Seismic Station Operator’s Guide To The Q330 Upgrade System

9 May 2011

Page 2: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

2

INDEX

Table of Contents Page

• Recording Room Equipment Rack 3• Stealth Station Computer 4• Keyboard & Newmar IPS 5• Main Circuit Breaker & 48 VDC Distribution 6• Exeltech Inverter & APC UPS 7• Vault / Wellhead Equipment 8• Q330 High Resolution Digitizer 9• Power Distribution Box (PDB) & Sensor Interface Box (SIB) 10• Auxiliary Vault Box (AVB) 11• ADAM Ethernet Switch & Ethernet Extender 12• Appendix A – UPS Switches and Indicators 13• Appendix B – UPS Battery Replacement Instructions 14• Appendix C – Procedures

– qmon - Seismic Equipment State of Health 15– Rebooting & Cycling power to the Stealth Computer 16

Page 3: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

3

Operators Guide to the IDA Q330 Upgrade System

Recording Room Equipment Rack

- Ethernet Switch- Thumb Drive Port- Stealth Station Computer- Monitor/Keyboard- Newmar IPS- 48 VDC Distribution- Main Circuit Breaker- APC UPS- Isolation Transformer- Exeltech Inverter

Page 4: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

4

Normal Switch Position & indicators

Stealth Station ComputerNormal Conditions

a. Ethernet Port – Link indicator on Green.

b. Ethernet Port – Activity indicator on yellow and flashing

c. Power & Disk Activity -indicator Green when Stealth power applied, indicator flashes red every 6 to 12 seconds showing disk activity.

NOTE: Stealth computer will boot to Login prompt when power is first applied.

For Login Instructions and general information on station equipment State of Health, see Appendix C

Page 5: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

5

Normal Switch Position & indicators

KeyboardNormal Conditions

Keyboard – a. NUM lock indicator “ON”If indicator off press Num Lock key (see picture for reference)

• Newmar IPS • Normal Conditions

a. “AC Input” switch ON (in up position)b. “AC OK” indicator ONc. Meter Select switch in “OUT” position (Volts) d. LCD meter displays “-54.4” (Newmar output volts)e. Rectifier Status – Internal indicator “ON”.f. Battery Contactor Closed indicator “ON”.

Page 6: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

6

Normal Switch Position & indicators

• Main Circuit Breaker

• Normal Conditions• a. Circuit Breaker switch in up

(“ON”) position• b. Indicator light “ON” when

Station AC Mains power is on.

• 48 VDC Distribution

• Normal Conditions• a. Green indicator lamp “ON”

indicates 54.4 V available to Exeltech Inverter and vault equipment.

• b. Fuse is 5A slo-blo (Bussman MDL-5-R or Equivalent)

• c. Spare 5A slo-blo fuses

Page 7: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

7

Normal Switch Position & indicators

• Exeltech Inverter –

• Normal conditions • a. Toggle Switch in “ON”

position.• b. Indicator light “ON”

• APC Uninterruptible Power System (UPS)

• Normal Conditions• a. “On Line” LED (Sine wave

label) is “ON” when UPS is supplying power to connected equipment.

• b. “Battery Charge” - The 5 vertical LED’s are “ON” when the UPS battery is 100% charged

• c. Description for other APC UPS indicators in Appendix A

Page 8: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

8

Vault/Wellhead Equipment

Vault/Wellhead Equipment

• 1. Q330’s – High Resolution Digitizers (qty. 2 per station)

• 2. Power Distribution Box (PDB)• 3. Sensor Interface Box (SIB)• 4. Metrozet E300 ( Vault site with

STS-1 seismometers only)• 5. Auxiliary Vault/Wellhead Box

(AVB)

Page 9: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

9

Normal Switch Position & indicators

• Q330 High Resolution Digitizer• Normal Conditions –• Status Indicators

– A. SYSTEM - Flashes GREEN about every 6 seconds– B. GPS SYSTEM – On solid YELLOW– C. DATA – Flashes YELLOW at irregular intervals– E. LINK OK – On solid Green

Fault Indicators – A. DATACOMM

1. Q330-00 DATACOMM indicator is OFF2. Q330-10 DATACOMM indicator Flashes RED about every 7 – 10

secondsB. CPU - OFFC. BOOT - OFFE. GPS - OFFF. ANALOG - OFFG. PRIMARY - OFFH. OVER-CURRENT - OFF

Page 10: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

10

Normal Switch Position & indicators

• POWER DISTRIBUTION BOX (PDB)

• Normal Conditions• A. 44 – 54 VDC indicator ON solid RED.

