22

010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come
Page 2: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

NeTIRail-INFRA Mid-termconference

4 November 2016, “Maison Grand Place” Grand Place, 19 – 1000 Brussels

Giorgio Travaini

Programme Coordinator – S2R JU

2

Page 3: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

A public-private partnership, a platform for the railsector as a whole to work together to drive innovationin the years to come until 2024

The S2R Joint Undertaking has been created in June 2014 to play amajor role in rail-related research and innovation, ensuringcoordination among projects and providing all stakeholders with

what is S2R

coordination among projects and providing all stakeholders withrelevant and available information on projects funded across Europe.It shall also manage all rail- focused research and innovation actionsco-funded by the UnionCouncil Regulation (EU) No 642/2014 of 16 June 2014 (S2R Regulation)

It reached autonomy in May 2016, it is now fullyoperational

3

Page 4: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

How is the Shift2Rail JU changing theR&I landscape of the rail sector?

Overcome the

Foster focused,coordinated

and long-terminvestment in

EU rail R&I

Increase theleverage

effect of EUrail R&I

Increase theoperational

performanceand cost-

effectiveness of

Shift2Rail is specially designedwithin Horizon 2020 toovercome the issues of R&Ifragmentation and to supportmarket uptake and theimplementation of innovativesolutions. Overcome the

issues of R&Ifragmentationand to support

the marketuptake

rail R&Ifunding

Establishsustained

networks andknowledgeexchangebetweendiverse

stakeholders

Ensure asystem-wideapproach toinnovation

and cost-effectiveness of

rail R&Isolutions.

Shift2Rail represent a powerfulinstrument to complement andsupport the establishment of theSingle European Railway Areaand contribute to meeting theambitious objectives of the EUtransport policy.

Page 5: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

Shift2Rail objectives

• Achieve the Single European RailwayArea through the removal of remainingtechnical obstacles holding back the railsector in terms of interoperability;

• Radically enhance the attractiveness andcompetitiveness of the European railwaysystem to ensure a modal shift towardsrail;

• Help the European rail industry to retainand consolidate its leadership on theglobal market for rail products andservices.

5

Page 6: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

The Shift2Rail FrameworkFrom policy objectives to concrete activities

• The general objectives of the Shift2Rail JointUndertaking are described in the Shift2RailRegulation, adopted on 16 June 2014

• The S2R Master Plan translates the generalobjectives into specific objectives, providing ahigh-level strategic vision to achieve them and

The S2RRegulation

The S2R

6

high-level strategic vision to achieve them andidentifying key priority research areas

• The S2R Multiannual Action Plan (MAAP),provides a detailed, long-term investment planthat concretely identifies the projects, milestonesand deliverables to achieve the Master Planobjectives

• The Annual Work Plans translate the S2R MAAPinto detailed, result-oriented activity plans andserve as the basis for identifying the JU calls

The S2RMaster Plan

The S2R MultiannualAction Plan

The S2R Annual Work Plans

Page 7: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

The Innovation Programmes

7

Page 8: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

From TRL0 to TRL6/7

8

Page 9: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

programme financials

IPs 777 M

IP1

225M

IP2

195M

IP3

153M

IP4

86M

IP5

83M

CCA

35M

IKAA163M

Other27M

9

225M 195M 153M 86M 83M 35M 27M

Programme 967M

S2R (H2020)

Co-Fin 450M

Railway Sector Net

Contribution 517M

Val

ues

asat

1Se

pt

20

16

inM

illio

nEU

R

Page 10: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

• 8 Founding Members other than the Union havingcommitted at least EUR 30 million for the duration ofShift2Rail, to secure substantial industry co-fundingfrom the start

• 19 Associated Members selected as a result of a callrepresenting a broad range of actors from the entire

an open organization

representing a broad range of actors from the entirerail value chain and from other innovative sectors,including SMEs, research organisations, universities,etc.

• at least 30% of the Union contribution through calls fornon-JU members

10

Page 11: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

Who are the members of the S2R JU other than the Union?

8 founding membersother than the Union

Alstom, Ansaldo STS, Bombardier, Construcciones y Auxiliar de Ferrocarriles (CAF), Siemens,Thales and infrastructure managers Trafikverket and Network Rail

12 associatedmembers that aresingle legal entities

Amadeus IT Group, AZD Praha, Deutsche Bahn, DIGINEXT, Faiveley Transport, HaConIngenieurgesellschaft, INDRA Sistemas, Kapsch CarrierCom, Knorr-Bremse, MER MEC, SNCFMobilités, Patentes Talgo

7 associatedmembers that areconsortia

• AERFITEC (AERNNOVA Aerospace, FIDAMC, Fundacion TECNALIA)

• Competitive Freight Wagon (Contraffic, DLR, Waggonbau Niesky, Centro de Estudios eInvestigaciones Técnicas (CEIT), Verband der Bahnindustrie in Deutschland)

11

consortia Investigaciones Técnicas (CEIT), Verband der Bahnindustrie in Deutschland)

