65
*CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 12 TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM January 1, 2008- December 31, 2010 *You may access this report on this website http://www.gppb.gov.ph

 · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

*CIAP-PDCB CONSOLIDATED CONSTRUCTORS

PERFORMANCE SUMMARY REPORT (CPES REPORTS)

12TH RELEASE

(ON-GOING/COMPLETED PROJECTS) FROM January 1, 2008- December 31, 2010

*You may access this report on this website http://www.gppb.gov.ph

Page 2:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

1

BACKGROUND: This report is prepared in connection with the

implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of Contractors Performance of the Implementing Rules and Regulations (IRR) of RA No. 9184 (Government Procurement Reform Act). Item 4 - Submission and Dissemination of Evaluation Results of Section 12, specifically mandated PDCB to consolidate the CPES evaluation results of all ongoing and completed projects and disseminate the same to all offices/agencies/corporations concerned. USES OF CPES INFORMATION:

The CPES rating and other information is designed to serve the information needs of the following: a) government agencies undertaking infrastructure projects; b) industry planners and decision makers, c) constructors, d) project owners, e) banking and financing institutions, f) insurance companies, g) consulting firms, h) professional associations, and i) embassies.

Information on contractors CPES ratings shall be used for

the following purposes: a) Pre-qualification/Eligibility Screening of Constructors; b) Awarding of Contracts; c) Project Monitoring and Control; d) Issuance of Certificate of Completion; e) Policy Formulation/Review; f) Industry Planning; and g) Granting of Incentives/Awards, and in adopting measure to further improve performance of contractors in the prosecution of government projects.

REPORT COVERAGE:

This report contains CPES rating and other project-related information of on-going and completed foreign assisted (FA) and locally funded (LF) infrastructure projects being undertaken by either local, foreign or joint venture constructors. The projects presented in these report covers: road, bridge, housing, building, ports and harbor, irrigation and flood control, and water supply projects.

REPORT CONTENTS:

Presented in this report are the names of constructors arranged alphabetically with the corresponding project classification. Information available in this report comprises three (3) parts, as follows: 1) Constructor General Information; 2) Project Data; and 3) CPES Rating.

Part 1 of the report includes the name of constructor/s and

PCAB License Number.

Information contained in Part 2 pertains to the project name, Implementing Agency, contract amount, and status of project (on-going or completed).

CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES (CIAP) PHILIPPINE DOMESTIC CONSTRUCTION BOARD (PDCB)

5/F Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati ave. Makati City Telephone Nos. 896-1801; 897-0791; Fax No. 897-0791

CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT

CPES Reports - On-going and Completed Projects from January 1, 2008 to December 31, 2010

Page 3:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

2

Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities, e) environmental,

safety and health, and f) resources deployment, and the CPES visit Rating and over-all /Final Rating and its Qualitative Description.

SOURCES OF INFORMATION

Data contained in this report were culled from the CPES Summary Report submitted by the *Department of Public Works and Highways (DPWH), Department of Transportation and Communications (DOTC), Department of Science and Technology (DOST), National Irrigation Administration (NIA), National Housing Authority (NHA) and University of the Philippines (U.P.) covering the period January 1, 2007 to December 31, 2009

As regards to data on negative slippage, this is when constructor got 0.00 on time for 15% or more negative slippage, this matter

may be brought about by any of the three (3) problems: a) Constructor-Related Problems, Agency-Related Problems; and Other Related Problems. Please see the enumerated problems on each classification on page 6 of this cover page. If you need particular information on the reason for the negative slippage of each concerned contractor, please contact the agency implementing the project.

For particular information on the data of each of the CPES Reports, please contact the person-in-charge of the concerned

implementing agencies listed below:

Engr. Arnel Fortunado (BCDA) Engr. Clarito Magsino (DBP) Arnaldo Reyes (DOST) Wilfredo C. Borbor (DOTC) Tel. No. 304-3511 Tel. No. 726-3508 Tel. No. 837-2071 loc. 2120 Tel No. 726-3508

For further information and queries, you may visit us at Philippine Domestic Construction Board (PDCB), 5th Floor Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati Ave. Makati City Philippines; call us at 897-0791/896-1801; or e-mail us at [email protected]. You may access this report on this website http://www.gppb.gov.ph.

Melrose Pailma (DPWH) Ma. Otelia F. Eclavea (NHA) Engr. Tess Pantalla (NIA) Atty. Ma. Hiyasmin Delos Santos (PPA) Tel No. 304-3511 Tel No. 928-4561 Tel. No. 927-79-84 Tel. No. 527-8356 loc. 356/541

Mr. Simon Aguilon (PRRC) Dr. Roland Viray (PUP) Dir. Ariel Betan (U.P) 926-5232/926-6449 716-91-53 928-28-63/925-0984

Page 4:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

3

CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM (CPES) IMPLEMENTING GUIDELINES

I. ASPECTS OF EVALUATION 1. During Construction (60% for Horizontal Projects such as Road, Bridge, Ports & Harbor, Irrigation and Flood

Control, Water Supply and Sewerage, etc., and 70% for Vertical Projects such as Housing, Building, Power Transmission Line and Substation) - minimum of two (2) visits with the conduct of first visit when the actual project accomplishment is at least 30% except for projects with a duration of 90 calendar days and below which may be subjected to just one (1) final visit.

2. Upon Completion (40% for Horizontal Projects and 30% for Vertical Projects) - final visit when the Implementing

Office reported 100% completion.

II. CRITERIA FOR EVALUATION

Amended Guidelines as Approved by NEDA InfraCom 27 August 2008

During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Materials 0.20 Time 0.15 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety and 0.07 Health (ESH) Resources Deployment 0.05 TOTAL 1.00

Page 5:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

4

As approved by NEDA InfraCom

19 May 2005 During Construction Upon Completion

Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.40 Materials 0.30 Materials 0.30 Time 0.10 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety 0.07 and Health (ESH) Resources Deployment 0.10 TOTAL 1.00

As approved by NEDA InfraCom

30 January 1998

During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Time 0.50 Time 0.10 TOTAL 1.00 Facilities 0.03 Environmental, Safety

and Health (ESH) 0.07 Resources Deployment 0.10 TOTAL 1.00

Page 6:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

5

III. CPES RATING & ITS QUALITATIVE DESCRIPTION

CPES Implementing Guidelines as Approved on 27 August 2008

As Approved on May 2005 and 30 January 1998

*CPES RATING Ranges Rating Qualitative Description

>96% Outstanding

>89% but < 96% Very Satisfactory >82% but < 89% Satisfactory >75% but < 82% Unsatisfactory < 75% Poor

*CPES RATING Ranges Rating Qualitative Description

>90% Outstanding

>80% but < 90% Very Satisfactory >70% but < 80% Satisfactory >60% but < 70% Fair < 60% Poor

Page 7:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

6

*CAUSES OF DELAY

CONSTRUCTOR-RELATED PROBLEMS AGENCY RELATED PROBLEMS

C-W01 - Insufficient manpower deployed in project site A-VO1-Delays in the approval of variation orders C-EO1 - Breakdown of equipment/equipment not operational A-TO1- Delays in the approval of contract time extension C-EO2 - Lack/Insufficient/Inadequate equipment deployed in project site A-SO1- Delays in the approval of suspension order C-MO1- Lack/Inadequate/Insufficient supply of construction A-DO1- Changes in construction designs Materials A-FO1- Delays in the release of funds

C-RO1- Lack of financial resources A-RO1- Right of Way (ROW) acquisition problem (squatter relocation problems, relocation

of utilities, (i.e. PLDT, MERALCO posts and other similar cases)

Page 8:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

7

*CAUSES OF DELAY OTHER-RELATED PROBLEMS O-WO1- Unfavorable weather condition (Occurrence of natural calamities; occurrence of flooding/ siltation on site; unworkable ground condition) O-PO1- Insurgence or peace and order problems/civil disturbances O-TO1- Third Party intervention *Can be a reason for the negative slippage of constructor (please see the CPES reports of constructor from the agency concerned.)

Page 9:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB 05/30/08 NCR 3.341 90 C 0.393 0.149 0.300 - - - 84.20 *84.20%

V. Satisfactory

121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB 11/24/08 NCR 3.821 90 C 0.280 0.200 0.300 - - - 78.00 *78.00%

Satisfactory

121 Construction Corporation (Formerly: 121 Construction) 21686 Impvt. of MPB at Sta. Maria Agro-Industrial

High School 11/26/08 III 1.717 90 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding

121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB, Brgy. Mabini J. Rizal 06/02/10 NCR 9.315 180 C 0.475 0.200 0.300 - - - 97.50 91.97%

V. Satisfactory

2H2L Construction 16293 Rehab./Reconst./Upgrading of Marikina-Victoria Valley-Antipolo Road 05/18/09 IV-A 19.221 180 O 0.387 0.239 0.150 0.030 0.025 0.050 88.10 -

2H2L Construction 16293 Impvt. of Flood Control at So. Upper East Kamias & So. East Kamias 03/12/09 IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90 *89.90%

V. Satisfactory

2H2L Construction 16293 Impvt. of Multi-Purpose Pavement at Brgy. Dela Paz & Brgy. San Isidro 03/12/09 IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20 *91.20%

V. Satisfactory

2H2L Construction 16293 Widening of Antipolo-Teresa Road 11/25/08 IV-A 19.224 180 C 0.261 0.300 0.300 - - - 86.10 80.34% V. Satisfactory

2H2L Construction 16293 Rehab./Reconst./Upgrading of Marikina-Victoria Valley-Antipolo Road 08/26/09 IVA 19.222 180 C 0.475 0.200 0.300 - - - 97.50 91.86%

V. Satisfactory

2-R Construction & Supply 15304 Const. of Additional Classroom @ Comprehensive Nat'l. H/S 05/21/09 I 2.417 120 C 0.496 0.072 0.300 - - - 86.80 *86.80%

Satisfactory

2-R Construction & Supply 15304 Repair/Impvt. of Villasis-Malasiqui San Carlos Road 08/27/08 I 2.410 60 C 0.338 0.200 0.300 - - - 83.80 *83.80%

V. Satisfactory

310 Construction Specialist Corporation 4875 Estrella-Pantaleon Bridge Approaches

(Across Pasig River) 11/28/08 NCR 38.627 405 C 0.376 0.200 0.300 - - - 87.60 83.22% V. Satisfactory

3E Construction 19588 Completion of Multi-Purpose Bldg., (Water District, Phase IV) Tankulan 03/03/08 X 2.365 120 C 0.335 0.136 0.000 - - - 47.10 71.44%

Satisfactory

3FS Construction 30464 Const. of Grouted Riprap @ Brgy. 90 03/18/09 VIII 0.962 70 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page1

Page 10:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

3FS Construction 30464 Upgrading of Bagahupi-Babatngon-Sta. Cruz, Barugo-Carigara Rd. 03/11/10 VIII 19.289 230 C 0.497 0.189 0.300 - - - 98.60 91.07%

V. Satisfactory

3K Builders 27277 Const. of 1 Unit 1 CL Dullao E/S 03/06/08 II 0.410 90 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory

3K Builders 27277 Repair/Rehab. of MNR, Km.174+000 - Km.175+000 w/ exception Villasis Section 06/10/10 I 9.996 32 C 0.455 0.133 0.300 - - - 88.80 88.80%

Satisfactory

3K Rock Engineering 27908 Completion of Multi-Purpose Building, Gundaway 03/06/09 II 1.783 60 C 0.458 0.200 0.300 - - - 95.80 *95.80%

V.Satisfactory

3K Rock Engineering 27908 Const. of Cultural Tourism Center, Saguday NHS 05/26/08 II 0.954 45 C 0.233 0.200 0.300 - - - 73.30 81.14%

V. Satisfactory

3K Rock Engineering 27908 Const. of Flood Control, Sangbay 08/18/08 II 0.954 70 C 0.321 0.204 0.300 - - - 82.50 *82.50% V. Satisfactory

3K Rock Engineering 27908 Const. of Sch. Bldg., Bannawang Integrated School 08/18/08 II 0.578 45 C 0.375 0.218 0.300 - - - 89.30 *89.30%

V. Satisfactory

3K Rock Engineering 27908 Const. of Sch. Bldg., Victoria H/S 11/25/08 II 1.622 100 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory

3K Rock Engineering 27908 Construction of Multi-Purpose Building, Magsaysay 09/03/09 II 0.572 45 C 0.407 0.200 0.300 - - - 90.70 *90.70%

V. Satisfactory

3K Rock Engineering 27908 Const./Repair of Multi-Purpose Building 02/25/10 II 1.735 60 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory

3K Rock Engineering 27908 Const./Completion of MPB, Liwayway 06/05/10 II 1.445 60 C 0.441 0.133 0.300 - - - 87.40 87.40% Satisfactory

3-L Construction 16745 Const. of 2 Storey Multi-Purpose Bldg. (Brgy. Hall), Brgy. San Gabriel 03/09/09 V 0.955 120 C 0.436 0.175 0.300 - - - 91.10 *91.10%

V. Satisfactory

3-L Construction 16745 Road Upgrading (Gravel to Paved), Sipocot-Cabusao Road 09/09/09 V 6.555 150 C 0.418 0.200 0.300 - - - 91.80 89.64%

V. Satisfactory

3RB Construction & Supply 19541 Const./Rehab. of Water Supply, Level 1 and II System 08/19/08 IV-A 1.921 30 C 0.288 0.200 0.300 - - - 78.80 73.94%

Satisfactory

3RB Construction & Supply 19541Road Upgrading along DM Jct.-Leg.-Sto.

Domingo-Tab.-Cam. Sur Bdry., Tiwi-Tabaco Section

02/24/09 V 19.233 150 C 0.488 0.133 0.300 - - - 92.10 84.30% Satisfactory

3RB Construction & Supply 19541 Impvt. of San Fernando North Road, San Jacinto Section 02/17/10 V 9.450 210 O 0.378 0.240 0.150 0.015 0.035 0.050 86.80 -

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page2

Page 11:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

3RB Construction & Supply 19541 Road Conc. & Impvt. of Barangay Road 02/22/10 V 0.959 160 C 0.396 0.139 0.300 - - - 83.50 86.38% Satisfactory

3RB Construction & Supply 19541 Const. of Sto. Cristo Seawall 05/28/10 V 2.876 150 C 0.458 0.133 0.300 - - - 89.10 89.10% Satisfactory

3RB Construction & Supply/Ajan Jaeda, Inc. (JV) JV-08-209 Const. of Tagas-Divino Rostro Bridge 09/01/09 V 19.179 202 O 0.384 0.240 0.150 0.030 0.033 0.050 88.70 -

3S Builders 18009 Completion of Drainage System 05/29/08 VII 0.634 60 C 0.333 0.300 0.300 - - - 93.30 91.50% Outstanding

4 A's Construction 9446 Asphalt Overlay of Daang Maharlika 03/03/09 II 1.929 30 C 0.464 0.133 0.300 - - - 89.70 *89.70% V.Satisfactory

4 A's Construction 9446 Construction of Road 08/11/08 II 1.926 90 C 0.326 0.200 0.300 - - - 82.60 79.54% Satisfactory

4 A's Construction 9446 Construction of 1-CL (7x9) Lupigue IS 09/05/09 II 1.108 45 C 0.454 0.133 0.300 - - - 88.70 *88.70% Satisfactory

4 A's Construction 9446 Const./Conc. of Road 02/23/10 II 4.822 330 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory

4B Construction Corporation 23445 Upgrading and Concreting of Subic-Philseco Road 03/03/09 III 41.616 180 C 0.407 0.163 0.300 - - - 87.00 83.76%

Satisfactory

4B Construction Corporation 23445Rehab./Reconst./Upgrading of Damaged

Paved National Road, Olongapo-Bugallon Road

05/23/09 III 33.265 45 C 0.374 0.200 0.300 - - - 87.40 *87.40%Satisfactory

4B Construction Corporation 23445 Rehab./Reconst./Upgrading of Damaged Paved National Road at Subic-Philseco Rd. 05/29/10 III 41.378 120 O 0.321 0.228 0.150 0.018 0.022 0.033 77.20 -

4B Construction Corporation 23445Repair/Rehab. of Paete-Famy Pob. Rd.,

Pangil-Siniloan Sect. Km.109+000 - Km.110+400

05/25/10 IVA 9.608 20 C 0.472 0.133 0.300 - - - 90.50 90.50% V. Satisfactory

525 Construction 28532 Rahab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 09/08/09 III 19.049 120 C 0.478 0.133 0.300 - - - 91.10 *91.10%

V. Satisfactory

525 Construction 28532 Rehab. of Sta.Rita-Biak na Bato via Pulong Bayabas Road 06/11/10 III 38.180 210 O 0.386 0.300 0.150 0.030 0.038 0.033 93.70

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page3

Page 12:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

525 Construction / MGSCC (JV)JV-07-095/

SLI-SN-005104

Rehabilitation/Improvement of Sta. Rita Biak na Bato Road 03/11/09 III 44.000 200 C 0.405 0.200 0.300 - - - 90.50 *90.50%

V.Satisfactory

525 Construction/MGSCC Joint Venture JV-08-235 Rehabilitation of Sta. Maria-Norzagaray

Road 09/07/09 III 46.339 180 C 0.479 0.133 0.300 - - - 91.20 86.64% Satisfactory

558 Builders & Construction Supply 25751 Conc. Sarangani-Davao del Sur Coastal Road (Taluya Section) 05/28/08 XII 9.435 189 C 0.346 0.300 0.000 - - - 64.60 67.68%

Fair

628 Construction Enterprises 30049 Construction of Two Classroom School Building at Lokeb Norte 03/06/09 I 1.369 70 C 0.429 0.178 0.300 - - - 90.70 *90.70%

V. Satisfactory

722 Construction 21923 Rehab/Reconst./Upgrading of Old Cagayan Valley Road (Pulilan Section) 05/28/09 III 9.543 45 C 0.359 0.200 0.300 - - - 85.90 *85.90%

Satisfactory

722 Construction 21923Const. of Multi-Purpose Bldg. Malinta E/S Lawang Bato E/S, Brgy. Lawang Bato &

Natividad Homes03/03/09 NCR 1.882 90 C 0.405 0.136 0.300 - - - 84.10 *84.10%

Satisfactory

722 Construction 21923 Const. of Sch. Bldg., 2 Storey, 2 CL Banga E/S 03/10/09 III 2.290 100 C 0.472 0.133 0.300 - - - 90.50 89.52%

V.Satisfactory

722 Construction 21923 Const. of Water System @ Northville II 08/19/08 NCR 1.424 60 C 0.278 0.177 0.300 - - - 75.50 *75.50% Satisfactory

722 Construction 21923 Rehab./Impvt. of Bocaue-San Jose Road, Tumana & Parada Section 08/29/08 III 3.807 60 C 0.347 0.200 0.300 - - - 84.70 *84.70%

V. Satisfactory

722 Construction 21923 Repair/Maintenance of Bigaa-Plaridel via Bulacan & Malolos Road (Barihan Section) 08/27/08 III 4.957 10 C 0.361 0.200 0.300 - - - 86.10 *86.10%

V. Satisfactory

722 Construction 21923 Repair/Rehab. of Road, Brgy. Perez 05/20/08 III 0.618 70 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory

722 Construction 21923 Rehab./Reconst./Upgrading of Damages Pavement along Mc Arthur Highway 05/31/10 NCR 9.506 120 C 0.436 0.200 0.300 - - - 93.60 93.60%

V. Satisfactory

722 Construction 21923 Rehab./Reconst./Upgrading at Old Cagayan Valley Rd. (Baliuag Sect.) 06/10/10 III 9.547 80 C 0.460 0.133 0.300 - - - 89.30 89.30%

V. Satisfactory

722 Construction 21923 Rehab./Reconst./Upgrading along Rizal Avenue Extension 05/27/09 NCR 9.494 120 C 0.380 0.200 0.300 - - - 88.00 *88.00%

Satisfactory

722 Construction 10221 Const. of MPB (Day Care) at Brgy. Polo 09/16/09 NCR 1.901 75 C 0.486 0.133 0.300 - - - 91.90 *91.90% V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page4

Page 13:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

739 Builders 31174 Completion of MPB, Brgy. Capangpangan 11/13/08 I 1.518 54 C 0.327 0.200 0.300 - - - 82.70 *82.70% V. Satisfactory

739 Builders 31174 Conc. of Caparacadan Road 05/17/08 I 0.189 7 C 0.254 0.300 0.300 - - - 85.40 *85.40% V. Satisfactory

739 Builders 31174 Const. of MPB @ Brgy. Sabang 05/17/08 I 4.750 150 C 0.296 0.300 0.300 - - - 89.60 *89.60% V. Satisfactory

739 Builders 31174 Const. of MPB @ San Lorenzo Village 02/28/08 I 1.087 68 C 0.261 0.200 0.300 - - - 76.10 *76.10% Satisfactory

739 Builders 31174 Road Concreting, Brgy. Napo 02/28/09 I 0.950 20 C 0.364 0.200 0.300 - - - 86.40 *86.40%Satisfactory

739 Builders 31174 Construction of School Building, Pila E/S, Brgy. Pila 09/07/09 I 0.950 60 C 0.454 0.154 0.300 - - - 90.80 *90.80%

V. Satisfactory

739 Builders 31174 Const. of Drainage Canal, Brgy. VII 05/29/10 I 1.141 80 C 0.444 0.133 0.300 - - - 87.70 87.70% Satisfactory

747 Builders & Trader 16892 Conc./Impvt. of Manila East Road 03/05/08 IV-A 6.236 150 C 0.275 0.200 0.300 - - - 77.50 83.44% V. Satisfactory

747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank 03/12/09 IVA 14.367 170 C 0.473 0.133 0.300 - - - 90.60 86.97%

Satisfactory

747 Builders & Trader 16892 Upgrading/Conc. of Roads with Drainage Impvt., M. Naval St. 11/21/08 NCR 9.589 120 C 0.355 0.200 0.300 - - - 85.50 78.96%

Satisfactory

747 Builders & Trader 16892 Proposed Rehab./Impvt. of Pres. Quirino Ave. West Bound (Singalong-Roxas Blvd.) 05/24/10 NCR 14.475 20 C 0.442 0.200 0.300 - - - 94.20 94.20%

V. Satisfactory

747 Builders and Trader 16892 Rehab./Reconst./Upgrading of Antipolo Circumferential Road "A" 08/26/09 IVA 19.213 180 C 0.411 0.200 0.300 - - - 91.10 88.70%

Satisfactory

811 Trading & Construction 21215 Const. of MPB at Sitio Simbahan, Brgy. Bagong Bayan II 05/15/08 IV-B 0.477 60 C 0.342 0.200 0.300 - - - 84.20 *84.20%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page5

Page 14:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

811 Trading & Construction 21215Const. of Two (2) Storey Bldg. Six (6)

Classroom Sch. Bldg. @ Dona Asuncion Reyes Memorial E/S

05/14/08 IV-B 0.948 80 C 0.304 0.300 0.300 - - - 90.40 91.73% Outstanding

811 Trading & Construction 21215 Repair/Rehab. of Multi-Purpose Building (Phase II) 02/26/09 IV-B 0.288 27 C 0.463 0.133 0.300 - - - 89.60 *89.60%

V.Satisfactory

811 Trading & Construction 21215 Repair/Rehab. of National Roads & Bridges, Mansalay Section 11/19/08 IV-B 4.710 90 C 0.304 0.200 0.300 - - - 80.40 *80.40%

V. Satisfactory

888 ACY Enterprises 32898Repair/Rehab. of Tablas Circ. Road,

Calatrava-San Agustin Road (Intermittent Section)

11/25/08 IV-B 9.999 32 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding

888 ACY Enterprises 32898Reconst. (Conc. Paving) of Jct. LIR,

Buenavista, Carmen-Danao-Getafe Rd., Poblacion Danao Sect.

