinated, integrated and coherent fashion thus building capacity, both human and capital, within the Municipality with a view of ensuring that the municipality’s central messages will be well articulated, consistent with the national GCS. This strategy is attached as Annexure A.

7.7.3 BELA BELA RISK MANAGEMENT PLAN (RMP)

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

102

Page 104: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

The municipality is currently having the draft plan (RMP) and it is in the process of submitting it to council for approval. The purpose of this plan is to ensure the efficient and effective internal controls within the institution.

7.7.4 BELA BELA FRAUD AND ANTI – CORRUPTION STRATEGY (FAC)

The municipality is currently having the draft plan (FAC) and it is in the process of submitting it to council for approval. The purpose of this plan is to ensure that the municipal institution is free from illegal activities relating to fraud and ccorruption.

7.7.5 BELA BELA LOCAL ECONOMIC DEVELOPMENT PLAN (LED)

The municipality is currently reviewing its Local Economic Development Strategy and it is assisted by the Department of Local Government and Housing. The development of an LED Strategy therefore would focus on the strengths of the economy (sectors with locational, comparative and competitive advantage) and overcoming the weaknesses in the current LED approach. The LED strategies would need to be crafted in a manner that will guide the Bela Bela on how to take advantage of economic opportunities, mitigate weaknesses in the economy and assist in the development of an appropriate institutional environment (internally and externally). This should also ensure that the institutional environment is conducive to partnerships and co-ordinated action when initiating the economic growth initiatives.

7.7.6 BELA BELA TOURISM DEVELOPMENT STRATEGY

The municipality has a tourism plan which mainly focused on the identification of tourism products within Bela Bela. The municipality is intending to review and redevelop the tourism development plan and the marketing strategy. The revised strategy should be credible with a robust analysis and quantification of the existing industry and formulate the long term sustainable strategy for tourism development.

7.7.7 BELA BELA INFRASTRUCTURE STRATEGY

The municipality is currently having the draft plan (Infrastructure Capital Study) and it is in the process of submitting it to council for approval. The purpose of this plan will be to guide the municipality in terms of infrastructure requirements within the key growth points of the municipal area.

7.7.8 BELA BELA MUNICIPAL HOUSING PLAN

The municipality does not currently have the Municipal Housing Plan in place.__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

103

Page 105: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

7.7.9 AREA BASED PLANS: LAND REFORM

The Land Reform is the competency of the Department of Agriculture and Land Affairs within Waterberg District and Bela Bela Municipality. There are not records that indicates that these Departments have prepared the Area Based Plans in this regard.

7.7.10 BELA BELA PMS POLICY FRAMEWORK

The municipality does not have the PMS Policy Framework in place.

7.7.11 BELA BELA LAND USE MANAGEMENT SCHEME (LUMS)

The municipality has commenced with the preparation of the Land Use Management Scheme within Bela Bela Area of jurisdiction. To this end the municipality has the draft scheme and draft clauses.

7.7.12 BELA BELA ELECTRICITY SERVICES PLAN

The current Electricity Services Plan for Bela Bela Municipality is outdated and needs to be reviewed based on the current status quo.

7.7.13 BELA BELA INDIGENT POLICY

The municipality prepared and adopted the indigent policy for Bela Bela Municipal Area in June 2007. This policy is currently being reviewed and it is scheduled for adoption on the 2008/ 09 financial year.

7.7.14 BELA BELA EPWP PROGRAMME

The municipality participates actively on the EPWP initiatives based on the criteria as set by the provincial Department of Public Works. Nevertheless there is no sector plan in place within Bela Bela which serves as the guide towards the implementation of the EPWP Programme.

7.7.15 BELA BELA HIV/ AIDS POLICY

The municipality does not have the HIV/ AIDS Policy in place.

7.7.16 BELA BELA FINANCIAL STRATEGY

The municipality prepared the Financial Strategy which has been incorporated within this IDP document.

7.7.17 BELA BELA FINANCIAL RECOVERY PLAN

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

104

Page 106: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

The municipality prepared the Financial Recovery Plan and it was presented to the Municipal Manager’s Forum in April 2008.

7.7.18 BELA BELA HUMAN RESOURCE STRATEGY

The municipality does not have the Human Resource Strategy in place.

7.7.19 BELA BELA WORKPLACE SKILLS PLAN

The municipality is in the process to prepare the Workplace Skills Plan for 2008/ 09 Financial Year.

7.7.20 BELA BELA MUNICIPAL RECRUITMENT AND RETENTION STRATEGY

The municipality has prepared a Draft Recruitment and Retention Strategy. This draft strategy is in the process of being submitted to Municipal Council for approval.

7.7.21 BELA BELA ENVIRONMENTAL MANAGEMENT PLAN

The municipality does not have the Environmental Management Plan in place.

7.7.22 BELA BELA WASTE MANAGEMENT PLAN

The municipality does not have the Waste Management Plan in place.

