At the beginning there were two canals: Canal Forth and Clyde was built in 1777, between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822. Geographical difficulties created a difference of 79ft. in elevation, and the two canals were connected by 11 locks. FRIDAYPAGE.com

082010 scottishcanals

  • Upload
    aciachi

  • View
    193

  • Download
    2

Embed Size (px)

Citation preview

Page 1: 082010 scottishcanals

At the beginning there were two canals:Canal Forth and Clyde was built in 1777,

between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland.

Canal Union between Falkirk and Edinburgh was finished in 1822. Geographical difficulties

created a difference of 79ft. in elevation, and the two canals were connected by 11 locks.

FRIDAYPAGE.com

Page 2: 082010 scottishcanals
Page 3: 082010 scottishcanals

In 1963, after 150 yrs of existence of this water way with 11 locks the construction of a huge water carousel started. This extraordinary idea was

finished in 2002 and became a symbol of Scotland.

This invention saves not only time but also energy.

Page 4: 082010 scottishcanals
Page 5: 082010 scottishcanals
Page 6: 082010 scottishcanals

This is the only rotational boat transporter in the world.

It has two arms and each arm forms a kind of huge tub

filled with water. Boats enter the tub,

then the tub locks up and the huge arm starts rotating .

Page 7: 082010 scottishcanals

lower canallower canal

Page 8: 082010 scottishcanals

Entrance to lower canalEntrance to lower canal

Page 9: 082010 scottishcanals

A Boat is approaching the “tub”A Boat is approaching the “tub”

Page 10: 082010 scottishcanals
Page 11: 082010 scottishcanals

There are boats in both “tubs” There are boats in both “tubs” upper and lowerupper and lower 35 m35 m

Page 12: 082010 scottishcanals

Rotation is startingRotation is starting

Page 13: 082010 scottishcanals

Boats in both rotating armsBoats in both rotating arms

Page 14: 082010 scottishcanals

RotationRotation

Page 15: 082010 scottishcanals
Page 16: 082010 scottishcanals

Just before “landing”Just before “landing”

Page 17: 082010 scottishcanals
Page 18: 082010 scottishcanals
Page 19: 082010 scottishcanals

Closing the gate , regulation of level of water

and “tubs” rotationTakes 15 min. only.

Page 20: 082010 scottishcanals
Page 21: 082010 scottishcanals

One “tub” 78ft. long with water and One “tub” 78ft. long with water and boat weights about 300 tons. boat weights about 300 tons.

Page 22: 082010 scottishcanals

The “tubs” are filled according the Archimedes’ Law.

So the weight of “tubs” are balanced.

To open the upper and lower lock and turn the whole system

by 180◦ they need an engine of 22.5 kW which only use 1.5 kWh