FC-QAD-FM-0043 Rev. 1
Age
nda
Item
s
Initial Kick off meeting Readiness Review Meeting 1 Readiness Review Meeting 2 Readiness Review Meeting 3 Post Launch Review
Discipline - Title Name 5/1/2014 5/31/2014 6/30/2014 7/30/2014 10/11/2014
This tab is to be filled in by Fisher
2 OF 14
FC-QAD-FM-0043-Supplier AQP Tracking ReportRev. 1
"SUPPLIER AQP PROGRAM STATUS REPORT"
Red 0 Project Title Calculation Date:
Yellow 0Fisher to fill in. 5/10/2023
Green 0 SUPPLIER NAMEFisher to fill in.
Kick-off Date: 5/1/2014 Review Performed by:
INITIAL SUPPLIER KICK-OFF REVIEWProgram Definition
Manufacturing Plant(s):Address City State Country Zip Code
Supplier to fill in.Form can be modified to cover added items as needed.
Part Numbers: Part Description Parts per Vehicle
Material0 0Supplier to fill in.
Prints reviewed at meeting.
Vehicle Product Planning Volume (PPV)
Capacity Planning Volume (CPV): Hours
Per DayWork Days Per
Week
Any outside/secondary
processing / CQI's - Detail
3 OF 14
Team Members
NAME EmailQuality Manager Supplier to fill in Fisher Job #1 DateQuality Engineer JIT Job #1 Date
Plant Manager Fisher PPAP 9/1/2014 Need to change as neededMaterials Manager O.E.M. Job #1 Date 11/1/2014Program Manager
Item #
Status
Element Targeted Date Reviewed With Comments
Red
Yello
w
Gre
en
1.0 In presentation
2.0 In presentation
3.0
4.0
5.0 6/18/2014
6.0 Establish PPAP Date 7/2/2014
6.5 IPF Review
7.0
Phone Number
Element Reviewed
Program Defined / Statement of RequirementsFisher Milestones reviewedSupplier Time Line ReviewedEstablish First Hits off production tooling dateEstablish Run @ Rate Date
Establish Readiness Review Dates
FC-ENP-FM--0005 Rev 2
CONTROL PLAN SPECIAL CHARACTERISTICS
Fisher Dynamics Special Characteristic MatrixControl Plan Key Contact / Phone Date (Orig.) Date (Rev)
Part Number / Latest Change Level Core Team Customer Engineering Approval Date
Part Name / Description Supplier / Plant Approval Date Customer Quality Approval Date
Supplier / Plant Supplier Code Other Approval Date (if Req'd.) Other Approvals Date
Item # Characteristic Description Machine Specification / Tolerance GR&R mean std dev. Ppk Pp Variable vs. Attribute Data in Production Process action plan
IPF #1Gage Diameter
Form Tube #210ø30.00 ± 1.00 mm 92 1 10.25% 30.05 0.036 1.67 1.852 Caliper Check at Set-UP / 1 part per Hour Variable Data Improve Clamping Blocks to reduce % GR&R John Smith 25-Dec
SUPPLIER NOTES / COMMENTS:
Key Classifications (Class): S/C = Safety Compliance, KPC = Key Product Characteristic, PQC = Product Quality Characteristic, FF = Fit and Function, IPF = Important Product Feature, CC = Critical Characteristic, SC = Significant Characteristic
PFMEA - Follow Current Edition of AIAG Potential Failure Mode and Effect Analysis - FMEA For Severity, Occurrence, and Detection Ratings
Op. # & Decription
Process FMEA RPN
Con Pln Page
Process Control / Control Plan Frequency of Checks
Person Responsible
Due Date
ExampleExample ExampleExample
Prototype
Pre-Launch
Production
FC-QAD-FM-0027 Rev. 4
0
Supplier AQP Open Issues List 0 0
Fisher to fill in. 0 Date Upated:
Action Action / Deliverable
Remarks Issue No.
Customer Issues
Engineering
Program Management
Manufacturing
Sales
Quality
Purchasing
Issue datemm/dd/yy
Responsible person
Target datemm/dd/yy
Close-out date
mm/dd/yy
6 OF 14
FC-QAD-FM-0043-Supplier AQP Tracking ReportRev. 1
"SUPPLIER AQP PROGRAM STATUS REPORT"
Red 0 Project Title Calculation Date:
Yellow 0Fisher to fill in.
