071100_2

Embed Size (px)

Citation preview

  • 7/26/2019 071100_2

    1/1

    Print Date: Sat Mar 28 11:53:03 CST 2015 MODEL 172 MAINTENANCE MANUAL (Rev 20

    7-11-00 (Rev 8)

    2015 Cessna Aircraft CompanyRetain printed data for historical reference only. For future maintenance, use only current data. Page 1

    EMERGENCY LIFTING/HOISTING- MAINTENANCE PRACTICES

    1. Lifting Procedure

    A. The airplane may be lifted with a hoist of two-ton capacity attached by rings, which are optionalequipment installed by Service Kit, or by means of suitable slings. The front sling should be hookedto each upper engine mount, and the aft sling should be positioned around the fuselage at the first

    bulkhead forward of the leading edge of the stabilizer. If the optional hoisting rings are used, aminimum cable length of 60 inches for each cable is required to prevent bending of the eyebolt-typehoisting rings. If desired, a spreader jig may be fabricated to apply vertical force to the eyebolts.