VALUE ENGINEERING……in the Lean Environment!

Dave Love

Value Engineering Project Mgr

10 MAY 2007

Distribution Statement A: Approved for public release; distribution unlimited.

Page 2: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

2

VE in the Lean Environment

Value Engineering Workshop

6 – 8 February 2007

Distribution Statement A: Approved for public release; distribution unlimited.

Page 3: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

3

VE in the Lean Environment

Problem Identification (Sustainment

Need)

Obsolescence Study

Reliability Analysis

Health Analysis & Assessment

Technology Trending

Parts Data

Vendor Interviews, Component Availability

Software, Inventory, Service Life and Systems

Population Cost

Modeling

Industry Standards

Groups, Market Study Reports

Field Failure Analysis Trending

Parts Derating

Customer Communication, Logistical RM&A

Data Bases

Structural, Thermal, & Material Analysis

Need to Predict Sustainment

Requirements

Function Analysis System Technique (FAST) Problem IDHow Why

SustainmentPlan

Distribution Statement A: Approved for public release; distribution unlimited.

Page 4: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

4

Function Analysis System Technique (FAST) BCA

Problem ID (Sustainment

Need)Analysis of Alternatives

Life of Type or Bridge

Buy

Engineering Solution

Logistical Solution

Tech Refresh

Insertion

Trade, Market &

Requirements Study

Redesign

Alternative Substitution

Trade, Market, &

Requirements Study

Reverse Engineer

Technology Solution

Technology Solution

Form Fit Function

Redesign

Component Analysis

BCA

Sustainment Work

Assessment Teams

How Why

VE in the Lean Environment

Distribution Statement A: Approved for public release; distribution unlimited.

Page 5: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

5

Goals and Objectives

• Define sustainment engineering

• Define systematic process to determine customer’s sustainment issues

• Systematic approach to Analysis of Alternatives (AoA)

Distribution Statement A: Approved for public release; distribution unlimited.

Page 6: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

6

Breakthroughs

• The ability to identify functions and the application to the Value Stream Analysis

• Credible definition of Sustainment Engineering

• Gaps in sustainment analysis consisting of Reliability Analysis and Sustainment Planning

• Identification of disconnection between capabilities within the Organization

Distribution Statement A: Approved for public release; distribution unlimited.

Page 7: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

7

Next Steps

Value Engineering Workshop findings provided as input to LEAN VSA •Reliability Analysis •Sustainment Plan •Sustainment Engineering Process

Distribution Statement A: Approved for public release; distribution unlimited.

Page 8: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

8

Enterprise Innovation VSA

Distribution Statement A: Approved for public release; distribution unlimited.

Page 9: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

9

Cost DriversApril 2002 thru March 2003

Item Name % Total Failures

% Total Populatio

n

Qty Unit $ Total $

Output TWT 39 2.6 342 $4258 $1341.7K

HVDU 9 5.3 41 $4645 $299.2K

HVPS 8 6.8 53 $4466 $267.0K

RF Mod B2 5 0.9 49 $4719 $173.5K

Tape Drive 4 10.3 17 $3481 $129.6K

RF Mod B3 3 0.2 26 $3459 $87.9K

RFMU 5 $14504 $76.0K

RF Switch (2x32) 2 4.1 15 $4879 $72.1K

Yig Flt BD3 CCA 1 2.2 4 $14571 $42.9K

Other 27 1280 $930.6K

System Level Totals 1832 $3420.5K

Cost per System $41.7KDistribution Statement A: Approved for public release; distribution unlimited.

Page 10: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

10

Reliability DriversApril 2002 thru March 2003

Item Name %CA of Total CAs MTBF

HVDU 9 76 10,000

Tape Drive 2 17 13,000

HV Relay Control 2 19 21,000

Pump Motor 1 9 24,000

Keyboard 1 7 31,000

Hard Disk System 1 5 44,000

System Level Totals

865 970

Distribution Statement A: Approved for public release; distribution unlimited.

Page 11: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

11

Supportability DriversApril 2002 thru March 2003

System Level Ao = 0.67 (Last 12 Months)

Item Name NL MLT Tot Log %NOB

New System Ao

(w/ no log. Delay

* Output TWT 145 250 35,862 73 0.674

HVDU 19 310 6,580 53 0.673

HV Relay Control 14 290 4,044 82 0.671

HVPS 12 260 3,124 24 0.671

Tape Drive 7 340 2,414 41 0.675

System Level Totals

533 530 183,489 62

Distribution Statement A: Approved for public release; distribution unlimited.

Page 12: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

12

Maintenance DriversApril 2002 thru March 2003

Item Name % of Total Hrs CA MTTR TOT CM (Hrs)

HVDU 13 76 6.0 457.9

HVPS 10 65 5.8 376.2

* Output TWT 5 200 1.0 198.5

Tape Drive 4 17 7.5 128.2

Output TWT 3 30 3.1 92.3

Other 65

System Level Totals 865 11.0 3609.3

Distribution Statement A: Approved for public release; distribution unlimited.

Page 13: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

13

TWT

• Doubled TWT Life

• Reduced Supply Demand by 190 Units per Year

• Estimated Cost Avoidance of $ 2.8 M/Yr

Traveling Wave Tube

Distribution Statement A: Approved for public release; distribution unlimited.

Page 14: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

14

Value = Function (VE) / Cost (Lean)

VE in the Lean Environment

Distribution Statement A: Approved for public release; distribution unlimited.

Page 15: 1 1 VALUE ENGINEERING … … in the Lean Environment! Dave Love Value Engineering Project Mgr 10 MAY 2007 Distribution Statement A: Approved for public release;

15

Together…

Value Engineering and Lean

Produce Synergy…!

VE in the Lean Environment

Distribution Statement A: Approved for public release; distribution unlimited.