1. Overview: Telecommunications Project

Planning and implementation (2007-today)

2. Discussion: Proposal to Improve Infrastructure

Upgrade horizontal wiring in buildings $28.8M upgrade, 345 buildings over 4 years Make systematic (vs. opportunistic) upgrades Emphasis: improve research support Need help identifying priorities

2

3

7-year Telecommunications Project

$22M project – accumulated reserves and augmentations Approved in December 2007, upgrades began in March 2008 Support research Refresh/upgrade campus data network Enhance security enhancements Expanded wireless Converge services Support emerging technology and services Emphasize open standards and flexibility Does not address horizontal wiring

4

Vision and Implementation

Scalable support for high bandwidth needs Uplinks scalable – 1, 2, 4, 10 Gbps – upgrade as demand

dictates Supports 1 Gbps to the desktop, 10 Gbps to research space

Research network component Improved redundancy, alternate paths, traffic engineering Support converged / real-time services

QoS implemented to support VoIP, video-over-IP

Support cloud computing, on- and off-site storage, enhanced connectivity to regional and national networks

5

6

Research Core

Access Switches

Core/Area Routers(23)

Distribution RoutersMajor Buildings

(108)

Access SwitchesTelco Rooms

(1800)

DWDM

Border

Davis Sac

30,000 Ports35,000 Devices

0.0

200.0

400.0

600.0

800.0

1000.0

1200.0

Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11

Bandwidth in Mbps

Bandwidth in Mbps

Network Utilizatio

n

Vision and Implementation

Expand centralized service Addresses fragmented wireless services Standardized across campus, fast roaming Initial focus on high traffic areas

Adding external mount antennas – cover traffic corridors Student Housing – Wireless in Residence Halls Managed Desktop Access Points

More rapid deployment, reduces costs Monitoring progress on femtocell offerings

Pre-positioning cabling in conjunction with WiFi deployments

7

8

0100020003000400050006000700080009000

10000

MAR-07 MAR-08 MAR-09 MAR-10

Wireless Avg Daily Users

Wireless Avg Daily Users

0

1000

2000

3000

4000

5000

6000

MAR-07 MAR-08 MAR-09 MAR-10

Wireless Peak Concurrent Users

Wireless Peak Concurrent Users

Today: 1048 Wireless APs Deployed

Campus goal – 3,000 APs (including ResNet)

Voice Network Vision and Implementation

Flexible front-end: ties together VoIP, analog, software services

Integrate Unified Communications services into campus Active Directory service (OCS)

Ties together current PBX, desktop VoIP, OCS and softphone services into one management platform for call routing Transition off analog PBX

Flexible, open standards based Can integrate or interface to emerging services

9

Voice Network

Central CallManagement

System

AD/OCS System Commercial Carriers

IP PBX

Analog Path

IP Path

Analog Gateway TDM PBX

10

Status

Data network and fiber plant can support campus needs

Last 100 meters is the limiting factorCENIC/Internet

End-UsersCore/Area Routers Building Router EthernetSwitches

Fiber Optic Backbone/Riser Cables(Condition – Excellent)

CopperHorizontal Wiring

(Condition – Mixed)

Campus Building

11

Deferred maintenance of horizontal wiring

Older buildings have a mixture of cable types Installed wiring breakdown:

1% CAT-6a – 10 Gbps (emerging standard) 59% CAT-5e – 1 Gbps (current standard) 29% CAT-5 – 100 Mbps (outdated) 11% CAT-3 – 10 Mbps (outdated)

Significant amount (20%) of active NAMs use CAT-3

12

Deferred maintenance: Horizontal wiring

Units and research programs in older buildings disadvantaged with lower speed data connections

Impacts high speed research needs, access to remote sites and servers, data storage, desktop management, etc. Wireless solutions – insufficient bandwidth and scalability

Affects approximately 60% of campus buildings (to varying degrees)

13

14

Upgrade CAT-3 and CAT-5 to CAT-5e in 345 buildings

Power, HVAC, pathway improvements where needed

Contingency Design & Construction Management – project

management Selected upgrades for CAT-6a and fiber to

research spaces Not addressed – Telco room expansion (use

renovation projects) Timeline for upgrades – approximately 4 years Estimated cost: $28.8M

