COURSE IN CP INSPECTION METHODS

• FOR CORROCEAN• Part II• CP Inspection

Page 2: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

2

• Check the CP system’s ability to avoid corrosion problems

• Detect any corrosion problems to adjust/retrofit before any major failure

• In general secure integrity of the structure/pipeline

• Collect data to reduce future inspection requirements

• Regulations/Authorities

Why CP inspection?

Page 3: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

3

Standards and regulations Regulations concerning load bearing structures in

the petroleum activities Guidelines on corrosion protection of load bearing

structures in the petroleum activity – 1992 Guidelines on condition monitoring of load bearing

structures to regulations concerning load bearing structures in the petroleum activities - 1992

Regulations relating to pipeline systems in the petroleum activities Guidelines on corrosion protection of pipeline system

etc. - 1998 DnV RP B401 1993 DnV RP B403 1987 (Calibration procedures etc.)

Page 4: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

4

Phases in an offshore structures life

A D

-1040

-900

-850

-650

mV wrt Ag/AgCl

B C

Page 5: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

5

Phases cont. Period A - Polarisation of new structure/pipeline. (Months)

Normally very short but dependant on design criteria and anode output characteristics.

  Period B - Protected Design Life. (e.g. 15 years )

Stabilised CP conditions but dependant on CP design, anode efficiency, coating breakdown and environmental conditions.

e.g.. Design for approx 5 to 10 % coating failure.CP level desired; -950 mV to -1050 mV.

  Period C - Depolarisation Period.

Period when anodes are reaching end of design life with reduced efficiency. The slope will depend on anode and coating conditions affecting protection level. Accuracy of CP measurements most critical.

  Period D - Under Protection.

This is a critical period when protective levels drop below -800 mV (or -900 mV for buried pipe). Danger of failure from corrosion at localised postions.

Page 6: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

6

Impressed Cathodic Protection

Sacrifical Cathodic Protection

Page 7: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

7

What do we measure?

• Potential (CP) (vs. Ag/AgCl or Zn ref. Cells)• Electrical Field Gradient (EFG or FG in

uV/cm)• Anode current (mA or Amp)• Visual inspection of anodes

(geometry/consumption/loss of)• Visual inspection of coating damages

Page 8: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

8

Principle of measurements

Page 9: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

9

CP measurements level

On steel material – typical potential level With Zinc anodes –800 mV to –1050 mV With Aluminium anodes –800 mV to –1100 mV

Protection level for steel –800 mV. Very well protected –900 mV to -1050 mV Freely corroding steel –650 mV

On anodes Zinc anodes –980 mV to –1050 mV Aluminium anodes –1000 mV to –1100 mV

Page 10: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

10

Survey Techniques

A Number of Survey Techniques Developed• Cell to Cell Survey (CP Stab Measurement)• CTC-2 Survey (CP/FG Measurement)

(Current)• Trailing Wire Survey (CP Measurement)• Clamp on meter (Anode current)

Page 11: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

11

Potential FieldsShowing Local Variations In Proximity To Anode

Page 12: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

12

Schematic potential profile

Page 13: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

13

Principle of Electric Field Gradient Measurement

Principle of Potential (CP) Measurement

Page 14: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

14

Stabber and Cell To Cell Technique

Page 15: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

15

Trailing wire utilising towed fish

Page 16: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

16

Cell To Cell Technique

Page 17: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

17

Cell to cell principle

Page 18: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

18

Trailing Wire Survey Utilising Drop Cell CTC Stepwise Technique

Page 19: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

19

CP/Field gradient measurements

Page 20: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

20

CTC-2 Field GradientCP General Arrangement

Page 21: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

21

CTC-2 Typical results exposed pipe

Page 22: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

22

FG horizontal offset error

Page 23: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

23

CP Inspection System Schematic

Page 24: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

24

Calibration requirements

Calibration of the reference cells used in the CP equipments, e.g. Ag/AgCl or Zn ref. cells

Check of control reference cells, 3 calomel cells required in a calibration set.

