4POWER KICK-OFF MEETINGRostock 30-31 May - 2012

Stefania Sabba (Councillor of the Environment) Alberto Rossini, Claudia Ozzi, Claudia BerrettaProvince of RiminiMobility and “Wide Areas projects” Department

Page 2: 1 4POWER KICK-OFF MEETING Rostock 30-31 May - 2012 Stefania Sabba (Councillor of the Environment) Alberto Rossini, Claudia Ozzi, Claudia Berretta Province

Ufficio Energia - Servizio Progetti di area vasta e mobilità di sistema 2

Off-Shore Wind Experience level

In 2008 the Province of Rimini started a monitoring project of the anemometric conditions for collecting data in order to assess the energy potential of the OFW in the Adriatic Sea

In 2008 the Province of Rimini started a monitoring project of the anemometric conditions for collecting data in order to assess the energy potential of the OFW in the Adriatic Sea

OFF-SHORE OFF-SHORE ITALIAN potential ITALIAN potential

sitessites

Page 3: 1 4POWER KICK-OFF MEETING Rostock 30-31 May - 2012 Stefania Sabba (Councillor of the Environment) Alberto Rossini, Claudia Ozzi, Claudia Berretta Province

Ufficio Energia - Servizio Progetti di area vasta e mobilità di sistema 3

Off-Shore Wind Experience levelThe Province of Rimini has set up a cooperation with

ENI (Hydrocarbon National Body) placing the anemometers and supporting computer technologies on the off-shore ENI Azalea B platform.

The Province of Rimini has set up a cooperation with ENI (Hydrocarbon National Body) placing the anemometers and supporting computer technologies on the off-shore ENI Azalea B platform.Since 14/01/2011 “Energia 2020 s.r.l.” Company has cooperated with the Province of Rimini for the assignment to the Province of wind monitoring electronics equipment (LIDAR Zephir 300) in free- use commodatum.

Since 14/01/2011 “Energia 2020 s.r.l.” Company has cooperated with the Province of Rimini for the assignment to the Province of wind monitoring electronics equipment (LIDAR Zephir 300) in free- use commodatum.The initial steps of the project are:

• Wind average speed measurement at different heights; • Distribution of the wind rose at different heights; • Analysis of turbulences of the vertical profile.

The initial steps of the project are: • Wind average speed measurement at different heights; • Distribution of the wind rose at different heights; • Analysis of turbulences of the vertical profile.

The aim is to survey the opportunity of realising a Off-Shore Wind farm in the area facing the Rimini coast.

The aim is to survey the opportunity of realising a Off-Shore Wind farm in the area facing the Rimini coast.

Page 4: 1 4POWER KICK-OFF MEETING Rostock 30-31 May - 2012 Stefania Sabba (Councillor of the Environment) Alberto Rossini, Claudia Ozzi, Claudia Berretta Province

Ufficio Energia - Servizio Progetti di area vasta e mobilità di sistema 4

Off-Shore Wind Experience level

Azalea Platform

To be placed in Summer 2012

Operating

Page 5: 1 4POWER KICK-OFF MEETING Rostock 30-31 May - 2012 Stefania Sabba (Councillor of the Environment) Alberto Rossini, Claudia Ozzi, Claudia Berretta Province

THANK YOU

for the KIND ATTENTION!!

Ufficio Energia - Servizio Progetti di area vasta e mobilità di sistema 5