9
December 2015 6-1 Encina MOT Decommissioning Project MND 6.0 MND PREPARATION SOURCES AND REFERENCES 1 This Mitigated Negative Declaration (MND) was prepared by the staff of the California 2 State Lands Commission’s (CSLC) Division of Environmental Planning and 3 Management (DEPM), with the assistance of Padre Associates, Inc. The analysis in the 4 MND is based on information identified, acquired, reviewed, and synthesized based on 5 DEPM guidance and recommendations. 6 6.1 CSLC STAFF 7 Project Manager: Kelly Keen, Environmental Scientist, DEPM 8 Other: Eric Gillies, Assistant Chief, DEPM 9 Cy R. Oggins, Chief, DEPM 10 6.2 SECTION AUTHORS AND/OR REVIEWERS Name and Title Affiliation MND Sections Simon Poulter, Principal Padre All Donna Hebert, Project Manager Padre All Matthew Ingamells, Senior Biologist Padre Terrestrial Biology, Air Quality, Greenhouse Gases Ray de Wit, Senior Marine Scientist Padre Marine Biology, Commercial Fisheries Jennifer Leighton, Environmental Specialist Padre Environmental Justice Patrick Crooks, Environmental Specialist Padre Air Quality, Greenhouse Gases, Commercial Fisheries 6.3 REFERENCES CITED 11 Aerotecnica Coltri, S.p.A. 2014. MCH-6 Portable Compressors. Available at: 12 www.coltrisub.it/MAIN/CATALOGUES/mch6_portable_eng/files/assets/common/do 13 wnloads/mch6_portable_eng.pdf. 14 Agua Hedionda Lagoon Foundation. 2014. Agua Hedionda Lagoon Foundation 15 Website. Available at: www.aguahedionda.org. Accessed November 19, 2014. 16 Ainslie, Dr. M. A., et al. 2009. TNO Report: Assessment of Natural and Anthropogenic 17 Sound Sources and Acoustic Propagation in the North Sea. 18 Cabrillo Power I LLC. 2008. Project No 13-7370, Drawing No. S-107, Encina Power 19 Plant Offshore Tanker Mooring. 20 California Air Resources Board (CARB). 2014. Top 4 Summary: Highest 4 Daily 21 Maximum 8-Hour Ozone Averages Website. Available at: 22 www.arb.ca.gov/adam/topfour/topfour1.php. Accessed November 12, 2014. 23

1 6.0 MND PREPARATION SOURCES AND REFERENCES · 9/6/2018  · 32 California. Prepared for NRG Cabrillo Power Operations Inc., February 2013. 33 John Minch and Associates, Inc. 2013

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1 6.0 MND PREPARATION SOURCES AND REFERENCES · 9/6/2018  · 32 California. Prepared for NRG Cabrillo Power Operations Inc., February 2013. 33 John Minch and Associates, Inc. 2013

December 2015 6-1 Encina MOT DecommissioningProject MND

6.0 MND PREPARATION SOURCES AND REFERENCES1

This Mitigated Negative Declaration (MND) was prepared by the staff of the California2

State Lands Commission’s (CSLC) Division of Environmental Planning and3

Management (DEPM), with the assistance of Padre Associates, Inc. The analysis in the4

MND is based on information identified, acquired, reviewed, and synthesized based on5

DEPM guidance and recommendations.6

6.1 CSLC STAFF7

Project Manager: Kelly Keen, Environmental Scientist, DEPM8

Other: Eric Gillies, Assistant Chief, DEPM9

Cy R. Oggins, Chief, DEPM10

6.2 SECTION AUTHORS AND/OR REVIEWERS

Name and Title Affiliation MND Sections

Simon Poulter, Principal Padre AllDonna Hebert, Project Manager Padre All

Matthew Ingamells, Senior Biologist PadreTerrestrial Biology, Air

Quality, Greenhouse Gases

Ray de Wit, Senior Marine Scientist PadreMarine Biology, Commercial

FisheriesJennifer Leighton, Environmental Specialist Padre Environmental Justice

Patrick Crooks, Environmental Specialist PadreAir Quality, Greenhouse

Gases, Commercial Fisheries

6.3 REFERENCES CITED11

Aerotecnica Coltri, S.p.A. 2014. MCH-6 Portable Compressors. Available at:12www.coltrisub.it/MAIN/CATALOGUES/mch6_portable_eng/files/assets/common/do13wnloads/mch6_portable_eng.pdf.14