5/10/2023
Green 0 SUPPLIER NAMEFisher to fill in.
1st Readiness Review 5/31/2014 Review Performed by:
1st READINESS REVIEW
Item #Status
Element Reviewed With Comments
Red
Yello
w
Gre
en
1.0 Supplier Time Line Reviewed
2.0
3.0
4.0 IPF Matrix reviewed
5.0 PFMEA Reviewed
6.0 Control Plan Reviewed
7.0
8.0 Lot Traceablility reviewed
9.0 IMDS Status verified
10.0
Element Reviewed
Drawing Reviewed confirmed Revision level
Process Flow Diagram reviewed with IPF Call-outs
Gage Requirements Established and Gage R&Rs scheduled for all IPF's
Pre-Launch Containment Plan Established (GP12)
7 OF 14
FC-QAD-FM-0043-Supplier AQP Tracking ReportRev. 1
"SUPPLIER AQP PROGRAM STATUS REPORT"
Red 0 Project Title Calculation Date:
Yellow 0Fisher to fill in.
5/10/2023
Green 0 SUPPLIER NAMEFisher to fill in.
2nd Readiness Review 6/30/2014 Review Performed by:
2nd READINESS REVIEW
Item #
Status
Element Reviewed With Comments
Red
Yello
w
Gre
en
1.0 Supplier Time Line Reviewed
2.0
3.0
4.0 IPF Matrix reviewed
5.0 PFMEA Reviewed
6.0 Control Plan Reviewed
7.0 Gage Status Reveiwed
8.0 Lot Traceablility reviewed
9.0 IMDS Status verified
10.0
Element Reviewed
Drawing Reviewed confirmed Revision level
Process Flow Diagram reviewed with IPF Call-outs
Pre-Launch Containment Plan Established (GP12)
8 OF 14
FC-QAD-FM-0043-Supplier AQP Tracking ReportRev. 1
"SUPPLIER AQP PROGRAM STATUS REPORT"
Red 0 Project Title Calculation Date:
Yellow 0Fisher to fill in.
5/10/2023
Green 0 SUPPLIER NAMEFisher to fill in.
3rd Readiness Review 6/18/2014 Review Performed by:
3rd Readiness Review RUN @ RATE
Item #
Status
Element Reviewed With Comments
Red
Yello
w
Gre
en
1.0 Supplier Time Line Reviewed
2.0
3.0
4.0
5.0 Line Walk PFMEA
6.0 Line Walk Control Plan
7.0
8.0 Validate Lot Traceability
9.0 IMDS Status verified
10.0
11.0 Review Launch Containment
12.0
13.0
Element Reviewed
Drawing Reviewed confirmed Revision level
Line Walk Process Flow Diagram with IPF Call-outs
IPF Matrix Walk Capability Results
Review Gage R&R results for all IPF's
Review 6 piece dimensional reuslts
Validate Poke-yokes and Red Rabbits
PPAP Package Review, validate with "Program Evidence Book"
9 OF 14
FC-QAD-FM-0043-Supplier AQP Tracking ReportRev. 1
"SUPPLIER AQP PROGRAM STATUS REPORT"
Red 0 Project Title Calculation Date:
Yellow 0Fisher to fill in.
5/10/2023
Green 0 SUPPLIER NAMEFisher to fill in.
