1 04.04.2007 SB Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard by Robert

04.04.2007 SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard

Embed Size (px)

DESCRIPTION

SB 3

Citation preview

Page 1: 04.04.2007 SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard

1 04.04.2007 SB

Cables from PP to calorimetersCabling being done by ITEP-Moscow and IAP-Bucarest teamSummary for cables/connectors list, rack wizard by Robert

Page 2: 04.04.2007 SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard

2 04.04.2007 SB

Cables routing

PP -> fix point -> ECAL PP -> fix point -> HCAL

HCAL -> fix point -> ECAL

380V + control for power supplies Power for CWs, pin-diods Data and TTC optical cables ECS SPECS Radioactive source for HCAL DSS Water

Trigger cables

Page 3: 04.04.2007 SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard

3 04.04.2007 SB

Page 4: 04.04.2007 SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard

4 04.04.2007 SB

Optical cables few problems identified by Patrick:

Trigger-Data fibers are not tagged Colour convention problem

to test before installation ? Trigger cables HCAL -> ECAL

length critical for 6 cables => individual routing Water cooling: water reservoir still to be produced Manpower “sharing” with other activities

Some details

Page 5: 04.04.2007 SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard

5 04.04.2007 SB

Minimal cabling for common test (ECAL L3B01 + HCAL L3A03)

380 V + control Data + trigger optical Trigger HCAL -> ECAL SPECS for CROCs, voltage and light distribution boards

ECAL+HCAL Power CWs and LEDs (?), backup: keep power supplies on the

calorimeter Turbines for two racks involved Connection of two chillers

problem: guarding/monitoring the power for chillers and turbines

Cabling for common test

Page 6: 04.04.2007 SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard

6 04.04.2007 SB

C-side rack 1 for ECAL/PS and HCAL rack to be finished on the week of 9/10 (partial DSS, temporary water?)

C-side to be completed on the week of 16/10 (partial DSS, temporary water?)

A-side to start on the week of 16/10 Permanent labels pending

Outlook