8/12/2019 01. Grounding Plan
1/1
Appd.Rev. Revision Date
Prepared by
ABB AB FACTS
Document No.
No. of sh.
Sheet
Rev Ind
Title (English)
Title (own language)Date
Issued by Dept
Approved by
Drawn byAssembly dwg
Vignesh
K Ekstrm 2011-05-17
DM
Vignesh
JNS 5 D MK 1
1
Grounding plan
A
F 5
2011-06-29
Form
No
Designcheckedby
Sheet
Cont
YearWeek
Dept
RevInd
Drawnby
2011-05-17 VENDOR'S DRG. NO.-
UNIT:PACKAGE :
SCALE -
TITLE :DESIGN
DRAWN
CHKD
APPROVED
DATE REV.SH.No.
PROJECT DRG.NO.-
CATEGORY OF DRG. APPROVAL INFORMATION REFERENCE RECORD CONSTRUCTION
SIZE A1
6MPTA INTEGRATED STEEL PLANT AT AN GUL, O RISSA
-
1 o f1
0
C0
9
10
O
IS
MPOAN
Y
Vignesh
Vignesh
Katarina
Katarina
Grounding Plan
MECON LIMITED
JINDAL STEEL & POWER LIMITED
ASEA BROWN BOVERI
1:100
N
3.
1.
2.
4.
between parallel conduits and earthwire
NOTE:
Follow the instructions describedin dwg. XN 360 000-ACS "Guidlinesfor installation of grounding conductors".
Where it is not stated the contrarythe earthwire is buried min. 600 mmbelowe the finished ground level.
The top layer of crushed stones shall bebetween 100 - 150 mm. The resistivityof the layer, wetted with groundwater,shall be approx. 3000 Ohm-m.
Earthwire shall follow the route forburied cable conduits. Maximum distance
is 500 mm.
XX
X
M5
b
b
b b
b
b
b b b
b b b
a a a
K3
b
b
b
aa
a
a
aa
a
a
F1
F1
F1
F1
F1
F1
K4K4K2
K2
K2
K2
K1 K1 K1 K1 K1 K1 K1
C1C1C1
F2F2F2
C1C1C1
M1M1M1M2M2M2
F3F3F3
C1C1C1
K3
D1
K3
C2C2
K6K6K6
K5
M4
K5
K5
a
M4
M4
M3
M3
M3
K3K3
D1
K6K6
K6
K6
K6
M5
M5
D1
K6
Fence
D1
SVC Building
earthing gridConnect to 33kv Swtchyard
earthing grid
Cable trench
D1D1D1D1D1
Connect to 33kv Switchyard
Cable trench from 33kV switchyard
D1
Current transformerC1,C2
DisconnectorD1
Jointing point to equipm. steel structure
Connection pionts
JSPL Angul SVC-Q, India
PVC conduits
MS Rod 40 mm Dia. approx L=1000 (INABB scope)
150mm2 Copper conductor (supplier by SEABB)
b=9m
No connectionX
a=4melse is noted)(L=approx 1,0m above ground where nothing
Designation Foundation for
F1,F2,F3 ReactorM1,M2,M3,M4,M5 Capacitor Banks
K1.K2,K3,K4,K5,K6 Pillars
A As per 1JNS10150D1ME-Rev A KE 2011-08-07
C
B
w
i
e
r
s
e
c
t
d
.
A
B
B
A
B
u
s
e
d
r
n
y
n
a
u
t
o
r
z
e
d
u
r
o
s
e
.
o
n
t
v
e
n
t
o
n
m
u
s
t
o
t
e
m
p
a
r
d
i
a
r
o
r
e
w
r
n
e
r
i
s
s
i
o
n
n
d
e
n
t
n
t
e
r
o
f
T
h
i
s
o
c
m
e
n
t
m
u
s
t
o
t
e
p
i
e
d
w
i
o
u
t
u
r
2
G
F
E
D
C
B
A
2 3 4 5 6 7 8 9 2
H
G
F
E
D
A