Page 25: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

25

Calibration of calomel reference cells

One set consists of 3 ”equal” calomel reference cells (SCE), i.e SCE 1, SCE 2 and SCE 3

Compare ref. cells by use of Multimeter; accept level from –2 mV to +2 mV.

Selection criteria: All accepted; select any. One reading out of range; the ref cell not in the reading to be used Only one reading OK; selected either of those. All readings outside accept criteria; select the best. After survey

deliver reference cell to laboratory for test.

Page 26: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

26

Calibration of silver/silver chloride half cell/Stab Reader

Ref. DnV RP B403. Check against either a Zinc-block or

calomel ref cells Ref. cells/ Stab Reader immersed for 15 to

30 min. before check. NOTE! Not water from firewater system!!

Accept criteria Against Zn-block: - 1010 mV to –1050 mV. Against Calomel half cell: +1 mV to –9 mV

Page 27: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

27

Calibration setup

Page 28: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

28

Check of CTC-2 probe (two ref. cells)

The matched pair used on CTC-2 system must be calibrated before mounting on ROV

New calibration within each 24 hours or pre and post dive.

FG reading is sensitive to drift/changes in the potential differences between the matched pair (offset) under operation.

”Zero field control”, by measuring ”off structure potential”, then on structure or anode.

Page 29: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

29

Basic Report For pipelines – raw data plot of potentials and

Field Gradient (FG) (if included in survey). Anode potentials, debris, coating damages etc.

For structures – tabulating potentials and FG readings

Post processing Different plot dependent on requirements

Reporting

Page 30: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

30

Data analysis

Detailed analysis – based on analytical methods and/or simulations (element methods)

May included the following: Anode current Output (Ia), remaining life (RL), wastage (W) Effect of different degree of burial Effect of changed coating damage percentage; also local effects Overall operating performance of CP system Current drain Stray current Depolarisation Life extension Retrofit Design analysis Trend analysis Optimisation of future inspection program

Page 31: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

31

Platform Data Trending Platform Potential Surveys For 1979,85,90 & 95

-1050

-1025

-1000

-975

-950

-925

-900

-70 -60 -50 -40 -30 -20 -10 0

Elevation/Metres

Po

ten

tial/m

Vw

rt A

g/A

gC

l Ref

Ele

ctro

de

1979 1985 1990 1995

Page 32: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

32

CP System StudiesEvaluation of Existing Systems

Basic Approach• Data Input• Methodology Employed• CP Study Output

Page 33: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

33

Data Input

• Detailed Structural Drawings of Submerged Steelwork• Component Hierarchy Listings• Historical Potential Measurements Recorded• Historical Anode Survey Data• Surface Area of Submerged Steel• Installation Dates• Anode Specifications• Anode Retrofit Details• Metallic Debris Levels• Reports on Remedial Actions

Page 34: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

34

Methodology Employed

• Review All Available Historical Data and Original Design• Data Input to Database and Manipulation to Req. Format• Analysis of Data to Provide CP Systems Overview and

Status• Determine Intermediate Survey Requirements• Tailored Survey• Calculations to Provide Predictions of Remaining Life• Determine Remedial Actions to Maintain Structure

Integrity to Anticipated End of Life• Computer Modelling for Retrofit Optimisation (if req.)• Determine Long Term Survey Programme

Page 35: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

35

CP Study Output

• Enhanced Confidence in Performance of CP System• Action Plan to Maintain CP System Integrity to End of

System Life• Tailored Cost-Effective Long Term Survey Programme

Page 36: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

36

CorrOcean’s Methodology

HistoricalDataDesign

Data

Optim ised inspection Frequency Retrofit

Optim ised Design

Life T im e Prediction

SEA CORRCom puterM odelling

Cois

Survey Data

Page 37: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

37

Some CP simulation examples. Simulation performed by CorrOcean’s

SEACORR/CP system

Page 38: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

38

-809.1-852.7-874.5-896.2-918.0-939.8-961.6-983.4

Page 39: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

39

Page 40: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

40

Page 41: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

41

Page 42: 1 COURSE IN CP INSPECTION METHODS FOR CORROCEAN Part II CP Inspection

C o r r O c e a nc u s t o m e r s

h a v e at e c h n o lo g ic a l

e d g e

42