HIGHWAY MATERIALSPart 2
Compaction and CBR
Mr Che Ros Ismail| Dr Norhidayah Abdul Hassan
Faculty of Civil Engineering
8/18/2019 02-Highway Materials - Compaction CBR
2/20
How to determine the
strength or bearingcapacity of soil?
2
8/18/2019 02-Highway Materials - Compaction CBR
3/20
3
Two major processes
Compaction test
(determine Maximum DryDensity, MDD and Optimum
Moisture Content, OMC)
California Bearing Ratio test
(determine CBR value)
8/18/2019 02-Highway Materials - Compaction CBR
4/20
Compact ion
4
Data and analysis
Calculate dry density andmoisture content (plot DD vs. MC)
Determine MDD and OMC
Compaction of sample
Tools: mold 2.3L, hammer 4.5 kgProcedures: compacted for 5
layers, 62 blows/layer
Sample preparation
dry soil (particle size ≤ 20mm) 5 different moisture contents
8/18/2019 02-Highway Materials - Compaction CBR
5/20
5
1
2
Compaction steps
8/18/2019 02-Highway Materials - Compaction CBR
6/20
Compaction steps
6
3
4
8/18/2019 02-Highway Materials - Compaction CBR
7/20
7
4
5
Compaction steps
8/18/2019 02-Highway Materials - Compaction CBR
8/20
Example Data:
Compaction data:
Moisture content data:
Sample1
Sample2
Sample3
Sample4
Sample5
Mass of mould (g)
Mass of mould + compacted sample (g)
Mass of compacted sample (g)
Bulk Density (Mg/m3)
Dry density (Mg/m3)
Sample
1
Sample
2
Sample
3
Sample
4
Sample
5
Mass of container (g)
Mass of container + wet sample (g)
Mass of container + dry sample (g)
Moisture content (%)
8/18/2019 02-Highway Materials - Compaction CBR
9/20
Dry Density vs. Moisture Content
Moisture Content
Dry Density
Compaction
CurveMDD
OMC
8/18/2019 02-Highway Materials - Compaction CBR
10/20
CBR Test
Data and analysisDetermine dry density, Plot Load (kN)
vs. Penetration of Plunger (mm)Determine Top and bottom CBR
values at 2.5 and 5 mm pen.
Compaction of sampleTools: mold 2.3L, hammer 4.5
kgProcedures: 3 samples, compacted for 5 layers,65, 35, 15 blows/layer, soaked in water for 4 days
Sample preparation
dry soil (particle size ≤ 20mm) optimum moisture content
8/18/2019 02-Highway Materials - Compaction CBR
11/20
11
Top
Bottom
Soaked CBR
8/18/2019 02-Highway Materials - Compaction CBR
12/20
12
CBR Testing
Sample
Penetration
dial gauge
Loading
dial gauge
8/18/2019 02-Highway Materials - Compaction CBR
13/20
13
CBR 1
0 2 4 6 8
0
2
4
6
8
10
12
Penetration, mm
L o a d , k
N
2.5 5.0
8/18/2019 02-Highway Materials - Compaction CBR
14/20
14
CBR 2
0 2 4 6 8
0
2
4
6
8
10
12
Penetration, mm
L o a d ,
k N
2.5 5.0
8/18/2019 02-Highway Materials - Compaction CBR
15/20
15
CBR 3
0 2 4 6 8
0
2
4
6
8
10
12
Penetration, mm
L o a d , k
N
0 2.5mm 5.0mm
Tangent line
8/18/2019 02-Highway Materials - Compaction CBR
16/20
CBR analysis
1. Calculate CBR values of top and bottom @ 2.5 and 5.0mm:
[email protected] = load at 2.5mm/13.24 x100
[email protected] = load at 5.0mm/19.96 x100
2. Report the highest CBR values for top and bottom and dry
density for all 3 samples
3. Plot CBR values versus dry density and determine CBR at
95% compaction (95% MDD)
16
8/18/2019 02-Highway Materials - Compaction CBR
17/20
CBR vs . DD Data
17
8/18/2019 02-Highway Materials - Compaction CBR
18/20
18
CBR vs. DD
95% compaction = 95% MDD
8/18/2019 02-Highway Materials - Compaction CBR
19/20
19
I n-situ CBR
8/18/2019 02-Highway Materials - Compaction CBR
20/20
THANK YOU