1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

Embed Size (px)

Citation preview

Page 1: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

1

Page 2: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

2

Dr.Chandan ChowdhuryCEO, IFS India

Page 3: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

3

Agenda

1. India as an IT major

2. IT solution for energy sector

3. Understanding solution through case studies

4. Highlight of energy solution

5. IT challenges as market gets deregulated

Page 4: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

4

Page 5: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

5

Bandwidth

Food

Cloth Shelter

Political Slogan – Paradigm Shift

Page 6: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

6

Matrimonial: an example

27 years boy IT grad in computing, techno savvy seeks confident girl , Java & C++ knowledge essential. Caste, religion no bar

Page 7: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

7

ENERGY

Major Focus Vertical;ENERGY

GENERATION TRANSMISSION DISTRIBUTION

Page 8: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

8

Hundreds of power plants/groups using IFS solutions

• OKG Nuclear Power Plant, Sweden• Barsebäck Nuclear Power Plant, Sweden• Forsmarks Nuclear Power Plant, Sweden• Ignalina Nuclear Power Plant, Lithuania • Swedish National Grid• ABB Generation, Sweden • Birka and Gullspångs Power, Sweden• BÅKAB, Sweden• Nordkraft Service, Sweden• Vannkraft Öst, Norway• Akershus Energyworks, Norway• Brista Power, Sweden• Helsingborg Energy, Sweden• Birka Service, Sweden• Oslo Energy, Norway• Tekniska Verken i Linköping, Sweden• Trondheim Energyworks, Norway• Viken, Norway• Norwegian State Power, Norway• Buskerud Energy Production, Norway• National Power Company of Iceland• Southern Energy Group, Poland• ECO Vankraft, Norway• AES, Sri Lanka• Byreiskaya Hydro Power, Russia

• Elektrocieplownia Zabrze, Poland• Elektrocieplownia Ostroleka, Poland• Elektrocieplownia Warszawskie, Poland• Elektrownia Laziska, Poland• Elektrownia Jaworzno, Poland• Belchatow Power Plant, Poland• WPEC Zielona Gora, Poland• Zespol Elektrociepl Poznan, Poland• Siersza Power Plant, Poland• PT PLN, Indonesia• Vattenfall Generation Services, Sweden• Växjö Energi, Sweden• Oxelö Energi, Sweden• Hafslund Energiverk, Norway• Vattenfall Power Generation, Sweden• Vattenfall Energy Distribution, Sweden• Fagersta Energi, Sweden• Jönköping Energi, Sweden• Norrköping Miljö & Energi, Sweden• Qin Shan, China• Tennet, Power Grid of Netherland• United Networks, New Zealand• Siemens Network Services, Australia• Zeya Hydropower, Russia• Three Gorges Power Group, China• Etc ....

Page 9: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

9

Global Power Market Size49% of Spend is Asia and 24% North America

From IIR 2005 Global Industry Outlook

Global Region Project Count TIV (in billions)

North America 849 $46.66

Middle America 7 $0.75

South America 45 $15.76

Europe 96 $21.87

Africa 28 $12.56

Asia 233 $95.07

Oceania 18 $2.68

Total 1,276 $195.36

2005 Project Spending by Global RegionThe current estimation of the worldwide need for new power generation equates to about 325 large new power stations per year.

Page 10: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

10

Basic Functions

NIS/GIS ERP/CMMS

SCADA

CIS

MarketBillingMeter readingCRMetc.

Generic functions Work Order ManagementProject ManagementProcurementsFinancial Managementetc.

Network specific functionsNetwork DocumentationNetwork CalculationsGeographical analysis Technical Planningetc.

Operation SCADATrouble CallEnergy ManagementDispatchetc.

Page 11: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

11

Basic Information

NIS/GIS ERP/CMMS

SCADA

CIS

Customer DataMeter Data

Assets Data Financial FocusFinancial DataMaintenance Data Plans and schedules

Assets Data Technical FocusAssets Relations Topology and Connectivity Spatial Information (GIS) Real Time Data

