1© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
The Wyndor Glass Company Problem (Hillier and Liberman)
The Wyndor Glass Company is planning to launch two new products. Product 1 is an 8-foot glass door with aluminum framing and Product 2 a 4x6 foot double-hung wood-framed window
Aluminum frames are made in Plant 1, wood frames are made in Plant 2, and Plant 3 produces the glass and assembles the products. Product 1 requires some of the production capacity in Plants 1 and 3, but none in Plant 2. Product 2 needs only Plants 2 and 3. The marketing division has concluded that the company could sell as much of either product as could be processed by these plants. The management of the company wants to determine what mixture of both products would be the most profitable. The following table provides the information available.
2© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
The Wyndor Glass Company Problem (Hillier and Liberman)
Production time per batch, hours Product
Plant 1 2
Production time available
per week, hours
1 1 0 4 2 0 2 12
3 3 2 18 Profit per batch $3,000 $5,000
3© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
The Wyndor Glass Company Problem Formulation
Formulation as a linear programming problem
Decision variables:
x1 = Number of batches of product 1 produced per week
x2 = Number of batches of product 2 produced per week
Objective function:
Maximize z = 3 X1 + 5X2 (in thousands of dollars)
Subject to:
x1 4 (Production Available in Plant 1) 2x2
12 (Production Available in Plant 2) 3x1+ 2x2
18 (Production Available in Plant 3) x1, x2
0
4© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Montana Wood Products Problem
Montana Wood Products manufacturers two-high quality products, tables and chairs. Its profit is $15 per chair and $21 per table. Weekly production is constrained by available labor and wood. Each chair requires 4 labor hours and 8 board feet of wood while each table requires 3 labor hours and 12 board feet of wood. Available wood is 2400 board feet and available labor is 920 hours. Management also requires at least 40 tables and at least 4 chairs be produced for every table produced. To maximize profits, how many chairs and tables should be produced?
5© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Montana Wood Products Problem Formulation
Objective Function
Max Z = 15x1 + 21x2
Subject To4x1 + 3x2 < 920 ( labor constraint)
8x1 + 12x2 < 2400 ( wood constraint)
x2 - 40 > 0 (make at least 40 tables)
x1 - 4 x2 > 0 (at least 4 chairs for every table)
x1 , x2 > 0 (non-negativity constraints)
6© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
The Sureset Concrete Company Problem
• The Sureset Concrete Company produces concrete. Two ingredients in concrete are sand (costs $6 per ton) and gravel (costs $8 per ton). Sand and gravel together must make up exactly 75% of the weight of the concrete. Also, no more than 40% of the concrete can be sand and at least 30% of the concrete be gravel. Each day 2000 tons of concrete are produced. To minimize costs, how many tons of gravel and sand should be purchased each day?
7© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
The Sureset Concrete Company Problem Formulation
Objective Function
Min Z = 6x1 + 8x2
Subject Tox1 + x2 = 1500 ( mix constraint)
x1 < 800 ( mix constraint)
x2 > 600 ( mix constraint )
x1 , x2 > 0 (non-negativity constraints)
8© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Widgets Problem
Suppose a company produces two types of widgets, manual and electric. Each requires in its manufacture the use of three machines; A, B, and C. A manual widget requires the use of the machine A for 2 hours, machine B for 1 hour, and machine C for 1 hour. An electric widget requires 1 hour on A, 2 hours on B, and 1 hour on C. Furthermore, suppose the maximum numbers of hours available per month for the use of machines A, B, and C are 180, 160, and 100, respectively. The profit on a manual widget is $4 and on electric widget it is $6. See the table below for a summary of data. If the company can sell all the widgets it can produce, how many of each type should it make in order to maximize the monthly profit?
Manual Electric Hoursavailable
A 2 1 180B 1 2 160C 1 1 100
profit $4 $6
9© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Widgets Problem Formulation
X1 = number of manual widgets
X2 = number of electric widgets
Objective Function max Z = 4X1 + 6X2
�� Subject To 2X1 + X2 180
X1+ 2X2 160
X1+ X2 100
X1 0, X2 0
10© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Product-Mix Problem
The Handy-Dandy Company wishes to schedule the production of a kitchen appliance which requires two resources – labor and material. The company is considering three different models of this appliance and its engineering department has furnished the following data:
Resources required Product/Model Resourcesto produce 1 unit A B C AvailableLabour (hours/unit) 7 3 6 150Material (lbs./unit) 4 4 5 200Profit ($/unit) 4 2 3
The supply of raw materials is restricted to 200 pounds per day. The daily availability of manpower is 150 hours. Formulate a linear programming model to determine the daily production rate of the various models of appliances in order to maximize the total profit.
11© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Product-Mix Problem Formulation
XA= daily production of model A
XB= daily production of model B
XC= daily production of model C
Objective Function
Maximize Z = 4XA + 2XB + 3XC
subject to the constrains
7XA + 3XB + 6XC 150
4XA + 4XB + 5XC 200
XA 0, XB 0, XC 0
12© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
An Electric Company Problem
• An electric company manufacturers two radio models, each on a separate rate production line. The daily capacity of the first line is 60 radios and that of the second is 75 radios. Each unit of the first model uses 10 pieces of a certain electronic component, whereas each unit of the second model requires 8 pieces of the same component. The maximum daily availability of the special component is 800 pieces. The profit per unit of models 1 and 2 is $30 and $20, respectively. Determine the optimum daily production of each model.
13© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
An Electric Company Problem Formulation
X1 = number of radios of model 1X2 = number of radios of model 2 Objective Function max Z =30X1 + 20X2
�� Subject To X1 60 X2 75
10 X1+8X2 800
X1 0, X2 0
14© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Furniture Factory Problem
• A small furniture factory manufacturers tables and chairs. It takes 2 hours to assemble a table and 30 minutes to assemble a chair. Assembly is carried out by four workers on the basis of a single 8-hour shift per day. Customers usually buy at least four chairs with each table, meaning that the factory must produce at least four times as many chairs as tables. The sale price is $150 per table and $50 per chair. Determine the daily production mix of chairs and tables that would maximize the total daily revenue to the factory.
15© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Furniture Factory Problem Formulation
X1 = number of tablesX2 = number of chairs Objective Function max Z =150X1 + 50X2
�� Subject To X2 - 4X1 0
120 X1+30X2 4x8x60
X1 0, X2 0
16© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Giapetto’s Woodcarving Problem
• Giapetto’s, Inc., manufactures wooden soldiers and trains.
Each soldier built:•Sell for $27 and uses $10 worth of raw materials.
•Giapetto’s variable labor/overhead costs by $14.
•Requires 2 hours of finishing labor.
•Requires 1 hour of carpentry labor
Each train built•Sell for $21 and used $9 worth of raw materials.
•Giapetto’s variable labor/overhead costs by $10.
•Requires 1 hour of finishing labor.
•Requires 1 hour of carpentry labor.
Each week Giapetto can obtain: all needed raw material, only 100 finishing hours & only 80 carpentry hours. Demand for the trains is unlimited, at most 40 soldiers are bought each week. Giapetto wants to maximize weekly profit. Formulate a mathematical model of Giapetto’s situation that can be used to maximize weekly profit.
17© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Giapetto’s Woodcarving Problem Formulation
x1 = number of soldiers produced each weekx2 = number of trains produced each week
Weekly profit = weekly revenue – weekly raw material costs – the weekly variable costs = 3x1 + 2x2
• objective function Maximize z = 3x1 + 2x2
• Subject to • 2 x1 + x2 ≤ 100 (finishing constraint)• x1 + x2 ≤ 80 (carpentry constraint)• x1 ≤ 40 (constraint on demand for soldiers)• x1 ≥ 0, x2 ≥ 0
18© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Graphical Solution of an LP Problem
• Used to solve LP problems with two (and sometimes three) decision variables
• Consists of two phases• Finding the values of the decision variables for which
all the constraints are met (feasible region of the solution space)
• Determining the optimal solution from all the points in the feasible region (from our knowledge of the nature of the optimal solution)
19© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Finding the Feasible Region (2D)
• Steps• Use the axis in a 2-dimensional graph to represent the
values that the decision variables can take
• For each constraint, replace the inequalities with equations and graph the resulting straight line on the 2-dimensional graph
• For the inequality constraints, find the side (half-space) of the graph meeting the original conditions (evaluate whether the inequality is satisfied at the origin)
• Find the intersection of all feasible regions defined by all the constraints. The resulting region is the (overall) feasible region.
20© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Equation Form
Basic data
Tons of raw material per ton of Maximum daily Exterior paint Interior paint availability (tons)
Raw material, M1 6 4 24Raw material, M2 1 2 6Profit per ton ($1000) 5 4
*Decision variables: Need to determine the amounts to be produced of exterior and interior paints.
x1 = tons produced daily of exterior paint
x2 = tons produced daily of interior paint*Objective (goal) aims to optimize: The company wants to increase its profit as much as
possible. z represents the total daily profit (in thousands of dollars)
Maximize z = 5x1 + 4x2
*Constraints: Restrict raw materials usage and demand
(Usage of a raw material) ≤ (Maximum raw material) by both paints availability
6x1 + 4x2 ≤ 24 (Raw material M1) x1 + 2x2 ≤ 6 (Raw material M2) -x1 + x2 ≤ 1 (Demand Limit) x2 ≤ 2 (Demand Limit) Nonnegativity restrictions: x1, x2 ≥ 0
21© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Graphical LP Solution
Graphical procedure includes 2 steps
Determination: 1) The solution space that defines all feasible solutions of the model 2) The optimum solution from among all the feasible points in the solution space
Step 1: Determination of the Feasible Solution Space x2
0x1
1 2 3 4 65
1
2
4
3
5
6
Nonnegativity constraints x1 ≥ 0 x2 ≥ 0Replace each inequality (≤) with equations (=)6x1 + 4x2 ≤ 24 6x1 + 4x2 = 24
x1 + 2x2 ≤ 6 x1 + 2x2 = 6 -x1 + x2 ≤ 1 -x1 + x2 = 1 x2 ≤ 2 x2 = 2 Determine 2 points 6x1 + 4x2 = 24 let x1 = 0, x2 = 6
let x2 = 0, x1 = 4 2 points: (0,6) and (4,0)
1
234
first quadrant
Graph of equations
22© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Feasible Space
123456
5
6
4
3
2
1
0 1 3 4 5 62
Reference pointConvenient computationally: (0,0) Note: select another point if the line passes through the origin, can’t use (0,0)
Ex: 6x1 + 4x2 ≤ 24 Feasible half-space
(0,0) 6 x 0 + 4 x 0 = 0 (0 ≤ 24) Not a feasible side(6,0) 6 x 6 + 4 x 0 = 36 (36 ≥ 24)
Constraints:
6x1 + 4x2 ≤ 24
x1 + 2x2 ≤ 6
-x1 + x2 ≤ 1
x2 ≤ 2
x1 ≥ 0
x2 ≥ 0Feasible space of the Reddy Mikks model
x2
x1
Solution space
23© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Optimum Solution
Step 2: Determination of the Optimum Solution
The feasible space consists of an infinite number of points
Optimum solution: identify the piont in which the profit function z = 5x1 + 4x2 increases (maximize z)..
0 1 2 3 4
1
2
3
x1
x2
Values of x1 and x2 associated with the optimum
point
6x1 + 4x2 = 24 solve
x1 + 2x2 = 6 simultaneously x1 = 3 and x2 = 1.5 z = 21
Optimum:
x1 + 2x2 ≤ 6
6x1 + 4x2 ≤ 24
x1 = 3 tons x2 = 1.5 tons z = $21,000
24© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Reddy Mikks Problem Formulation
25© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Reddy Mikks Problem Solution
I
12
344
1 2 3 E4 5 6 7
00 + 2(0)+ 2(0) 6 6
Constraint 4: Constraint 4: X XI I 2 2
Constraint 3: Constraint 3: -X-XE E + X+ XI I 1 1 Constraint 2: Constraint 2: 2X2XE E + X+ XI I 8 8
Feasible Feasible RegionRegion
Constraint 1: Constraint 1: XXE E + 2X+ 2XI I 6 6
26© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Example(2)
• Objective Function
Minimize z = 3x – y
• Subject to x – y 1
x + y 5
x 0, and y 0.
27© 2003 by Prentice Hall, Inc. Upper Saddle River, NJ 07458
Example(2)\solution
y
x
1 yx
5 yx(1, 0)
(3, 2)
(0, 5)vertex value of z at vertex
(0, 0) z = 3(0) – (0) = 0
(1, 0) z = 3(1) – (0) = 3
(3, 2) z = 3(3) – (2) = 7
(0, 5) z = 3(0) – (5) = –5
The minimum value of z is –5 and this occurs at (0, 5).