1
SAP Note Header Data Symptom When you confirm internal activities within repetitive manufacturing, the system generates the error message RU008 ("No operations exist in order &"). Other Terms Transactions: MFBF, MF40; reference cost estimate Reason and Prerequisites The cost estimate used for the confirmation was created with a reference cost estimate. However, the referenced cost estimate was created with a costing variant which does not allow the update of the standard price. Result: The data on the operation required for the confirmation is saved in the database. Solution Only carry out a cost estimate for repetitive manufacturing materials by means of the reference cost estimate if the referenced cost estimate permits the update in the material master. Validity References This document refers to: SAP Notes This document is referenced by: SAP Notes (1) 453847 - Error message RU008 with confirmation of operations Version 1 Validity: 21.11.2001 - active Language English Released On 21.11.2001 23:00:00 Release Status Released for Customer Component CO-PC-PCP Product Cost Planning Priority Recommendations / Additional Info Category Consulting Software Component From Rel. To Rel. And Subsequent SAP_APPL 45A 45B 46A 46B 46C 46C 470 470 1013857 MFBF: Message RU 008 for repetitive manufacturing confrmtion 1013857 MFBF: Message RU 008 for repetitive manufacturing confrmtion

0000453847

  • Upload
    burak

  • View
    65

  • Download
    9

Embed Size (px)

DESCRIPTION

product cost planning

Citation preview

  • SAP Note

    Header Data

    Symptom

    When you confirm internal activities within repetitive manufacturing, the system generates the error message RU008 ("No operations exist in order &").

    Other Terms

    Transactions: MFBF, MF40; reference cost estimate

    Reason and Prerequisites

    The cost estimate used for the confirmation was created with a reference cost estimate. However, the referenced cost estimate was created with a costing variant which does not allow the update of the standard price. Result: The data on the operation required for the confirmation is saved in the database.

    Solution

    Only carry out a cost estimate for repetitive manufacturing materials by means of the reference cost estimate if the referenced cost estimate permits the update in the material master.

    Validity

    References

    This document refers to:

    SAP Notes

    This document is referenced by:

    SAP Notes (1)

    453847 - Error message RU008 with confirmation of operations

    Version 1 Validity: 21.11.2001 - active Language English

    Released On 21.11.2001 23:00:00 Release Status Released for Customer Component CO-PC-PCP Product Cost Planning Priority Recommendations / Additional Info Category Consulting

    Software Component From Rel. To Rel. And Subsequent

    SAP_APPL 45A 45B

    46A 46B

    46C 46C

    470 470

    1013857 MFBF: Message RU 008 for repetitive manufacturing confrmtion

    1013857 MFBF: Message RU 008 for repetitive manufacturing confrmtion