06/01/10 VII 9.541 419 O 0.360 0.300 0.000 0.030 0.045 0.033 76.80 -

888 ACY Enterprises 32898 Reconst. (Conc. Paving) of Loay Interior Rd., Trinidad & San Miguel Sect. 06/02/10 VII 14.320 270 O 0.356 0.300 0.000 0.030 0.045 0.033 76.40 -

A C J Construction Resources 10635 Concreting of Poblacion Magpet-Nowa-Basak Road (Basak Section) 05/30/09 R-XII 18.797 180 O 0.336 0.300 0.000 0.024 0.055 0.050 76.50 -

A C O Construction 13105Const. of Rotonda along National Highway

(Zamboanga Peninsula) Cross Rd. Upgrading Project @ Poblacion Ipil

02/25/10 IX 2.829 115 O 0.319 0.300 0.000 0.020 0.042 0.033 71.40 -

A C O Construction 13105Zamboanga Peninsula Crossroads Upgrading Project (Completion of

Roundabout) Sta.1801+231.50 06/05/10 IX 1.861 60 C 0.476 0.133 0.300 - - - 90.90 90.90%

V. Satisfactory

A C O Construction 13105Const. of Rotonda along National Highway

(Zamboanga Peninsula Crossroad Upgrading Project) at Poblacion Ipil

06/05/10 IX 2.829 115 C 0.456 0.133 0.000 - - - 58.90 66.40% Poor

A C O Construction 13105 Conc. of Liloy-Zamboanga del Norte-Ipil-Zamboanga Sibugay Rd. Ph. I 03/05/09 IX 14.306 150 C 0.425 0.147 0.300 - - - 87.20 86.90%

Satisfactory

A. Ballesta Construction 8446 Const. of Road Network along E. Balite Boulevard Ext. 08/30/08 VIII 14.393 160 C 0.242 0.200 0.300 - - - 74.20 61.12%

Fair

A. De Guia Construction 18228 Conc. of Pob. Burgos-Caliguian Road 11/20/08 II 9.648 180 C 0.344 0.200 0.300 - - - 84.40 82.84% V. Satisfactory

A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Naguilian-San Mariano Rd., Villapaz Section 08/25/09 II 19.296 104 C 0.420 0.200 0.300 - - - 92.00 92.84%

V. Satisfactory

A. De Guia Construction 18228 Concreting of Junction National -Potia Road 08/27/09 II 7.043 110 C 0.410 0.200 0.300 - - - 91.00 91.42%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page6

Page 15:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

A. De Guia Construction 18228 Rehab./Reconst. of Daang Maharlika Road, KO309+300-KO309+878 08/27/09 II 18.811 130 C 0.411 0.200 0.300 - - - 91.10 91.10%

V. Satisfactory

A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Gamu-Roxas Road (Roxas Section) 02/23/10 II 19.293 240 C 0.402 0.133 0.300 - - - 83.50 88.78%

Satisfactory

A. De Guia Construction 18228 Const./Completion/Continuation of Unfinished On-going Bridges 03/01/10 II 11.574 120 C 0.415 0.133 0.300 - - - 84.80 86.78%

Satisfactory

A. De Guia Construction 18228Rehab./Reconst./Upgrading of Damaged

Paved national Road, Daang Maharlika KO 320+000 - KO 321+000

06/03/10 II 16.396 120 O 0.387 0.295 0.150 0.030 0.042 0.033 93.70 -

A. De Guia Construction 18228

Rehab./Reconst./Upgrading of Damaged Paved National Road Santiago-Baluarte-

Quirino Bdry. Road KO326+(-)280 - KO328+000 w/ exception

08/27/10 II 15.432 149 C 0.292 0.200 0.300 - - - 79.20 87.24% Satisfactory

A. De Guia Construction 18228Restoration of Road Slope & Slope

Protection along Naguilian-San Mariano Road KO395+850 - KO401+800

08/25/10 II 14.471 120 C 0.389 0.150 0.300 - - - 83.90 85.28% Satisfactory

A. De Guia Construction 18228Road Upgrading (Gravel to Paved) of Jct.

Ipil-Panang-Quirino Bdry. Road; KO366+058 - KO367+118

08/27/10 II 17.373 149 C 0.403 0.146 0.300 - - - 84.90 84.90% Satisfactory

A. De Guia Construction 18228

Rehab./Reconst./Upgrading of Damaged Paved National Roads, Santiago-Baluarte-

Quirino Bdry. Road; KO328+100 - KO331+000 w/ exception

08/27/10 II 18.623 149 O 0.308 0.300 0.091 0.030 0.054 0.017 80.00 -

A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Santiago-Tuguegarao Rd. Burucboc Sect. 08/25/10 II 9.647 133 O 0.358 0.300 0.000 0.030 0.043 0.000 73.10 -

A. De Guia Construction 18228

Rehab./Reconst./Upgrading of Damaged Paved National Roads Santiago-Tuguegarao Road, KO333+500 -

KO334+850

08/28/10 II 17.123 149 O 0.347 0.300 0.000 0.030 0.054 0.000 73.10 -

A. Montalbo Trading and Construction 32684 Const. of Multi-Purpose Building at Bigain

1st 03/01/10 IVA 1.135 30 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page7

Page 16:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

A. Seva Construction 20124 Rehabilitation of Electrical System Masscom Theater 06/27/08 PUP 1.389 60 C 0.400 0.300 0.300 - - - 100.00 100.00%

Outstanding

A. Seva Construction 20124 Repair of Roofing and Ceiling Masscom Theater 01/04/08 PUP 1.361 60 C 0.400 0.300 0.300 - - - 100.00 100.00%

Outstanding

A.A De Vera Construction 6191 Const./Repair & Completion of Instructional Classroom, Corella CES 06/10/09 VII 0.504 105 C 0.492 0.200 0.300 - - - 99.20 *99.20%

Outstanding

A.A De Vera Construction 6191Completion of Tagbilaran City Puericulture

Center & Maternity House and Related Facilities

06/10/09 VII 4.575 150 C 0.500 0.169 0.300 - - - 96.90 *96.90% Outstanding

A.A De Vera Construction 6191 Const./Repair/Rehab. of Multi-Purpose Building 06/10/09 VII 0.460 105 C 0.483 0.154 0.300 - - - 93.70 95.52%

V. Satisfactory

A.A De Vera Construction 6191 Completion of Multi-Purpose Building 03/04/09 VII 0.458 60 C 0.382 0.200 0.300 - - - 88.20 *88.20%Satisfactory

A.A De Vera Construction 6191 Const. of 2 Storey, 6 CL Sch. Bldg. @ Lawis E/S 11/21/08 VII 4.175 120 C 0.367 0.300 0.300 - - - 96.70 94.18%

Outstanding

A.A De Vera Construction 6191 Rehab./Expansion of Waterworks System 09/02/09 VII 4.510 240 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory

A.A De Vera Construction 6191 Const./Rehab. of School Bldg. at Cogon E/S 06/05/10 VII 0.591 35 C 0.415 0.200 0.000 - - - 61.50 61.50% Poor

A.A De Vera Construction 6191 Const. of Water System Development Project 08/25/10 VII 1.413 90 C 0.497 0.133 0.300 - - - 93.00 93.00%

V. Satisfactory

A.B Aponesto Construction Parts & Supply 22998 Road Upgrading (Gravel to Paved) along

Compostela-Cateel Rd., Osmeña Sect. 06/04/10 XI 18.892 180 O 0.355 0.238 0.150 0.030 0.045 0.033 85.10 -

A.B Aponesto Construction, Parts & Supply 22998 Concreting of Montevista-DNAS Road 03/01/10 XI 32.748 300 C 0.353 0.200 0.300 - - - 85.30 88.48%

Satisfactory

A.B Taylan Construction & Development 25273 Const. of RCBC and Canal along Manila

North Road (Km. 483+040) 02/22/10 I 4.816 65 C 0.329 0.133 0.300 - - - 76.20 76.20% Unsatisfactory

A.C Cunanan Construction 20752Repair/Rehabilitation of Sewer and Drainage System at Northwing and

Eastwing07/23/08 PUP 1.241 67 C 0.400 0.300 0.300 - - - 100.00 100.00%

Outstanding

A.C Rivero Development Corporation 5122 Const./Impvt. of Multi-Purpose Bldg. at Maasin City (Legislative Building) 03/06/09 VIII 0.934 75 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page8

Page 17:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

A.C Rivero Development Corporation 5122 Widening of Cabalagnan Bridge I 02/27/08 VI 7.946 215 C 0.323 0.200 0.300 - - - 82.30 81.31% V. Satisfactory

A.C Rivero Development Corporation 5122Rehab./Reconst./Upgrading of Bacolod South Road Km. 6+862-Km. 8+350 w/

exception09/12/09 VI 26.470 280 O 0.331 0.282 0.150 0.030 0.045 0.033 87.10 -

A.C Rivero Development Corporation (Formerly: A.C. Rivero Const.) 5122 Const. of Subang Daku Bridge 09/04/10 VIII 18.890 345 O 0.382 0.240 0.150 0.030 0.037 0.033 87.20 -

A.C Rivero Development Corporation (Formerly: A.C. Rivero Const.) 5122

Rehab./Reconst./Upgrading of Bacolod South Rd. Km. 6+862 to Km. 8+350 with

exceptions03/06/10 VI 26.337 280 C 0.393 0.200 0.300 - - - 89.30 87.98%

Satisfactory

A.C Soliven Construction & General Merchandise 19278 Construction of 2 CL S.B. at La Paz H/S 09/01/09 III 0.974 90 C 0.483 0.133 0.300 - - - 91.60 *91.60%

V. Satisfactory

A.C Soliven Construction & General Merchandise 19278

Channel Impvt./Slope Protection @ San Roque Creek, Camias Creek & San Vicente

Creek02/23/10 III 4.781 60 C 0.445 0.177 0.300 - - - 92.20 92.20%

V. Satisfactory

A.D Construction 6946 Conc. of Line Canal along National Road, Concepcion 09/09/09 IVA 1.442 90 C 0.371 0.200 0.300 - - - 87.10 *87.10%

Satisfactory

A.D.L Constrak 26442 Const. of Sch. Bldg. @ Roxas Central School 08/21/08 IV-B 0.481 69 C 0.360 0.200 0.300 - - - 86.00 84.11%

V. Satisfactory

A.D.P Construction & Supply 3466 Const. of Bugasong-Valderrama Road, Liaures Section (Alternate Route) 11/27/08 VI 14.426 178 C 0.335 0.087 0.300 - - - 72.20 81.05%

V. Satisfactory

A.D.P Construction & Supply 3466 Reconst. of Dumaguete North Road 03/12/09 VII 18.881 230 C 0.442 0.200 0.300 - - - 94.20 82.14%Satisfactory

A.D.P Construction & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 06/14/10 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -

A.D.P Construction & Supply 3466 Conc. of Pototan-Lambunao Road, Km. 38+380-Km. 53+000 with exception) 09/05/10 VI 9.419 150 O 0.397 0.240 0.150 0.030 0.047 0.033 89.70 -

A.D.P Construction & Supply 3466

Rehab./Reconst./Upgrading of Damaged Paved National Road, Roxas City Boundary-

Panitan Road-Jct. Bailan Road, Capiz (KM.112+750-Km.122+705) with exception

08/31/10 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -

A.D.P Construction & Supply 3466 Road Upgrading of Sara-Concepcion Road, Sara and Concepcion 09/06/10 VI 66.119 270 O 0.371 0.240 0.150 0.030 0.042 0.033 86.60 -

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page9

Page 18:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

A.D.P Construction & Supply 3466 Impv't./Conc. Of Mana-Ticulon-Lagumit-Little Baguio Rd. 08/25/10 XI 47.455 571 C 0.292 0.133 0.000 - - - 42.50 42.50%

Poor

A.D.S San Juan Construction 12853 Conc. of Dionisio Anore St., Brgy. Mambog 02/16/10 IVA 1.728 90 C 0.427 0.200 0.300 - - - 92.70 92.70% V. Satisfactory

A.F.G Construction & Construction Supply 17161

Rehab./Reconst./Upgrading of Damaged Paved National Road, Jct. Nat'l. Road-

Sagay-Bato-Dian-ay-Marcelo-Balea-Jct. National Road, Bato Section

08/29/10 VI 37.184 220 O 0.308 0.238 0.150 0.030 0.042 0.033 80.10 -

A.F.G Construction & Construction Supply 17161 Rehab. of Amerang Flood Control, Tigum

River, Brgy. Amerang 09/05/10 VI 8.159 257 C 0.456 0.133 0.000 - - - 58.90 69.28% Poor

A.F.G Construction & Construction Supply 17161 Conc. of Road @ Brgy. Mansilingan 02/27/08 VI 1.861 150 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

A.F.G Construction & Construction Supply 17161 Const. of Diversion/By Pass Road along

Kalibo-Iloilo Highway, Banga Section 11/30/08 VI 14.461 180 C 0.351 0.300 0.300 - - - 95.10 90.90% Outstanding

A.F.G Construction & Construction Supply 17161 Rehab. of Dumaguete North Road 11/27/08 VII 4.894 42 C 0.324 0.200 0.300 - - - 82.40 73.10%

Satisfactory

A.F.G Construction & Construction Supply 17161 Rehab. of Bacolod South Rd. (Hingaran

Section) 09/15/09 VI 14.221 222 C 0.398 0.133 0.300 - - - 83.10 83.88% Satisfactory

A.F.G Construction & Construction Supply 17161 Const. of MPB (Covered Court) at San

Enrique NHS 03/10/10 VI 1.925 78 C 0.405 0.200 0.300 - - - 90.50 87.08% Satisfactory

A.G Cosipag Construction 12700 Balogo CIS 06/1-6/09 NIA 2.144 150 C 0.421 0.126 0.300 - - - 84.68 *84.68% Satisfactory

A.G Herrera Construction Corp. 26307 Construction of Multi-Purpose Building, Sto. Cristo 06/01/09 III 2.381 80 C 0.488 0.133 0.300 - - - 92.10

90.42%

V. Satisfactory

A.I.P Construction 32458 Road Concreting at Pinget Barangay 03/13/09 CAR 1.872 45 C 0.386 0.200 0.300 - - - 88.60 *88.60% Satisfactory

A.I.P Construction 32458 Rehab. of Kin-iway - Tamboan FMR 06/02/10 CAR 0.987 253 O 0.300 0.300 0.150 0.022 0.030 0.033 83.50 -

A.I.P Construction 32458 Rehab. of Ambasing-Balugang FMR 08/27/10 CAR 0.800 268 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page10

Page 19:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

A.I.P Construction 32458Restoration of Road Cuts along Bontoc-Baguio Road Alab Section (Km. 383+619-

Km. 384+124)08/27/10 CAR 1.732 70 O 0.318 0.252 0.150 0.030 0.035 0.033 81.80 -

A.J Lava Builders 22265 Const. of the Makinabang Baliuag FMR 11/24/08 III 4.769 62 C 0.296 0.300 0.300 - - - 89.60 *89.60% V. Satisfactory

A.J Lava Builders 22265 Repair & Rehab. of Daang Maharlika Road (Guiguinto & Plaridel Section) 08/28/08 III 9.930 20 C 0.257 0.211 0.300 - - - 76.80 *76.80%

Satisfactory

A.J Lava Builders 22265 Repair & Rehab. of Gen. Alejo Santos Highway 11/24/08 III 9.927 18 C 0.255 0.300 0.300 - - - 85.50 *85.50%

V. Satisfactory

A.J Lava Builders 22265 Impvt./Rehab. of MPB, Brgy. San Antonio 09/14/09 NCR 2.021 90 C 0.412 0.133 0.300 - - - 84.50 *84.50% Satisfactory

A.J Lava Builders 22265 Impv't./Rehab. of MPB and Alley Fernandez St., Brgy. San Antonio 06/04/10 NCR 0.961 45 C 0.455 0.200 0.300 - - - 95.50 95.50%

V. Satisfactory

A.J Taylan Construction Corporation 2336 Const. of San Mateo Bridge 05/22/08 I 16.502 331 C 0.236 0.269 0.300 - - - 80.50 *80.50% V. Satisfactory

A.J Taylan Construction Corporation 2336 Const. of Seawall 08/25/08 II 14.173 270 C 0.323 0.226 0.000 - - - 54.90 74.58% Satisfactory

A.J Taylan Construction Corporation 2336 Impvt. of Ilocos Norte-Kalinga Apayao Road 02/29/08 I 19.283 270 C 0.215 0.200 0.300 - - - 71.50 77.80% Satisfactory

A.J Taylan Construction Corporation 2336Road Opening/Const. of Missing Links of National Road, Solsona-Kabugao Road,

Ilocos Norte Side09/09/09 I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -

A.L Dare Construction 11932 Const./Rehab./Replacement/ Completion/ and Repair of Plaridel E/S 02/27/08 NCR 1.718 120 O 0.324 0.168 0.100 0.020 0.047 0.100 75.90 -

A.L Dare Construction 11932 Impvt./Rehab. of Brgy. Roads @ Sindalan and Dolores 05/12/08 III 4.753 50 C 0.313 0.200 0.300 - - - 81.30 *81.30%

V. Satisfactory

A.L Dare Construction 11932 Impvt. of Kennon Road, Camp 4 06/09/10 CAR 7.177 150 O 0.306 0.300 0.150 0.022 0.030 0.033 84.10 -

A.L Dare Construction 11932 Const./Repair/Rehab. of Slope Protection along Porac River, Mabical Sect. 08/16/10 III 14.344 90 C 0.481 0.133 0.300 - - - 91.40 91.40%

V. Satisfactory

A.L Gantuangco Construction 30872 Construction of the Diversion Works and Canal System of Libertad CIP - Phase 2 11/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 -

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page11

Page 20:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

A.L Gantuangco Construction 30872 Benolho CIS 10/6-10/08 NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -

A.L Salazar Construction, Inc. 3899 Conc. of Taytay (Pancol)-El Nido National Road 05/29/08 IV-B 28.821 255 C 0.300 0.300 0.300 - - - 90.00 *90.00%

V. Satisfactory

A.L Salazar Construction, Inc. 3899 Impvt. of FMR, Brgy. Pintong Bukawe, Phase II 11/27/08 IV-A 14.346 120 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

A.L.R Construction Corporation 24110 Completion of Two (2) Storey 4-CL at Landayan E/S 08/23/10 IVA 2.302 225 C 0.407 0.165 0.300 - - - 87.20 87.06%

Satisfactory

A.L.R Construction Corporation 24110 Construction of Overpass (Phase I), Pagsawitan 05/30/09 IV-A 3.849 129 C 0.482 0.133 0.300 - - - 91.50 *91.50%

V. Satisfactory

A.L.R Construction Corporation 24110Const. of Pedestrian Overpass at Brgy. San

Antonio and Biñan-Carmona Road Intersection

06/01/09 IV-A 19.203 241 C 0.466 0.133 0.300 - - - 89.90 90.86% V. Satisfactory

A.L.R Construction Corporation 24110 Conc.of Road, Inday Subdivision 03/13/09 IVA 0.958 90 C 0.461 0.133 0.300 - - - 89.40 89.40% V. Satisfactory

A.L.R Construction Corporation 24110 Const. of Pedestrian Overpass along Calamba-Sto. Tomas 05/22/08 IV-A 9.601 120 C 0.352 0.200 0.300 - - - 85.20 83.22%

V. Satisfactory

A.L.R Construction Corporation 24110 Const.of Multi Purpose Pavement with Perimeter Fence, Marcelino M. Santos NHS 03/13/09 IVA 0.957 90 C 0.480 0.133 0.300 - - - 91.30 *91.30%

V. Satisfactory

A.L.R Construction Corporation 24110 Const. of Pedestrian Overpass (Phase II) Brgy. Pagsawitan 09/01/09 IVA 2.882 35 C 0.484 0.185 0.300 - - - 96.90 *96.90%

Outstanding

A.L.R Construction Corporation 24110 Const. of Multi-Purpose Building at Brgy. Timugan 09/03/09 IVA 2.111 40 C 0.389 0.155 0.300 - - - 84.40 *84.40%

Satisfactory

A.L.R Construction Corporation 24110 Conc. of Roads, Brgy. San Luis 02/15/10 IVA 3.358 90 C 0.455 0.200 0.300 - - - 95.50 95.50% V. Satisfactory

A.L.R Construction Corporation 24110 Completion of 2-Storey 4-CL @ Landayan E/S 02/24/10 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page12

