Scope Parameters Page 1 of 10 Annexure 2: Scope Parameters Sheet Following points are mandatory for preparation of offer: Sr. No. Scope Details A Contact Details: 1 Client Name & complete address with Phone no. 2 Contact person, designation & Phone / Cell no. 3 Complete Name of work B Line Details 1 Line details - Circuit ( SC or DC) & KV. 2 Line length in Km 3 Number of phases. 4 New Line / Rectification of Existing line 5 Total No. of Angle Towers

002 - Annexure 2 - Scope Parameters Sheet

Embed Size (px)

DESCRIPTION

scope para

Citation preview

Page 1: 002 - Annexure 2 - Scope Parameters Sheet

Scope Parameters

Page 1 of 5

Annexure 2: Scope Parameters Sheet

Following points are mandatory for preparation of offer:

Sr. No. Scope Details

A Contact Details:

1 Client Name & complete address with Phone no.

2 Contact person, designation & Phone / Cell no.

3 Complete Name of work

B Line Details

1 Line details - Circuit ( SC or DC) & KV.

2 Line length in Km

3 Number of phases.

4 New Line / Rectification of Existing line

5 Total No. of Angle Towers

Page 2: 002 - Annexure 2 - Scope Parameters Sheet

Scope Parameters

Page 2 of 5

6 Total No. of Suspension Towers

7 Tower details No. of towers Nominal Span

a 2 degree Supension towers

b 15 degree angle towers

c 30 degree angle towers

d 45 degree angle towers

e 60 degree angle towers

f 90 degree angle towers

C Offer Type: (Total Turnkey / Partial Turnkey / Supply)

D Detailing of Scope for supply portion Type / Complete details

1 Supply of Conductors Yes / No

2 Supply of Earthwire Yes / No

3 Supply of Insulators. Yes / No

4 Supply of OPGW. Yes / No

Page 3: 002 - Annexure 2 - Scope Parameters Sheet

Scope Parameters

Page 3 of 5

5 Supply of Monopole Accessories Yes / No

6 Supply of Hardware & Accessories of Conductor & Earthwire Yes / No

7 Supply of Hardware & Accessories of OPGW Yes / No

8 Supply of Pipe Type Earthing Yes / No

9 Supply of Counterpoise Earthing Yes / No

10 Other materials, not covered above Yes / No

11 Specifications of which power utility to be refered

12 If Not, Alternative new specifications if any

13 Owner Supplied Materials

E Detailing of Scope for Erection portion Remarks / Details, if any

Page 4: 002 - Annexure 2 - Scope Parameters Sheet

Scope Parameters

Page 4 of 5

1 Check Survey Yes / No

2 Detailed Survey Yes / No

3 Soil Investigation Yes / No

4 Excavation in Soft Soil Yes / No

5 Excavation in Hard Murum Yes / No

6 Excavation in DFR / Soft Rock Yes / No

7 Excavation in Hard Rock Yes / No

8 Fixing of Earthing Yes / No

9 Supply & Fixing of Reiforcement steel Yes / No

10 RCC / PCC Yes / No

11 Monopole Erection Yes / No

Page 5: 002 - Annexure 2 - Scope Parameters Sheet

Scope Parameters

Page 5 of 5

12 Dismantaling of existing tower, if any Yes / No

13 Stringing Yes / No

14 Destringing & Restringing, if any Yes / No

15 Other Activities, not covered above Yes / No

F Other Special Comments, if any

G Offer Required by (Date)