Agua Hedionda Lagoon Foundation. 2014. Agua Hedionda Lagoon Foundation15Website. Available at: www.aguahedionda.org. Accessed November 19, 2014.16

Ainslie, Dr. M. A., et al. 2009. TNO Report: Assessment of Natural and Anthropogenic17Sound Sources and Acoustic Propagation in the North Sea.18

Cabrillo Power I LLC. 2008. Project No 13-7370, Drawing No. S-107, Encina Power19Plant Offshore Tanker Mooring.20

California Air Resources Board (CARB). 2014. Top 4 Summary: Highest 4 Daily21Maximum 8-Hour Ozone Averages Website. Available at:22www.arb.ca.gov/adam/topfour/topfour1.php. Accessed November 12, 2014.23

Page 2: 1 6.0 MND PREPARATION SOURCES AND REFERENCES · 9/6/2018  · 32 California. Prepared for NRG Cabrillo Power Operations Inc., February 2013. 33 John Minch and Associates, Inc. 2013

MND Preparation Sources and References

Encina MOT Decommissioning 6-2 December 2015Project MND

California Climate Action Registry (CCAR). 2009. California Climate Action Registry1General Reporting Protocol Reporting Entity-Wide Greenhouse Gas Emissions2Version 3.1.3

California Department of Fish and Wildlife (CDFW). 2014. California Grunion4Information – California Grunion Facts and Expected Runs. Available at:5https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=36316&inline=true. Accessed6November 5, 2014.7

. 2015a. Commercial Digest: California Fishing Regulations, 2015-2016. Available8at: https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=94111&inline=true.9Accessed June 2, 2015.10

. 2015b. Dungeness Crab of California and Its Close Relatives Website. Available11at: www.dfg.ca.gov/marine/dungeness_crab.asp. Accessed June 2, 2015.12

. 2015c. Life History Information for Selected California Marine Invertebrates and13Plants Website. Available at: www.dfg.ca.gov/marine/table_inv.asp. Accessed June144, 2015.15

. 2015d. Barred Sandbass Spawning Movements and Habitat Characterization16Website. Available at: https://www.dfg.ca.gov/marine/scfrmp/bsbspawning.asp.17Accessed June 2, 2015.18

. Unpublished. Commercial and recreational fish catch data (Fish Blocks 821 and19822; 2008 through 2012). Provided via e-mail to Padre Associates from CDFW,20Fisheries Statistics Division, Los Alamitos, CA.21

California Department of Fish and Wildlife (CDFW) Office of Spill Prevention and22Response (OSPR). 2008. Introduced Aquatic Species in the Marine and Estuarine23Waters of California (December 2008). Available at:24www.marine.gov/Research/2008_Marine_Invasive_Species_Legislative_Report_Fin25al%20.pdf. Accessed November 3, 2014.26

. 2014. 2014 Triennial Report on the California Department of Fish and Wildlife’s27

Marine Invasive Species Program (November 2014). Available at:28

https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=91995. Accessed October 1,29

2015.30

California Department of Transportation (Caltrans). 2011. Traffic and Vehicle System31Data Unit, 2011 All Traffic Volumes on CSHS Website. Available at: http://traffic-32counts.dot.ca.gov/2011all/. Accessed November 18, 2014.33