Page 21:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

A.L.R Construction Corporation 24110 Completion of MPB at Brgy. Zapote 05/27/10 IVA 0.959 30 C 0.458 0.075 0.300 - - - 83.30 83.30% Satisfactory

A.L.R Construction Corporation 24110 Const. of Pedestrian Overpass, Old Manila South Road, Km.34+520 08/23/10 IVA 9.632 167 O 0.381 0.274 0.150 0.022 0.030 0.033 89.00 -

A.L.R Construction Corporation 24110Road Upgrading (Gravel to Paved-HDM-4) of

Jct. MWCR (Bagong Silang)-Cabacao Diversion Road, Brgy. Cabacao

08/28/10 IVB 9.649 145 C 0.409 0.198 0.300 - - - 90.70 88.60% Satisfactory

A.M Ayunan Construction 13983 Const. of MPB at Datu Usman E/S 11/18/08 XII 1.908 75 C 0.319 0.182 0.300 - - - 80.10 65.40% Fair

A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) 7096

Kalibo Airport Development Project (Asphalt Overlay of Runway, Extension of

Apron and Construction of Drainage Canal)04/14/10 DOTC 283.188 360 C 0.449 0.200 0.300 - - - 94.90 92.40%

V. Satisfactory

A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) JV-05-011 Const. of Ibajay Bridge & Approaches 05/26/08 VI 138.616 611 C 0.370 0.278 0.000 - - - 64.80 78.74%

Satisfactory

A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) JV-07-097 Conc. of Iloilo-Caticlan Highway (Pototan-

Passi-Capiz Bdry. Sect.) 05/31/10 VI 158.259 570 C 0.379 0.200 0.300 - - - 87.90 87.82% Satisfactory

A.M Robles Construction 28056 Conc. of FMR, Brgy. Colo 11/17/08 I 1.926 55 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

A.M Robles Construction 28056 Completion of Multi-Purpose Building at Pinaglabanan 05/28/09 NCR 4.776 90 C 0.487 0.133 0.300 - - - 92.00 *92.00%

V. Satisfactory

A.M Robles Construction 28056 Construction of Water Supply @ Brgy. San Simon 03/02/09 I 0.530 40 C 0.415 0.184 0.300 - - - 89.90 *89.90%

V. Satisfactory

A.P Consebido Construction and Trading 33616 Const. of MPB, Brgy. Alimanguan 08/20/10 IVB 0.974 114 C 0.447 0.200 0.300 - - - 94.70 88.54%

Satisfactory

A.P Palacios Construction 29021 Completion/Conc. of Road, Buhangin to ANSHS Road 08/25/08 III 2.170 150 C 0.347 0.206 0.300 - - - 85.30 *85.30%

V. Satisfactory

A.P Palacios Construction 29021 Conc. of Road from Brgy. Bacong to Brgy. San Jose 11/26/08 III 0.702 75 C 0.316 0.300 0.300 - - - 91.60 *92.50%

Outstanding

A.P Palacios Construction 29021 Const. of Drainage System, Public Market (Ph-2) 05/26/08 III 0.934 60 C 0.284 0.274 0.300 - - - 85.80 *85.80%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page13

Page 22:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

A.P Palacios Construction 29021 Rehab./Impvt. of Dikidit-Suguit FTMR 09/08/09 III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -

A.P Palacios Construction 29021 Const. of MPB, Brgy. Pingit 06/05/10 III 4.287 180 C 0.470 0.133 0.300 - - - 90.30 90.30% V. Satisfactory

A.P.B Construction 17055 Repair/Rehab. of Baguio-Bauang Road, Km. 296+050-Km. 297+050 with exceptions 08/29/10 CAR 4.891 47 C 0.456 0.176 0.300 - - - 93.20 93.40%

V. Satisfactory

A.P.B Construction 17055 Rehab. and Conc. of Road at Brgy. Balligi, Kias Barangay 03/03/10 CAR 1.248 60 C 0.384 0.158 0.300 - - - 84.20 84.20%

Satisfactory

A.P.B Construction 17055 Road Opening at Middle Quirino Hill Brgy. 08/28/08 CAR 0.953 45 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

A.P.O General Construction 7010 Rehab./Reconst. of Dungon-Agat Section, Km. 216+648-Km. 217+723 (V.S.) Camp 1 08/29/10 CAR 4.555 90 C 0.466 0.133 0.300 - - - 89.90 89.90%

V. Satisfactory

A.Q Loisaga Construction & General Services 32691 Const. of 2 CL in Quillo-Quillo E/S 09/01/09 IVA 2.023 120 C 0.470 0.133 0.300 - - - 90.30 *90.30%

V. Satisfactory

A.R & Mark Builders 31673 Const. of 1 CL Sch. Bldg. @ Talahiron ES 11/20/08 X 0.495 60 C 0.236 0.300 0.300 - - - 83.60 *83.60% V. Satisfactory

A.R & Mark Builders 31673 Const. of @-CL Maramag CES 02/25/10 X 0.989 105 C 0.418 0.133 0.300 - - - 85.10 85.10% Satisfactory

A.R Lustre Jr. Construction 7680 Puerto Princesa Airport Development Project 8/13-14/09 DOTC 90.817 270 C 0.488 0.200 0.300 - - - 98.80 98.80%

Outstanding

A.R Lustre Jr. Construction 7680 Rehab/Reconst./Upgrading of Bigaa-Plaridel via Bulacan and Malolos Road 05/28/09 III 13.077 75 C 0.449 0.196 0.300 - - - 94.50 *94.50%

V. Satisfactory

A.R Lustre Jr. Construction 7680 Asphalt Overlay along Capitol-Canigaran Road 11/17/08 IV-B 9.697 60 C 0.332 0.300 0.300 - - - 93.20 91.16%

Outstanding

A.R Lustre Jr. Construction 7680 Const. of Tagbarungis Bridge, PPSR 08/11/08 IV-B 20.378 240 C 0.374 0.200 0.300 - - - 87.40 85.06% V. Satisfactory

A.R Lustre Jr. Construction 7680 Construction of Multi-Purpose Building 03/07/09 IV-B 0.383 90 C 0.481 0.107 0.300 - - - 88.80 *88.80% Satisfactory

A.R Lustre Jr. Construction 7680 Repair/Rehab/Impvt. of Santiago-Syjuco E/S 09/17/09 NCR 0.482 45 C 0.482 0.000 0.300 - - - 78.20 *78.20% Unsatisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page14

Page 23:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

A.R Lustre Jr. Construction 7680 Conc. of Puerto-Princesa-Sabang Road 09/11/09 IVB 48.140 284 C 0.419 0.200 0.300 - - - 91.90 90.61%V. Satisfactory

A.R Lustre Jr. Construction 7680Rehab./Reconst./Upgrading of Damaged

Paved Nat'l. Rds. At Bigaa-Plaridel via Bulacan and Malolos Rd.

08/27/10 III 14.352 90 C 0.367 0.185 0.300 - - - 85.20 85.20% Satisfactory

A.R Lustre Jr. Construction 7680 Conc. of Puerto Princesa South Road 08/22/10 IVB 38.599 216 O 0.364 0.300 0.137 0.030 0.055 0.033 91.90 -

A.R.L Construction 27645 Rehab/Impvt./Upgrading of Pulilan-Calumpit Road (Pulilan Section) 05/28/09 III 9.542 60 C 0.376 0.200 0.300 - - - 87.60 *87.60%

Satisfactory

A.R.L Construction 27645 Conc. of Brgy. Road Caniogan 08/27/08 III 0.956 12 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory

A.R.L Construction 27645 Package IV-MRA-08 Asphalt Overlay of Road @ Poblacion 11/24/08 III 0.500 20 C 0.326 0.300 0.300 - - - 92.60 *92.60%

Outstanding

A.R.L Construction 27645 Riprapping of Access Road @ Poblacion 11/24/08 III 0.477 35 C 0.240 0.300 0.300 - - - 84.00 *84.00% V. Satisfactory

A.R.L Construction 27645 Upgrading/Conc. of Roads with Drainage Improvement 03/04/09 NCR 0.476 45 C 0.364 0.200 0.300 - - - 86.40 *86.40%

Satisfactory

A.R.L Construction 27645Const. of Flood Control (Revetrment),

Poblacion, San Sebastian, San Jose, Sta. Monica,

09/04/09 III 6.697 80 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory

A.R.L Construction 27645 Repair/Rehab. of School Building BSU 03/03/10 III 0.989 18 C 0.454 0.148 0.300 - - - 90.20 90.20% V. Satisfactory

A.R.L Construction 27645 Rehab./Reconst./Upgrading of Damaged Pavement along 7th Ave. East 05/31/10 NCR 6.445 90 C 0.409 0.200 0.300 - - - 90.90 90.90%

V. Satisfactory

A.S Obquia Construction 19844 Completion of MPB 09/03/08 VII 0.175 120 C 0.366 0.300 0.300 - - - 96.60 *91.60% Outstanding

A.S.M Francisco Dev't and Construction Corp. 19098 Proposed Exterior Repainting Works 03/24/09 U.P. 1.368 120 C 0.400 0.200 0.300 - - - 90.00 90.00%

V. Satisfactory

A.S.S Construction 31509 Completion of Alaremil Building II 03/2-3/10 DOST 9.607 250 C 0.496 0.200 0.300 - - - 99.60 97.64% Outstanding

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page15

Page 24:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

A.S.S. Construction 31509 Completion of ACA Building II 05/14-15/09 DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -

A.S.S. Construction 31509 Construction of Sports Complex 05/14-15/09 DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding

A.S.S. Construction 31509 Partial Completion of vast set, PCASTRD & PCIERD bldg. 07/08/09 DOST 7.479 135 C 0.483 0.200 0.300 - - - 98.30 *98.30%

Outstanding

A.S.V Construction Supply and Services 13490 Const. of FMR, Venegas St., Brgy. Layac-

Sta.Isabel 05/26/10 III 0.473 60 C 0.444 0.133 0.300 - - - 87.70 87.70% Satisfactory

A.Y.U Engineering and Construction 25632 Conc. of Road at Brgy. Dumoy 12/03/08 XI 9.435 90 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding

AB Aponesto Construction, Parts & Supply 22998 Conc. of Lublub-Bolilac-Salad Road,

Km.277+707.50-Km.278+711 09/05/10 VI 14.425 192 O 0.356 0.240 0.150 0.030 0.042 0.033 85.10 -

Abesco Construction & Development Corp. 2934 Construction of Multi-Purpose Building @

Cupang Elem. School 05/21/09 III 3.273 88 C 0.484 0.133 0.300 - - - 91.70 90.23%V. Satisfactory

Abu Construction 22313 Const. of Tantangan RCDG Bridge 03/06/08 XII 3.858 154 C 0.323 0.237 0.300 - - - 86.00 83.48% V. Satisfactory

Abu Construction 22313 Rehab. of Potable Water System @ Brgy. Saravia 08/29/08 XII 0.873 120 C 0.338 0.300 0.300 - - - 93.80 87.57%

V. Satisfactory

Abu Construction 22313 Const. of Multi-Purpose Building 06/10/10 XII 1.926 126 C 0.494 0.133 0.300 - - - 92.70 92.70% V. Satisfactory

Abu Construction 22313 Completion of MPB (Mini Gym) at Brgy. San Rafael 06/08/10 XII 1.897 65 C 0.386 0.133 0.300 - - - 81.90 81.90%

Unsatisfactory

Abu Construction 22313 Completion of MPB (Gym) at Brgy. Baras 06/08/10 XII 0.764 65 C 0.339 0.133 0.300 - - - 77.20 77.20% Unsatisfactory

Abulug Construction Company, Inc. 5593 Matuno-Sto. Domingo CIS 2/11-12/2008 NIA 3.126 150 O 0.3515 0.1619 0.1 0.03 0.035 0.2 87.84 -

Abulug Construction Company, Inc. 5593 Concreting of Jct. Claveria-Dibalio-Luzon Road 05/21/09 II 9.648 273 C 0.485 0.133 0.300 - - - 91.80 88.95%

Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page16

Page 25:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Abulug Construction Company, Inc. 5593 Conc. of Jct. Cadcadir-Cabugao Road 02/19/08 II 8.199 180 C 0.269 0.300 0.300 - - - 86.90 84.92% V. Satisfactory

Abulug Construction Company, Inc. 5593 Conc. of Larion-Cabbo Road, Tuguegarao City & Penablanca 08/27/08 II 13.884 240 C 0.358 0.200 0.300 - - - 85.80 84.30%

V. Satisfactory

Abulug Construction Company, Inc. 5593 Const. of Colony Road 11/13/08 II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -

Abulug Construction Company, Inc. 5593 Const. of Public Market (Phase II) 02/23/09 II 1.446 269 C 0.476 0.133 0.300 - - - 90.90 87.40% Satisfactory

Abulug Construction Company, Inc. 5593 Const. of Punta Seawall 02/19/08 II 0.298 60 C 0.310 0.200 0.300 - - - 81.00 79.26% Satisfactory

Abulug Construction Company, Inc. 5593 Lucban River Control Project 02/29/09 II 3.858 347 C 0.417 0.133 0.300 - - - 85.00 83.35% Satisfactory

Abulug Construction Company, Inc. 5593 Matuno- Sto. Domingo CIS 2/11-12/08 NIA 3.126 150 O 0.352 0.162 0.100 0.030 0.035 0.200 *87.84 -

Abulug Construction Company, Inc. 5593 Reblocking along MNR 08/26/08 II 19.296 180 C 0.295 0.215 0.300 - - - 81.00 82.08% V. Satisfactory

Abulug Construction Company, Inc. 5593 Replacement of Langagan Bridge along MNR 08/26/08 II 4.814 150 C 0.370 0.201 0.300 - - - 87.10 86.20%

V. Satisfactory

Abulug Construction Company, Inc. 5593Reblocking along Bangag-Allapacan-Magapit Road (BAMR), KO686+400-

KO687+20009/08/09 II 7.999 150 C 0.406 0.200 0.300 - - - 90.60 *90.60%

V. Satisfactory

Abulug Construction Company, Inc. 5593 Concrete Paving of Ballesteros Road (Washington & Luna St.,) 09/08/09 II 1.930 150 C 0.405 0.200 0.300 - - - 90.50 88.94%

Satisfactory

Abulug Construction Company, Inc. 5593 Const. of Zitanga Brgy. Roads 02/17/10 II 9.648 132 C 0.370 0.200 0.300 - - - 87.00 88.14% Satisfactory

Abulug Construction Company, Inc. 5593 Rehab. of Ballesteros Central School Building 02/17/10 II 0.192 60 C 0.437 0.133 0.300 - - - 87.00 87.00%

Satisfactory

Abulug Construction Company, Inc. 5593 Construction of Deepwell 02/18/10 II 0.289 60 C 0.396 0.133 0.300 - - - 82.90 82.90% Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page17

Page 26:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Abulug Developers & Builders Co., Inc. 2366 Conc. of Luna Street at Centro West 05/24/10 II 0.964 120 C 0.434 0.200 0.300 - - - 93.40 93.40%

V. Satisfactory

Abulug Developers & Builders Co., Inc. 2366 Emergency Restoration of Cadcadir Bridge

#1 Approach KO 600+(-)595 Phase I 05/24/10 II 0.995 90 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory

Abulug Developers & Builders Co., Inc. 2366

Restoration of Scoured Approaches & Eroded Bank of Cadcadir Bridge 2 KO

602+723 Phase II05/24/10 II 0.771 90 C 0.408 0.200 0.300 - - - 90.80 90.80%

V. Satisfactory

Abulug Developers & Builders Co., Inc. 2366

Restoration of Scoured Approaches & Eroded Bank of Cadcadir Bridge 1 Phase II,

KO 600+ (-594)05/24/10 II 0.963 90 C 0.467 0.134 0.300 - - - 90.10 90.10%

V. Satisfactory

Abulug Developers & Builders Co., Inc. 2366 Const. of Sto.Tomas FMR 05/25/10 II 0.962 105 O 0.277 0.300 0.150 0.024 0.037 0.050 83.80 -

Abulug Developers & Builders Co., Inc. 2366 Reblocking along Manila North Road (Fugu

Bdry.-Bangag Section) 05/21/09 II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 -

Abulug Developers & Builders Co., Inc. 2366 Reblocking along Manila North Road

(Ballesteros-Abulug Section) 09/08/09 II 18.527 210 C 0.407 0.200 0.300 - - - 90.70 89.38% V. Satisfactory

Abulug Developers & Builders Co., Inc. 2366 Construction of 1-CL Bessang E/S 09/08/09 II 0.484 60 C 0.404 0.181 0.300 - - - 88.50 *88.50%

Satisfactory

Abulug Developers & Builders Co., Inc. 2366 Emergency/Rehab. of Slope Protection KO

590+640, MNR 02/17/10 II 1.495 90 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory

Abulug Developers & Builders Co., Inc. 2366 Emergency/Rehab. of Slope Protection KO

590+340, MNR 02/17/10 II 0.995 90 C 0.467 0.133 0.300 - - - 90.00 90.00% V. Satisfactory

Abulug Developers & Builders Co., Inc. 2366 Concrete Paving of Jones Street 02/12/10 II 0.868 90 C 0.384 0.200 0.300 - - - 88.40 88.40%

Satisfactory

Abulug Developers & Builders Co., Inc. 2366 Reblocking along Manila North Road (/Fugu

Bdry. - Bangag Sect.) 02/17/10 II 19.299 234 C 0.394 0.200 0.300 - - - 89.40 88.08% Satisfactory

Abulug Developers & Builders Co., Inc. 2366 Rehab./Regravelling of Curva to

Capallepaan Farm-to-Market Road 02/18/10 II 0.675 60 C 0.353 0.200 0.300 - - - 85.30 85.30% Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page18

Page 27:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Abulug Developers & Builders Co., Inc. 2366 Road Opening of Pimpila Farm-to-Market

Road 02/17/10 II 0.820 75 C 0.348 0.200 0.300 - - - 84.80 84.80% Satisfactory

Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas

Construction)2366 Retrofitting of Pamplona Bridge, Manila

North Road 02/24/09 II 10.290 180 C 0.386 0.200 0.300 - - - 88.60 82.96% Satisfactory

Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas

Construction)2366 Restoration of River Control Project along

Goron & Langgangan River 08/19/10 II 12.542 166 O 0.400 0.300 0.150 0.020 0.043 0.050 96.30 -

Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas

Construction)2366 Restoration of Slope Protection KO591+320

- KO591+353, MNR 08/19/10 II 1.928 120 C 0.434 0.200 0.300 - - - 93.40 93.40% V. Satisfactory

Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas

Construction)2366 Const. of Slope Protection at KO673+000 -

KO673+853 MNR 08/19/10 II 1.929 90 C 0.420 0.200 0.300 - - - 92.00 92.00% V. Satisfactory

Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas

Construction)2366 Conc. along Cadcadir-Kabugao Road 08/19/10 II 5.015 166 O 0.352 0.293 0.150 0.030 0.043 0.050 91.80 -

Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas

Construction)2366 Emergency Rehab. of Slope Protection

KO600+525 - KO602+200, MNR 08/19/10 II 4.195 90 C 0.347 0.200 0.300 - - - 84.70 87.58% Satisfactory

Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas

Construction)2366 Conc. along Claveria Dibalio-Luzon-

Cagayan Bdry. Road 08/19/10 II 2.938 153 C 0.374 0.200 0.300 - - - 87.40 87.40% Satisfactory

Aca Construction & Supply 10784 Conc. of Esperanza Road 05/27/08 I 0.382 30 C 0.262 0.300 0.300 - - - 86.20 * 86.20% V. Satisfactory

Aca Construction & Supply 10784 Construction of Multi-Purpose Building, Bancagan 02/26/09 I 0.096 30 C 0.417 0.133 0.300 - - - 85.00 *85.00%

Satisfactory

Aca Construction & Supply 10784 Construction of Water Supply 02/26/09 I 0.096 30 C 0.338 0.188 0.300 - - - 82.60 *82.60%Satisfactory

Aca Construction & Supply 10784 Repair of Farm-to-Market Road 02/26/09 I 0.480 30 C 0.343 0.200 0.300 - - - 84.30 *84.30%Satisfactory

Accuracy Builders Enterprise 27507 River Impvt. of Cabalisian River, Brgy. Sta. Lucia 11/24/08 I 4.485 75 C 0.400 - 0.500 - - - 90.00 * 90.00%

V. Satisfactory

Acer Industrial/Solid Rock Construction Joint Venture

SLI-SN-005433/JV-

08-217

Rehabilitation of Libingan ng mga Bayani Road-MRT Road 05/27/09 NCR 4.694 75 C 0.396 0.133 0.300 - - - 82.90 *82.90%

Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page19

Page 28:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

ACJ Construction Resources 10635 Concreting of Paco-Roxas-Arakan Road (Luhong-Kiyaab Section) 05/30/09 R-XII 18.566 205 C 0.338 0.200 0.300 - - - 83.80 88.42%

Satisifactory

ACJ Construction Resources 10635 Conc. of Paco-Roxas-Arakan Valley National Road, (Luhong-Kiyaab Section) 03/01/08 XII 12.751 170 C 0.365 0.102 0.300 - - - 76.70 *76.70%

Satisfactory

ACJ Construction Resources 10635 Concreting of Poblacion Magpet-Nowa Road (Nowa Basak Sect.) 03/10/09 XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -

ACJ Construction Resources 10635Const. of Malaang PSG Bridge inc. Conc.

