Carbon di-oxide ReportTejgaonReport: 04
A. No. of runs 1 nos. 0 nos.B. Running hours 659 hrs 0 hrsC. Average Start up time 2.0 hrs 0.0 hrsD. Start up time (a x c) 2.0 hrs 0.0 hrsE. Production Hours 657 hrs 0 hrsF. Natural Gas Hours 659 hrs 0 hrsG. Breakdown/Maintenance time 61 hrs - hrsH. Idle time 0 hrs 0 hrsI. Titas gas consumption 191,677 m3 0 m3J. CO2 Storage Tank (Opening Stock) 70,577 Kg. 0 Kg.K. Total Production (Total Received) 308,479 Kg. 0 Kg.L. Production in cyl. (CO, PCO, PMCO) 14,179 Kg. 0 Kg.M. Dry Ice production (DRYICE) 8,900 Kg. 0 Kg.N. Tanker Delivery of LCO (LCO) 313,925 Kg. 0 Kg. O. Total Loss 25,916 Kg. 0 Kg.P. Total Issue 362,920 0 Kg.Q. CO2 Storage Tank (Closing Stock) 16,135 Kg. 0 Kg.R. Production by Natural Gas 303,139 Kg. 0 Kg.S. Production rate by NG 461 Kg/Hr. #DIV/0! Kg/Hr.T. Gas Yield 1.58 Kg./M3 #DIV/0! Kg./M3U. Power Consumption 136,377 Kwh. 0 Kwh.V. Specific Power 0.450 Kwh/kg #DIV/0! Kwh/kgW. Dry Ice Recovery 5,340 Kg
X. % Loss 7.14 %
Y. Maintenance: i.
For the month of April-14Budget Actual Variance Budget Actual Variance
Carbon di-oxide, Kg 362,000 303,139 -16% 1,364,000 952,309 -30%
Copy toHead of Supply, CO Area Manager, TejgaonFinance Manager, CO 1-May-14
Product Volume
Wittemann Union
April-14
Cumulative
LCO2 Pump MaintenanceCO2 Gas Cooler Maintenance,Heat Exchanger,CO2 Compressor,Cooling Tower Pump Filter