. 2013. I-5 North Coast Corridor Project Final EIR/EIS.34

. 2014. Interstate 5 North Coast Express Lanes Project Fact Sheet.35

Page 3: 1 6.0 MND PREPARATION SOURCES AND REFERENCES · 9/6/2018  · 32 California. Prepared for NRG Cabrillo Power Operations Inc., February 2013. 33 John Minch and Associates, Inc. 2013

MND Preparation Sources and References

December 2015 6-3 Encina MOT DecommissioningProject MND

California Energy Commission (CEC). 2009. Carlsbad Energy Center Project: Final1Staff Assessment. Application for Certification (07-AFC-6), San Diego County.2

California Geological Survey. 2012a. Aggregate Sustainability in California.3

. 2012b. Aggregate Sustainability in California – Fifty-Year Aggregate Demand4Compared to Permitted Aggregate Reserves. Map Sheet 52 (Updated 2012).5

California State Lands Commission (CSLC). 2004. Final Environmental Impact Report6Revised PRC-421 Pier Removal Project. Chapter 4.6, Noise, p. 4.6-6.7

. 2005. Agua Hedionda Lagoon Northern Inlet Jetty Restoration and Renewal of8CSLC Lease Project Environmental Impact Report/Environmental Assessment,9Section 4.2, Hydrology and Water Quality.10

. 2013. California State Lands Commission Shipwreck Database. Available at:11http://shipwrecks.slc.ca.gov/ShipwrecksDatabase/Shipwrecks_Database.asp.12Accessed January 16, 2013.13

. 2014. About the Marine Invasive Species Program Webpage. Available at:14www.slc.ca.gov/spec_pub/mfd/ballast_water/About_The_Program.html. Accessed15May 29, 2014.16

CalRecycle. 2015. Facility/Site Summary Details: West Miramar Sanitary Landfill (37-17AA-0020). Available at: www.calrecycle.ca.gov/SWFacilities/Directory/37-AA-180020/Detail. Accessed May 21, 2015.19

Carlsbad Desalination Project. 2014. Carlsbad Desalination Project Website. Available20at: http://carlsbaddesal.com/desalination-plant1. Accessed November 6, 2014.21

Carlsbad Energy Center, LLC. 2014a. Petition to Amend Carlsbad Energy Center22Project. Prepared by CH2MHill.23

Carlsbad Housing and Redevelopment Commission. 2005 (amended). South Carlsbad24Redevelopment Project Redevelopment Plan.25

Carlsbad Unified School District. 2014. MySchoolLocator for Carlsbad Unified School26District. Available at: http://locator.decisioninsite.com/?studyID=104029. Accessed27November 11, 2014.28

City of Carlsbad. 1994. General Plan: Noise Element.29

. 1995. Noise Guidelines Manual.30

. 2003. General Plan: Parks and Recreation Element.31

. 2004 (amended, originally adopted 1999). Habitat Management Plan for Natural32Communities in the City of Carlsbad.33

Page 4: 1 6.0 MND PREPARATION SOURCES AND REFERENCES · 9/6/2018  · 32 California. Prepared for NRG Cabrillo Power Operations Inc., February 2013. 33 John Minch and Associates, Inc. 2013

MND Preparation Sources and References

Encina MOT Decommissioning 6-4 December 2015Project MND

. 2005. Final Environmental Impact Report (EIR 03-05) Precise Development Plan1and Desalination Plant Project: Biological Resources. State Clearinghouse No.22004041081. Prepared with the assistance of Dudek and Associates, Inc.3

. 2006 (amended). General Plan: Open Space and Conservation Element.4

. 2010a (amended, originally adopted 1982). City of Carlsbad Local Coastal5Program.6

. 2010b (updated, originally adopted 1982). Agua Hedionda Land Use Plan.7

. 2012a. General Plan: Land Use Map. Updated May 2012.8

. 2012b. Zoning Map. Plotted May 2012.9

. 2013a (amended). General Plan: Land Use Element.10

. 2013b (amended). General Plan: Circulation Element.11

. 2014a (amended, originally adopted 2006). Encina Power Station Precise12Development Plan.13