Asset Data Real time Focus

Page 12: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

12

IFS Foundation1

IFSFINANCIALS

GENERALLEDGER

REPORTGENERATOR

FIXEDASSETS

ACCOUNTSRECEIVABLE

CONSOLIDATEDACCOUNTS

ACCOUNTS PAYABLE

CASH FLOW

IFS eBUSINESS

eMARKETS

MOBILE & WIRELESSSERVICES

EMPLOYEEPORTALS

ePROCUREMENT

COLLABORATIONPORTALS

ACCOUNTINGRULES

CUSTOMERRELATIONSHIPMANAGEMENT

DOCUMENTMANAGEMENT

PROJECTMANAGEMENT

SUPPLY CHAIN MANAGEMENT

BUSINESS PERFORMANCE

IFSDISTRIBUTION

DEMAND PLANNING

SUPPLIERSCHEDULES

PURCHASING

INVENTORY

INVOICING

IFSMAINTENANCE

EQUIPMENT

EQUIPMENTPERFORMANCE

EQUIPMENTMETERING

WORK | SERVICEORDER

EQUIPMENTMONITORING

SCHEDULING

DCS/SCADAINTEGRATION

PREVENTIVEMAINTENANCE

IFS HUMAN

RESOURCES

RECRUITING

TRAINING ADMINISTRATION

PAYROLLADMINISTRATION

TIME &ATTENDANCE

HUMANCAPITAL

MANAGEMENT

PROJECTREPORTING

EXPENSEREPORTING

EMPLOYEESELF-SERVICE

QUALITYMANAGEMENT

IFS ENGINEERING

PDMCONFIGURATION

ASSET DATAMANAGEMENT

ELECTRICALDESIGN

PROJECTDELIVERY

INSTRUMENTATIONDESIGN

INTEGRATION PLATFORM

IFSOPERATION

OPERATIONMANAGEMENT

SAFETY ANDRELIABILITY

PLANNING ANDCONTRACT

FUELMANAGEMENT

IFSBILLING

BILLING

METERING &COLLECTIONS

RECEIVABLES

IFS Utility Solution

Page 13: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

13

Page 14: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

14

Page 15: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

15

PROJECTQUALITY

MANAGEMENTACCOUNTING

RULESDOCUMENT

MANAGEMENTBUSINESS

PERFORMANCE

IFSDISTRIBUTION

IFSMAINTENANCE

IFS ENGINEERING

IFS FRONT OFFICE

IFS HUMAN

RESOURCES

INVENTORYEQUIPMENTMONITORING

PDMCONFIGURATION

MARKETINGENCYCLOPEDIA

SKILLS &QUALIFICATIONS

EQUIPMENTINVOICINGSALES

CONFIGURATORPLANT LAYOUT &

PIPING DESIGNRECRUITMENT

CUSTOMERORDERS

WORKORDER

PROPOSALGENERATION

ELECTRICALDESIGN

PROJECTREPORTING

CUSTOMERSCHEDULING

PREVENTIVEMAINTENANCE

FIELD SERVICE &OPERATIONS

INSTRUMENTATIONDESIGN

TIME &ATTENDANCE

EQUIPMENTPERFORMANCE

PROJECTDELIVERY

PURCHASINGSALES &

MARKETINGEMPLOYEE

DEVELOPMENT

SCHEDULINGSUPPLIER

SCHEDULINGPROCESSDESIGN

EXPENSEREPORTING

IFSFINANCIALS

GENERALLEDGER

ACCOUNTSRECEIVABLE

FIXEDASSETS

CONSOLIDATEDACCOUNTS

ACCOUNTSPAYABLE

REPORTGENERATOR

FINANCIAL LEDGER

PAYROLLINTERFACE

TECHNOLOGY PLATFORM -OPEN, FLEXIBLE, EASY TO USE

VEHICLEINFORMATIONMANAGEMENT

ENTERPRISESTOREFRONT

IFS eBUSINESS

WIRELESSSERVICES

COLLABORATIONPORTALS

CONTACTCENTER

eMARKETS

EMPLOYEEPORTALS

ePROCUREMENT

WEB STORE

PERSONAL PORTAL MANAGEMENT

IFS SPECIALMODULES

OPERATIONMANAGEMENT

SAFETY ANDRELIABILITY

SCADA (ABBADVANT OCS &

SPIDER)INTERFACE

TGPMSINTERFACE

PLANNING ANDCONTRACT

OA (LOTUSNOTES)

INTERFACE

BUSINESSMODELLER

The Three Gorges ePMS system.

Went Live Jan 2003Implementation started in May 2002.

27*700=18,900 MW project

Page 16: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

16

Scenario #1: power system outage

Work flow instance NIS/GIS

EAM/ERP

SCADA/DCS

Other systems

Identify disturbance     CRM, CIS

Analyze the extent and significance of the disturbance

     

Minimize the outage by remote control

     

Inform Call Center and others and keep them informed

    CRM

Create Outage Work Order    

Assign Crews to the work   HR

Page 17: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

17

Scenario #1: power system outage

Work flow instance NIS/GIS

EAM/ERP

SCADA/DCS

Other systems

Perform ultimate fault location and supply restoration

    MCMS (=Mobile Crew Mgmt System)

Issue work permit certificate    Initiate and plan remaining repair work

   

Perform ultimate repair work    Submit work ready certificate    Plan reenergize switching      Perform switching for reenergizing the repaired part

     

Register time and materials used      Create disturbance report    

Register disturbance on equipment causing the disturbance

   

Page 18: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

18

Page 19: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

19

FinanceFinance

PurchasePurchaseMaintenanceMaintenance

Payroll

Stores

Project &Engineering

HRCustomer Customer ServicesServices

Legacy applications – “Islands” of Information

Enterprise

Material receiptMaterial receiptMaterial Material accountingaccounting

Operations

Page 20: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

20

Page 21: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

22

China Yangtze River Three Gorges Project Development Corporation

Three Gorges Power Plant, the largest hydro plant in the world with 18,900 MW (27x700MW).