Post Launch Date 10/11/2014 Review Performed by:
Post Launch Review 30 Days after Job #1
Item #
Status
Element Reviewed With Comments
Red
Yello
w
Gre
en
1.0
2.0
3.0
4.0
Element Reviewed
Review Containment Results (GP12)Review any Quality Concerns via 8'DReview any potential Engineering changesRelease from Containment status (GP12)
FC-QAD-FM-0043 Rev. 1
Program Evidence Book
Section Title Complete1. Print / Design Records
2. Process Flow Diagram / IPF Process Flow
3. PFMEA
4. Control Plan
5. IPF Map
6. Dimensional Results
7. Operator Instructions
8. Inspection Instructions / Results / Plex
9. Gage Instructions
10. Packaging; Incoming / Bulk / Outgoing
11. Master Sample Production Parts
12. Poke-Yokes / Red Rabbits
13. Training
14. Maintenance book / Log
15. Preventive Maintenance Plan
Initial supplier Kick-off reviewReview Program Timing & MilestonesReview Supplier Time – Line( Updates to be submitted to Fisher Program Managers at established intervals)Establish first hits off production tool dateEstablish Run @ Rate DateEstablish PPAP Submission DateEstablish timing for Readiness Reviews
First Readiness Review (30 Days after Initial Supplier Kick-off Review)Review Quality DocumentsProcess Flow Diagram with IPF Call-outsIPF MatrixPFMEAControl PlanGage Requirements & Gage R & R for IPF call-outsLot TraceabilityIMDS StatusPre-Launch Containment (GP12 required 30 days post Job # 1)
2nd Readiness Review (30 Days Prior to PPAP Due Date)Review Quality DocumentsProcess Flow Diagram with IPF Call-outsIPF MatrixPFMEAControl PlanGage Requirements & Gage R & R for IPF call-outsLot TraceabilityIMDS StatusPre-Launch Containment(GP12 required 30 days post Job # 1)
2nd Readiness Review (30 Days Prior to PPAP Due Date)Review Quality DocumentsProcess Flow Diagram with IPF Call-outsIPF MatrixPFMEAControl PlanGage Requirements & Gage R & R for IPF call-outsLot TraceabilityIMDS StatusPre-Launch Containment(GP12 required 30 days post Job # 1)
3rd Readiness Review (Run @ Rate)Review Quality DocumentsLine Walk Process Flow Diagram with IPF Call-outsIPF Matrix Walk Capability ResultsLine Walk PFMEALine Walk Control PlanReview Gage R & R results for IPF call-outsValidate Lot TraceabilityIMDS StatusReview 6 pieces dimensional resultsPre-Launch Containment(GP12 required 30 days post Job # 1) PPAP Package Review
Post Launch Review 30 Days after Job # 1 ( can be performed on-site or via conference call)Review Containment (GP12 results)Review any quality concerns via 8’DRelease from Containment requirement
Initial supplier Kick-off reviewReview Program Timing & MilestonesReview Supplier Time – Line( Updates to be submitted to Fisher Program Managers at established intervals)Establish first hits off production tool dateEstablish Run @ Rate DateEstablish PPAP Submission DateEstablish timing for Readiness Reviews
First Readiness Review (30 Days after Initial Supplier Kick-off Review)Review Quality DocumentsProcess Flow Diagram with IPF Call-outsIPF MatrixPFMEAControl PlanGage Requirements & Gage R & R for IPF call-outsLot TraceabilityIMDS StatusPre-Launch Containment (GP12 required 30 days post Job # 1)
2nd Readiness Review (30 Days Prior to PPAP Due Date)Review Quality DocumentsProcess Flow Diagram with IPF Call-outsIPF MatrixPFMEAControl PlanGage Requirements & Gage R & R for IPF call-outsLot TraceabilityIMDS StatusPre-Launch Containment(GP12 required 30 days post Job # 1)
2nd Readiness Review (30 Days Prior to PPAP Due Date)Review Quality DocumentsProcess Flow Diagram with IPF Call-outsIPF MatrixPFMEAControl PlanGage Requirements & Gage R & R for IPF call-outsLot TraceabilityIMDS StatusPre-Launch Containment(GP12 required 30 days post Job # 1)
3rd Readiness Review (Run @ Rate)Review Quality DocumentsLine Walk Process Flow Diagram with IPF Call-outsIPF Matrix Walk Capability ResultsLine Walk PFMEALine Walk Control PlanReview Gage R & R results for IPF call-outsValidate Lot TraceabilityIMDS StatusReview 6 pieces dimensional resultsPre-Launch Containment(GP12 required 30 days post Job # 1) PPAP Package Review
Post Launch Review 30 Days after Job # 1 ( can be performed on-site or via conference call)Review Containment (GP12 results)Review any quality concerns via 8’DRelease from Containment requirement