. 2014b. Draft General Plan: Housing Element.14

. 2015a. Climate Action Plan.15

. 2015b. Fire Department. Available at: www.carlsbadca.gov/services/depts/fire/.16Accessed May 21, 2015.17

. 2015c. Fire Stations Map Webpage. Available at:18http://ccmaps.carlsbadca.gov/facilities/index.html. Accessed May 21, 2015.19

. 2015d. Police Department. Available at:20www.carlsbadca.gov/services/depts/police. Accessed May 21, 2015.21

. Undated(a). General Plan: Public Safety Element.22

. Undated(b). Emergency Planning. Available at:23www.carlsbadca.gov/services/depts/fire/emergency/planning/default.asp. Accessed24November 13, 2014.25

. Undated(c). Comparison of Proposed and Existing General Plan Goals and26Policies. Available at:27www.carlsbadca.gov/civicax/filebank/blobdload.aspx?BlobID=26337. Accessed28March 16, 2015.29

City of San Diego. 2015. Miramar Landfill. Available at:30www.sandiego.gov/environmental-services/miramar/index.shtml. Accessed May 21,312015.32

Page 5: 1 6.0 MND PREPARATION SOURCES AND REFERENCES · 9/6/2018  · 32 California. Prepared for NRG Cabrillo Power Operations Inc., February 2013. 33 John Minch and Associates, Inc. 2013

MND Preparation Sources and References

December 2015 6-5 Encina MOT DecommissioningProject MND

Conejo Archaeological Consultants (Conejo). 2013. Letter report to Padre Associates,1Inc. Records Search Results for the Cabrillo I LLC Encina Site Marine Oil Terminal2Abandonment Plan, City of Carlsbad, San Diego County, January 21, 2013.3

County of San Diego. 2012. Climate Action Plan.4

County of San Diego Airport Land Use Commission. 2010. McClellan-Palomar Airport5Land Use Compatibility Plan.6

County of San Diego Department of Environmental Health, Land and Water Quality7Division. 2005. Letter to Ms. Barbara Montgomery, San Diego Gas & Electric re:8Voluntary Assistance Program, File H13941-003, March 18, 2005.9

___. 2015. Letter to Mr. Stephen Hoffmann regarding Voluntary Assistance Program,10File #H13941-005, March 23, 2015.11

County of San Diego Land Use and Environment Group. 2007. County of San Diego12Guidelines for Determining Significance and Report Format and Content13Requirements – Air Quality.14

___. 2013. County of San Diego Guidelines for Determining Significance and Report15Format and Content Requirements – Climate Change.16

Drew, P. 2015. City of Carlsbad personal communication with D. Hebert, Padre17Associates, Inc., July 10, 2015.18

Fugro Pelagos, Inc. 2013. Cabrillo Power I LLC Encina Power Station Bathymetry and19Geophysical Survey, Bathymetry and Surficial Features, April 2013.20

Geldert, J. 2014. City of Carlsbad telephone communication with Donna Hebert, Project21Manager, Padre Associates Inc., July 7, 2014.22

Grebner, D.M. and K.H. Kim. 2015. Underwater Noise Impacts of Encina23Decommissioning, Carlsbad, California, 2015. Greeneridge Sciences Rep. 518-1.24Report from Greeneridge Sciences, Inc., Santa Barbara, CA for Padre Associates,25Inc., Ventura, CA.26

Hastings, M.C., and A.N. Popper. 2005. Effects of Sound on Fish. Report for California27Department of Transportation, Sacramento, CA. Final Report #CS05-0537, Project28P476 Noise thresholds for endangered fish. 85p.29