• EUropean Rail Operating community (Infraestruturas de Portugal, Association of TrainOperating Companies, BLS, CP, Finnish Transport Agency, ÖBB-Infrastruktur, Polskie KolejePaństwowe, PRORAIL , Rede Ferroviária Nacional, Schweizerische Bundesbahnen, Slovenske zeleznice, Türkiye Cumhuriyeti Devlet Demiryollari)

• Smart DeMain (Strukton Rail, ACCIONA Infraestructuras, DLR, Fraunhofer, CEMOSA)

• SmartRaCon (DLR, CEIT, Fondation Railenium, Nottingham Scientific Ltd)

• Swi'Tracken (Fondation Railenium, Universidade Do Porto, Universidad Del Pais Vasco,Universidade Do Minho, TATASTEEL, VOSSLOH-COGIFER, Institut für Zukunftsstudien undTechnologiebewertung, EGIS RAIL, Groupe EUROTUNNEL, TRONICO ALCEN)

• Virtual Vehicle Austria consortium+ (Kompetenzzentrum, FCP Firtsch, GetznerWerkstoffe, Kirchdorfer Fertigteilholding, Plasser&Theurer, Vvoestalpine Schienen,Voestalpine VAE, Wiener Linien, AVL List, PJM Messtechnik, TATRAVAGONKA, AC2Tresearch, Materials Center Leoben Forschung

Page 12: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

where we are, latest news

• Lighthouse, ongoing 4 Projects & 52 Mio EUR

• Members’ R&I activities, 1 Sept 16, 13 Projects & 142Mio EUR

• OC R&I activities, 1 Nov 16, 14 Projects & 25 Mio EUR

• 1st meeting of System Integration Working Group

12

• 1 meeting of System Integration Working Group

• MAAP Top Down review

• AWP 2017 under preparation & Info Days

• Set up of the Organization ongoing

Page 13: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

Cost-Efficient and Reliable High-CapacityInfrastructure

Focus on Innovation Programme 3

Infrastructure

13

Page 14: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

Objectives of IP3

• Builds on In2Rail – lighthouse project …but input coming also from other EU funded

projects, in particular those funded under theH2020 2014 call

• Improved reliability• Enhanced capacity

14

• Enhanced capacity• Improved customer experience• Lower investment costs• Reduced operating costs• Respect and adaption of TSIs• Removal of open-points• Improved standardisation

Page 15: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

Management of inter-dependencies

15

IAMS = Intelligent Asset ManagementSolutionsRIMMS = Railway Integrated Measuring andMonitoring SystemDRIMS = Dynamic Railway InformationManagement System

Page 16: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

S2R IP3 projects status and the MAAP150,3M€until 2024

16

OC complementary projects

22,7M€ value (10,1M€ S2R grants)

5M€ value (100% funded)

CFM projects

Cal

ls2

01

5-2

01

6

13M€ value

Lighthouse project

Page 17: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

IN2SMART – S2R key expected outcome

Project started on September 1. 16,4M€ value (7,3M€ funding)

Scope :

• Identify, measure and collect data/information related to the status of therail infrastructural assets

• Manage heterogeneous data/information of railway infrastructural assetsthrough open, standardised, seamless and secure approaches.

• Investigate intelligent asset management and execution strategies

17

• Investigate intelligent asset management and execution strategies

Expected impact :

Reduction in the recurrent costs of rail operations within a range of 25-45%.Taking the context of the work streams into account, the lower operating costswill evolve from reductions maintenance costs (~25%) and increases inreliability of operation (~20%). Furthermore lean implementation strategies mayamount up to 30% of total costs

Page 18: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

IN2TRACK – S2R key expected outcome

Project started on September 1. 6,3M€ (2,8M€ funding)

Scope :

• Methods for improved prediction, monitoring and mitigation ofdeterioration and lateral instability of rails and switches & crossings;

• For bridges and tunnels inspection technology with capability of detectingdamages at early stage. Methods for improving performance of bridges andtunnels;

• Noise and vibrations, both rolling noise and squeal noise and the impact of

18

• Noise and vibrations, both rolling noise and squeal noise and the impact ofdifferent innovative solutions on generation, translation and emission ofnoise;

Expected impact :

• Contribute to tracks and civil structures by increasing the lifetime,decreasing traffic disturbances, and identifying new solutions for tracks,switches & crossings, bridges and tunnels

• Decreased noise and vibration impact

Page 19: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

S-CODE – S2R key expected outcome

Project started on November 1. 5M€ value and funding

Scope:• next generation of track and switches and crossings (S&C) design towards

intelligent systems

• smart design and material science solutions targeting simplified systems

new switching function using novel kinematic elements and mechatronics• new switching function using novel kinematic elements and mechatronicstechnology

Expected impacts:• improvements in capacity, reliability and safety, while at the same time

reducing investment and life cycle costs

Page 20: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

IP3 Next steps

20

Page 21: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come

THANK YOU FOR YOUR ATTENTION

IP3 Contact:

21

IP3 Contact:[email protected]

Visit our website:www.shift2rail.org

Page 22: 010 161104 S2R NETIRAILINFRA - NeTIRail projectnetirail.eu/IMG/pdf/010_161104_s2r_netirailinfra.pdf · sector as a whole to work together to drive innovation in the years to come