01. Grounding Plan

Embed Size (px)

Citation preview

  • 8/12/2019 01. Grounding Plan

    1/1

    Appd.Rev. Revision Date

    Prepared by

    ABB AB FACTS

    Document No.

    No. of sh.

    Sheet

    Rev Ind

    Title (English)

    Title (own language)Date

    Issued by Dept

    Approved by

    Drawn byAssembly dwg

    Vignesh

    K Ekstrm 2011-05-17

    DM

    Vignesh

    JNS 5 D MK 1

    1

    Grounding plan

    A

    F 5

    2011-06-29

    Form

    No

    Designcheckedby

    Sheet

    Cont

    YearWeek

    Dept

    RevInd

    Drawnby

    2011-05-17 VENDOR'S DRG. NO.-

    UNIT:PACKAGE :

    SCALE -

    TITLE :DESIGN

    DRAWN

    CHKD

    APPROVED

    DATE REV.SH.No.

    PROJECT DRG.NO.-

    CATEGORY OF DRG. APPROVAL INFORMATION REFERENCE RECORD CONSTRUCTION

    SIZE A1

    6MPTA INTEGRATED STEEL PLANT AT AN GUL, O RISSA

    -

    1 o f1

    0

    C0

    9

    10

    O

    IS

    MPOAN

    Y

    Vignesh

    Vignesh

    Katarina

    Katarina

    Grounding Plan

    MECON LIMITED

    JINDAL STEEL & POWER LIMITED

    ASEA BROWN BOVERI

    1:100

    N

    3.

    1.

    2.

    4.

    between parallel conduits and earthwire

    NOTE:

    Follow the instructions describedin dwg. XN 360 000-ACS "Guidlinesfor installation of grounding conductors".

    Where it is not stated the contrarythe earthwire is buried min. 600 mmbelowe the finished ground level.

    The top layer of crushed stones shall bebetween 100 - 150 mm. The resistivityof the layer, wetted with groundwater,shall be approx. 3000 Ohm-m.

    Earthwire shall follow the route forburied cable conduits. Maximum distance

    is 500 mm.

    XX

    X

    M5

    b

    b

    b b

    b

    b

    b b b

    b b b

    a a a

    K3

    b

    b

    b

    aa

    a

    a

    aa

    a

    a

    F1

    F1

    F1

    F1

    F1

    F1

    K4K4K2

    K2

    K2

    K2

    K1 K1 K1 K1 K1 K1 K1

    C1C1C1

    F2F2F2

    C1C1C1

    M1M1M1M2M2M2

    F3F3F3

    C1C1C1

    K3

    D1

    K3

    C2C2

    K6K6K6

    K5

    M4

    K5

    K5

    a

    M4

    M4

    M3

    M3

    M3

    K3K3

    D1

    K6K6

    K6

    K6

    K6

    M5

    M5

    D1

    K6

    Fence

    D1

    SVC Building

    earthing gridConnect to 33kv Swtchyard

    earthing grid

    Cable trench

    D1D1D1D1D1

    Connect to 33kv Switchyard

    Cable trench from 33kV switchyard

    D1

    Current transformerC1,C2

    DisconnectorD1

    Jointing point to equipm. steel structure

    Connection pionts

    JSPL Angul SVC-Q, India

    PVC conduits

    MS Rod 40 mm Dia. approx L=1000 (INABB scope)

    150mm2 Copper conductor (supplier by SEABB)

    b=9m

    No connectionX

    a=4melse is noted)(L=approx 1,0m above ground where nothing

    Designation Foundation for

    F1,F2,F3 ReactorM1,M2,M3,M4,M5 Capacitor Banks

    K1.K2,K3,K4,K5,K6 Pillars

    A As per 1JNS10150D1ME-Rev A KE 2011-08-07

    C

    B

    w

    i

    e

    r

    s

    e

    c

    t

    d

    .

    A

    B

    B

    A

    B

    u

    s

    e

    d

    r

    n

    y

    n

    a

    u

    t

    o

    r

    z

    e

    d

    u

    r

    o

    s

    e

    .

    o

    n

    t

    v

    e

    n

    t

    o

    n

    m

    u

    s

    t

    o

    t

    e

    m

    p

    a

    r

    d

    i

    a

    r

    o

    r

    e

    w

    r

    n

    e

    r

    i

    s

    s

    i

    o

    n

    n

    d

    e

    n

    t

    n

    t

    e

    r

    o

    f

    T

    h

    i

    s

    o

    c

    m

    e

    n

    t

    m

    u

    s

    t

    o

    t

    e

    p

    i

    e

    d

    w

    i

    o

    u

    t

    u

    r

    2

    G

    F

    E

    D

    C

    B

    A

    2 3 4 5 6 7 8 9 2

    H

    G

    F

    E

    D

    A