Jenkins, S.A. 2013. Technical Memorandum: Shoreline Evolution Analysis of Impacts30Related to Removal of the South Beach Groin at Encina Power Station, Carlsbad,31California. Prepared for NRG Cabrillo Power Operations Inc., February 2013.32

John Minch and Associates, Inc. 2013. A Cultural Resources Evaluation of the Cabrillo33Power I LLC Encina Site Offshore Marine Oil Terminal, Carlsbad, San Diego34County, February 19, 2013.35

Page 6: 1 6.0 MND PREPARATION SOURCES AND REFERENCES · 9/6/2018  · 32 California. Prepared for NRG Cabrillo Power Operations Inc., February 2013. 33 John Minch and Associates, Inc. 2013

MND Preparation Sources and References

Encina MOT Decommissioning 6-6 December 2015Project MND

Keep San Diego Moving Transnet. 2015. Coastal Rail Website. Available at:1www.keepsandiegomoving.com/Lossan/lossan-carlsbad-double-track.aspx.2Accessed January 8, 2015.3

Kennedy, B. 2014. City of Carlsbad personal communication with D. Hebert, Padre4Associates, Inc., November 12, 2014.5

Kim, J. 2014. City of Carlsbad personal communication with D. Hebert, Padre6Associates, Inc., January 6, 2014.7

Le Page, S. and R. Ware. 2001. Marine Biological Investigations for the Jetty8Restoration Project at Agua Hedionda Lagoon. Prepared for Cabrillo Power I, LLC.9

MBC Applied Environmental Sciences. 2012. Status of the Kelp Beds 2011 - San Diego10and Orange County Region Nine Kelp Survey Consortium.11

Merkel & Associates, Inc. 2013a. Encina Power Station Marine Biological Resources12Survey to Support the Project to Abandon or Remove the Marine Oil Terminal13Facilities. Prepared for Cabrillo Power I, LLC, February 2013.14

___. 2013b. Encina Power Plant Receiving Water Monitoring Program: Fall 201215Monitoring Results. Prepared for Cabrillo Power I, LLC, January 2013.16

National Research Council of the National Academies. 2003. Committee on Potential17Impacts of Ambient Noise in the Ocean on Marine Mammals, Ocean Studies Board,18Division on Earth and Life Studies. Ocean Noise and Marine Mammals.19

National Oceanic and Atmospheric Administration (NOAA). 2015. DRAFT Guidance for20assessing the effects of anthropogenic sound on marine mammals: Underwater21acoustic threshold levels for onset of permanent and temporary threshold shifts,22July 23, 2015. Available at:23www.nmfs.noaa.gov/pr/acoustics/draft%20acoustic%20guidance%20July%202015.24pdf. Accessed September 24, 2015.25

NOAA Habitat Conservation National Marine Fisheries Service. 2015. Habitat Protection26– Essential Fish Habitat Text Descriptions & Geographic Information System Data27Inventory for the Pacific Region Website. Available at:28www.habitat.noaa.gov/protection/efh/newInv/index.html. Accessed June 2, 2015.29

Native American Heritage Commission. 2013. Letter to Conejo Archaeological30Consultants, January 11, 2013. Sacred Lands File Search and Native American31Contacts List for the proposed NRG Cabrillo Power I LLC Encina Site Marine Oil32Terminal Abandonment Planning Project Located Off The Coast Near Agua33Hedionda Lagoons, San Diego County, California.34

Natural Resources Conservation Service. 2013. Custom Soil Resource Report for San35Diego County Area, California. Available at:36

Page 7: 1 6.0 MND PREPARATION SOURCES AND REFERENCES · 9/6/2018  · 32 California. Prepared for NRG Cabrillo Power Operations Inc., February 2013. 33 John Minch and Associates, Inc. 2013

MND Preparation Sources and References

December 2015 6-7 Encina MOT DecommissioningProject MND

http://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm. Accessed January 21,12013.2

