18
04.11.19 Webinar Montgomery, AL

04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

04.11.19 WebinarMontgomery, AL

Page 2: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

National Public Safety Telecommunicators WeekRIL 14 – 20, 2019

Page 3: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

911 SavesAct

vUnder the U.S. Bureau of Labor Statistics’ StandOccupation Classification System (SOCS), publsafety telecommunicators are classified as "Offiand Administrative Support Occupations" – awhich utterly fails to recognize their key role in public safety, the specialized training and skills required, and the uniquely stressful work environments in which they serve to protect us a

vRep. Norma Torres (D-CA), herself a former 9-1dispatcher, will introduce the Supporting AccuraViews of Emergency Services Act (911 SAVES)which would require that public safety telecommunicators be classified as a “ProtectiveService Occupation,” alongside others in the pusafety family.

vThere is now a companion bill introduced by Senators Burr andKlobuchar!

Page 4: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

911 Saves Act Grassroots Campaign

Page 5: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

nate Bill 138ends §11-98-4.1

Calendar Date Body Amd/Sub Matter

03/19/2019 S Read for the first time and referred to the Senate comon Governmental Affairs

04/02/2019 S Read for the second time and placed on the calendar

04/03/2019 S Third Reading Passed

04/03/2019 S 198623-2 Price Amendment Offered

04/03/2019 S Price motion to Adopt adopted Roll Call 125

04/03/2019 S Motion to Read a Third Time and Pass adopted Roll

04/04/2019 S Engrossed

04/04/2019 H Read for the first time and referred to the House of Representatives committee on State Government

H Acted on by State Government as Favorable

quires an annual report to distributed among the stricts by the Board, rather an a state plan

andates the Board to ovide for call and data livery to the 9-1-1 centers

rects the Executive rector of the Alabama 9-1-1

oard to prepare an annual port detailing the training ovided by the Board

Page 6: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

AT&T-aintained

CPE PSAPs

Ndigital nces with the ork ementation, reach out to

idual PSAPs to t in this process.

To request a visit from an AT&T for ANGEN prep work with INdigplease use the steps listed below:

1) The PSAP should contact Sandi Benzehafer of the AT&T 911 ServiceManagement Team via email at [email protected]. The PSAP should advthey wish to schedule a vendor meet with INdigital for ANGEN prep woThe PSAP will be asked to provide the following information as part of request:◦ i. PSAP Name◦ ii. PSAP Address◦ iii. Local PSAP contact name and number for our technician to use◦ iv. Approval of billable charges◦ v. Date vendor meet is requested

*Note: this work requires a minimum 7 days’ advance scheduling, so it recommended to reach out to Sandi as soon as possible in advance of yorequested date.

2) Sandi will confirm receipt of the request back to the PSAP and adviseany special considerations prior to scheduling the work.

3) Sandi will schedule the vendor meet on the date requested and confirback to the PSAP the vendor meet has been scheduled along with an ATticket number for reference.

Page 7: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

ANGEN 2.0 Activities

Alabama Next Generation Emergency Network

Page 8: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions
Page 9: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions
Page 10: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

aving Texty Installed in Your PSAP

Fill Out Survey• Counties in yellow have 

submitted their survey.

Page 11: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

aving Texty Installed in Your PSAP

Fill Out Survey• Counties in yellow have submitted their survey.

Page 12: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

aving Texty Installed in Your PSAP

Fill Out Survey

Return Letter of Agreement and Request for Service• Will be emailed to you following 

completion of the PSAP survey.• Still awaiting LOA from counties 

in red.

INdigital reaches out to thecarriers on your behalf.• Carrier activity in tan

INdigital will schedule Texty install in the PSAP.

Page 13: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

Events of Note

March 19thOzark‐Dale Bomb Threat

Page 14: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

Optimal Service Button (OSB) Utilizatio

OSB is currently active in the Wiregrass on MEVO.“Abandon” was pressed when the threat was realized and the PSAP staff evacuated.Calls were automatically sent to Dothan/Houston County

Page 15: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

OSB Importance

• INdigital’s NOC was immediately aware the PSAP had been abandoned. 

• No 9‐1‐1 calls were missed even though it was not safe tooperate from the PSAP.

Page 16: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

Notes from the Deputy

Director

GISA Conference

Training Notices Distribution List• If you would like to be added to this email list, please

contact Adam Brown, [email protected] or Dana Grubbs, [email protected].

Page 17: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

When What Where

April 16-18, 2019

9-1-1 Center Supervisor Program-Limited availability, please contact the Alabama 9-1-1 Board office.

Elmore County EOC, Wetumpka, AL

April 30-May 1, 2019

ALEMD Phase 1 Instructor Course

Alabama 9-1-1 Board, Montgomery, AL

May 6-8, 2019 Center Training Officer Program (CTO)

DeKalb County 9-1-1, Rainsville, AL

June 4, 2019 Recruit, Hire, Retain, & Promote for Success

Alabama 9-1-1 Board, Montgomery, AL

July 9, 2019 Recruit, Hire, Retain, & Promote for Success

Birmingham 9-1-1, Birmingham, AL

August 13, 2019

Quality Assurance: Achieving QA/QI in the PSAP

Shelton Community CoGallion, AL

September 17, 2019

Quality Assurance: Achieving QA/QI in the PSAP

Central Alabama CommCollege, Alexander Cit

things ning…

.

Page 18: 04.11.19 Webinar Slides - al911board.com · September 17, 2019 Quality Assurance:Achieving QA/QI in the PSAP Central Alabama Comm College, Alexander Cit things ning…. uestions

uestions