Paving of Bridsge Approaches along Davao-Cotabato Road

05/17/08 XII 42.684 300 C 0.376 0.200 0.300 - - - 87.60 84.02% V. Satisfactory

ACJ Construction Resources 10635 Const. of MPB 08/23/08 XII 9.634 100 C 0.335 0.270 0.300 - - - 90.50 83.22% V. Satisfactory

ACJ Construction Resources 10635 Rechanneling of Malamote River 11/22/08 XII 1.443 45 C 0.375 0.188 0.300 - - - 86.30 *86.30% V. Satisfactory

ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road Kiyaab-

Antipas Section (Km. 1648+300-Km.1649+385.63)

09/05/09 XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 -

ACJ Construction Resources 10635 Conc. of Poblacion-Magpet-Nowa Road, Nowa-Basak Section w/ exception 09/05/09 XII 18.798 200 C 0.358 0.200 0.300 - - - 85.80 84.30%

Satisfactory

ACJ Construction Resources 10635 Asphalt Overlay along Davao-Cotabato Rd., Saguing Section 03/01/10 XII 6.765 68 C 0.429 0.200 0.300 - - - 92.90 92.90%

V. Satisfactory

ACJ Construction Resources 10635 Asphalt Overlay along Davao-Cotabato Rd., Paco Section 03/01/10 XII 7.711 71 C 0.429 0.200 0.300 - - - 92.90 92.90%

V. Satisfactory

ACJ Construction Resources 10635Const. of Kinamalig Bridge including

Concrete Paving of Approach along Paco-Roxas-Arakan

03/02/10 XII 12.815 202 C 0.384 0.142 0.300 - - - 82.60 86.08% Satisfactory

ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road, Kiyab-

Antipas Section, Km. 1648+300-Km. 1649+385.63

03/02/10 XII 16.826 175 C 0.379 0.143 0.300 - - - 82.20 85.71% Satisfactory

ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road, inclined Gap Ipuan Section, Km. 1640+374.10 - Km.

1646+794.2803/02/10 XII 13.144 189 C 0.394 0.145 0.300 - - - 83.90 83.90%

Satisfactory

ACJ Construction Resources 10635Rehab./Reconst. of Damaged Paved along

Makilala-Allah Junction Road, La Esperanza Section

06/05/10 XII 9.961 55 C 0.436 0.133 0.300 - - - 86.90 86.90% Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page20

Page 29:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

ACJ Construction Resources 10635 Rehab./Reconst. of Damage Paved along Matalam-M'lang-Bagontapay Road 06/05/10 XII 14.307 60 C 0.424 0.133 0.300 - - - 85.70 85.70%

Satisfactory

ACJ Construction Resources 10635Road Upgrading of Matalam-Mlang-Bagontapay Road, Additional Lane

(Poblacion Section)08/27/10 XII 18.338 153 C 0.476 0.127 0.300 - - - 90.30 90.30%

V. Satisfactory

Acme Builders Corp./MWJ Construction JV JV-08-243 Conc. of Burauen-Albuena Road Km.

98+986.50-Km. 986+857.50 w/ exceptions 02/22/10 VIII 46.887 240 C 0.411 0.200 0.300 - - - 91.10 91.10% V. Satisactory

Acme Builders Corporation 6442 Construction of Sinugbuhan Bridge 06/04/09 VI 33.384 676 C 0.441 0.133 0.300 - - - 87.40 85.20% Satisfactory

Acme Builders Corporation 6442 Asphalt Overlay along Tigbao-Pulak-Sta. Fe Road, Km 925+370-Km 926+379 03/18/09 VIII 11.310 90 C 0.393 0.133 0.300 - - - 82.60 *82.60%

Satisfactory

Acme Builders Corporation 6442 Clearing and Rehab. of Mangonbangon & Burayan River 11/25/08 VIII 9.635 150 C 0.312 0.200 0.300 - - - 81.20 *81.20%

V. Satisfactory

Acme Builders Corporation 6442 Construction of Bagacay Bridge 03/02/09 VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -

Acme Builders Corporation 6442 Rehab. of Guimbal Bridge along Iloilo-Antique Road 03/04/08 VI 33.372 600 C 0.267 0.200 0.300 - - - 76.70 78.59%

Satisfactory

Acme Builders Corporation 6442 Rehabilitation of Mahayahay Creek 03/03/09 VIII 6.709 170 C 0.375 0.133 0.300 - - - 80.80 84.10%Satisfactory

Acme Builders Corporation 6442 Const. of Palo East By-Pass Road 03/11/10 VIII 19.260 240 C 0.436 0.200 0.300 - - - 93.60 89.76% V. Satisfactory

Acme Builders Corporation 6442Rehab./Reconst./Impvt./Upgrading of

Damaged Pavement, Tacloban Baybay South Rd.

06/17/10 VIII 34.600 150 O 0.366 0.300 0.150 0.030 0.032 0.033 91.10 -

Acme Builders Corporation 6442 Const. of Palo East By Pass Road (including Bridge) 09/07/10 VIII 28.738 180 O 0.377 0.240 0.150 0.030 0.042 0.050 88.90 -

Acme Builders Corporation 6442Rehab./Reconst./Upgrading of Daang Maharlika, Palo-Tolosa Section, Km.

915+000 to Km. 921+70009/07/10 VIII 24.050 200 O 0.385 0.240 0.150 0.030 0.042 0.033 88.00 -

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page21

Page 30:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Acme Builders Corporation 6442Rehab./Reconst./Impvt./Upgrading of

Damaged Pavement, Tacloban Baybay South Road

09/08/10 VIII 33.358 150 C 0.398 0.133 0.300 - - - 83.10 87.90% Satisfactory

Acme Builders Corporation / B. Vicencio Construction JV-07-066 Const. of Palo East By Pass Road (Const.

of Bernard Reed II Bridge) 08/31/09 VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 -

Acme Builders Corporation / MWJ Construction (JV) JV-08-243 Const. of Albuera-Burauen Road including

Bridges, Burauen Sect. 09/02/09 VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 -

Acme Builders Corporation/B. Vicencio Const. (JV) JV-07-067

Conc. of Oras-San Policarpio-Arteche Road, Brgy. Baras-Arteche (Poblacion)

Section05/19/08 VIII 59.291 315 C 0.338 0.300 0.300 - - - 93.80 93.02%

Outstanding

ACV Construction & Surveying 10903 Concreting of FMR @ Various Brgys., Urbiztondo and Mangatarem 03/09/09 I 3.838 60 C 0.353 0.200 0.300 - - - 85.30 *85.30%

Satisfactory

ADB Dynamic Builders & Supply 33359Repair/Rehab. of St., Brgy. Dalupirit; Rehab.

of San Roque St., Brgy. Vinisitahan; Rehab./Repair of St., Brgy. Pilar

03/07/09 VIII 1.437 60 C 0.463 0.200 0.300 - - - 96.30 *96.30% Outstanding

Adelfa & Charlie Enterprises 11569

Completion/Continuation of Unfinished/Ongoing Bridges, Calaguise

Steel Bridge along Sambolawan-Calaguise-Calubian Road

08/22/08 VIII 34.810 290 C 0.338 0.200 0.300 - - - 83.80 82.15% V. Satisfactory

Adelfa & Charlie Enterprises 11569 Construction of MPP Brgy. Hibulangan 03/11/09 VIII 0.142 30 C 0.433 0.133 0.300 - - - 86.60 *86.60%Satisfactory

Adelfa & Charlie Enterprises 11569 Mapuyo CIS 10/6-10/08 NIA 1.485 45 C 0.375 0.180 0.300 - - - 85.50 85.50% V.Satisfactory

Adfil Corporation 14437 Rehab./Reconst. of NRJ Bahbah-Talacogon Road 06/09/09 XIII 19.263 220 C 0.485 0.200 0.300 - - - 98.50 *98.50%

Outstanding

Adfil Corporation 14437

Repair/Rehab./Impvt. of Roads & Bridges along the National Highway Epoxy Sealing of Cracks in concrete girder, deck slab & conc. Pavement (injectable epoxy) along

Bahbah, Talacogon Road

06/09/09 XIII 9.429 180 C 0.464 0.200 0.300 - - - 96.40 *96.40% Outstanding

Adfil Corporation 14437 Rehabilitation/Concreting of Tagcatong-Vinapor Road 05/25/09 XIII 9.629 210 C 0.489 0.133 0.300 - - - 92.20 *92.20%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page22

Page 31:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Adfil Corporation 14437 Completion/Impvt./Rehab. of Libertad Bridge & Approaches 12/02/08 XIII 26.210 210 C 0.348 0.200 0.300 - - - 84.80 88.70%

V. Satisfactory

Adfil Corporation 14437 Conc. of Butuan City-Pianing/Tandag Road 12/03/08 XIII 4.012 105 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satisfactory

Adfil Corporation 14437 Conc. of Dapa-Junction Cancohoy Road 03/07/09 XIII 28.451 241 C 0.414 0.200 0.300 - - - 91.40 88.94% Satisfactory

Adfil Corporation 14437 Conc. of Gap along La Paz-Loreto Road 03/10/08 XIII 4.791 185 C 0.367 0.200 0.300 - - - 86.70 81.12% V. Satisfactory

Adfil Corporation 14437 Const. of Cabadbaran River Dike (Upstream) 02/26/08 XIII 9.548 180 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

Adfil Corporation 14437 Const. of Tag-iho1 Bridge and Approaches (Completion) 05/17/08 XIII 22.141 280 C 0.360 0.300 0.300 - - - 96.00 96.00%

Outstanding

Adfil Corporation 14437 Rehab. of Camagong Flood Control 05/28/08 XIII 9.440 150 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

Adfil Corporation 14437 Rehab./Reconst. of Damaged Paved National Road along Agusan-Misamis Road 03/02/09 XIII 9.634 180 C 0.405 0.200 0.300 - - - 90.50 86.36%

Satisfactory

Adfil Corporation 14437 Rehab./Reconst. of Damaged Paved National Road along Agusan-Surigao Road 03/03/09 XIII 9.635 180 C 0.408 0.200 0.300 - - - 90.80 87.50%

Satisfactory

Adfil Corporation 14437Repair/Reconst. of Butuan City-Cagayan de Oro-Iligan Road (Agusan-Misamis Oriental

Road) inc. Bridge03/18/09 XIII 19.198 210 C 0.402 0.200 0.300 - - - 90.20 89.06%

V.Satisfactory

Adfil Corporation 14437 Repair/Rehab. of NRJ Bahbah-Talacogon Road 03/20/09 XIII 9.633 188 C 0.431 0.200 0.300 - - - 93.10 87.04%

Satisfactory

Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Roads Gingoog-Calveria-

Villanueva Road09/10/09 X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 -

Adfil Corporation 14437

Rehab./Reconst. of Damaged Paved National Rd. along Butuan City-CDO-Iligan

Rd.,(Agusan-Misamis Oriental Sect )Libertad-Bancasi Sect

09/16/09 XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 -

Adfil Corporation 14437Const./Completion/Continuation of

Unfinished Bridge and Approaches, Brgy. Libertad

09/16/09 XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 -

Adfil Corporation 14437 Rehab. of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 14.427 210 C 0.416 0.194 0.300 - - - 91.00 94.66% V.Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page23

Page 32:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Adfil Corporation 14437 Concreting of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 -

Adfil Corporation 14437 Rehab. of Magaboy and Lucena Bridge Approaches-Slope/Bank Protection 06/13/10 XIII 4.709 105 C 0.450 0.200 0.300 - - - 95.00 95.00%

V. Satisfactory

Adfil Corporation 14437 Conc. of Butuan City-Pianing-Tandag Road 06/16/10 XIII 18.905 270 O 0.360 0.300 0.150 0.030 0.045 0.033 91.80 -

Adfil Corporation 14437 Conc. of NRJ Cuevas-Sampaguita Road 06/14/10 XIII 60.039 270 O 0.388 0.235 0.150 0.030 0.055 0.033 89.10 -

Adfil Corporation 14437 Rehab. of River Dike 06/01/10 XIII 9.649 150 C 0.408 0.179 0.300 - - - 88.70 88.46% Satisfactory

Adfil Corporation 14437Repair/Maintenance with Asphalt Overlay of

Tabon-Tabon Slip along Agusan- Davao Road

06/17/10 XIII 32.364 225 O 0.371 0.240 0.150 0.030 0.055 0.033 87.90 -

Adfil Corporation 14437 Rehab. of Magsaysay Bridge along Iligan City 09/09/10 XIII 48.161 300 O 0.352 0.300 0.150 0.030 0.055 0.050 93.70 -

Adfil Corporation 14437 Completion/Continuation of Libertad Bridge & Approaches 09/08/10 XIII 11.224 180 C 0.462 0.189 0.300 - - - 95.10 92.58%

V. Satisfactory

Adfil Corporation 14437 Conc. of Pulang Lupa-Sta. Josefa Road 09/06/10 XIII 19.249 195 O 0.371 0.265 0.150 0.030 0.055 0.050 92.10 -

Adfil Corporation 14437 Conc./Repair of Slip along NRJ Cuevas-Sampaguita Road 09/06/10 XIII 47.951 470 O 0.381 0.252 0.150 0.030 0.055 0.050 91.80 -

Adfil Corporation 14437 Rehab. of Wawa Bridge along Agusan-Davao Road 09/06/10 XIII 110.862 315 O 0.379 0.263 0.150 0.030 0.055 0.033 91.00 -

Adfil Corporation 14437Rehab./Along Reconst. of Daang Maharlika (Agusan-Surigao Road) Ampayon-Taguibo

Sect.09/09/10 XIII 35.253 270 C 0.400 0.200 0.300 - - - 90.00 90.54%

V. Satisfactory

Adfil Corporation 14437 Rehab. of Butuan City-Cagayan de Oro-Iligan Road (Agusan-Mis. Or. Section) 08/25/10 XIII 105.123 210 O 0.334 0.300 0.150 0.030 0.050 0.033 89.70 -

Adfil Corporation 14437Repair/Maintenance with Asphalt Overlay of

Tabon-Tabon Slip along Agusan-Davao Road

09/06/10 XIII 32.398 225 C 0.440 0.133 0.300 - - - 87.30 87.66% Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page24

Page 33:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Adfil Corporation (Formerly: Adfil Construction) 14437 Rehab./Reconst. of Damaged Rd. Gingoog-

Claveria-Villanueva Rd. 03/10/10 X 96.400 405 C 0.437 0.200 0.300 - - - 93.70 89.71% V.Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Const. of River Dike Protection, Brgy. Agao 03/10/10 XIII 9.556 90 C 0.485 0.133 0.300 - - - 91.80 91.80%

V.Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Impv't./Rehab. of Iligan-Cagayan-Butuan

Rd. (Agusan-Misamis Oriental Section) 02/23/10 XIII 67.446 180 C 0.480 0.133 0.300 - - - 91.30 91.30% V.Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Const./Conc. of NRJ San Francisco-Bahi

Rd. 03/07/10 XIII 28.892 330 C 0.431 0.133 0.300 - - - 86.40 91.20% V.Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Upgrading/Conc. of NRJ Cuevas-Bislig Rd. 03/07/10 XIII 28.874 315 C 0.485 0.133 0.300 - - - 91.80 90.66%

V.Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Conc. of Dapa-Del Carmen (Sayak-Airport

Rd.) 02/26/10 XIII 75.947 390 C 0.456 0.133 0.300 - - - 88.90 88.90% Satisfactory

Adfil Corporation/RID Corporation (JV) JV-06-022 Repair/Rehab. of Patin-ay Bridge along

Agusan-Davao Road, Patin-ay 06/08/09 XIII 23.749 658 C 0.458 0.200 0.300 - - - 95.80 91.84% V. Satisfactory

Adige Sta. Clara (JV) JV-06-032 DPWH Component Project under the Help for Catubig Agricultural Advancement Proj. 05/30/09 VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -

Adige Sta. Clara (JV) JV-06-032 DPWH Component Project under the HELP for Catubig Agricultural Project (HCAAP) 08/25/08 VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -

Adimre Construction 25534 Marilao Port Development Project 08/20/09 DOTC 2.862 60 C 0.451 0.200 0.300 - - - 95.10 95.10% V. Satisfactory

Adimre Construction 25534 Sta. Cruz Port Development Project 08/20/09 DOTC 0.960 30 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfactory

Adimre Construction 25534 Sasmuan Port Development Project 08/20/09 DOTC 2.871 60 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page25

Page 34:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Adimre Construction 25534 Hagonoy Port Development Project 10/02/09 DOTC 0.949 30 C 0.460 0.200 0.300 - - - 96.00 96.00% Outstanding

Adimre Construction 25534 Baguio Airport Development Project 04/04/09 DOTC 861.940 60 C 0.435 0.181 0.300 - - - 91.60 91.60% V. Satisfactory

Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase II) 08/28/08 III 1.907 56 C 0.334 0.200 0.300 - - - 83.40 83.61% V. Satisfactory

Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase IV) 05/19/08 III 1.907 56 O 0.342 0.240 0.100 0.030 0.025 0.100 83.70 -

Adimre Construction 25534 Const. of Standard One Classroom School Building (Modified) at GITMES 09/05/09 III 0.526 24 C 0.442 0.133 0.300 - - - 87.50 *87.50%

Satisfactory

Adimre Construction 25534

Dumaguete Airport Dev't Project (Completion of Imprv't of Terminal Building

and Purchase/ Installation of Bagage Conveyor)

01/21/10 DOTC 13.500 90 C 0.402 0.199 0.300 - - - 90.10 90.10% V.Satisfactory

Adimre Construction 25534 Tuguegarao Airport Dev't Project (Continuation of Widening of Runway) 03/04/10 DOTC 9.588 90 C 0.452 0.200 0.300 - - - 95.20 95.20%

V.Satisfactory

Adimre Construction 25534Tuguegarao Airport Dev't Project

(Continuation of Widening of Runway and Improvement of Fire Station Building)

03/04/10 DOTC 12.490 90 C 0.458 0.200 0.300 - - - 95.80 95.80% V.Satisfactory

Adimre Construction 25534

Laoag Airport Development Project (Upgrading of Radar Area, Continuation of Perimeter Fence Construction of Drainage

System)

04/09/10 DOTC 9.604 120 C - 0.419 0.200 0.300 - - 91.90 91.90% V. Satisfactory

Adimre Construction 25534 Laoag Airport Development Project (Improvement of Fire Station Building) 04/09/10 DOTC 4.821 120 C 0.464 0.200 0.300 - - - 96.40 96.40%

Outstanding

Adimre Construction 25534Laoag Airport Development Project

(Shoulder Grade Correction including Drainage System)

04/09/10 DOTC 4.793 75 C 0.410 0.200 0.300 - - - 91.00 91.00% V. Satisfactory

Adimre Construction 25534 Tuguegarao Airport Development Project (Repair/Rehabilitation of Terminal Building) 09/10/10 DOTC 1.927 90 C 0.449 0.200 0.300 - - - 94.90 94.90%

V. Satisfactory

Adimre Construction 25534 Canalate Port Development Project (Improvement of Port) 12/03/10 DOTC 1.919 60 C 0.458 0.200 0.300 - - - 95.80 95.80%

V. Satisfactory

Adroit Construction 11169 Completion of Bridge, General Luna 2nd Phase 03/02/09 III 3.026 30 C 0.332 0.200 0.300 - - - 83.20 *83.20%

Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page26

Page 35:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Adroit Construction 11169 Concreting of Brgy. Maligaya Road 03/02/09 III 1.867 25 C 0.404 0.133 0.300 - - - 83.70 *83.70%Satisfactory

Adroit Construction 11169 Const. of 4 CL, Central Luzon State University 11/17/08 III 1.800 90 C 0.319 0.300 0.300 - - - 91.90 *91.90%

Outstanding

Advanced Foundation Construction Systems Corp. 15449

Const. of Baguio Flyover & Approaches (Phase V), BGH-Rotonda Marcos Highway-Gov. Pack-Kisad Road, Kennon Road Jct.

03/06/08 CAR 61.894 100 C 0.385 0.300 0.300 - - - 98.50 93.10% Outstanding

Agafer Construction 7912 Const. of Cagayan River Control 11/11/08 II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -

Aison Dominique Construction & Supply 32805 Const. of Cabucgayan MPB (Phase III) 08/21/08 VIII 1.896 120 C 0.373 0.187 0.300 - - - 86.00 79.07%

Satisfactory

Aison Dominique Construction & Supply 32805 Const. of Multi-Purpose Building

(Cooperative) 02/23/10 VIII 0.473 86 C 0.399 0.200 0.300 - - - 89.90 77.79% Unsatisfactory

Ajan Jaeda, inc. 17869 Corollary Works for Banquerohan Resettlement Project, Ph. 2 9/14-18/09 NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 -

Ajan Jeada, Inc. (Formerly: Jeada Construction) 17869 Impvt. of MPB, BU College of Engineering

Campus 02/24/09 V 16.149 240 C 0.457 0.133 0.300 - - - 89.00 89.80% V. Satisfactory

AJYSC Marketing 26924Const. of Office and Storage Bldg. and other Office/Quarter Requirements of

DPWH Regional Office XII06/06/09 R-XII 10.437 150 C 0.477 0.200 0.300 - - - 97.70 *97.70%

Outstanding

AJYSC Marketing 26924 Rehab./Improvement of Bulok Bridge along Marbel-Makar Road 06/05/09 R-XII 4.764 90 O 0.271 0.300 0.150 0.030 0.059 0.050 86.00 -

AJYSC Marketing 26924 Const. of River Bank Protection Allah River (Kolambog Section) 08/27/08 XII 2.874 112 C 0.266 0.300 0.300 - - - 86.60 82.22%

V. Satisfactory

AJYSC Marketing 26924 Const./Widening of Matin-ao Bridge & Widening of Approaches 03/06/08 XII 3.848 184 C 0.351 0.115 0.300 - - - 76.60 81.82%

V. Satisfactory

AJYSC Marketing 26924 Repair of Multi-Purpose Building at San Emmanuel 03/12/09 XII 0.960 105 C 0.433 0.200 0.300 - - - 93.30 *93.30%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page27

Page 36:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

AJYSC Marketing 26924 Road Upgrading (Gravel to concrete) along Surallah-Lake Sebu-Maitum Road 03/15/09 XII 16.034 289 C 0.476 0.200 0.300 - - - 97.60 90.14%

V. Satisfactory

AJYSC Marketing 26924 Widening/Conc. of Kalandagan Bridge I, along Dulawan-Marbel Road 03/04/08 XII 11.332 277 C 0.352 0.200 0.300 - - - 85.20 84.90%

V. Satisfactory

AJYSC Marketing 26924Road Upgrading (Gravel to Paved) along

Isulan-H-way Jct. Dukay-Dagumbayan-Sen. Ninoy Aquino Road (Sarmiento Sect.)

