3 Subtractive/Additive Metering Data Requirement –ERCOT TDSPs sending netted 15 minute interval data –Non-ERCOT TDSPs sending all 15 minute interval data Solution = Adopt ERCOT TDSP methodology Mid Cycle Meter Read with Profile Change –Caused by change in IDR, Demand, or TOU status –4 Options considered, no good compromise solution determined Solution = Change the meter on cycle read date Meter Reads required on Historical Usage Request –Present interpretation requires both meter read and consumption Solution = Drop requirement to provide meter read Consumption Discrepancy –Interval data does not match consumption data Solution = Revise Tx SET transaction to allow for adjustment Critical Retail Issues RMS Update Retail Metering
Citation preview
1
Critical Retail Issues RMS UpdateRMS Meeting Results
2/01RMS Formed
3/01RMS Identified “pent-up” issues•Tx Set transaction development•Service Order Workshops•Outage workshops
4/01RMS Identified Pilot Open Critical Issues•Workshops initiated to resolve issues
•Permits/Inspections•Critical Care•Move In/Move Out•Service Order/Notification•Retail Metering
5/01•Approved Pilot Work arounds•Identified Market Open Critical Issues•RMS workshops initiated to resolve issues
6/01RMS Approved 62 Resolved Critical IssuesBegan the Prioritizing processDeveloped Protocol Change RequestsDeveloped ERCOT System Change RequestsDeveloped Tx Set Transaction ChangeRequests
2
• Analysis of the 62 Critical Issues– 12 - Business process definition requiring no system change– 24 - Business system change required by point-to-point MPs– 26 - Business system change required by all MPs, ERCOT included
• Analysis of the 26 change issues effecting ERCOT– 10 - Priority 1 - essential for Market Open– 8 - Priority 2 - important for Market Open– 8 - Priority 3 - after Market Open
• Analysis of the 10 Priority 1 issues– 4 - Retail Metering, not Protocol changes required– 3 - Permit/Inspections, will require Protocol changes– 3 - Move In/Move Out, will require Protocol changes
Critical Retail Issues RMS UpdateIssue Analysis
All interested MPs were involved in the workshop process. 62 Critical Issues wereidentified and a resolution consensus was gained on practically every issue
3
• Subtractive/Additive Metering Data Requirement– ERCOT TDSPs sending netted 15 minute interval data– Non-ERCOT TDSPs sending all 15 minute interval dataSolution = Adopt ERCOT TDSP methodology
• Mid Cycle Meter Read with Profile Change– Caused by change in IDR, Demand, or TOU status– 4 Options considered, no good compromise solution determinedSolution = Change the meter on cycle read date
• Meter Reads required on Historical Usage Request– Present interpretation requires both meter read and consumptionSolution = Drop requirement to provide meter read
• Consumption Discrepancy– Interval data does not match consumption dataSolution = Revise Tx SET transaction to allow for adjustment
Critical Retail Issues RMS UpdateRetail Metering
4
• Pending order waiting completion of City Inspection– TDSPs agree to pend orderSolution = Develop a new transaction to provide electronic notification
• Move In Un-executable– Need a means to notify CR/Customer if a problem existsSolution = Provide notification on new transaction
• Cancel Move In Request– Permit is no longer needed or requiredSolution = Provide notification means to keep record accurate
Critical Retail Issues RMS UpdatePermits/Inspections
Volume Summary (estimate) TXU ERCOT
Yearly volumes 240,000 600,00Daily volumes 1,000 2,500Personnel Required* 20 50
*assumed 10 minute/call processing time
5
• Existing Process Creates Service Gaps
– Option 1 - No change, deal with customer problems– Option 2 - CR manages and communicates problem– Option 3 - ERCOT manages and communicates problem
• Timing Requirement when CSA in effect– Service not disconnected at Move OutSolution = Clarify timing requirement, ERCOT ensures switch in 1 business
day• Same CR on a new Move In
– CR responsible for final bill determinationSolution = Change existing reject code reason
Critical Retail Issues RMS UpdateMove In/Move Outs
CR26/1
CR16/15
CR26/30
Customer BMove In # 1
Customer AMove Out
Customer BMove In # 2