Pacific Fishery Management Council. 1998. Amendment 8 to the Northern Anchovy3Fishery Management Plan incorporating a name change to: The Coastal Pelagic4Species Fishery Management Plan. Appendix D – Description and Identification of5Essential Fish Habitat for the Coastal Pelagic Species Fishery Management Plan.6

___. 2003. U.S. West Coast Highly Migratory Life History Accounts and Essential Fish7Habitat Descriptions. Highly Migratory Species Fish Management Plan (HMS FMP):8Appendix F.9

___. 2005. Pacific Coast Groundfish Fishery Management Plan for the California,10Oregon, and Washington Groundfish Fishery: Amendment 18 (Bycatch Mitigation11Program) and Amendment 19 (Essential Fish Habitat).12

___. 2011. Coastal Pelagic Species Fishery Management Plan as amended through13Amendment 13.14

___. 2014. Pacific Coast Groundfish Fishery Management Plan for the California,15Oregon, and Washington Groundfish Fishery.16

Popper, A.N. 2003. Effects of anthropogenic sound on fishes. Fisheries, 28(10):24-31.17

Popper, A. N., A. D. Hawkins, R. R. Fay, D. A. Mann, S. Bartol, T. J. Carlson, S.18Coombs, W. T. Ellison, R. L., Gentry, M. B. Halvorsen, S. Lokkeborg, P. H. Rogers,19B. L. Southall, D. G. Zeddies, and W. N. Tavolga. 2014. Sound exposure guidelines20for fishes and sea turtles: A technical report prepared by ANSI-Accredited21Standards Committee S3/SC1 and registered with ANSI, ASA S3/SC1.4 TR-2014.22ASA Press and Springer Briefs in Oceanography, U.S.A. 73p.23

Port of Long Beach (POLB). 2007. Port of Long Beach Air Emissions Inventory (2005).24Prepared by Starcrest Consulting Group. Available at:25www.polb.com/environment/air/emissions.asp. Accessed June 9, 2014.26

___. 2011. Port of Long Beach Air Emissions Inventory (2010). Prepared by Starcrest27Consulting Group. Available at28www.polb.com/civica/filebank/blobdload.asp?BlobID=8561. Accessed June 9, 2014.29

Ramcharitar, J., Higgs, D. M., and A. N. Popper. 2001. Sciaenid inner ears: A study in30diversity. Brain Behav. Evol. 58: 152-162.31

Rincon Consultants, Inc. 2013. Addendum No. 4 to the December 2009 Interim32Remediation Work Plan and Addendum to VAP #113941-004 for the Encina Power33Station, Carlsbad California, Cabrillo Power I LLC. August 14, 2013.34

___. 2014a. Results of Soil and Groundwater Sampling Activities near the35Administration Building and Work Plan to Conduct Groundwater Monitoring and36

Page 8: 1 6.0 MND PREPARATION SOURCES AND REFERENCES · 9/6/2018  · 32 California. Prepared for NRG Cabrillo Power Operations Inc., February 2013. 33 John Minch and Associates, Inc. 2013

MND Preparation Sources and References

Encina MOT Decommissioning 6-8 December 2015Project MND

Reporting Activities, Encina Power Station, Carlsbad, California, Cabrillo Power,1LLC, February 14, 2014.2

___. 2014b. Letter Report to Nasser Sionit regarding Soil Assessment and Remediation3– Phase 4 Area Encina Power Station, Carlsbad, California, Cabrillo Power I LLC.4

Royal Environmental Services, Inc. 2013. Letter Report Regarding Pre-Demolition5Asbestos and Lead Paint Survey Encina Power Station Marine Terminal, Carlsbad,6California, February 12, 2013.7

San Diego Association of Governments. 2003. Final Multiple Habitat Conservation8Program: Executive Summary. Prepared by AMEC Earth and Environmental, Inc.9and Conservation Biology Institute, March 2013.10