7.7.23 WATERBERG DISTRICT DISASTER MANAGEMENT PLAN

Waterberg District Municipality adopted the District Disaster Management Plan which was also mainstreamed on the 2007/ 08 Integrated Development Plan. The purpose of the Disaster Management Plan is to provide a basis of planning disaster interventions and prevention strategies and to afford the Bela-Bela Municipality the capacity to prevent and deal with disaster and to avoid developments which are likely to be subject to high risk of disaster. The summary of this plan is attached as Annexure B.

7.7.24 DISTRICT WASTE MANAGEMENT PLAN

Waterberg District Municipality adopted the Waste Management Strategy in 2007.

7.7.25 AIR QUALITY MANAGEMENT PLAN

The municipality does not currently have an Air Quality Management Plan in place.__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

105

Page 107: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

7.7.26 WATERBERG TOURISM DEVELOPMENT STRATEGY

The district wide tourism development strategy was prepared and adopted in 2006. The strategy captured that tourism is one of the three key pillars of the economy within the district followed by mining and agriculture. There are a number of strengths and weaknesses that the strategy identified at the analysis stage. The strengths include the nature based attractions with supporting products e.g. wilderness, tranquility, unspoiled & unpolluted environment and hospitality are the main themes.

The weakness include poor infrastructure especially roads, tourism products are not properly branded e.g. Accommodation, rail tourism is not capitalized upon, shortage of tour guides skills, education of SMMEs on business management and expansion, fragmented institutional arrangements (i.e. poor communication, poor relationship between tourism public & private bodies and lack of proper reporting lines), few public and private sector partnership, no transformation in the tourism sector and the utility services (i.e. water, electricity and telecommunication) are a growing problem.

The district tourism vision was then developed as follows:-

“To position the Waterberg as a leading weekend, shortbreak, holiday, meetings and events destination for domestic travellers and a new “must see” destination for international business and leisure tourists”

In order to support the implementation of this vision the objectives, strategies and implementation programmes were then developed as part of the strategy.

7.7.27 WATERBERG AGRICULTURAL DEVELOPMENT STRATEGY

The district wide agricultural development strategy was prepared in 2005. This strategy made the followed recommendations with regards to the agricultural development within Waterberg:-

Waterberg is a unique area with high agricultural and agri tourism potential. A lot of this potential is being realised at primary production level. Value and wealth is being lost outside the district both up and down the value chain.

Local government (Municipalities) has two major roles to play in order to help to fine tune a relatively well-developed commercial agricultural & agri-tourism sector. Help nurture and develop the emerging agricultural sector to integrate into mainstream commercial agriculture.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

106

Page 108: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

Need for good governance, sound management, maintenance and development of bulk infrastructure. Enabling and facilitating environment – law & order, stable property values & efficient rates and taxes.

Building and preparation of adequate resources to assist emerging agriculture – interim implementation structure & other resource gaps.

7.7.28 WATERBERG ENVIRONMENTAL MANAGEMENT PLAN

The district wide Environmental Management Plan was prepared in September 2006. The context of this plan has been mainstreamed on 4.6 which is the environmental analysis for Bela Bela.

7.7.29 WATERBERG INTEGRATED TRANSPORT PLAN

Waterberg District prepared the Integrated Transport Plan in 2007. The preparation of the Integrated Transport Plan is enforced by Section 27(2) of the NLTTA which indicates that the ITP must formulate the planning authority’s official vision, policy and objectives, consistent with the national and provincial policies, with due regard being given to any relevant integrated development planning or land development objectives. This plan is attached as Annexure C.

7.7.30 WATERBERG LED STRATEGY

The district wide LED Strategy was prepared and adopted in 2007. The purpose of this study was to investigate the economic development opportunities in the district. As part of the process which was used to develop the district wide LED strategy, the various sectoral and functional strategies were also combined into the LED strategy. This enabled an LED implementation plan that guides implementation and facilitation of initiatives. The District LED strategy is also focused on potential development of a range of sectors and not only on a specific few.

7.7.31 WATERBERG MINING STRATEGY

Waterberg District prepared and adopted the Mining Strategy in 2006. The purpose of this strategy was to provide Waterberg District with a policy instrument by which leadership and strategic direction can be given to the mining industry for increased competitiveness on a sustainable basis, increased investment as a basis for job creation and economic growth, and improvements in the quality of life of the district population, including priorities such as BEE, as well as reductions in HIV/AIDS and poverty, regional integration. This __________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT

107

Page 109: 1 Document.doc · Web view1. INTRODUCTION 4 1.1 Purpose of this Report 4 1.2 Bela Bela Local Municipality 4 1.3 Location 4 1.4 Scope of the Review Process 5 1.5 Formulation of the

BELA BELA INTEGRATED DEVELOPMENT PLAN: 2008/09 REVISED IDP

strategy noted that Bela Bela role in terms of mining is insignificance with a very limited potential in terms of mineral resources occurrence.

__________________________________________________________________________________ FACILITATED BY: BELA BELA MUNICIPAL ECONOMIC DEVELOPMENT AND PLANNING DEPARTMENT