09/09/09 XII 19.094 235 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory

AJYSC Marketing 26924 Rehab./Impvt. of Bulok Bridge along Marbel-Makar Rd. Km. 1710+722 09/10/09 XII 4.764 90 C 0.400 0.200 0.300 - - - 90.00 87.60%

Satisfactory

AJYSC Marketing 26924 Const./Replacement of Banga Bridge and Approaches Phase II 03/08/10 XII 24.657 240 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 -

AJYSC Marketing 26924 Const. of Multi-Purpose Pavement, Norala Park 06/11/10 XII 1.907 133 C 0.410 0.200 0.300 - - - 91.00 91.00%

V. Satisfactory

AJYSC Marketing 26924Const. of Sapali River Bank

Protection/River Control along Lamsugod to Lamian Section

06/11/10 XII 4.803 140 C 0.400 0.133 0.300 - - - 83.30 84.50% Satisfactory

AJYSC Marketing 26924 Repair of Buayan Bridge and Approaches and its Protection Structures, Brgy. Buayan 09/09/10 XII 18.855 134 C 0.463 0.133 0.300 - - - 89.60 89.60%

V. Satisfactory

AJYSC Marketing 26924Road Upgrading (gravel to paved) Based on Gravel Rd. Strategies, Surallah-Lake Sebu-

Maitum Rd., Lake Sebu Section09/03/10 XII 19.071 252 O 0.363 0.251 0.150 0.030 0.051 0.033 87.80 -

AJYSC Marketing 26924 Const./Replacement of Banga Bridge and Approaches, (Phase II) 09/03/10 XII 26.942 255 C 0.428 0.133 0.300 - - - 86.10 85.74%

Satisfactory

AJYSC Marketing 26924Road Upgrading (Gravel to Concrete) along Isulan Hwy. Jct. Dukay-Bagumbayan-Sen.

Ninoy Aquino Rd. (Sitio Nuling Section)08/31/10 XII 19.114 220 O 0.305 0.239 0.150 0.030 0.042 0.033 79.90 -

AKH Construction and Trading Corporation 20759

Repair/Maintenance of Waiting Area / Lounge of Secretary's Office DPWH Central

Office05/19/09 NCR 7.230 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V. Satisfactory

AKH Construction and Trading Corporation 20759 Construction of Multi-Purpose Building

Phase I, T. Paez Elem. School 02/27/09 NCR 9.645 60 C 0.389 0.013 0.300 - - - 70.20 *70.20% Poor

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page28

Page 37:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

AKH Construction and Trading Corporation 20759 Rehab./Reconst. of Damaged Pavement of

Legarda St. 08/14/08 NCR 6.713 90 C 0.346 0.235 0.300 - - - 88.10 *88.10% V. Satisfactory

AKH Construction and Trading Corporation 20759 Proposed Rehab. of MPB at T. Paez Elem.

School (Phase 2) 09/01/09 NCR 10.609 90 C 0.476 0.133 0.300 - - - 90.90 90.90% V. Satisfactory

AKH Construction and Trading Corporation 20759 Proposed Repair/Rehab. of Roads &

Drainage at Brgy. 598/600 02/16/10 NCR 2.888 90 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory

AKN Construction Corporation (Formerly: AKN Const.) 11845

Proposed Impvt. of Road inc. Drainage System along Magallanes St., Brgy.

Tunasan02/25/09 NCR 19.089 162 C 0.341 0.184 0.300 - - - 82.50 83.88%

Satisfactory

AKN Construction Corporation (Formerly: AKN Construction) 11845 Rehab./Reconstruction/Upgrading of Ninoy

Aquino Avenue 06/02/09 NCR 19.092 45 C 0.418 0.200 0.300 - - - 91.80 *91.80% V. Satisfactory

AKN Construction Corporation (Formerly: AKN Construction) 11845

Rehab./Reconstruction of Muntinlupa Insular Prison Road and its Vicinity, Brgy.

Poblacion09/09/09 NCR 19.113 100 O 0.297 0.219 0.150 0.023 0.035 0.050 77.40 -

AKN Construction Corporation (Formerly: AKN Construction) 11845

Reconst./Const. of Dikes, Valenzuela-Obando Bdry. Dike, Brgy. Palasan and

Pariancillo Villa08/19/10 NCR 2.850 90 C 0.339 0.200 0.300 - - - 83.90 83.90%

Satisfactory

Al Chris Construction 12406 Conc. of (LIR) Loay-Loboc-Carmen Road (Loboc Section) 08/28/08 VII 4.492 85 C 0.316 0.042 0.000 - - - 35.80 55.18%

Poor

Al Chris Construction 12406 Const. of Two (2) CL Sch. Bldg. w/o Toilet, San Roque H/S 11/18/08 VII 0.841 240 C 0.390 0.200 0.300 - - - 89.00 *89.00%

V. Satisfactory

AL Chris Construction 12406 Tagbilaran Airport Development Project 03/27/09 NIA 5.756 120 C 0.390 0.200 0.300 - - - 89.00 89.00% Satisfactory

Al Chris Construction 12406 Concrete Paving of Panglao Island Circ. Road, Songculan 08/24/10 VII 9.075 130 O 0.385 0.233 0.150 0.023 0.037 0.050 87.80 -

Al Fahdel Const. and Services 17953Conc./Impvt. of Tubod-Ganassi Road

(Caniogan Section) Sta. 1602+0000-Sta. 1603+000 w/ exception

09/14/09 X 18.126 150 C 0.429 0.200 0.300 - - - 92.90 89.18% V. Satisfactory

Al Hussein Construction 18438 Rehab. of Linamon-Zamboanga Road, Baroy Section 08/30/08 X 4.525 90 C 0.344 0.200 0.300 - - - 84.40 *84.40%

V. Satisfactory

Al Hussein Construction 18438

Rehab./Reconst./Upgrading along Misamis Oriental- Ma. Cristina Bdry. Road at Marcelo-

Timoga Section, Sta.1532+961 - Sta 1535+068 w/ exception

06/09/10 X 9.255 105 O 0.386 0.240 0.150 0.030 0.055 0.033 89.40 -

Al Hussein Construction 18438 Conc. of Kibawe-Kadingilan-Kalilangan Road, Kadilingan Sect. 06/14/10 X 73.672 330 C 0.407 0.168 0.300 - - - 87.50 88.52%

Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page29

Page 38:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Al Hussein Construction 18438Rehab./Reconst./Upgrading of Segapod

Maigo Kolambugan Section, Sta. 1564+000 - Sta.1566+000 w/ exception

06/09/10 X 18.546 150 O 0.383 0.240 0.127 0.030 0.055 0.033 86.80 -

Alafalfa Construction 29712Restoration of Roadslip along Nueva

Vizcaya-Ifugao-Mt. Province Bdry. Road, Km. 330+800-Km. 330+828, Phase I

08/25/10 CAR 1.238 136 C 0.445 0.133 0.300 - - - 87.80 87.80 Satisfactory

Alajeno Construction and Supplies 28713 Construction of MPB (Municipal Building) Phase II 06/02/09 IX 2.480 120 C 0.440 0.133 0.300 - - - 87.30 *87.30%

Satisfactory

Alajeno Construction and Supplies 28713 Const. of Public Market at Brgy. Penoles, Lakewood 06/11/10 IX 0.495 45 C 0.491 0.133 0.300 - - - 92.40 92.40%

V. Satisfactory

Alajeño Construction and Supplies 28713 Const. of MPB (Municipal Bldg.) Phase I 11/27/08 IX 4.595 160 C 0.373 0.164 0.300 - - - 83.70 75.30% Satisfactory

Alajeño Construction and Supplies 28713 Const. of Sch. Bldg. @ Antonio NHS 08/30/08 IX 0.481 30 C 0.209 0.200 0.300 - - - 70.90 75.45% Satisfactory

Al-B Construction 11740 Rehab./Reconst./Upgrading along Angeles-Porac-Floridablanca-Dinalupihan Rd. 06/01/10 III 18.839 90 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 -

Al-B Construction 11740Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rd. along Angeles-Porac-

Floridablanca-Dinalupihan Rd.08/16/10 III 19.175 100 C 0.438 0.160 0.300 - - - 89.80 89.26%

V. Satisfactory

Alberich Builders 27987 Repair/Impvt. of Masarawang-Mabatano-Pamasan Road 11/13/08 V 0.956 30 C 0.316 0.200 0.300 - - - 81.60 *81.60%

V. Satisfactory

Alberto Uy Construction & Development 20924 Repair/Rehab. of Multi-Purpose Building @

Sitio Facoma, Bagong Bayan II 05/27/09 IV-B 0.476 45 C 0.424 0.170 0.300 - - - 89.40 *89.40% V. Satisfactory

Alberto Uy Construction & Development 20924 Concreting of Cantil-Dayhagan Road 02/26/09 IV-B 0.947 69 C 0.436 0.133 0.300 - - - 86.90 *86.90%

Satisfactory

Alberto Uy Construction & Development 20924 Const. of 1 CL Sch. Bldg. @ Carmundo NHS 05/15/08 IV-B 0.470 120 C 0.376 0.300 0.300 - - - 97.60 *97.60%

Outstanding

Alberto Uy Construction & Development 20924 Const. of Drainage Canal 11/19/08 IV-B 1.889 91 C 0.358 0.200 0.300 - - - 85.80 89.40%

V. Satisfactory

Alberto Uy Construction & Development 20924 Const. of MPB at Buong Lupa 05/26/10 IVB 0.480 43 C 0.447 0.180 0.300 - - - 92.70 92.70%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page30

Page 39:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Alcel Construction 15129 Construction of School Building at Cayucay NHS 03/10/09 I 0.913 75 C 0.394 0.181 0.300 - - - 87.50 *87.50%

Satisfactory

Alcel Construction 15129 Const. of San Vicente-Pogo Bridge, San Vicente 03/01/10 I 22.182 380 C 0.333 0.200 0.300 - - - 83.30 83.30%

Satisfactory

Alcel Construction 15129 Rehab./Impvt. at Kennon Road, Km.244+000 - Km.248+138 06/09/10 CAR 9.616 60 C 0.358 0.200 0.300 - - - 85.80 85.80%

Satisfactory

Alcel Construction 15129Repair/Rehab. along Manila North Road, Km. 445+28 - Km.484+897, Pinili, Badoc,

Currimao, Batac & San Nicolas06/02/10 I 9.649 60 C 0.473 0.133 0.300 - - - 90.60 90.60%

V. Satisfactory

Alcel Construction 15129 Repair/Impvt. of Agoo Processional Road, Km. 235+298-Km. 236+708 w/ exception 08/25/10 I 8.652 90 C 0.405 0.133 0.300 - - - 83.80 83.80%

Satisfactory

Alcel Construction 15129Asphalt Overlay of Sta. Barbara-Mangaldan

Road Km. 203+700-Km. 205+300 w/exception

05/26/09 I 14.473 25 C 0.458 0.133 0.300 - - - 89.10 *89.10% V.Satisfactory

Alcel Construction 15129 Completion of MPB, PSU Bamban 08/29/08 I 0.474 60 C 0.292 0.200 0.300 - - - 79.20 *79.20% Satisfactory

Alcel Construction 15129 Conc. of FMR, Brgy. Licsi 11/27/08 I 0.568 30 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory

Alcel Construction 15129 Const. of MPB, Phase VI 05/30/08 I 0.812 70 C 0.269 0.300 0.300 - - - 86.90 *86.90% V. Satisfactory

Alcel Construction 15129 Impvt. of Pangasinan-Zambales Road 05/30/08 I 27.954 255 C 0.266 0.300 0.300 - - - 86.60 *86.60% V. Satisfactory

Alcel Construction 15129 Rehab./Reconst./Upgrading of Mangaldan-Manaoag-Binalonan Road 08/28/09 I 48.250 240 C 0.422 0.200 0.300 - - - 92.20 *92.20%

V. Satisfactory

Aldana Construction 21763 Construction of Perimeter Fence Gate, Slope Protection 03/2-3/10 DOST 6.363 75 C 0.491 0.20 0.30 - - - 99.10 87.13%

Satisfactory

Aldana Construction 21736 Const. of Drainage Poblacion Zone II 03/04/10 I 2.407 90 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory

Aldana Construction 31174 Road Conc. of Farm-to-Market Road, Brgy. Sallacong (San Mariano) 02/19/10 I 1.901 70 C 0.329 0.200 0.300 - - - 82.90 82.90%

Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page31

Page 40:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Aldana Construction 21736 Const. of MPB (Phase V) 06/10/10 I 7.715 125 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory

Ale Builders Construction & Development Corp. 5180 Drainage Impvt. along Boni-Serrano Avenue 03/02/10 NCR 4.754 90 C 0.440 0.133 0.300 - - - 87.30 87.30%

Satisfactory

Ale Builders Construction & Development Corp. 5180 Proposed Const. of Roads and Drainage at

Baseco Compound 02/16/10 NCR 72.324 303 C 0.368 0.190 0.300 - - - 85.80 85.98% Satisfactory

ALE Builders Construction & Development Corp. 5180

Proposed Rehab./Reconst./Upgrading of Damaged Paved National Roads, Quirino

Ave.05/24/10 NCR 19.294 30 C 0.442 0.200 0.300 - - - 94.20 94.20%

V. Satisfactory

ALE Builders Construction & Development Corp. 5180 Proposed Const./Rehab./Repair of School

Building @ Manuel A. Roxas High School 05/24/10 NCR 4.818 120 C 0.492 0.133 0.300 - - - 92.50 85.78% Satisfactory

ALE Builders Construction and Development Corp. 5180 Impvt./Upgrading of Paraiso ng Batang

Maynila Multi-Purpose Building 05/18/09 NCR 0.964 30 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory

ALE Builders Construction and Development Corp. 5180 Proposed Repair/Rehab. of Epifanio Delo

Santos Elem. School 05/13/08 NCR 1.444 60 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding

ALE Builders Construction and Development Corp. 5180 Repair/Rehab. Roads with Drainage Impv't,

Brgy. 34, Zone 3 03/03/09 NCR 5.254 90 C 0.342 0.200 0.300 - - - 84.20 *84.20% Satisfactory

ALE Builders Construction and Development Corp. 5180 Rehab./Reconst./Upgrading of G. Araneta

Ave. 08/18/10 NCR 9.549 90 C 0.300 0.200 0.300 - - - 80.00 80.00% Unsatisfactory

ALE Builders Construction and Development Corp. 5180 Proposed Repair/Rehab. of Baseco MPB,

Baseco Compound 08/23/10 NCR 1.155 45 C 0.322 0.133 0.300 - - - 75.50 75.50% Unsatisfactory

Ale-J Construction & Trading 26445 Const. of Multi-Purpose Bdlg. @ Veterans Memorial Medical Center 03/09/09 NCR 3.819 120 C 0.362 0.200 0.300 - - - 86.20 *86.20%

Satisfactory

Al-Fahdel Const. and Eng'g 17953Conc./Impvt. of Tubod-Ganassi Road (Caniogan Sect.) Sta. 1602+000-Sta.

1603+000 with exception06/05/09 X 18.126 150 O 0.344 0.265 0.150 0.015 0.043 0.050 86.70 -

Al-Fahdel Const. and Eng'g 17953Rehab./Reconst./Upgrading along Linamon-

Zamboanga Road at Tacub Section, Sta.1540+711 - Sta.1543+440.50

06/07/10 X 9.279 105 O 0.354 0.240 0.150 0.030 0.050 0.050 87.40 -

Al-Fahdel Const. and Eng'g 17953

Rehab./Reconst./Upgrading of Damaged Paved National Roads along Misamis

Oriental-Ma.Cristina Bdry. Road, Sta.1519+966 - Sta.1520+962, Sta.Felomina-

Valderama Section

08/28/10 X 13.919 120 C 0.468 0.200 0.300 - - - 96.80 91.64% V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page32

Page 41:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Al-Fahdel Const. and Eng'g 17953

Rehab./Reconst./Upgrading of Damged Paved National Roads along Misamis

Oriental-Ma.Cristina Bdry. Road, Nunucan-Ditucalan Section, Sta.1532+245.50 -

Sta.1535+000

08/28/10 X 9.277 105 C 0.467 0.200 0.300 - - - 96.70 91.24% V. Satisfactory

Al-Fahdel Const. and Eng'g. 17953 Road Upgrading (Gravel to Paved) Iligan City-Marawi City via Bito-Abaga Rd. 09/11/09 X 14.361 115 C 0.339 0.200 0.300 - - - 83.90 *83.90%

Satisfactory

Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. at Kulasihan

Primary School 08/30/08 X 0.417 45 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. At SADMIS 03/14/09 X 0.944 111 C 0.408 0.133 0.300 - - - 84.10 *84.10%

Satisfactory

Al-Fahdel Construction & Engineering 17953 Rehab. of Linamon-Zamboanga Road,

Maigo Section 03/15/09 X 13.492 261 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory

Alfalfa Construction 29712 Nueva Vizcaya-Ifugao-Mt. Province Road (Intermittent Section) 05/26/09 CAR 7.590 200 C 0.407 0.200 0.300 - - - 90.70 82.60%

Satisfactory

Alfalfa Construction 29712Rehab./Reconst. of Damaged National Road along N. Vizcaya-Ifugao-Mt. Province Bdry.

Road, Nayon Section08/25/10 CAR 10.206 180 O 0.348 0.300 0.150 0.008 0.025 0.033 86.40 -

Alfalfa Construction 29712Restoration of Road along Banaue-

Mayoyao-Aguinaldo-A Lista-Isabela Bdry. Road

03/06/09 CAR 4.277 179 C 0.443 0.200 0.300 - - - 94.30 92.80% V.Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)17162 Completion of Binalbagan Bridge 2 - Km.

66+910 along Hinigaran-Isabela Road 03/05/09 VI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 -

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)17162 Road Upgrading, Jct. Palencia-Boy Scout,

Campsite Road 03/05/09 VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 -

Alfie's Construction 17162 Construction and Improvement of Taloc Main Drainage 3/16-21/09 NIA 5.762 408 C 0.441 0.200 0.300 - - - 94.14 *94.14%

Satisfactory

Alfie's Construction 17162 Rehabilitation and Improvement of Sibud Main Drainage 04/16-18/09 NIA 7.699 271 C 0.427 0.300 0.200 - - - 92.70 92.70%

V. Satisfactory

Alfie's Construction & Construction Supply Inc. (Formerly: Alfie's

Construction & Construction Supply)17162

Conc. of Jct. Bearin-Salong-Tapi-Dacongcogon-Bantayan Rd. (Km. 99+675-

Km. 131+142.75 w/ exceptions) Brgy. Salong & Bantayan

03/08/10 VI 79.400 400 C 0.363 0.192 0.300 - - - 85.50 85.50% Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page33

Page 42:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Alfies Construction & Construction Supply, Inc. 17162 Completion of Binalbagan Bridge 2 along

Hinigaran-Isabela Road 09/15/09 VI 45.049 850 C 0.465 0.133 0.300 - - - 89.80 86.22% Satisfactory

Alfies Construction & Construction Supply, Inc. 17162

Conc. of Junction Bearin-Salong-Tapi-Dacongcogon-Bantayan Raod (Km.

99+675.50-Km.131+142.75 w/ exception, Brgy. Salong & Batayan

09/17/09 VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -

Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.

& Const. Supply)17162 Conc. of Jct. Bearin-Salong-Tapi-Bantayan

Rd. (Salong Section), Brgy. Salong 08/25/10 VI 14.301 110 C 0.409 0.133 0.300 - - - 84.20 85.16% Satisfactory

Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.

& Const. Supply)17162

Reconst. of Vallehermosa-Canlaon City, La Castellana Road, Sta. 65+665.80-Sta.

66+500.00 w/ exception08/26/10 VI 5.600 147 C 0.350 0.200 0.300 - - - 85.00 85.00%

Satisfactory

Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.

& Const. Supply)17162

Rehab./Reconst./Upgrading of Damaged Paved National Road along Bacolod North

Road, Silay City Section08/28/10 VI 14.900 130 C 0.423 0.133 0.300 - - - 85.60 84.94%

Satisfactory

Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.