• SENSOR INTERFACE BOX (SIB)

• Normal Conditions• A. The SIB is powered only in borehole

applications and left un-powered in Vault/STS-1 applications.

• B. In the powered application, the LCD meter will display the Internal supply voltages of the SIB according to the switch position.

• +/- 15 VDC• +24 VDC• +/- 12 VDC

Page 11: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

11

Normal Switch Position & indicators

• Auxiliary Vault Box (AVB)

• Adam Ethernet Switch• Digi-One Sp• Ethernet Extender• Ethernet Surge Protector• Sola DC/DC Converter

– 12 VDC (Adam Switch)– +/- 15 V (Metrozet E300)

Page 12: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

12

Normal Switch Position & indicators

• Auxiliary Vault Box (AVB)

• ADAM Ethernet Switch• Normal Operation

– Power Indicator – On solid Green– Ethernet Ports

• Link/Speed Indicator – Green and flashing or Orange and flashing

• Ethernet Extender• Normal Operation• Line Indicators

– Link – On solid– TX – Flashing– RX – Flashing

• Ethernet Indicators– Link – On solid– 100 – On solid– TX – Flashing– RX – Flashing

MDI-X Switch“IN” Position

Page 13: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

13

Appendix A UPS Front Panel Indicators

»

• Load - % of UPS power used by load (17%, 33%, 50%, 67% & 85%)• AVR Trim – UPS compensating for high utility voltage• Online – UPS supplying utility power to the load• AVR Boost – UPS compensating for low utility voltage• Power On – Press and release. Turns the UPS “ON”• Power Off – Press and release. Turns the UPS “OFF”• Overload – Overload Condition. The UPS emits a sustained alarm tone. • On Battery – UPS supplying battery power to connected equipment.• Replace Battery – Battery failure. UPS emits short beeps for one minute.• Battery Charge – Present charge of the UPS battery. (0%, 40%, 60%,

80% & 100%). When all five LED’s lit, UPS battery is fully charged.

Page 14: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

14

Appendix B

UPS Battery Replacement

• 1. Face the front of the UPS to remove the bezel. Use both hands and grasp the finger clips on either side of the bezel. Pull toward you. The bezel will unsnap. Set the bezel aside

• 2. Use a screwdriver to remove the two battery door screws and open

• the door (hinged panel). Set the screws aside in a safe place. You will replace them later.

• 3. To disconnect the battery, take out the white cord that is tucked into the space above the battery. This cord serves as a handle for the connector. Grasp the cord and pull firmly toward you.

• 4. Be careful during this step—the battery module is heavy. Pull the battery module out of the UPS by pulling the clear label, not the white cord.

• 5. Install the replacement battery by following the above directions in reverse order.

Page 15: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

15

Appendix C Procedures

• qmon - Seismic Equipment State of Health

• To determine whether or not the high resolution digitizers in the vault (or at the wellhead) are sending data to the station computer, do the following;

• At the login prompt on the station computer keyboard, type the usr name and <Enter> followed by the password and <Enter>. Usr name = ________ : Password = ___________At the nrts@sta prompt, type qmon followed by <Enter>

• The monitor screen should now look like the display above.• Normal operation of the digitizer q330-00 will show the Data Port 1 Data Sent

counter incrementing.• Press the key. This will toggle the display and show the q330-10 digitizer status.• Normal operation of digitizer q330-10 will show the Data Port 1 Data Sent counter

incrementing.• Type quit to exit qmon• You should have the nrts@ffc prompt displayed at the bottom of the screen.• logout of the station computer by typing logout.

Page 16: 1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011

16

Appendix C(cont’d)

Procedures

• Rebooting, Cycling Power & turning off the Stealth Station Computer

• Turning off the Station Computer:– Note, if you need to turn off the computer, first execute the

shutdown procedure by logging in as user nrts and executing the following command;

– sudo init 0

• Cycling Power & Rebooting the Station Computer– To Reboot – Type the command sudo shutdown -r now – To Cycle Power – Type the command sudo shutodown -h now

• [ lots of messages will now scroll down the screen] Power to the Stealth can be removed when the following messages are displayed,

• “The operating system has been halted”• “Press any key to reboot”

• Once the power cord is disconnected, wait 10 seconds, then reconnect the power cord to the Stealth. The station computer will boot to the login prompt and the power cycle is complete.