Upload
viktorgligorov
View
213
Download
0
Embed Size (px)
Citation preview
8/17/2019 07 Ross Deposit Formation Mitigation
1/15
Michael G. RossMichael G. RossSouthwest Research InstituteSouthwest Research Institute
September 12, 2007September 12, 2007
Southwest
Research
Institute ®
LPG Deposit Formation and Mitigation
Study
Fourth Annual Texas Propane
Technology Forum
8/17/2019 07 Ross Deposit Formation Mitigation
2/15
Backroun!
Heavy-ends in LPG can
produce deposits in
engines
The mechanisms that
control deposit formation
rates are not well
understood
8/17/2019 07 Ross Deposit Formation Mitigation
3/15
"ea#$ %n! Resi!ue &oncentrations
Note: 0.0 mL of heavy ends per !00 mL offuel e"uates to 0. gallons #$ cups% of heavy
ends per !000 gallons of fuel
Resi!ue
'm( per 100 m()
Typical LPG &uel 0.00' ( 0.0)
*+T, -!$) LPG specification limit 0.0
eported levels associated withengine performance pro/lems
0.00$ - '.00
8/17/2019 07 Ross Deposit Formation Mitigation
4/15
8/17/2019 07 Ross Deposit Formation Mitigation
5/15
5!!iti#es &an &hane (ocation o6
+eposits
Intake mani6ol!!eposits with
a!!iti#e
Intake mani6ol!!eposits without
a!!iti#e
8/17/2019 07 Ross Deposit Formation Mitigation
6/15
ily eposit4ithout *dditive 4ith *dditive
5!!iti#es &an Increase +eposits
8/17/2019 07 Ross Deposit Formation Mitigation
7/15
Boilin *oint +istributions o6 +eposits
with an! without 5!!iti#e
"ea#$%n!sromuel
(uberom
5!!iti#e
"ea#$
%n!s
/ &20
uel +eposit
ith 5!!iti#e
uel +eposit ithout 5!!iti#e
8/17/2019 07 Ross Deposit Formation Mitigation
8/15
8uestions 5!!resse! b$ this Stu!$
4hat is the range of LPG contaminants
found in the field5
How do factors li6e vapori7er temperature
affect deposit formation rates5
2an filtration /e used at the point of use to
remove heavy-ends and prevent
deposits5 How effective are additives in preventing
deposits5
8/17/2019 07 Ross Deposit Formation Mitigation
9/15
*ro9ect *lan
2ollect and analy7e fuel samples from
around the country that are 6nown to cause
vapori7er deposits
evelop a LPG deposit test fuel specification
2onstruct a test rig to study deposit formation
effects under carefully controlled conditions
Test vapori7er temperature effects Test filters
Test additives #engine testing%
8/17/2019 07 Ross Deposit Formation Mitigation
10/15
Sample &ollection *rocess
+ite with deposit pro/lem contacts +w8
+w8 ships sample 6it /y air freight
LPG distri/utor or "ualified +w8 contractor
collects samples
+w8 contractor handles pac6aging9 la/eling9
and ha7ardous material manifests for return
shipping +w8 analy7es samples
8/17/2019 07 Ross Deposit Formation Mitigation
11/15
(*G Sample :its
!L stainless steel cylinder
for LPG samples
Glass containers for deposit
samples
8/17/2019 07 Ross Deposit Formation Mitigation
12/15
uel Sample %;ample
'.0 mL of residue per!00 mL of vapori7edLPG #0; the *+T,limit%
8/17/2019 07 Ross Deposit Formation Mitigation
13/15
+eposit
8/17/2019 07 Ross Deposit Formation Mitigation
14/15
Status
+ample collection is in progress
Test rig design is nearing completion
Testing is e;pected to /e complete in spring
of '00$
8/17/2019 07 Ross Deposit Formation Mitigation
15/15
uel Samples
4e are see6ing additional fuel samples
6nown to cause vapori7er deposits
Please contact:
,ichael G. oss
Program ,anager
Phone: #'!0% ''-'>?0
@-mail: michael.rossAswri.org