The first batch of units have already been commissioned

Other associated projects:

Gezhouba Power Plant 2,715MW.New construction projects (Xiangjiaba 6,000 MW,

Xiluodu 12,600MW, Wudongde 7,400MW and Baihetan 12,500MW).

Total – 60,115 MW

Page 22: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

23

The Transmission System Operatorof Norway

Page 23: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

24

Assets and Maintenance

10,000 km of high voltage power lines (132, 220, 300 and 420 kV)

Transformers, switching and compensator stations

Page 24: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

25

PROJECTQUALITY

MANAGEMENTACCOUNTING

RULESDOCUMENT

MANAGEMENTBUSINESS

PERFORMANCE

IFSDISTRIBUTION

IFSMAINTENANCE

IFS ENGINEERING

IFS FRONT OFFICE

IFS HUMAN

RESOURCES

INVENTORYEQUIPMENTMONITORING

PDMCONFIGURATION

MARKETINGENCYCLOPEDIA

SKILLS &QUALIFICATIONS

EQUIPMENTINVOICINGSALES

CONFIGURATORPLANT LAYOUT &

PIPING DESIGNRECRUITMENT

CUSTOMERORDERS

WORKORDER

PROPOSALGENERATION

ELECTRICALDESIGN

PROJECTREPORTING

CUSTOMERSCHEDULING

PREVENTIVEMAINTENANCE

FIELD SERVICE &OPERATIONS

INSTRUMENTATIONDESIGN

TIME &ATTENDANCE

EQUIPMENTPERFORMANCE

PROJECTDELIVERY

PURCHASINGSALES &

MARKETINGEMPLOYEE

DEVELOPMENT

SCHEDULINGSUPPLIER

SCHEDULINGPROCESSDESIGN

EXPENSEREPORTING

IFSFINANCIALS

GENERALLEDGER

ACCOUNTSRECEIVABLE

FIXEDASSETS

CONSOLIDATEDACCOUNTS

ACCOUNTSPAYABLE

REPORTGENERATOR

FINANCIAL LEDGER

PAYROLLINTERFACE

IFS Foundation1 V5

VEHICLEINFORMATIONMANAGEMENT

ENTERPRISESTOREFRONT

IFS eBUSINESS

WIRELESSSERVICES

COLLABORATIONPORTALS

CONTACTCENTER

eMARKETS

EMPLOYEEPORTALS

ePROCUREMENT

WEB STORE

PERSONAL PORTAL MANAGEMENT

IFSOPERATIONS

OPERATIONMANAGEMENT

BUDGETTING

SCADAINTERFACE

FUELMANAGEMENT

The IFS solution

Page 25: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

28

Recovery information

Scenario #1 : power system outage

Real-time informationDisturbance records

Customer Service

Type of disturbanceTime to recoverNo. of customers affected

Work order

Asset Management

SparesSales

Customers affected

Customer complaints

Engineering

Disturbance information

Accounting

Asset records

Reports

Reports

SubstationAutomation

Repair and Maintenance

Customer

Work report

Fault statistics

Disturbance report

Disturbance report

Compensation

Control Center

Pro-Active information

Page 26: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

29

Page 27: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

30

Finance PortalExample of a measure areaMeasure Areas

Page 28: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

31

Page 29: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

32

EAM Portal

Page 30: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

33

Page 31: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

34

Finance PortalExample of a measure areaMeasure Areas

Page 32: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

35

Page 33: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

36

EAM Portal

Page 34: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

37

Alerts

Portal is configured to display only

measures where indicators are red

Current view of the organization. How

much has each Profit Center sold so far in

this month? Current view of the organization. How many orders do we have right now and

how does that compare to history?

Page 35: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

38

Page 36: 1 2 Dr.Chandan Chowdhury CEO, IFS India 3 Agenda 1.India as an IT major 2.IT solution for energy sector 3.Understanding solution through case studies

39

Areas to focus

Expansion Projects – Generation, Transmission, Distribution

Effective Planning, Monitoring and Execution of Projects

Controlling time and cost overrun of Projects through Exception Based Project Monitoring

Asset Life Cycle Management

Operation and Maintenance

Increased availability through incorporation of Best Operation & Maintenance Practices like RCM (Reliability Centered Maintenance), TPM

Improved spare parts management system

Reduction in cost of operation

On-line real time information through integration with SCADA system

Increase predictability of the plant

Integration

Business intelligence solution (multi dimensional analysis)

High quality timely information for decision support & proactive management

Management dashboard