& Const. Supply)17162

Conc. of Kabankalan-Jct. Salong-Tapi-Dacongcogon-Bantayan Road, Tapi Section

at Brgy. Tapi08/25/10 VI 28.917 290 O 0.355 0.240 0.150 0.030 0.037 0.033 84.50 -

Alfie's Construction & Construction Supply, Inc. (Formerly: Alfies

Construction & Construction Supply)17162

Conc. of Kabankalan-Jct. Salong-Tapi-Dacongcogon-Bantayan Rd., Tapi Sect. at

Brgy. Tapi06/05/10 VI 27.998 280 O 0.354 0.225 0.150 0.022 0.051 0.033 83.50 -

Alfrego Builders & Supply 19284 Improvement/Riprapping of Sasa Creek Second Congressional District 06/11/09 XI 4.720 150 O 0.343 0.300 0.150 0.030 0.047 0.050 92.00 -

Alfrego Builders & Supply 19284 Conc. of Road at Alambre 08/19/08 XI 0.933 90 C 0.342 0.300 0.300 - - - 94.20 85.74% V. Satisfactory

Alfrego Builders & Supply 19284 Conc. of Road at Mercedes 03/11/08 XI 0.935 90 C 0.324 0.300 0.300 - - - 92.40 *92.40% Outstanding

Alfrego Builders & Supply 19284Conc. of Road from Davao-Agusan National

Road Jct. passing through Iliong up to Purok Communal

12/04/08 XI 1.882 90 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

Alfrego Builders & Supply 19284 Improvemant/Riprap of Sasa Creek 06/11/09 XI 4.721 160 C 0.476 0.133 0.300 - - - 90.90 91.56% V. Satisfactory

Alfrego Builders & Supply 19284 Construction of Mandug River Control 03/08/10 XI 4.720 90 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page34

Page 43:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Algamon Construction 30704 Const./Widening/Gravelling of Roads from Brgy. R. Ecleo-Brgy. Del Pilar 06/01/09 XIII 1.927 209 C 0.385 0.168 0.300 - - - 85.30 84.52%

Satisfactory

Algamon Construction 30704 Const. of Sch. Bldg., Cantilan East Elem. Sch. 11/26/08 XIII 1.848 90 C 0.382 0.200 0.300 - - - 88.20 *88.20%

V. Satisfactory

Algamon Construction 30704 Const. of MPB (Covered Court) Brgy. Anticala 03/10/10 XIII 2.226 90 C 0.478 0.133 0.300 - - - 91.10 91.10%

V.Satisfactory

Algamon Construction 30704 Const. of MPB (Covered Court), Brgy. Doongan 06/16/10 XIII 1.898 90 C 0.441 0.200 0.300 - - - 94.10 94.10%

V. Satisfactory

Algamon Construction 30704 Const. of Ipil Public Market, Brgy. Ipil 06/07/10 XIII 0.733 60 C 0.407 0.133 0.300 - - - 84.00 84.00% Satisfactory

Algimar Construction 1523 Esperanza Port Development Project 07/08/09 DOTC 8.637 120 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory

Algimar Construction 15232 Concreting of Tablas Circumferential Road (Hinugasan-Camantaya Section) 05/21/09 IV-B 19.298 180 O 0.312 0.236 0.150 0.030 0.040 0.033 80.10 -

Algimar Construction 15232 Repair/Rehab. of Masbate-Cataingan-Placer Road, Nabangig-Pawican Sect. 05/26/09 V 14.249 120 C 0.466 0.133 0.300 - - - 89.90 *89.90%

V. Satisfactory

Algimar Construction 15232Const. of 1 Unit 7x7 S/B at Teofilo

Tamabago E/S, Palanas South realigned to Dimasalang C/S

05/26/09 V 0.843 90 O 0.292 0.300 0.150 0.030 0.032 0.033 83.70 -

Algimar Construction 15232 Conc. of Lubi-Binoog Road 11/24/08 IV-B 9.398 100 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory

Algimar Construction 15232 Const. of Bridge Approaches @ Maingaran Bridge 02/27/09 V 9.495 87 O 0.337 0.235 0.000 0.030 0.056 0.033 69.10 -

Algimar Construction 15232 Const. of Jct. Ban-ao-Tubod 08/25/08 V 9.597 45 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory

Algimar Construction 15232Const. of Lined Canal with Cover from

Quezon St. infornt of MNCHS, JZES and Jollibee Store

08/23/08 V 3.798 180 C 0.297 0.200 0.300 - - - 79.70 78.50% Satisfactory

Algimar Construction 15232 Const.of Multi-Purpose Building (Balai Alumni) 02/28/09 V 0.480 120 C 0.480 0.133 0.300 - - - 91.30 *91.30%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page35

Page 44:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Algimar Construction 15232 Repair/Rehab. of Masbate-Cataingan-Placer Road 02/28/09 V 9.598 90 C 0.466 0.133 0.300 - - - 89.90 *89.90%

V. Satisfactory

Algimar Construction 15232 Conc. of Tablas Circumferential Road (Doña Juana-Binunga-an Section) 08/27/09 IVB 19.652 180 O 0.319 0.291 0.150 0.030 0.047 0.033 87.00 -

Algimar Construction 15232 Conc. of Buenavista-Cawayan Road, San Jose-Tuburan 08/28/09 V 18.998 131 C 0.432 0.150 0.300 - - - 88.20 *88.20%

Satisfactory

Algimar Construction 15232 Concreting of Jct. Buenavista-Cawayan Road, Cabungahan-Madbad Section 08/28/09 V 19.000 130 C 0.427 0.151 0.300 - - - 87.80 *87.80%

Satisfactory

Algimar Construction 15232 Conc. of Tablas Circumferential Road (Doña Juana-Binongaan Section) 02/22/10 IVB 19.652 180 C 0.388 0.200 0.300 - - - 88.80 87.72%

Satisfactory

Algimar Construction 15232 Conc. of Tablas Circumferential Road (Hinugusan-Camantaya Section) 02/23/10 IVB 19.676 180 C 0.395 0.200 0.300 - - - 89.50 85.81%

Satisfactory

Algimar Construction 15232 Conc. of Milagros-Cataingan-Esperanza Road, Malamag Section 02/19/10 V 38.585 150 C 0.429 0.133 0.300 - - - 86.20 86.20%

Satisfactory

Algimar Construction 15232 Const./Road Opening of Sta. Maria-Pato-o-Odiongan Road 08/24/10 IVB 19.298 175 C 0.354 0.036 0.300 - - - 69.00 69.00% Poor

Algimar Construction 15232 Const. of Masbate 2nd DEO Bldg. (Phase I) 08/23/10 V 8.900 60 C 0.407 0.200 0.300 - - - 90.70 90.70% V. Satisfactory

Algimar Construction 15232 Rehab./Reconst. Of Masbate-Cataingan Placer Rd., Masbate-Catingan-Placer 08/23/10 V 18.817 90 C 0.406 0.200 0.300 - - - 90.60 90.60%

V. Satisfactory

Algimar Construction 15232Const. of 1 unit 1 CL 7x7 S/B Teofilo

Tamabago E/S, Palanas South realigned to Dimasalang C/S

08/24/10 V 0.843 190 C 0.347 0.200 0.300 - - - 84.70 84.00% Satisfactory

Algimar Construction/Hi-Tone Construction & Development

Corporation JVJV-07-078 Concreting of Cataingan-Esperanza Road 02/19/10 V 90.015 453 C 0.438 0.133 0.300 - - - 87.10 87.10%

Satisfactory

Algon Eng'g Construction Corp. 270 Construction of Laboratory Building 02/02/10 DOST 16.635 210 C 0.468 0.20 0.30 - - - 96.80 97.43% Outstanding

Algon Engineering Construction Corp. 270 Construction of Overhead Water Tank with

Cistern 8/12/09 DOST 3.193 138 C 0.500 0.200 0.100 - - - 80.00 80.00% Unsatisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page36

Page 45:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Algon Engineering Construction Corporation 270 Rehab./Reconst./Upgrading of Digos-Makar

Road 05/30/09 XI 31.136 180 C 0.498 0.140 0.300 - - - 93.80 *93.80% V. Satisfactory

Algon Engineering Construction Corporation 270 Asphalt Overlay of Davao-Cotabato By Pass

Road 05/16/08 XI 12.771 150 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory

Algon Engineering Construction Corporation 270 Bridge Component of CP 6, Mindanao

Bridges, Rawa-an and Sagadan Bridges 03/14/09 ADB 37.809 1,078 O 0.365 0.300 0.000 0.030 0.045 0.050 79.00 -

Algon Engineering Construction Corporation 270 Impv't./Conc. of La Fortuna Tagum Terminal-

Capitol, Canocotan Road 03/01/08 XI 34.314 226 C 0.303 0.300 0.300 - - - 90.30 88.56% V. Satisfactory

Algon Engineering Construction Corporation 270 Repair and Rehab. of Toril-Bayabas-Eden

Road 11/17/08 XI 4.816 90 C 0.366 0.300 0.300 - - - 96.60 94.26% Outstanding

Algon Engineering Construction Corporation 270 Rehab. of Sumlog Bridge and Approaches

along Davao-Oriental-Surigao Coastal Road 03/05/10 XI 52.988 270 C 0.485 0.133 0.300 - - - 91.80 91.80% V. Satisfactory

Algon Engineering Construction Corporation 270

CP-5: Impvt./Conc. of Surigao Del Sur-Davao Oriental Coastal Road, (Manay-

Boston) Caraga-Baganga Section03/04/10 XI 172.836 537 C 0.359 0.200 0.300 - - - 85.90 89.02%

V. Satisfactory

Algon Engineering Construction Corporation 270 Rehab./Impvt. of Davao-Bukidnon Rd. at

Calinan Sect. 05/31/10 XI 10.743 90 C 0.451 0.133 0.300 - - - 88.40 88.40% Satisfactory

Algon Engineering Construction Corporation 270 Rehab./Reconst./Upgrading of Digos-Makar

Rd. 06/10/10 XI 14.465 90 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory

Algon Engineering Construction Corporation 270 Rehab. Sumlog Bridge and Approaches

along Davao Oriental-Surigao Coastal Rd. 09/07/10 XI 82.031 530 C 0.467 0.133 0.300 - - - 90.00 89.94% V. Satisfactory

Algon Engineering Construction Corporation 270 Rehab./Impv't. of Davao-Bukidnon Rd. at

Mintal Sect. 08/24/10 XI 18.892 180 C 0.391 0.200 0.300 - - - 89.10 88.98% Satisfactory

Algon Engineering Construction Corporation 270 Construction of Laboratory Building Phase

2 11/17/10 DOST 17.637 - C 0.465 0.20 0.30 - - - 96.50 97.08% Outstanding

Allado Construction Co., Inc. 228 Rehab./Reconst./Upgrading along Davao-Cotabato Rd. (Davao City-Jct. Digos Sect.) 06/12/10 XI 93.085 450 C 0.408 0.133 0.300 - - - 84.10 86.08%

Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page37

Page 46:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Allado Construction Co., Inc. 228Rehab./Reconst./Upgrading of Damaged

Paved National Rd. along Davao-Cotabato Rd. (Davao City-Junction Digos Sect.)

08/28/10 XI 78.045 240 O 0.284 0.291 0.150 0.030 0.043 0.050 84.80 -

Allen Construction 12584 Regravelling of Various Barangays 05/26/09 III 1.875 25 C 0.340 0.200 0.300 - - - 84.00 *84.00% Satisfactory

Allen Construction 12584 Const. of 2 CL, Guimba National High Sch. 05/22/08 III 0.751 60 C 0.352 0.300 0.300 - - - 95.20 *95.20% Outstanding

Allen Construction 12584 Construction of MPB, Baloc Nat'l Trade School 03/02/09 III 1.892 45 C 0.479 0.178 0.300 - - - 95.70 *95.70%

V. Satisfactory

Allen Construction 12584 Rehab./Reconst. of Nueva Ecija-Pangasinan Road 09/03/09 III 12.165 61 C 0.479 0.133 0.300 - - - 91.20 *91.20%

V. Satisfactory

Allen Construction 12584Repair/Restoration of Damaged Pavement

Daang Maharlika Rd. Km.136+050 - Km.136+550

06/08/10 III 2.809 21 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory

Allen Construction 12584 Rehab./Reconst. Cabanatuan City-Carmen Rd. 06/07/10 III 14.075 60 C 0.420 0.133 0.300 - - - 85.30 85.30%

Satisfactory

Allen Construction 12584 Rehab./Reconst. of Daang Maharlika Rd. Km.137+330 - Km.137+770, Baloc 08/23/10 III 5.430 25 C 0.394 0.200 0.300 - - - 89.40 89.40%

V. Satisfactory

Alleyway Construction 15310 Cons. of Multi-Purpose Building, Brgy. 204, Zone 18 02/27/09 NCR 3.839 60 C 0.338 0.200 0.300 - - - 83.80 *83.80%

Satisfactory

Alleyway Construction 15310 Rehab./Reconst./Upgrading of España Boulevard 08/24/10 NCR 38.956 204 C 0.345 0.193 0.300 - - - 83.80 83.80%

Satisfactory

Allied Trade Resources 31667 Construction of Site Development Projects 8/12/09 DOST 3.065 131 C 0.475 0.182 0.300 - - - 95.70 95.70% Outstanding

Allied Trade Resources Multi Purpose Cooperative 31667 Const./Impv't of 2-CL School Building @

Malitbog E/S, Brgy. New Malitbog 03/12/09 XI 2.352 60 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory

Allied Trade Resources Multi Purpose Cooperative 31667 Rehab./Impvt. of MPB @ Brgy. Ising 11/30/08 XI 2.356 90 C 0.301 0.233 0.300 - - - 83.40 87.53%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page38

Page 47:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Allied Trade Resources Multi-Purpose Cooperative 31667 DOTC-CARAGA Regional Office Dev't

Project (Phase 1) 07/30/09 DOTC 3.953 150 C 0.426 0.200 0.300 - - - 92.60 92.60% V. Satisfactory

Allied Trade Resources Multi-Purpose Cooperative 31667 Repair & Waterproofing of Central

Administration Building 07/08/09 U.P. 1.154 60 C 0.450 0.200 0.300 - - - 95.00 *95.00% V. Satisfactory

Allied Trade Resources Multi-Purpose Cooperative 31667 Completion of Multi-Purpose Buiding at

Davao City National H/S 03/10/10 XI 0.940 90 C 0.413 0.200 0.300 - - - 91.30 91.30% V. Satisfactory

Almakar Builders & Metal Works 21929 Completion of 2 CL Sch. Bldg. at Gahak Marulas E/S 11/10/08 IV-A 0.669 75 C 0.344 0.300 - - - - 64.40 *64.40%

Fair

Almakar Builders & Metal Works 21929 Const. of Concrete Pathway 05/26/08 IV-A 0.258 45 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory

Almakar Builders and Metal Works 21929 Complete Const. of Two (2) Storey 2-CL Academic Sch. Bldg. at Soldier's Hill IV E/S 08/27/10 IVA 2.115 150 O 0.354 0.225 0.150 0.030 0.029 0.033 82.10 -

Alnino Construction & Supply 18378 Const. of Access Road to RORO Terminal, Guiron-San Antonio Section 08/19/08 V 4.750 90 C 0.201 0.200 0.300 - - - 70.10 *70.10%

Satisfactory

Alnino Construction & Supply 18378 Const. of Buenavista Seawall 05/13/08 V 4.751 90 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory

Alnino Construction & Supply 18378 Concreting of Bayawas Road 02/15/10 V 1.882 120 C 0.370 0.200 0.300 - - - 87.00 87.00% Satisfactory

Alnino Construction & Supply 18378 Const. of Abucay-Cagdongon Road 05/25/10 V 4.705 90 C 0.348 0.200 0.300 - - - 84.80 84.80% Satisfactory

Alnino Construction & Supply 18378 Conc. Of San Vicente-Mayon Rd. 08/30/10 V 1.448 60 O 0.286 0.300 0.150 0.030 0.040 0.050 85.60 -

Alnino Construction & Supply 18378 Conc. Of Sugod-Sta. Teresita-Canarum Rd. 08/30/10 V 1.448 60 O 0.287 0.300 0.150 0.022 0.035 0.050 84.40 -

Alnino Construction & Supply 18378 Conc. Of San Juan (Roro) Rd. 08/30/10 V 1.448 60 C 0.325 0.200 0.300 - - - 82.50 82.50% Satisfactory

Alnor Construction & Const. Supplies 26705 Conc. of Kinalablaban Bridge Approaches and Road, Surigao-Davao Coastal Road 08/23/08 XIII 7.643 180 C 0.236 0.300 0.300 - - - 83.60 *83.60%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page39

Page 48:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Alnor Construction & Const. Supplies 26705 Const. of MPB @ Brgy. Binocaran 05/14/08 XIII 0.926 60 C 0.377 0.200 0.300 - - - 87.70 87.67% V. Satisfactory

Alnor Construction & Const. Supplies 26705 Const./Widening of Dinagat-Loreto Road (Tag-abaca Sect.) 11/19/08 XIII 14.390 195 C 0.375 0.300 0.000 - - - 67.50 61.74%

Fair

Alpha Ryder Construction and Supplies 12197 Conc. of Jamislagan-Buhatan Road 11/19/08 V 4.682 60 C 0.346 0.200 0.300 - - - 84.60 *84.60%

V. Satisfactory

Alpha Ryder Construction and Supplies 12197 Conc. of Legazpi Manito-Punta De Jesus

Road, Malabago-Tinapian Section 03/03/09 V 32.545 210 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory

Alpha Ryder Construction and Supplies 12197 Road Upgrading of Ariman-Casiguran 08/30/10 V 15.168 75 C 0.375 0.200 0.300 - - - 87.50 87.50%

Satisfactory

Alpha Ryder Construction and Supplies 12197 Rehab./Reconst. Of Jct. Abuyog-Gubat-

Ariman Rd. 08/29/10 V 8.379 135 C 0.404 0.200 0.300 - - - 90.40 86.02% Satisfactory

Alpha Tech Builders 26072 Asphalt Overlay of Gutlang-Alumbijud Road 05/23/08 VII 0.915 10 C 0.376 0.300 0.300 - - - 97.60 *97.60% Outstanding

Alpha Tech Builders 26072 Asphalt Overlay of Tabayag-Lapay Road 08/22/08 VII 0.915 10 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding

Alphin Trading & Construction 26260 Conc. of FMR (Sonquil Section) 03/04/08 I 0.289 60 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory

Alphin Trading & Construction 26260 Construction of 1 Classroom, Payas NHS 03/06/09 I 0.482 150 C 0.456 0.154 0.300 - - - 91.00 *91.00%V. Satisfactory

Alphin Trading & Construction 26260 Repair/Impvt. of San Carlos-Calasiao Road 08/27/08 I 2.891 75 C 0.314 0.300 0.300 - - - 91.40 *91.40% Outstanding

Alphin Trading & Construction 26260 Construction of 2-CL @ Mabulitek 08/27/09 I 0.972 65 C 0.488 0.200 0.300 - - - 98.80 *98.80% Outstanding

Alphin Trading & Construction 26260 Rehab. of DPWH Pangasinan 3rd DEO Building, Tumana 08/25/09 I 2.885 75 C 0.442 0.139 0.300 - - - 88.10 91.39%

V. Satisfactory

Alpiz Construction and Development Corp. 11039 Impvt. and Desilting of Teresa River 06/10/10 IVA 9.621 60 C 0.414 0.200 0.300 - - - 91.40 91.40%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page40

Page 49:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Alraf Construction & Enterprises 17297 Rehab./Const./Impvt. of Zamboanga City-Pagadian Road 05/26/09 IX 44.695 253 O 0.396 0.300 0.150 0.030 0.042 0.050 96.80 -

Alraf Construction & Enterprises 17297Completion (Impvt./Conc. Paving) of Licomo

Quiniput Road, Segment II Manguso-Mulawin Section

11/17/08 IX 36.137 290 C 0.365 0.200 0.300 - - - 86.50 88.27% V. Satisfactory

Alraf Construction & Enterprises 17297 Impvt./Conc. of Isabela-Maluso National Road, Bañas-Garlayan Section 05/15/08 IX 7.605 131 C 0.219 0.300 0.300 - - - 81.90 80.61%

V. Satisfactory

Alraf Construction & Enterprises 17297 Rehabilitation of Brgy. Mercedes Road (Phase II) 03/03/09 IX 4.651 60 C 0.426 0.200 0.300 - - - 92.60 *92.60%

V. Satisfactory

Alraf Construction & Enterprises 17297Rehab./Reconst. of Damaged Paved

National Road (Pagadian-Zamboanga City Road)

09/01/09 IX 14.152 132 C 0.429 0.200 0.300 - - - 92.90 94.88% V. Satisfactory

Alraf Construction & Enterprises 17297 Rehab./Const./Impvt. of Zambaonga City-Pagadian Road (with Intermittent Section) 09/02/09 IX 46.408 295 O 0.338 0.300 0.150 0.030 0.055 0.050 92.30 -

Alraf Construction & Enterprises 17297

Impvt./Gravelling of Sirawai-Sibuco Rd., Bongon-Piacan-Napolan-Lagao Sect.

Sta.11+160 - Sta.11+860, Sta.12+311.70 - Sta.14+120

06/02/10 IX 60.373 531 O 0.377 0.249 0.150 0.030 0.042 0.050 89.80 -

Alraf Construction & Enterprises 17297

Impv't./Gravelling of Sirawai-Sibuco Rd. Bongon-Piacan-Napolan-Lagao Sect., Sta.11+160 - Sta.11+860, Sta.11+860 -

Sta.11+311.70, Sta.12+343 - Sta.14+120

08/24/10 IX 60.373 569 O 0.369 0.249 0.150 0.030 0.042 0.050 89.00 -

Alraf Construction & Enterprises 17297 Pagadian-Zamboanga City Rd. (Sangali-Victoria Sect.) 09/08/10 IX 19.160 170 C 0.447 0.133 0.300 - - - 88.00 88.00%

Satisfactory

Alraf Construction & Enterprises 17297

Const./Opening of Zamboanga West Coast Rd., Napolan-Cawit-Cawit-Anongan Sect. Sta.14+700 - Sta.18+780 w/ exceptions,

Sta.18+420 - Sta.18+500

09/05/10 IX 95.698 765 C 0.439 0.133 0.300 - - - 87.20 85.78% Satisfactory

Alro Construction & Development Corp. 18361 Const. of Polangui-Iriga Bridge 11/21/09 V 13.202 200 C 0.400 0.200 0.300 - - - 90.00 87.90%

V. Satisfactory

Alro Construction & Development Corp. 18361 Road Opening/Improvement of Montinegro

Cabanbanan Road 03/09/09 V 19.108 90 C 0.458 - 0.500 - - - 95.80 *95.80% V. Satisfactory

Alro Construction & Development Corporation 18361 Rehabilitation of Goyundan to Payak Road 05/29/09 V 4.777 158 C 0.357 0.200 0.300 - - - 85.70 *85.70%

Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page41

Page 50:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Alro Construction & Development Corporation 8361 Concreting of FMR from Macad to Tilnac 06/01/09 V 9.459 150 C 0.418 0.133 0.300 - - - 85.10 *85.10%

Satisfactory

Alro Construction & Development Corporation 18361

Rehab./Reconst. of Iriga City-San Isidro-Sagrada-San Ramon Road (San Pedro

Section)09/09/09 V 15.275 179 C 0.401 0.174 0.300 - - - 87.50 *87.50%

Satisfactory

Al's Enterprise and Construction 9721 Const./Rehab. of Hospital (Felipe Abrigo Memorial Hospital) 03/17/09 VIII 4.775 151 O 0.349 0.240 0.000 0.010 0.000 0.000 59.90 -

Alt Construction 32365 Const. of Access Road to RORO Terminal, Sta. Fe-Guiron Section 08/19/08 V 4.754 90 C 0.251 0.200 0.300 - - - 75.10 *75.10%

Satisfactory

Alt Construction 32365 Const. of Sorsogon State College Flood Control/Drainage System 05/21/08 V 4.800 45 C 0.375 0.177 0.300 - - - 85.20 *85.20%

V. Satisfactory

Alzam Enterprises 19113

Demolition/Reconst. of Approaches & Dranaige incl. Bridge Protection Works,

Reconst. of Gov. Generoso (Bankerohan) Br.

