17
Get Complete Collection of IBM Exam's PDF. 1 Total Question 10 IBM 000-189 Blueworks Live; IBM Business Process Manager Express or Standard Edition V7.5.1, BPM Analysis Exam http://www.test4certification.com/000-189.html

000-189 test4certification.com

Embed Size (px)

DESCRIPTION

 

Citation preview

Get Complete Collection of IBM Exam's PDF.

1

Total Question 10

IBM 000-189

Blueworks Live; IBM Business Process Manager Express or

Standard Edition V7.5.1, BPM Analysis Exam

http://www.test4certification.com/000-189.html

Get Complete Collection of IBM Exam's PDF.

2

Question: 1 A BPM analyst is creating a process model for requesting a renovation permit. The BPM analyst is using the following description of the first activity: "One of our municipal office clerks receives a paper permit application from the local resident, an applicant. The clerk first looks up the resident's name and address in our system, then enters the information from the paper application into the system, and assigns a temporary permit number to the application. When the application entry is complete, the clerk sends it to a manager to assign it to an adjudicator." Which name should the BPM analyst use for the first task that accurately describes the activity and follows recommended naming conventions? A. Application Entry B. Create Application C. Clerk Receive and Enter Application D. Lookup name, create application, assign number, and send it to the manager

Answer: B

Question: 2 A BPM analyst needs to make a change to the connections in the following process diagram. The order of activities needs to be changed so that "Grind Beans" is followed by "Brew Coffee". "Heat Milk" will come last after "Brew Coffee".

How should the BPM analyst make this change to the connection?

Get Complete Collection of IBM Exam's PDF.

3

A. Click on the "Brew Coffee" activity and drag it onto the connection between "Grind Beans" and "Heat Milk" B. Click on the "Grind Beans" activity and drag it onto the connection between "Heat Milk" and "Brew Coffee" C. Click on the connection between "Heat Milk" and "Brew Coffee" and drag the connection arrow to "Grind Beans" D. Click on the connection between "Grind Beans" and "Heat Milk" and drag the connection arrow to "Brew Coffee".

Answer: A

Question: 3 A BPM analyst is designing a process in the Process Diagram View, and realizes the process must account for a technical exception following an activity. What symbol in the BlueWorks Live needs to be used for this technical exception?

A. Option A B. Option B C. Option C D. Option D

Answer: B

Get Complete Collection of IBM Exam's PDF.

4

Question: 4 A BPM analyst has modeled the process for creating a custom coffee beverage. The BPM analyst noticed a lot of detail in the process model and has started refactoring the model to reduce the complexity. Which section of the process represents a series of activities performed by the same participant that the analyst reduced into a single activity?

Get Complete Collection of IBM Exam's PDF.

9

A. option A B. Option B C. Option C D. Option D

Answer: B

Question: 5 A BPM analyst has modeled the process for creating a custom coffee beverage. The BPM analyst noticed a lot of detail in the process model and has started refactoring the model to reduce the complexity. Which section of the process represents multiple roles working together that the BPM analyst reduced into a single sub-process without losing the intent or meaning of the process?

Get Complete Collection of IBM Exam's PDF.

14

A. Option A B. Otpion B C. Option C D. Option D

Answer: C

Question: 6 A BPM analyst has modeled the following process. However, after the "Extract Data" and "Send data use case template to client", the client has stated that "Complete data scenarios" should be done.

How should the BPM analyst adjust the process? A. Join A and B B. Insert join before A, and move B after A C. Insert Join before B, and move A after B D. Move B before A, and insert a join after A

Answer: B

Get Complete Collection of IBM Exam's PDF.

15

Question: 7 A company needs to improve their hiring process and hired a BPM analyst to map the current state. During the discovery session, the business subject matter experts (SMEs) indicate to the BPM analyst that the hiring request is reviewed by both the human resource admin and the human resource manager. How should the BPM analyst document the participant role for this activity? A. Assign the admin as the participant since the admin is paid less. B. Assign the manager as the participant since the admin reports to the manager. C. Break the "Review" task into separate tasks and define who does what. D. Pick either the admin or the manager and assign the "Review" task to that role.

Answer: C

Question: 8 A company needs to improve their hiring process and hired a BPM analyst to map the current state. What is the first thing the BPM analyst should do while constructing a discovery map? Identify the: A. Value-Add activities. B. sub processes within the hiring process. C. start and end points of the hiring process. D. activity where the maximum problems lie.

Answer: C

Question: 9 During the Process Discovery phase, the BPM analyst needs to schedule and plan for the Process Improvement and Discovery Workshop (PIDW). In planning the PIDW, what activities should the BPM analyst include on the agenda? A. 1. Prepare workshop participants. 2. Introduce BPM. 3. Identify: Business case overview. 4. Assess: Determine business impact. 5. Define: Document the business process. 6. Develop the use cases. 7. Discuss findings and proposed solution. B. 1. Prepare workshop participants. 2. Introduce BPM.

Get Complete Collection of IBM Exam's PDF.

16

3. Identify: Business case overview. 4. Assess: Determine business impact. 5. Define: Document the business process inventory and roadmap. 6. Develop the solution approach. 7. Discuss detailed estimates. C. 1. Prepare workshop participants. 2. Introduce BPM. 3. Identify: Business case overview. 4. Assess: Determine business impact. 5. Define: Document the business process. 6. Develop the solution approach. 7. Discuss findings and proposed solution. D. 1. Prepare workshop participants. 2. Introduce BPM. 3. Identify: Business case overview. 4. Assess: Determine business impact. 5. Define: Demonstrate the business process playback. 6. Develop the use cases. 7. Discuss findings and proposed solution.

Answer: C

Question: 10 During the Process Discovery phase, the BPM analyst needs to identify who must fully participate in the Process Improvement and Discovery Workshops (PIDW). Of the many roles in a BPM project, which roles must fully participate? A. Process Owner, Subject Matter Expert B. Technical Consultant, Process Owner, BPM Developer C. Technical Consultant, Process Owner, Project Manager D. Project Manager, Process Owner, Subject Matter Expert

Answer: A

Get Complete Collection of IBM Exam's PDF.

17

Thank You for Using Our Product

Test4certification provide latest certification material only.

Microsoft Cisco IBM HP Apple MCSE

70-281 70-282 CCNA

640-760 640-816 IBM Mastery

00M-646 00M-245 HP APC

HP0-J47 HP0-S29 ACMT

9L0-063 9L0-010

MCTS 70-664 70-672

CCNP 642-812 642-825

IBM Lotus 000-M64 000-M48

HP ASP HP3-C15 HP2-B44

Mac OS X 9L0-407 9L0-510

MCITP 70-667 70-642

CCDP 642-902 642-874

IBM Tivoli software 000-560 000-033

HP ASC HP2-E34 HP2-K22

ACTC 9L0-062 9L0-624

MBS MB6-872 MB2-876

CCSP 642-627 642-545

IBM Cloud Computing 000-032 000-280

HP Specialist HP3-X01 HP2-E44

ACSP 9L0-402 9L0-410

MCSA 2003 70-620 70-680

CCVP 642-427 642-642

IBM Storage 000-203 000-957

Master ASE HP0-J44 HP0-M24

ACMA 9L0-827 9L0-619

MCAS 77-884 77-602

CCDA 640-863 640-864

IBM WebSphere 000-172 000-216

HP Sales HP2-E43 HP2-Z14

Logic Pro 9 9L0-837 9L0-839

IBM 000-189

Blueworks Live; IBM Business Process Manager Express or

Standard Edition V7.5.1, BPM Analysis Exam

http://www.test4certification.com/000-189.html