15

Emphasis: supporting research excellence Upgrade on a per building basis Group buildings into tiers based on priority for

upgrade Academic units determine first tier

Identify most critical buildings – emphasis on research spaces

Dean- and/or faculty-led advisory committee Determine composition of subsequent tiers,

scheduling Develop process and criteria for prioritization Some flexibility – changes accommodated

16

Possible Prioritization Criteria Locations with IT-intensive research (existing or

planned) Improve grant award opportunities Upgrade locations, first with CAT-3 then CAT-5 Tolerance for disruption

Technical Indicators Percent assigned research space in building Percent CAT-3 and CAT-5 wiring Building size / # NAMs Bandwidth consumption

17

18

Building NameC5e

NAMsC5

NAMsC3

NAMsTotal % C3

% Cat 5e or Better

% ASF Research Est Costs

TUPPER HALL 581 759 350 1690 20.7% 34.4% 64% $1,655,381BRIGGS 259 582 153 994 15.4% 26.1% 78% $906,373ACADMC SURGE 149 369 303 821 36.9% 18.1% 45% $754,041PHYGEO 150 120 121 391 30.9% 38.4% 43% $722,971BAINER 40 154 150 344 43.6% 11.6% 49% $707,403MEYER 197 53 315 565 55.8% 34.9% 52% $594,421KEMPER HALL 81 316 397 0.0% 20.4% 44% $535,883GHAUSI HALL 12 835 847 0.0% 1.4% 51% $480,125HARING 30 376 5 411 1.2% 7.3% 52% $456,459CHEM ANX 162 54 90 306 29.4% 52.9% 76% $398,752HART 64 103 180 347 51.9% 18.4% 17% $369,065SOCSCI&HUMAN 156 701 49 906 5.4% 17.2% 8% $329,648PLANT & ENV SCIENCE 40 559 599 0.0% 6.7% 71% $321,425SCHOOL OF EDUCATION BLDG 53 51 123 227 54.2% 23.3% 10% $303,996CHEM 85 12 119 216 55.1% 39.4% 66% $283,182WICKSN 103 67 219 389 56.3% 26.5% 53% $266,493YOUNG 89 58 212 359 59.1% 24.8% 32% $265,561VET MED 2 102 71 44 217 20.3% 47.0% 16% $254,350

Total: $9,605,528

19

Building NameC5e

NAMsC5

NAMsC3

NAMsTotal % C3

% Cat 5e or Better

% ASF Research Est Costs

STORER 60 77 122 259 47.1% 23.2% 70% $242,434SURGE 3 90 41 86 217 39.6% 41.5% 53% $206,841HOAGLD 120 24 67 211 31.8% 56.9% 21% $186,406LIF-SCI ADN 51 320 371 0.0% 13.7% 79% $184,000EVERSN 24 110 69 203 34.0% 11.8% 44% $126,414WALKER 30 33 43 106 40.6% 28.3% 28% $118,228VMEYER 53 12 45 110 40.9% 48.2% 58% $90,634FOOD SC&TECH 1 27 4 32 12.5% 3.1% 81% $87,164CTR NEUROSCI 104 26 130 0.0% 80.0% 62% $85,658ASMDSN 26 24 31 81 38.3% 32.1% 55% $82,355PRIMATE CENTER LAB 23 55 1 79 1.3% 29.1% 89% $80,077MANN 15 14 29 48.3% 0.0% 87% $70,590EH 6 8 22 36 61.1% 16.7% 40% $63,264PLANT REPRODUCTIVE 213 59 272 0.0% 78.3% 82% $62,963NEUROSCI BLD 172 61 233 0.0% 73.8% 87% $52,038CTR COMP MED 42 66 108 0.0% 38.9% 85% $37,950HOAGLD ANX 2 1 5 8 62.5% 25.0% 100% $14,030ASMDSN ANNEX 3 9 2 14 14.3% 21.4% 94% $8,913

Total: $1,799,957

Upgrade horizontal wiring in buildings $28.8M upgrade, 345 buildings over 4 years Make systematic upgrades vs. opportunistic Phased or tiered approach Emphasis on improving research support Need help identifying priorities

20

Deans’ endorsement of proposal and approach

Continue work with BIA to establish financial commitments

Develop first tier building prioritization Bring proposal to key campus stakeholders Obtain approval from campus administration Charge Advisory Committee

21