___. 2014. 2050 Regional Transportation Plan Webpage. Available at:11www.sandag.org/index.asp?projectid=349&fuseaction=projects.detail. Accessed12November 19, 2014.13

San Diego County Office of Emergency Services. 2010. Unified San Diego County14Emergency Services Organization Operational Area Emergency Plan.15

San Diego Gas and Electric Environmental Analysis Laboratory. 2010. Analytical Report16re: Encina Mooring Caretaker Status Including Laboratory Analysis Of Pipeline17Flush Water, September 29, 2010.18

Schultze, D. L. 1983. California Barracuda Life History, Fisheries and Management.19

Southall, B.L., A.E. Bowles, W.T. Ellison, J.J. Finneran, R.L. Gentry, C.R. Greene, Jr.,20D. Kastak, D.R. Ketten, J.H. Miller, P.E. Nachtigall, W.J. Richardson, J.A. Thomas,21and P.L. Tyack. 2007. Marine mammal noise exposure criteria: Initial scientific22recommendations. Aquatic Mammals 33:411-521.23

State Water Resources Control Board (SWRCB). 2010. 2010 303(d) List USEPA24Approved with Sources. Available at:25www.waterboards.ca.gov/water_issues/programs/tmdl/integrated2010.shtml.26Accessed February 2013.27

___. 2012. Water Quality Control Plan Ocean Waters of California (California Ocean28Plan).29

___. 2014a. GeoTracker SLT19726861 Case Summary. Accessed November 11, 2014.30

___. 2014b. GeoTracker SLT19726861 List of Documents. Accessed November 11,312014.32

___. 2014c. GeoTracker SLT19726861 Map Screenshot. Accessed November 11,332014.34

Page 9: 1 6.0 MND PREPARATION SOURCES AND REFERENCES · 9/6/2018  · 32 California. Prepared for NRG Cabrillo Power Operations Inc., February 2013. 33 John Minch and Associates, Inc. 2013

MND Preparation Sources and References

December 2015 6-9 Encina MOT DecommissioningProject MND

___. 2015. GeoTracker Website. Available at: http://geotracker.waterboards.ca.gov/.1Accessed July 10, 2015.2

TNO. 2008. TNO-DV 2007 A598 Review of Published Thresholds for Human Divers3Exposed to Underwater Sound.4

TT Technologies, Inc. 2014. TT Rammers and Noise Information. Mark Steffy,5Longitude 123, Inc. with Donna Herbert, Project Manager, Padre Associates, Inc.,6March 14, 2014.7

U.S. Census Bureau. 2014a. Tract Map Database. Map 05. Available at:8www2.census.gov/geo/maps/dc10map/tract/st06_ca/c06073_san_diego. Accessed9November 4, 2014.10

. 2014b. Tables DP-1 - Profile of General Population and Housing Characteristics,112010. Census Tract 178.13, San Diego County, City of Carlsbad, City of Oceanside,12San Diego County. Available at: http://factfinder2.census.gov. Accessed November134, 2014.14

. 2014c. Tables DP03-Selected Economic Characteristics, 2008-2012 American15Community Survey 5-Year Estimates. Census Tract 1. Available at:16http://factfinder2.census.gov. Accessed November 4, 2014.17

. 2014d. Tables DP03-Selected Economic Characteristics. 2013 American18Community Survey 1-Year Estimates. City of Carlsbad, City of Oceanside, San19Diego County. Available at: http://factfinder2.census.gov. Accessed November 4,202014.21

U.S. Coast Guard (USCG). 2015. USCG Station San Diego. Available at:22www.military.com/base-guide/us-coast-guard-station-san-diego. Accessed May 21,232015.24

Wartzok, D. and D.R. Ketten. 1999. Marine mammal sensory systems. Pages 117-17525in J.E. Reynolds III and S.A. Rommel, eds. Biology of Marine Mammals.26Washington, D.C.: Smithsonian Institution Press.27