09/04/08 XI 30.557 180 C 0.358 0.300 0.300 - - - 95.80 89.95% V. Satisfactory

Alzam Enterprises 19113 Rehab. of Bayabas-Eden Road 03/02/09 XI 19.280 210 C 0.365 0.200 0.300 - - - 86.50 85.66% Satisfactory

Alzam Enterprises 19113 Road Impvt./Conc. of Additional Two Lanes along Maa Rd. Section 09/04/08 XI 18.870 210 C 0.329 0.300 0.300 - - - 92.90 87.14%

V. Satisfactory

Alzam Enterprises 19113 Widening of Agusan-Davao Road, Tibungco Section 03/18/09 XI 28.925 210 C 0.439 0.200 0.300 - - - 93.90 93.42%

V. Satisfactory

Alzam Enterprises 19113Rehab./ Reconst./Upgrading of Damaged

Paved National Roads at Davao City Diversion Road, La Verna Section

09/16/09 XI 19.272 210 C 0.476 0.200 0.300 - - - 97.60 97.60% Outstanding

Alzam Enterprises 19113Widening of Agusan-Davao Road for

Package 2-A, Bunawan Section, Brgy. Bunawan

09/16/09 XI 9.639 150 C 0.484 0.148 0.300 - - - 93.20 *93.20% V. Satisfactory

Alzam Enterprises 19113 Construction of Road Network Camp Catitipan, PNP 03/11/10 XI 22.145 180 C 0.400 0.200 0.300 - - - 90.00 90.00%

V. Satisfactory

Alzam Enterprises 19113

Rehab./Reconst./Upgrading of Damaged paved National Roads at Davao City

Diversion Road for Package 2-C at a) Junction Davao-Agusan to Panacan

Relocation Section

03/11/10 XI 19.275 210 C 0.397 0.200 0.300 - - - 89.70 89.70% V. Satisfactory

Alzam Enterprises 19113Rehab./Reconst. Of Damaged Paved National Roads/Widening of Road at

Package III09/09/10 XI 38.503 210 C 0.450 0.133 0.300 - - - 88.30 88.60%

Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page42

Page 51:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Alzen Engineering & Construction Supplies 13911 Conc. of Kidapawan-Ilomavis Tourist Road

(Mua-an Section) 08/24/08 XII 5.760 55 C 0.301 0.288 0.300 - - - 88.90 88.48% V. Satisfactory

Alzen Engineering & Construction Supplies 13911 Conc. of Kidapawan-Magpet-Pangao-An

Road (Sumawan-Gubatan Section) 08/24/08 XII 11.338 143 C 0.270 0.287 0.300 - - - 85.70 85.58% V. Satisfactory

AMA Construction 10015 Const. of MPB, Brgy. Victoria 08/29/08 XIII 0.737 60 C 0.331 0.200 0.300 - - - 83.10 *83.10% V. Satisfactory

Ameg Construction & Supply 21556 Conc. of Gogon-Tiris Road 08/19/08 V 0.944 90 C 0.307 0.200 0.300 - - - 80.70 *80.70% V. Satisfactory

Ameg Construction & Supply 21556 Repair/Impvt. of DPWH Bldg. 11/19/08 V 1.910 90 C 0.399 0.200 0.300 - - - 89.90 *89.90% V. Satisfactory

Ameg Construction & Supply 21556 Construction of 1-CL School Building 08/24/09 V 0.575 90 C 0.398 0.162 0.300 - - - 86.00 85.02% Satisfactory

Ameg Construction & Supply 21556 Conc. Of San Antonio Sevilla Rd. 08/30/10 V 0.942 60 C 0.428 0.133 0.300 - - - 86.10 86.10% Satisfactory

Amopia Construction and Supplies 27511 Conc. of Davao-Cotabato Road, KPES-UCCP Section both sides 03/02/08 XII 9.398 120 C 0.291 0.100 0.000 - - - 39.10 57.76%

Poor

Amopia Construction and Supplies 27511 Conc. of Kidapawan-Ilomavis Tourist Road 05/17/08 XII 8.079 90 O 0.337 0.240 0.000 0.030 0.035 0.067 70.90 -

Angel & Sam Construction & General Merchandise 19968 Const. of 2-Classroom School Building,

Kibungsod NHS 06/01/09 X 1.188 134 C 0.435 0.098 0.300 - - - 83.30 83.93% Satisfactory

Angel & Sam Construction & General Merchandise 19968 Conc. of Cadre Rd. Camp Evangelista Main

Road going to Hospital Section 02/26/08 X 9.548 180 C 0.305 0.200 0.300 - - - 80.50 87.04% V. Satisfactory

Angel & Sam Construction & General Merchandise 19968 Rehab. of ICBR Puerto-Cugman Section 03/02/09 X 13.912 198 O 0.298 0.240 0.144 0.030 0.040 0.050 80.20 -

Angel & Sam Construction & General Merchandise 19968 Rehab./Upgrading of National Road-South

Divisiria (RN Abejuela St.-Corrales St.) 09/01/09 X 3.564 130 C 0.446 0.200 0.300 - - - 94.60 *94.60% V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page43

Page 52:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Angel & Sam Construction & General Merchandise 19968 Repair of ICBR Puerto-Cugman Section 09/01/09 X 14.311 207 C 0.459 0.133 0.300 - - - 89.20 83.80%

Satisfactory

Angel & Sam Construction & General Merchandise 19968 Rehab./Upgrading of Sayre Highway 02/22/10 X 16.172 240 C 0.341 0.200 0.300 - - - 84.10 83.53%

Satisfactory

Anilos Trading & Construction 31557 Const. of MPB @ Poblacion 05/30/08 IV-B 1.919 110 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding

Anilos Trading & Construction 31557 Const. of Puerto Princesa Pilot E/S 03/05/08 IV-B 1.540 90 C 0.393 0.200 0.300 - - - 89.30 82.93% V. Satisfactory

Anilos Trading & Construction 31557 Const. of 1 CL Tagumpay NHS 03/06/09 IV-B 0.568 180 C 0.493 0.200 0.300 - - - 99.30 83.20% Satisfactory

Anilos Trading & Construction 31557 Const. of Multi-Purpose Building, Phase II, Brgy. Bagong Sikat 03/07/09 IV-B 0.549 90 C 0.473 0.127 0.300 - - - 90.00 *90.00%

V.Satisfactory

Anilos Trading & Construction 31557 Const.of MPB 1st Engineering District, Poblacion Roxas 03/06/09 IV-B 0.947 100 C 0.482 0.105 0.300 - - - 88.70 *88.70%

Satisfactory

Anilos Trading & Construction 31557 Construction of Farm to Market Road 03/07/09 IV-B 1.378 104 C 0.442 0.110 0.300 - - - 85.20 *85.20% Satisfactory

Anilos Trading and Construction 31557 Construction of MPB Relocation Site Brgy. Matahimik 06/05/09 IV-B 0.387 75 C 0.385 0.155 0.300 - - - 84.00 *84.00%

Satisfactory

Anilos Trading and Construction 31557 Rehab./Impvt. of DPWH-Palawan 1st DEO Bldg. inc. Employees Quarters, 09/07/09 IVB 1.895 120 C 0.500 0.110 0.000 - - - 61.00 62.12%

Poor

Anilos Trading and Construction 31557 Const. of 4-CL Don Ramon Roces MES (Partial) 03/05/10 IVB 3.766 210 C 0.330 0.200 0.300 - - - 83.00 77.51%

Unsatisfactory

Annasor Construction & Trading 30825 Const. of MPB 08/13/08 III 1.909 60 C 0.391 0.300 0.000 - - - 69.10 58.18% Poor

Anrol Construction 10136 Rehab. of Manila East Road, Morong-Pililla Section (Intermittent) 06/05/09 IV-A 19.212 75 C 0.446 0.133 0.300 - - - 87.90 *87.90%

Satisfactory

Anrol Construction 10136 Rehab. of Manila East Road, Baras Section (Intermittent) 06/05/09 IV-A 19.212 75 C 0.429 0.133 0.300 - - - 86.20 *86.20%

Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page44

Page 53:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Anrol Construction 10136 Rehab. of San Mateo-Rodriguez Road 11/27/08 IV-A 9.587 45 C 0.265 0.284 0.300 - - - 84.90 *84.90% V. Satisfactory

Anrol Construction 10136 Impvt./Rehab. of MPB Brgy. West Triangle 03/01/10 NCR 3.372 120 C 0.486 0.133 0.300 - - - 91.90 91.90% V.Satisfactory

Antonio V. Nidea Construction 6382 Conc. of Camalig-Inarado-Gapo-Peñaranda Road 08/15/08 V 9.430 200 C 0.323 0.221 0.300 - - - 84.40 80.86%

V. Satisfactory

Antonio V. Nidea Construction 6382 Opening/Const. of Banao-Calpi Road 11/13/08 V 19.176 120 C 0.397 0.294 0.300 - - - 99.10 *99.10% Outstanding

Antonio V. Nidea Construction 6382 Repair/Restoration of Awang River Control, Awang River 02/26/08 V 9.499 378 C 0.371 0.200 0.300 - - - 87.10 *87.10%

V. Satisfactory

Antonio V. Nidea Construction 6382 Road Opening of Hinipaan-Sabang Road 08/13/08 V 14.358 120 C 0.386 0.282 0.300 - - - 96.80 75.02% Satisfactory

Antonio V. Nidea Construction 6382Const. of Iriga Flood Control Project

(Consolidation Dam, Ground Sill, Slope Protection & Damage Canal)

02/28/10 V 28.505 240 O 0.352 0.240 0.150 0.030 0.035 0.033 84.00 -

Antonio V. Nidea Construction 6382 Construction/Imvpt. Of Ponso-San Agustin FMR 02/28/10 V 4.808 180 C 0.403 0.133 0.300 - - - 83.60 83.60%

Satisfactory

Antonio V. Nidea Construction, Inc. 6382 Const./Repair/Rehab./Impv't. of Libmanan-Cabusao Flood Control 09/02/10 V 57.610 240 C 0.389 0.200 0.300 - - - 88.90 88.90%

Satisfactory

Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea

Construction)6382 Opening/Impvt. of Brgy. Manika-Sitio Tina

Rd. (Phase II) 02/27/10 VI 36.658 340 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory

Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea

Construction)6382 Opening/Imprv't. of Sitio Babangan-Sito

Igtulukon Rd. (Phase I) 02/26/10 VI 19.297 270 C 0.383 0.162 0.300 - - - 84.50 84.50% Satisfactory

Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea

Construction)6382 Desilting/Deepening of Agbunyog River 08/24/10 IVB 33.770 240 O 0.390 0.268 0.150 0.022 0.028 0.017 87.50 -

Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea

Construction)6382 Opening/Impvt. of Brgy. Manika-Sitio Tina

Road (Phase I) 09/04/10 VI 40.517 360 C 0.480 0.191 0.300 - - - 97.10 89.30% V. Satisfactory

AOG Construction 29758

Rehab. of National Arterial Secondary & Local Roads Brdy. Maasin-Macrohon-

Sogod, Daang Maharlika Road with exception

05/26/09 VIII 19.088 270 C 0.337 0.200 0.300 - - - 83.70 82.98% Satisfactory

AOG Construction 29758 Conc. of Basak-Rizal-Matinao Rizal FMR 08/30/08 VIII 9.437 260 C 0.303 0.200 0.300 - - - 80.30 83.30% V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page45

Page 54:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

APB Construction 17055 Repair of Public Market at Baguio City 06/09/10 CAR 3.813 90 C 0.464 0.200 0.300 - - - 96.40 96.40% Oustanding

APD Construction 17467 Addalam River Irrigation Project 2/13-15/2008 NIA 7.466 180 O 0.3369 0.1871 0.03 0.03 0.0408 0.2 82.48 -

APD Construction 17467 Conc. of Naguilian-San Marcelino Road (Alibadbad Section) 05/21/08 II 9.648 90 C 0.376 0.202 0.300 - - - 87.80 *87.80%

V. Satisfactory

APD Construction 17467 Conc. of Villa Sur Brgy. Road 05/26/08 II 2.720 90 C 0.310 0.300 0.300 - - - 91.00 *91.00% Outstanding

APD Construction 17467 Const. of Pigalo Bridge (Phase II) 02/28/08 II 2.820 195 C 0.362 0.200 0.300 - - - 86.20 86.95% V. Satisfactory

APD Construction 17467

Const./Impvt./Rehab. of Cordon-Diffun-Maddela-Aurora (CDMA) Road & ist related

Roads & Bridges (Cab-Diffun Section) Cualo Blvd Road

03/04/08 II 0.959 100 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

APD Construction 17467Impvt. of Cordon-Diffun-Maddela-Aurora

(CDMA) Bdry. Road & its related Roads & Bridges (Rehab. Of Ramos Bridge Phase II)

08/18/08 II 2.604 110 C 0.371 0.243 0.300 - - - 91.40 *91.40% Outstanding

APD Construction 17467 Impvt./Conc. of Cordon-Aurora Bdry. Road (Maddela Jct.-Dumabato Section) 08/18/08 II 13.274 200 C 0.366 0.262 0.300 - - - 92.80 *92.80%

Outstanding

APD Construction 17467 Impv't/Rehab of Ricarte Norte-Ifugao Villa Road, Ganano ARC 03/07/09 II 9.646 180 C 0.454 0.200 0.300 - - - 95.40 *95.40%

V.Satisfactory

APD Construction 17467 Repair/Impvt./Reblocking along Jct. Mangandingay-Saguday Rd. 11/25/08 II 9.576 180 C 0.360 0.300 0.300 - - - 96.00 *96.00%

Outstanding

APD Construction 17467

Impvt./Conc. along Cordon-Diffun-Madella-Aurora Bdry. Rds. & its related roads (San Marcos-Gundaway Section & its Related

Road

09/03/09 II 19.300 150 C 0.437 0.200 0.300 - - - 93.70 94.30% V. Satisfactory

APD Construction 17467Rehab./Reconst./Upgrading of Damaged

Paved National Roads with Widening, Daang Maharlika KO346+610-KO347+290

08/26/09 II 13.006 132 C 0.425 0.200 0.300 - - - 92.50 92.50% V. Satisfactory

APD Construction 17467 Upgrading/Concreting of Ilagan-Delfin-Mallig Road 08/25/09 II 12.540 104 C 0.421 0.200 0.300 - - - 92.10 92.10%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page46

Page 55:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

APD Construction 17467Impvt./Conc. along Divisoria-Panang Bdry. Road & Its Related Roads (Divisoria Rd. &

its related roads)02/25/10 II 19.223 150 C 0.419 0.200 0.300 - - - 91.90 91.90%

V. Satisfactory

APD Construction 17467Impvt./Conc. along CDMA Bdry. Road & its related Road (Palacian Road and its related

Roads)06/05/10 II 15.419 120 C 0.478 0.176 0.300 - - - 95.40 95.40%

V. Satisfactory

APD Construction 17467Impvt./Conc. along CDMA Boundary Road

and its related Roads (Gundaway Road and its Related Roads)

08/29/10 II 19.279 150 C 0.446 0.184 0.300 - - - 93.00 93.00% V. Satisfactory

Apex Builders 32329Repair/Rehab. of Scoured Slope Protection

along DM Jct. Legazpi-Sto. Domingo Tabaco-CamSur Bdry.

02/26/10 V 3.019 90 C 0.411 0.133 0.300 - - - 84.40 84.40% Satisfactory

APU Trading & Construction (Formerly: APU Const.) 8379

Const. of Farm-to-Market Road at Brgy. Doña Anicia Road, Brgy. Dau, Mabalacat

and San Ildefonso06/04/09 III 1.897 30 C 0.411 0.200 0.300 - - - 91.10 *91.10%

V. Satisfactory

Aqualine Construction 11555 Rehab. of Tamalarong-Libertad FMR, Sta. 0+000-Sta. 1+500 06/03/09 IV-B 2.690 90 C 0.358 0.171 0.300 - - - 82.90 83.70%

Satisfactory

Aquino-Dela Cruz Eng'g & Construction 16751 Rehabilitation of Farm-to-Market Road 03/05/09 I 1.250 25 C 0.371 0.200 0.300 - - - 87.10 *87.10%

Satisfactory

Aquino-Dela Cruz Eng'g & Construction 16751 Const. of One Unit, 2-CL S/B at Enrico T.

Prado NHS 03/02/10 I 0.965 60 C 0.401 0.133 0.300 - - - 83.40 83.40% Satisfactory

Aquino-Dela Cruz Eng'g & Construction 16751

Repair and Rehab. of Urdaneta Jct. - Dagupan Rd. Sta. Barbara and Calasiao, Pangasinan, Km.202+130 - Km.203+064

with exception

06/03/10 I 10.000 30 C 0.449 0.133 0.300 - - - 88.20 88.20% Satisfactory

Aquino-Dela Cruz Eng'g & Construction 16751 Rehab. of Tarlac Road 06/07/10 I 8.675 20 C 0.428 0.133 0.300 - - - 86.10 86.10%

Satisfactory

Aquino-Dela Cruz Eng'g & Construction 16751 Rehab./Impvt. of Sta. Barbara Old Road Km.

200+024-Km. 200+407 08/31/10 I 4.014 15 C 0.420 0.195 0.300 - - - 91.50 91.50% V. Satisfactory

Aquino-Dela Cruz Eng'g & Construction 16751 Const. of Employees Quarter & Impvt. of

DPWH Pangasinan Sub-DEO 08/30/10 I 3.858 120 C 0.483 0.133 0.300 - - - 91.60 87.19% Satisfactory

Aquino-Dela Cruz Eng'g. & Construction 16751 Road Upgrading (Gravel to Paved) of San

Nicolas-San Quintin-Umingan-Guimba Road 08/25/09 I 10.598 89 C 0.407 0.200 0.300 - - - 90.70 89.26% V. Satisfactory

AR Adlawan Construction 13108 Road Upgrading (Gravel to Paved), Sibonga-Dumanjug Road 06/01/09 VII 9.531 45 C 0.413 0.200 0.300 - - - 91.30 *91.30%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page47

Page 56:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

AR Adlawan Construction 13108 Concreting of Sibonga-Dumanjug Road 06/01/09 VII 28.915 210 C 0.440 0.200 0.300 - - - 94.00 83.14% Satisfactory

AR Adlawan Construction 13108Conc. of Sibonga-Dumanjug Road, Starting at Boundary Cebu 2nd DEO and Cebu 4th

DEO (Km. 65+968-Km.64+988)06/01/09 VII 18.391 120 C 0.426 0.200 0.300 - - - 92.60 74.48%

Poor

AR Adlawan Construction 13108 Conc. of Cebu-Toledo Wharf Road 09/04/08 VII 34.318 210 C 0.322 0.300 0.300 - - - 92.20 85.14% V. Satisfactory

AR Adlawan Construction 13108 Const. of 2 CL Sch. Bldg. @ Can-Asujan NHS 03/08/08 VII 34.320 60 C 0.351 0.200 0.300 - - - 85.10 *85.10%

V. Satisfactory

AR Adlawan Construction 13108 Const. of Lower Calajo-an-Pakigne Bridge 06/17/10 VII 4.815 90 C 0.363 0.200 0.300 - - - 86.30 86.30% Satisfactory

AR Adlawan Construction 13108Rehab./Reconst//Upgrading of Carcar-Barili-

Mantayupan Road, Km. 45+500 - Km. 46+070

08/24/10 VII 25.387 210 C 0.421 0.200 0.300 - - - 92.10 92.10% V. Satisfactory

AR Adlawan Construction 13108Impvt./Asphalting of Sibonga-Dumanjug

Road, Sta. 71+000-Sta. 73+920 (with exception)

09/07/10 VII 48.116 285 O 0.345 0.292 0.150 0.022 0.033 0.033 87.50 -

Arago Construction & Supply 31324 Const. of 1 Unit 1 CL Sch. Bldg. @ Bagtong C/S 03/17/09 VIII 0.460 75 C 0.461 0.200 0.300 - - - 96.10 *96.10%

Outstanding

Arcinue Commercial 6746 Rehab./Asphalt Overlay of Manaoag Cadre Road, Km. 0+000-Km. 0+587 05/26/09 I 3.857 20 C 0.432 0.133 0.300 - - - 86.50 *86.50%

Satisfactory

Arcinue Commercial 6746Rehab./Reconts./Upgrading along Bacnoton-Luna-Balaoan Road, Km. 283+221-Km. 307+896 w/exception

05/27/09 I 16.169 90 O 0.358 0.207 0.150 0.030 0.040 0.033 81.80 -

Arcinue Commercial 6746 Const. of 2 CL Sch. Bldg. Anduyan NHS 02/20/08 I 0.899 90 C 0.373 0.207 0.300 - - - 88.00 83.73% V. Satisfactory

Arcinue Commercial 6746 Const. of 2 CL School Bldg. @ Lloren E/S 08/11/08 I 0.764 90 C 0.324 0.200 0.300 - - - 82.40 *82.40% V. Satisfactory

Arcinue Commercial 6746 Const. of Maypalic Bridge 02/29/08 I 12.048 200 C 0.292 0.200 0.000 - - - 49.20 61.59% Fair

Arcinue Commercial 6746 Impvt./Repair/Rehab. of Pangasinan-Zambales Road 08/25/08 I 9.468 90 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page48

Page 57:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Arcinue Commercial 6746 Opening of Farm-to-Market Road, Brgy. Namonitan 08/11/08 I 0.478 45 C 0.386 0.289 0.300 - - - 97.50 *97.50%

Outstanding

Arcinue Commercial 6746 Rehab. & Impvt. of Cabaroan Bridge along San Juan-San Gabriel Road 08/22/08 I 1.897 50 C 0.305 0.200 0.300 - - - 80.50 *80.50%

V. Satisfactory

Arcinue Commercial 6746 Rehab./Reconst. of Damaged Nat'l Road, San Fernando-Bagulin Road 08/22/08 I 19.219 90 C 0.363 0.200 0.300 - - - 86.30 83.96%

