1 CAPACITY DEVELOPMENT for the CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 2 nd nd National Workshop on National Workshop on Capacity Development Capacity Development for the Clean for the Clean Development Mechanism Development Mechanism Organised by the Ministry of Environment with Support from UCCEE and AIT 04 November 2003 Phnom Penh, Cambodia

1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

Embed Size (px)

Citation preview

Page 1: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

1

CAPACITY DEVELOPMENT for theCAPACITY DEVELOPMENT for theCLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM)

22ndnd National Workshop on National Workshop on

Capacity Development Capacity Development for the Clean for the Clean

Development MechanismDevelopment Mechanism

Organised by the Ministry of Environment with Support from UCCEE and AIT

04 November 2003Phnom Penh, Cambodia

Page 2: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

2

International Status of CDM

Bridget McIntosh Advisor, Climate Change Office

CDM GOALS•assist

developing countries in achieving

sustainable development

•assist developed countries in achieving

Kyoto Protocol

compliance

Page 3: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

3

Presentation Overview

Status of CDM and the Kyoto Protocol

Size of the international carbon market

Who are the CDM carbon buyers and prices?

Who are the CDM carbon sellers?

What are the main CDM project types?

Approval status of CDM projects

Status of forestry and agriculture in CDM

CDM Case Study

Summary of Carbon Market

Page 4: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

4

Status of CDM + Kyoto Protocol Kyoto Protocol not yet in force - must be

ratified by 55 countries + represent 55% total global greenhouse emissions

To date, 117 countries have ratified representing 44.2% of emissions If Russia ratifies the Kyoto Protocol, it will

reach 55% and enter into force Russia is holding out for ‘better deal’ and

studying the impacts of signing the protocol USA and Australia withdrew from the

Protocol - reduces size of carbon market

Page 5: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

5

Size of CDM Market Worldwide demand for emission

reduction 700-800 MtCO2eq/yrWithdrawal of US at 25% emissions

limited market size Estimate 100-300 MTC02/yr for CDM

Equates to 750,000 10MW hydro projects CDM forestry activities limited to 1%

of developed countries total reductions Limits size of CDM forestry market

Page 6: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

6

Main CDM CER buyers to date

Source PointCarbon Sept 03 CERs issued 2005 (produced -2004)

Other

CERUPT

NCDF

PCF

Dutch Government CDM target 67 MtCO2eq

Page 7: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

7

Who are the CDM buyers? Multilateral Funds - pool $ from different

carbon buyersPrototype Carbon Fund - WB fund (6

governments; 17 companies) $180mCDCF - Community Development Carbon

Fund. WB fund- target $100m. Focus on small scale projects. target for LDC

BioCarbon Fund - target $100m; approved last month, calling for subscription.

Netherlands CDM Facility - $35m managed by WB

spread risk over projects + countries

Page 8: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

8

Who are the CDM buyers? Cont.

Dutch Government Tender process - called CERUPT - 18

projects selected (75% renewables)Allocate funds to other multilateral and

private banks - International Finance Corporation- Latin American Bank CAF- Rabo Bank- WB CDCF, PCF

Bilateral projects, private companies

Page 9: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

9

Bagasse6% Biomass

8%

Waste21%

Geothermal12%Forestry

4%

Industrial Energy Efficiency

18%

Small hydro12%

Wind14%

N20 Removal5%

PCF Project Types

Page 10: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

10

Reductions by country

Brazil

Indonesia

Panama

India

Others

Where are the projects?

Eg Costa Rica, Chile

No host country approval in Brazil

Source PointCarbon Sept 03

Page 11: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

11

Status of CDM Projects Currently 49 projects already

contracted, in process of CDM Exec Board approval

many projects in finalisation stageRough estimate of 600 projects at pre-PDD

stage30 Project Idea Notes submitted to CDCF40 Project Idea Notes submitted to

BioCarbon Fund360 Project Idea Notes for PCF (only 5-10%

are signed) Not all these will make it through

Page 12: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

12

Approval status of CDM projects Baseline methodology

must be approved by the CDM executive board for projects larger than 15MW, reduce 15,000 t CO2e -

35 projects have been submitted since opening in April. 6 baselines approvedSept Round - 14 projectsColombia Wind 19.5MW Oil Field Gas Recovery and Utilization2xSugar waste co-generation Municipal Solid Waste to Energy India

Page 13: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

13

Success rate

Source PointCarbon Sept 03

Page 14: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

14

Bioenergy Case Study - India 18 MW Bioenergy Project Tamilnadu

Use crop, juliflora waste to create electricity

Project located in remote rural indigenous area 800sq km; 93 villagesAgricultural area - 75% people involved in

rice growing, cotton, ground nuts. Wood from wild juliflora for charcoal.

Revenue stream to local indigenous farmers - $6/tonne biomass waste

Employment - collection of biomass Improved electricity infrastructure

Page 15: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

15

Carbon 800,000t CO2eq over 10 years Baseline calculation

Historical average emissions for grid Based on coal, lignite, oil, gasAnalysis of future electricity supplies based

on fossil fuels plus improved efficiency Deduct emissions from transport of waste

Monitoring and Verification PlanMonitor electrical output, biomass usedEmissions from gridEmissions from transport of waste

Bioenergy Case Study - India cont.

Page 16: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

16

Status of forestry + agriculture in CDM

Rules for land use activities and CDM being finalised at COP-9 Dec 2003.

Considerations include:Forest definitionsAccounting methodologiesBaseline methodologiesPermanence of CERsSimplified methodology for small scale

Currently using definitions for Annex 1 countries

Page 17: 1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development

17

Summary of CDM carbon market

Dutch and WB Multilateral Funds dominated to date. New funds entering - esp Japan.

Many projects in pipeline Renewables preferred project type Investment preference: neighbouring

countries; Latin America; large, well-known countries

Price preference: indicatively 3-6.5 USD/tCO2eq (limited data); some willing to pay more for “quality CERs”