V. Satisfactory

Arcinue Commercial 6746 Replacement of Cuenca NHS 02/02/08 I 0.899 90 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory

Arcinue Commercial 6746 Rehab./Reconst./Upgrading of Bacnotan-Luna-Balaoan Road 09/02/09 I 16.169 99 C 0.425 0.200 0.300 - - - 92.50 86.08%

Satisfactory

Arcinue Commercial 6746 Impvt. of Pias-Currimao-Balacad Road with exception, Paoay Section 09/09/09 I 31.831 360 C 0.364 0.168 0.300 - - - 83.20 85.96%

Satisfactory

Arcinue Commercial 6746 Const. of Mangato Bridge, Brgy. Mangato 09/10/09 I 27.553 519 C 0.459 0.133 0.300 - - - 89.20 82.96% Satisfactory

Arcinue Commercial 6746 Construction of School Building @ Sto. Rosario E/S 09/01/09 I 2.148 210 C 0.440 0.086 0.300 - - - 82.60 *82.60%

Satisfactory

Arcinue Commercial 6746 Const./Repair of Tavora E/S 02/27/10 I 4.982 180 C 0.408 0.133 0.300 - - - 84.10 84.10% Satisfactory

Arcinue Commercial 6746Raising of Grade of Earthdike &

Const./Rehab. of Agno River Bank Protection, Brgy. Warding

06/04/10 I 9.647 120 C 0.325 0.200 0.300 - - - 82.50 82.50% Satisfactory

Arcinue Commercial 6746 Asphalt Overlay along Manila North Road, Km.293+000 - Km.296+000 w/ exception 05/25/10 I 14.256 40 C 0.390 0.003 0.300 - - - 69.30 69.30%

Poor

Arcinue Commercial 6746 Concrete Lining Dike along Sinocalan River, Maningding-Ventinilla-Tuliao Section 08/30/10 I 14.474 240 C 0.383 0.200 0.300 - - - 88.30 88.30%

Satisfactory

Arcinue Commercial 6746

Installation & Application of Road Safety Devices Pangasinan-Zambales Road,

Pangasinan-Tarlac Road and Labrador-Lingayen Rd. w/ exceptions

09/01/10 I 4.997 30 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page49

Page 58:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Arcinue Commercial 6746

Urgent Rehab. Works due to Passage Typhoon Peping in the Province of

Pangasinan under the Agno River Control Project, Brgy. San Felipe

08/27/10 AFCS-PMO 1.947 45 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory

Arcinue Commercial / Top Tech Trading & Const. (JV) JV-09-223

Rehab./Reconst./Upgrading of Damaged National Rd., Diokno Highway inc. Slope

Protection08/24/10 IVA 23.874 150 C 0.462 0.133 0.300 - - - 89.50 89.50%

V. Satisfactory

Aretas Development & Supply 25669 Const. of MPB, Sampaguita Hills, Brgy. Marcelo Green 02/17/10 NCR 3.837 75 C 0.497 0.133 0.300 - - - 93.00 93.00%

V.Satisfactory

Argealis Construction 16122 Construction of PPMC Motorpool Shed 8/19-22/08 PPA 1.200 45 C 0.342 0.300 0.300 - - - 94.19 94.19% Outstanding

Arik Construction 32786 Conc. of Shoulder along Daet-Bagasbas Airport Road 11/27/08 V 0.467 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

Arky Construction and Supply 32692 Const. of Circ. Road, Brgy. Ibinigay-Bagumbayan 05/19/08 V 4.750 90 C 0.325 0.200 0.300 - - - 82.50 82.38%

V. Satisfactory

Arky Construction and Supply 32692 Repair & Rehab. of Revetment (Flood Control) 08/23/08 V 0.475 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

Arky Construction and Supply 32692 Repair & Rehab. of Revetment (Flood Control) 08/23/08 V 0.948 75 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

Arky Construction and Supply 32692Rehab./Reconst. of Damaged Masbate-

Cataingan-Placer National Road (Intermittent Section)

08/27/09 V 17.364 150 C 0.387 0.200 0.300 - - - 88.70 *88.70% Satisfactory

Arky Construction and Supply 32692 Rehab./Reconst. of Damaged Masbate Capitol-Cadre National Road 02/18/10 V 11.566 253 C 0.418 0.160 0.300 - - - 87.80 83.69%

Satisfactory

Arlor Construction 30822 Const./Rehab. of Road at Natunuan North-Kaingin 02/26/10 IVA 0.497 30 C 0.442 0.133 0.300 - - - 87.50 87.50%

Satisfactory

Armando U. Khong General Contractor 16163 Upgrading/Conc. with Drainage Impvt. of M.

dela Fuente St. 05/16/08 NCR 15.936 150 C 0.365 0.268 0.300 - - - 93.30 94.20% Outstanding

Armando U. Khong Hun General Contractor 16163

Rehab./Reconst./Upgrading of Diokno Ave., including Approach of Diokno Bridge

(Phase I)05/19/09 NCR 19.290 120 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page50

Page 59:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Armando U. Khong Hun General Contractor 16163 Construction of Pedestrian Overpass

along Domestic Road 05/19/09 NCR 11.573 120 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory

Armando U. Khong Hun General Contractor 16163 Const./Improvement of Slope Protection of

San Dionisio River (Phase I, II & III) 06/02/09 NCR 33.720 90 C 0.443 0.133 0.300 - - - 87.60 *87.60% Satisfactory

Armando U. Khong Hun General Contractor 16163

Proposed Rehab./Reconst./Upgrading of Damaged Paved National Road, South

Superhighway West Service Road, Pasay City

05/24/10 NCR 19.295 30 C 0.411 0.200 0.300 - - - 91.10 91.10% V. Satisfactory

Armando U. Khong Hun General Contractor, Inc. 16163 Rehab./Reconst./Upgrading of Blumentrit

St. 08/24/10 NCR 24.071 150 C 0.416 0.133 0.300 - - - 84.90 87.78% Satisfactory

ARN Builders 18930 Rehab./Recons. of Aklan East Road 06/06/09 VI 19.283 180 C 0.438 0.200 0.300 - - - 93.80 84.32% Satisfactory

ARN Builders 18930 Conc. of Altavas Diversion Road 03/06/08 VI 16.521 160 C 0.328 0.200 0.300 - - - 82.80 85.11% V. Satisfactory

ARN Builders 18930 Construction of Kinawahan Bridge & Approaches 03/06/09 VII 25.238 210 C 0.269 0.192 0.300 - - - 76.10 *76.10%

Unsatisfactory

ARN Builders 18930 Rehab./Reconstruction of Aklan East Road 11/30/08 VI 19.283 180 O 0.218 0.240 0.100 0.015 0.032 0.100 70.50 -

ARN Builders 18930 Rehab./Reconst./Upgrading of Aklan East Road 09/05/09 VI 31.795 240 O 0.335 0.240 0.150 0.000 0.032 0.100 -

ARN Builders 18930 Const. of Multi-Purpose Building at Cabadiangan 09/14/09 VII 1.776 90 C 0.485 0.200 0.300 - - - 98.50 -

ARN Builders 18930 Const. of Cabancalan-Canduman Bridge (E. Cortes Bridge) 03/08/10 VII 30.409 255 C 0.444 0.078 0.300 - - - 82.20 73.92%

Poor

ARN Builders 18930 Road to Complete Nautical Highway, Rehab. of Daang Maharlika Road 02/28/10 VIII 47.490 365 C 0.392 0.200 0.300 - - - 89.20 88.58%

Satisfactory

ARN Builders 18930CP-4: Imprvt./Conc. of Kapalong-Talaingod-Valencia, Bukidnon Road, Brgy. Sto. Niño

Section Phase I02/27/10 XI 153.445 530 C 0.387 0.200 0.300 - - - 88.70 90.29%

V. Satisfactory

ARN Builders 18930CP-5: Impvt. / Conc. Of Kapalong-Talaingod-Valencia, Bukidnon Road, Brgy. Sto. Nino

Section Phase II 02/27/10 XI 173.459 540 C 0.363 0.200 0.300 - - - 86.30 89.60%

V. Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page51

Page 60:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

ARN Builders 18930CP-8: Const. of Six (6) Bridges inc.

Approaches along Kapalong-Talaingod-Valencia-Bukidnon Road

02/26/10 XI 123.463 540 C 0.355 0.133 0.300 - - - 78.80 89.52% V. Satisfactiry

ARN Builders 18930Repair/Rehab. of Caraga Gov. LN Lopez and Quinonoan Bridges along Baganga-

Mati Road03/04/10 XI 93.754 375 C 0.402 0.133 0.300 - - - 83.50 83.50%

V. Satisfactory

ARSVI Construction 23518 Conc. and Impvt. of San Andres Road 09/09/09 IVA 2.893 90 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory

ARSVI Construction 23518 Const. of School Building at Elementary School, Brgy. Banjo East 03/03/10 IVA 0.998 90 C 0.484 0.133 0.300 - - - 91.70 91.70%

V. Satisfactory

Aryanesa Construction & Enterprises 33362 Repair/Const. of Dolores River Control 09/05/10 VIII 4.724 335 O 0.337 0.242 0.150 0.030 0.025 0.033 81.70 -

Asanco Gen. Merchandising & Construction 30517 Const. of Multi-Purpose Pavement,

Barangay New Guinlo 03/04/10 IVB 0.775 54 C 0.428 0.133 0.300 - - - 86.10 86.10% Satisfactory

Asand Construction and Development 21691 Construction of Academic Building II 12/2/09 DOST 10.309 210 C 0.455 0.195 0.300 - - - 95.00 95.00%

V. Satisfactory

ASC Construction and Concrete Products 26788 Addalam River Irrigation Project 2/13-15/08 NIA 5.013 150 C 0.308 0.240 0.300 84.77 *84.77%

V. Satisfactory

Asian Pearl Construction & Development Corporation 9059 Completion of Multi-Purpose Building, Sitio

Parang, Brgy. San Marcos 03/03/09 I 1.414 34 C 0.416 0.133 0.300 - - - 84.90 *84.90%Satisfactory

Asian Pearl Construction & Dev't. Corp. 9059 Conc. along Ilocos Norte-Apayao Road 11/17/08 I 11.226 152 C 0.340 0.200 0.300 - - - 84.00 85.20%

V. Satisfactory

Asian Pearl Construction & Dev't. Corp. 9059 Const. of First Floor of the Proposed Three

(3) Storey Bldg., Ilocos Norte NHS 08/21/08 I 8.356 180 C 0.334 0.200 0.000 - - - 53.40 74.22% Satisfactory

ASS Construction 31509 Construction of Sports Complex 5/14-15/09 DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding

Asugas Builders 32764 Const. & Completion of MPB (Municipal Bldg.) Phase II 11/27/08 IX 2.300 120 C 0.355 0.133 0.300 - - - 78.80 *78.80%

Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page52

Page 61:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Asugas Builders 32764 Const./Impvt. of MPB (Municipal Bldg.) Phase III, Poblacion Tigbao 03/14/09 IX 1.835 120 C 0.415 0.133 0.300 - - - 84.80 *84.80%

Satisfactory

Asugas Builders 32764 Construction and Completion of Multi-Pupose Building (Phase III) 03/14/09 IX 1.835 120 C 0.447 0.133 0.300 - - - 88.00 *88.00%

Satisfactory

Atlantic Construction 24232 Const. of 1 CL Std. Sch. Bldg. at Manaring E/S 02/26/08 II 0.473 35 C 0.318 0.200 0.300 - - - 81.80 *81.80%

V. Satisfactory

Atlantic Construction 24232 Const. of 1 H/S CL at Brgy. Cabannungan 05/20/08 II 0.421 55 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Atlantic Construction 24232 Const. of Sta. Maria MPB 03/02/09 II 3.816 120 C 0.410 0.200 0.300 - - - 91.00 82.04% Satisfactory

Atlantic Construction 24232 Rehab./Impvt. of Road Jct. Santiago-Tuguegarao to Sta. Maria Town Proper 03/02/09 II 4.765 146 C 0.406 0.200 0.300 - - - 90.60 85.38%

Satisfactory

Atlantic Construction 24232 Repair/Maintenance of Baculud River Control (Phase I) 08/13/08 II 0.743 35 C 0.320 0.200 0.300 - - - 82.00 *82.00%

V. Satisfactory

Atlantic Construction 24232Road Concreting of Brgys. Quibal, San Andres, Visitacion, San Roque and San

Juan03/02/09 II 4.772 120 C 0.389 0.200 0.300 - - - 88.90 84.10%

Satisfactory

Atlantic Construction 24232 Road Concreting of Sto. Tomas-Bagutari 11/18/08 II 2.865 70 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory

Atlantic Construction 24232 Construction of 2-CL Naguilian Bacolod E/S 09/05/09 II 1.816 60 C 0.482 0.133 0.300 - - - 91.50 *91.50% V. Satisfactory

Atlas Enterprises 4953 Construction of Cabanatuan-Gen. Trinidad Road 09/04/09 III 4.752 90 C 0.458 0.133 0.300 - - - 89.10 *89.10%

V. Satisfactory

ATR Construction 15968 Conc. of Roads at Quirino District 11/20/08 XI 1.884 75 C 0.195 0.300 0.300 - - - 79.50 *79.50% Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page53

Page 62:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

ATR Construction 15968 Concreting of Roads at Brgy., Tres De Mayo, Quirino St.-Perfect 03/07/09 XI 1.884 45 C 0.462 0.192 0.300 - - - 95.40 *95.40%

V. Satisfactory

ATR Construction 15968 Const. of Drainage along Digos-Makar Road 05/15/08 XI 4.701 90 C 0.393 0.200 0.300 - - - 89.30 90.68% Outstanding

Avatar Construction Company 31455 Const./Widening/Gravelling of Roads from Brgy. Glenville to Brgy. Gomez 06/02/09 XIII 1.902 234 C 0.497 0.169 0.300 - - - 96.60 *96.60%

Outstanding

Avatar Constructions Company 31455Rehab./Reconstruction of Damaged Paved National Road along Dinagat-Loreto Road

(San Jose Section)06/02/09 XIII 5.717 240 C 0.464 0.200 0.300 - - - 96.40 85.69%

Satisfactory

Avatar Constructions Company 31455 Completion of Brgy. Aurelio MPB 11/20/08 XIII 2.892 180 C 0.319 0.200 0.300 - - - 81.90 *81.90% V. Satisfactory

Avatar Constructions Company 31455 Completion of Road from Brgy. Mahayahay Road to Shrine Road 03/05/09 XIII 2.364 180 C 0.385 0.200 0.300 - - - 88.50 *88.50%

Satisfactory

Avatar Constructions Company 31455 Conc. of Dinagat-Loreto Road (San Jose-Mahayahay Section) 08/21/08 XIII 10.411 322 C 0.374 0.200 0.300 - - - 87.40 76.48%

Satisfactory

Avatar Constructions Company 31455 Const. of Sta. Cruz Beach Road 03/05/09 XIII 3.855 210 C 0.473 0.132 0.300 - - - 90.50 *90.50% V. Satisfactory

Avatar Constructions Company 31455 Const./Widening of Rds. From Brgy. Poblacion to Brgy. Jacquez 09/04/09 XIII 1.897 332 C 0.497 0.133 0.300 - - - 93.00 *93.00%

V.Satisfactory

Avatar Constructions Company 31455 Opening of Brgy. Matingbe - Brgy. Gomez Farm to Market Rd. 02/24/10 XIII 4.813 150 C 0.491 0.133 0.300 - - - 92.40 92.40%

V.Satisfactory

Avatar Constructions Company 31455 Road Conc. with Drainage along Jct. National Rd. to Brgy. Justiniana Rd. 02/24/10 XIII 4.773 210 C 0.473 0.133 0.300 - - - 90.60 90.00

V.Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page54

Page 63:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

Avatar Constructions Company 31455 Const. of MPB, Phase IV 06/03/10 XIII 14.473 210 O 0.379 0.300 0.150 0.030 0.050 0.033 94.20 -

Avatar Constructions Company 31455 Const./Conc. of Roads w/ Drainage System leading to San Jose MBP, Brgy. Don Ruben 08/25/10 XIII 9.263 180 O 0.390 0.238 0.150 0.030 0.045 0.050 90.30 -

Avatar Constructions Company 31455 Repair/Rehab. of Brgy. Sta. Cruz-Brgy. Wilson FMR 08/25/10 XIII 9.452 210 C 0.437 0.133 0.300 - - - 87.00 87.24%

Satisfactory

Aylan Construction & Trading 11884 Completion of Multi-Purpose Bldg. 06/05/10 VII 0.143 150 C 0.329 0.133 0.300 - - - 76.20 76.20% Unsatisfactory

Aylan Construction and Trading 11884 Rehab. of Commonwealth E/S & GSIS E/S 05/26/08 NCR 3.818 60 C 0.228 0.300 0.300 - - - 82.80 *82.80% V. Satisfactory

Aylan Construction and Trading 11884 Repair/Rehab. of Flora Ylagan H/S 02/29/08 NCR 0.710 45 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory

Aylan Construction and Trading 11884 Completion of Academic Bldg., San Roque Elem. School 09/10/09 NCR 9.591 90 C 0.337 0.133 0.300 - - - 77.00 *77.00%

Unsatisfactory

Aylan Construction and Trading 11884 Repair/Rehab. of Camp Crame High School, Brgy. Lipunan ng Crame 02/26/10 NCR 1.781 90 C 0.493 0.133 0.300 - - - 92.60 92.60%

V.Satisfactory

Aylan Construction and Trading 11884 Const. of MPB @ Monte Vista Subd. Brgy. Industrial Valley Complex 06/02/10 NCR 1.445 60 C 0.458 0.200 0.300 - - - 95.80 95.80%

V. Satisfactory

Aylan Construction and Trading 11884 Const./Completion of School Building @ Leodegario Victorino E/S 06/03/10 NCR 14.450 170 C 0.406 0.200 0.300 - - - 90.60 87.24%

Satisfactory

Aylan Construction and Trading 11884 Repair/Rehab. of Camp Crame E/S 08/16/10 NCR 0.654 75 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory

B B C Construction 16510 Const. of Multi-Purpose Building (Covered Court) Agusan National High School 06/10/09 XIII 3.737 150 C 0.478 0.200 0.300 - - - 97.80 *97.80%

Outstanding

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page55

Page 64:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

B L F Construction 15829 Const. of School Building (CNM) Phase III @Bataan, Peninsula State University 08/28/09 III 1.870 36 C 0.420 0.133 0.300 - - - 85.30 *85.30%

Satisfactory

B. Bernardo Construction 6196 Improvement of Farm-to-Market Road, Brgy. Catmon 06/01/09 III 3.524 90 C 0.446 0.200 0.300 - - - 94.60 *94.60%

V. Satisfactory

B. Bernardo Construction 6196 Conc. Reblocking of Pulilan-Calumpit Road 03/06/09 III 9.566 90 C 0.346 0.200 0.300 - - - 84.60 84.72% Satisfactory

B. Bernardo Construction 6196 Rehab. of Sumulong Highway 08/21/08 NCR 19.220 150 C 0.266 0.298 0.300 - - - 86.40 *86.40% V. Satisfactory

B. Bernardo Construction 6196 Completion of Riprapping along Malanday Creek, Brgy. Malanday 02/23/10 NCR 4.785 60 C 0.371 0.200 0.300 - - - 87.10 87.10%

Satisfactory

B. Bernardo Construction 6196 Const. of Two (2) Classroom School Bldg. (2nd Flr.) at Caypombo 08/28/10 III 2.623 100 C 0.482 0.089 0.300 - - - 87.10 87.10%

Satisfactory

B. Valencerena Trading & Construction 22147 Const./Impvt. of Various MPB, Brgy.

Teachers Village West 09/11/09 NCR 2.861 60 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory

B. Valencerina Trading & Construction 22147 Rehabilitation of Alley at Sweet Dreams

Compound, Brgy. Parang 05/28/09 NCR 0.675 90 C 0.389 0.133 0.300 - - - 82.20 *82.20% Satisfactory

B. Valencerina Trading & Construction 22147 Completion of MPB 11/18/08 NCR 1.903 60 C 0.375 0.252 0.300 - - - 92.70 *92.70%

Outstanding

B. Valencerina Trading & Construction 22147 Conc. of FMR, Brgy. San Pedro 11/17/08 I 1.637 50 C 0.243 0.200 0.300 - - - 74.30 *74.30%

Satisfactory

B. Valencerina Trading & Construction 22147 Rehab. of Road @ Sitio Anawin at Brgy.

San Isidro 03/06/08 IVA 0.957 30 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

B. Valencerina Trading & Construction 22147 Rehab. of Sch. Bldg. @ Brgy. San Rafael 11/27/08 IV-A 0.960 45 C 0.329 0.200 0.300 - - - 82.90 *82.90%

V. Satisfactory

B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose Building 06/10/10 IVA 0.994 45 C 0.472 0.200 0.300 - - - 97.20 97.20%

Outstanding

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page56

Page 65:  · 1 BACKGROUND: This report is prepared in connection with the implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010

NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUSCPES VISIT

RATINGWMS MTL TIME FAC*IMPL.

AGENCY

B. Valencerina Trading & Construction 22147 Rehab. of Hanging Bridge, Brgy. San Rafael 08/16/10 IVA 1.927 45 C 0.400 0.200 0.300 - - - 90.00 90.00%

V. Satisfactory

B. Valencerina Trading & Construction 22147 Const. of Road, Barangay Geronimo 08/16/10 IVA 1.919 45 C 0.356 0.200 0.300 - - - 85.60 85.60%

Satisfactory

B. Valencerina Trading and Construction 22147 Conc. of Bungon Farm-to-Market Road 02/22/10 I 1.927 75 C 0.293 0.133 0.300 - - - 72.60 72.60%

POOR

B. Valencerina Trading and Construction 22147 Const. of MPB., Brgy. Rosario 02/24/10 NCR 5.271 90 C 0.427 0.200 0.300 - - - 92.70 92.70%

V.Satisfactory

07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page57